November 28, Village of Scarsdale 1001 Post Road Scarsdale, New York Attn: David A. Goessl, P.E. Village Engineer
|
|
- Roland Snow
- 5 years ago
- Views:
Transcription
1 November 28, 2017 Village of Scarsdale 1001 Post Road Scarsdale, New York Attn: David A. Gosl, P.E. Village Engineer RE: Pavement Management Study Dear Mr. Gosl As directed by the Village, we cducted a visual survey to quantify pavement each block of Village streets. The street network in Scarsdale currently csists of approximately 589 segments (a village block or a street link between two intersectis) totaling 78.8 directial mil. All of the roadway sectis are Asphalt pavements. We evaluated and updated the Village s pavement and roadside asset management study using Microsoft Excel spreadsheet. The collected cditi data were analyzed and were assigned a Pavement Cditi Rating () a scale of 1 to 100 based severity and extent of observed either from digitally recorded video of selected Village streets or visual observati while surveying the road. The purpose of this pavement management study was to update or replace village s existing Excel spreadsheet. The spreadsheet identifi feasible maintenance and rehabilitati strategi, cditi levels and costs. One of the benefits of using a pavement management study is to provide a more efficient means of allocating funds, such as Life Cycle cost analysis techniqu to determine annual costs for 5/10/15/20 year analysis period. Thus giving the Village the ability to justify and secure funding, based more accurate and accsible informati and a quantified cditi of the road network. After this program is implemented for several years, the Village will be able to track the performance of the treatments, to show the impact of funding decisis and track the cditi of the road sectis. The Pavement Cditi Rating () is an indicator of the health of the segment a scale of 1 to 100 (91 to 100 being the bt cditi road and 1 to 25 being the worst cditi road). The can be used to project the future cditi and tablish the rate of deteriorati, measure the impact of treatments and determine the maintenance and rehabilitati needs. Streets receiving a rating between 91 and 100 were newly d and csidered in excellent cditi, those rated between 76 and 90 were csidered good cditi, those rated between 60 to 75 were csidered fair cditi, those ls than 60 were csidered as poor cditi streets. Excellent cditi streets require little or no maintenance. Village segments with a between 76 and 90 require either routine maintenance (i.e. slurry seal) or rurfacing with a 2 HMAC overlay in field selected spots. maintenance may be postped since the Village do not have any such rehab program.. MHM Associat Ravenna Drive, South Bend, IN Phe: jhmoh@aol.com Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 1 of 82
2 Village segments with a rating between 60 and 75 require major maintenance in alligator cracked areas (deep patching ctract, 4 base course + 1 1/2 course) or rurfacing with a 2 HMAC overlay in field selected spots. Pot patching indicated the spreadsheet involv removing debris, cleaning, adding new material if needed, and applying a temporary asphalt material. The patch are usually repaired at a later date with a permanent fix or are repaired during the next rehabilitati or prervati project. Village segments with a rating between 35 and 59 are csidered poor roads and require Figure-1 major maintenance such as furnishing & placing NYSDOT base course, 4" in depth after compacti including excavati, and preparati of sub-grade and furnishing & placing asphalt ccrete wedge course, , 1 ½" depth after compacti, as directed.. The above suggtis are based up engineering judgment and the Village s current maintenance practic. The criteria for selecting what treatment to apply and when to apply it should be based up the Village standards and funding availability. Below please find the percentage of Village street segments for each cditi rating: 15% percent of Scarsdale streets or 91 Village segments are in excellent cditi. 35 % percent of Scarsdale streets or 207 Village segments are in good cditi 41 % percent of Scarsdale streets or 242 Village segments are in fair cditi. 8% percent of Scarsdale streets or 49 Village segments are in poor cditi. MHM Associat Ravenna Drive, South Bend, IN Phe: jhmoh@aol.com Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 2 of 82
3 Distrs were quantified based extent and severity: SEVERITY EXTENT 1 = Low 1-30% of e area 2 = Moderate 31-50% of area 3 = High 51% or more of area For budgeting purpos, MHM timated cost of upgrading segments with a network Pavement Cditi Rating = 90 or ls to the dirable N of 85 is $ 7,082, dollars. All new cstructi, recstructi, rehabilitati and maintenance projects should employ some level of ecomic evaluati to determine the most cost effective method and timing. Thus, Life-Cycle Cost Analysis technique was used in this study to determine annual costs. Life-cycle cost analysis (LCCA)¹ is defined as: "...an analysis technique that builds the well-founded principl of ecomic analysis to evaluate the over-all lg-term ecomic efficiency between competing alternative invtment optis. It do not addrs equity issu. It incorporat initial and discounted future agency, user, and other relevant costs over the life of alternative invtments. It attempts to identify the bt value (the lowt lg-term cost that satisfi the performance objective being sought) for invtment expenditur." For performance period, MHM csidered three alternative periods for up grading the roads and streets, 5, 10 and 20 year performance periods. The costs associated with maintenance/rehabilitati activiti for the three periods were calculated based net prent value (NPV) and equivalent uniform annual costs (EUAC). EUAC is determined by cverting all project costs to a uniform recurring annual cost over the analysis period. Whereas NPV discounts all costs to a single base year costs and then compar the costs, EUAC discounts all projects to a recurring yearly cost and then compar the costs. EUAC is a useful indicator when budgets are tablished an annual basis. Discount Rat : District Primary Credit Rate Secdary Credit Rate Effective Date New York 1.75% 2.25% (Note-1) Estimat New York : 2.25% to 3.0% Note-1: Using a discount rate of 3.0%, the following reprents the summary of ECAC from Table-1, Table-2 and Table-3: Annual cost over 5 year analysis period $1,060, Annual cost over 10 year analysis period $ 770, Annual cost over 15 year analysis period $ 128, MHM Associat Ravenna Drive, South Bend, IN Phe: jhmoh@aol.com Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 3 of 82
4 5 Year Analysis: Discount Rate 3% Initial Invtment $5,408, Rehab Cost 7,082, Annual Cash Flow $1,000, Table - 1 NPV $7,717, Initial Cstr. Cost +Year 5 PV Summati Annual cost over 5 year analysis period: EUAC = $1,060, MHM Associat Ravenna Drive, South Bend, IN Phe: jhmoh@aol.com Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 4 of 82
5 10 Year Analysis: Discount Rate 3% Initial Invtment 5,408, Rehab Cost 7,082, Annual Cash Flow $1,000, Table-2 NPV $3,011, Initial Cstr. Cost +Year 10 PV Summati Annual cost over 10 year analysis period: EUAC = $770, MHM Associat Ravenna Drive, South Bend, IN Phe: jhmoh@aol.com Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 5 of 82
6 15 /20 Year Analysis: Discount Rate 3% Initial Invtment 5,408, Rehab Cost 7,082, Annual Cash Flow $1,000, Table - 3 NPV $359, Initial Cstr. Cost +Year 15 PV Summati* Annual cost over 15 year analysis period: EUAC = $128, * May it be noted, 15 year analysis is more realistic than 20 year analysis. The Village of Scarsdale us two maintenance and rehabilitati methods csisting of patching ctract, milling and rurfacing ctract with crack sealing included. Figure -1 shown next page indentifi costs to rehabilitate Village streets by cditi category MHM Associat Ravenna Drive, South Bend, IN Phe: jhmoh@aol.com Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 6 of 82
7 Figure -1 Fair cditi roads comprise 58% of the timated funding needed to fix and upgrade village streets. Poor cditi roads comprise 38% of the timated funding needed to fix and upgrade village streets. Good cditi roads comprise 4% of the timated funding needed to fix and upgrade village streets. Please free to ctact me (Phe: ) should you have any qutis regarding this report. Rpectfully, M. H.(Jerry) Mohajeri, P.E. Principal MHM Associat MHM Associat Ravenna Drive, South Bend, IN Phe: Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 7 of 82
8 Scarsdale Street Cditi Asssment BROWN 1004 HARVEST DRIVE 1008 CROSSWAY 1012 RIDGEDALE 1016 e Width Alligator Block/Lg. EASTCHESTER LINE A LR L L Patch Repairs $ $ 1, e Width Alligator Block/Lg. STRATTON A LR L L Y e Width Alligator Block/Lg. CARTHAGE A LR L e Width Alligator Block/Lg. SYCAMORE A LR L L e Width Alligator Block/Lg. CHURCH LANE POPHAM A LR L Y 1020 LOCKWOOD e Width Alligator Block/Lg. LOCKWOOD A LR M M 5 Y e Width Alligator Block/Lg. ROCK CREEK LANE Aspen L L Y 1024 Aspen 1028 MYRTLEDALE A LR L Y e Width Alligator Block/Lg. MAMARONEC K CUL DE SAC A LR L L 1032 e Width Alligator Block/Lg. TUNSTALL DEAD END A LR L L 1036 e Width Alligator Block/Lg. DUNHAM CUL DE SAC A LR Y e Width ALIDA ARCHER LANE ARDMORE ASPEN AUTHENRIETH AXTELL DRIVE BANSOM BARKER LANE BARRY BEECHWOOD LANE BELL Alligator Block/Lg. HMAC $ $ 24, HMAC $ $ 29, HMAC $ $ 92, New e, No HMAC $ $ 42, HMAC $ $ 10, HMAC $ $ 24, HMAC $ $ 13, HMAC $ $ 76, New e, No Red Red Red Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 8 of 82
9 Scarsdale Street Cditi Asssment TUNSTALL CARMAN LR??? L CARMAN GRAND BOULEVARD SPRAGUE ROCK CREEK LANE GRAND BOULEVARD LR??? L Y No SPRAGUE A LR M L Y EASTCHESTER LINE A LR Y e Width Alligator Block/Lg. $ 1.00 $ HMAC $ $ 25, New e, No BOULDER BROOK A LR L No SPIDER A LR L Patch Repair. $ $ 9, WALWORTH CLAREMONT 1064 WHIG 1068 e Width Alligator Block/Lg. CLAREMONT A LR L No GREENACRES A LR L No e Width Alligator Block/Lg. OLMSTED A LR L Y Patch Repair. $ $ 8, e Width Alligator Block/Lg. RICHBELL DEAD END A LR L L 1 e Width Alligator Block/Lg. HMAC $ $ 11, LAKIN CUL DE SAC A LR L 1 Y Delamin Repair $ $ 3, e Width Alligator Block/Lg. KELWYNNE MORRIS LANE A LR M L ROCK CREEK LANE e Width Alligator Block/Lg. THORNWOOD PLACE A LR L THORNWOOD PLACE SYLVAN LANE A LR L SYLVAN LANE 1080 CHASE SAXON WOOD A LR 95 Y e Width BENEDICT BERKELEY BERWICK BETHEL BIRCH LANE BIRCHALL DRIVE BLACK BIRCH LANE BONIFACE CIRCLE Alligator Block/Lg. HMAC $ $ 116, HMAC $ $ 27, HMAC $ $ 24, New e, No SPENCER PLACE A LR No Accs No BOULDER BROOK Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 9 of 82
10 Scarsdale Street Cditi Asssment BENEDICT e Width Alligator Block/Lg. SAXON WOODS A LR L e Width Alligator Block/Lg. EASTCHESTE R LINE POTTER A LR??? L L Y Lost data POTTER POST A LR L L Y Lost data 1096 POST GAYLOR A LR M L Y 1100 GAYLOR BELL A LR L Y 1104 BELL $ 1.00 $ HMAC $ $ 9, HMAC $ $ 16, HMAC $ $ 9, $ 1.00 $ WEBSTER A LR L Y Patch Repairs $ $ 3, WEBSTER NELSON A LR L Y Patch Repairs $ $ 2, NELSON LYONS A LR L L Y HMAC $ $ 8, LYONS BRADLEY MADISON BRADLEY A LR L Y MADISON A LR L Y No JOHNSON A LR L Y No JOHNSON WHITE A LR L Y No 1132 WHITE 1136 CLARENCE 1144 BMOOR 1140 WEAVER STREET CARMAN SPRAGUE CLARENCE A LR L Y No ROCHELLE LINE A LR L Y No e Width Alligator Block/Lg. BMOOR A LR L e Width Alligator Block/Lg. BMOOR A LR L L 2 Y e Width Alligator Block/Lg. SPRAGUE A LR Y $ 1.00 $ $ 1.00 $ Patch / DelamRepair. $ $ 27, New e, No EASTCHESTER LINE A LR M Y Patch Repair. $ $ 13, e Width BOULEVARD BRADFORD RD LOOP BRADFORD BRADLEY BRAMBACH Alligator Block/Lg DEAD END EWART A LR L $ 1.00 $ Red Red Red Red Red Red 1160 EWART ALIDA A LR L No 1164 EWART e Width BRAYTON Alligator Block/Lg. GREENACRES A L L M Y HMAC $ $ 70, Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 10 of 82
11 Scarsdale Street Cditi Asssment HARCOURT e Width Alligator Block/Lg. OLMSTED A LR M M 2 Y OLMSTED BUTLER A LR L Y 0 No FENIMORE COHAWNEY COHAWNEY A LR M L Y CHESTERFIELD A LR L Y No CHESTERFIEL D BUTLER A LR M M Y FENIMORE OAKSTWAIN A LR Y OAKSTWAIN SAGE TERRACE A LR Y SAGE TERRACE HUNTINGTON KINGSTON HUNTINGTON A LR Y KINGSTON A LR GORHAM COURT A LR Y GORHAM COURT FARLEY A LR Y e Width Alligator Block/Lg. CLOSED- DETOUR HMAC $ $ 48, HMAC $ $ 13, HMAC $ $ 22, New e, No New e, No New e, No $ 1.00 $ $ 1.00 $ OGDEN WHIG A LR M L Y Patch Repair. $ $ 7, OLMSTED 1216 WHIG A LR M M 2 Y HMAC $ $ 23, OLMSTED TORY LANE A LR L L Y 1224 TORY LANE HORSEGUARD LANE A LR L L Y HORSEGUAR D LANE BUTLER A LR L L Y No BUTLER CHESTERFIEL D COHAWNEY KINGSTON $ 1.00 $ $ 1.00 $ CHESTERFIELD A LR L Y Patch Repairs $ $ 9, COHAWNEY A LR M M Y HMAC $ $ 30, FENIMORE A LR M L Y Patch Repairs $ $ 4, HUNTINGTON A LR M M Y HMAC $ $ 45, HUNTINGTON SAGE TERRACE A LR L L Y SAGE TERRACE DONELLAN 1260 GRIFFEN 1264 GRIFFEN DONELLAN A LR L Y No FENIMORE A LR L L Y e Width Alligator Block/Lg. $ 1.00 $ $ 1.00 $ GRIFFEN A LR L No e Width BREWSTER BRITE BRITTANY CLOSE BMOOR Alligator Block/Lg. 310 NORTH OF BRADFORD A LR L L Y Patch Repair. $ $ 16, BROOK LANE Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 11 of 82
12 Scarsdale Street Cditi Asssment e Width Alligator Block/Lg. WALWORTH CUL DE SAC A LR L Y HEATHCOTE e Width Alligator Block/Lg. MAMARONECK A LR Y MAMARONEC K DEAD END A LR Y 1280 e Width Alligator Block/Lg. PINECREST DUNHAM A LR Y e Width Alligator Block/Lg ALIDA EWART RD A LR L L EWART RD DEAD END A LR L Y 1292 POST e Width Alligator Block/Lg. $ 1.00 $ New e, No New e, No New e, No HMAC $ $ 22, $ 1.00 $ RICHBELL A LR L L 1 Y Patch Repair. $ $ 19, e Width Alligator Block/Lg. TOMPKINS HICKORY LANE A LR L Y No HICKORY LANE BREWSTER A LR L L Y Patch Repairs $ $ 4, BREWSTER HAMPTON A LR L M Y HMAC $ $ 16, HAMPTON BRITE A LR L M 1 Y HMAC $ $ 19, BRITE OAK LANE A LR L Y No 1316 OAK LANE 1320 FOX MEADOW A LR Y FOX MEADOW BRONX RIVER PARKWAY A LR Y e Width Alligator Block/Lg. New e, No New e, No 1324 MAMARONEC K RUGBY LANE A LR L L Y Patch Repairs $ $ 3, RUGBY LANE OXFORD A LR M L 1 Y HMAC $ $ 31, MAMARONEC K e Width BROOKBY BROOKLINE BROWN BURGESS BUTLER CAMBRIDGE CANTERBURY Alligator Block/Lg. LEATHERSTOC K A LR L Y CARMAN $ 1.00 $ Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 12 of 82
13 Scarsdale Street Cditi Asssment 2017 e Width Alligator Block/Lg POST GAYLOR A LR Y 1340 GAYLOR BELL A LR Y 1344 BELL WEBSTER A LR Y WEBSTER NELSON A LR Y NELSON LYONS A LR Y 1356 LYONS BRADLEY MADISON BRADLEY A LR Y MADISON A LR L M Y JOHNSON A LR M M Y e Width CARSTENSEN Alligator Block/Lg. HMAC $ $ 8, HMAC $ $ 8, Red Red 1368 CRANE RECTORY LANE A LR L L Y No 1372 RECTORY LANE WAYSIDE LANE A LR L Rutting 1376 HEATHCOTE e Width Alligator Block/Lg. STRATTON A LR L Y e Width Alligator Block/Lg. MAMARONEC K LINCOLN A LR L L Y LINCOLN FAYETTE A LR L Y FAYETTE $ 1.00 $ HMAC $ $ 31, WAKEFIELD A LR L L Y No WAKEFIELD HEATHCOTE A LR M M Y HEATHCOTE CROSSWAY A LR L L Y No KELWYNNE BROOKBY MAMARONEC K 1412 e Width Alligator Block/Lg. BROOKBY A LR Y MAMARONECK A LR Y QUAKER CENTER A LR Y e Width Alligator Block/Lg. CANTERBURY CUL DE SAC A LR L Y 1416 CRANE e Width CARTHAGE LANE CARTHAGE CATHERINE CAYUGA CHASE Alligator Block/Lg. HMAC $ $ 38, $ 1.00 $ HMAC $ $ 9, New e, No New e, No New e, No $ 1.00 $ WOODLAND PLACE A LR L L Y Patch Repairs $ $ 3, Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 13 of 82
14 Scarsdale Street Cditi Asssment WOODLAND PLACE SPENCER PLACE A LR L SPENCER PLACE POPHAM A LR L 3 Patch Repairs $ $ 6, e Width Alligator Block/Lg. FOX MEADOW OAK LANE A LR L Y 1432 OAK LANE BRITE A LR L Y BRITE SHAWNEE HAMPTON BREWSTER KENSINGTON 1456 CHASE SHAWNEE A LR L Y HAMPTON A LR L L Y No BREWSTER A LR L L Y No $ 1.00 $ $ 1.00 $ $ 1.00 $ KENSINGTON A LR L Y Patch Repairs $ $ 4, TOMPKINS A LR L Y e Width Alligator Block/Lg. EAST PARKWAY A LR L L Y e Width Alligator Block/Lg OGDEN CRANE A LR L Y 1468 CRANE POPHAM A LR POPHAM e Width Alligator Block/Lg. $ 1.00 $ $ 1.00 $ 1, New e, No LOCKWOOD A LR L 2 No e Width Alligator Block/Lg. OVERHILL CUL DE SAC A LR L OVERHILL BERKELEY WALWORTH 1488 SPRAGUE 1492 BOULEVARD $ 1.00 $ OVERHILL A LR L Y Patch Repairs $ $ 26, e Width WALWORTH A LR Alligator Block/Lg. BRONX RIVER PARK A LR L M 4 Y e Width CHESTERFIELD CHRISTIE PLACE CHURCH LANE CHURCH LANE SOUTH CIRCLE CLAREMONT CLARENCE Alligator Block/Lg. $ 1.00 $ HMAC $ $ 11, EASTCHESTER LINE A LR L M Y Patch Repairs $ $ 6, SPRAGUE A LR M Y Patch Repairs $ $ 6, COHAWNEY Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 14 of 82
15 Scarsdale Street Cditi Asssment TOMPKINS KENSINGTON BREWSTER HAMPTON e Width Alligator Block/Lg. KENSINGTON A LR M M Y BREWSTER A LR M L Y+ HAMPTON A LR M M Y SHAWNEE A LR M M Y SHAWNEE BRITE A LR M M Y HMAC $ $ 14, HMAC $ $ 12, HMAC $ $ 9, HMAC $ $ 8, HMAC $ $ 10, BRITE OAK LANE A LR L L Y Patch Repairs $ $ 4, e Width Alligator Block/Lg. SHELDRAKE DEAD END A LR L 1 Patch Repairs $ $ 11, MAMARONEC K MAYFLOWER e Width Alligator Block/Lg. MAYFLOWER A LR Y CONTINENTAL A LR Y CONTINENTA L DEAD END A LR Y 1536 WALWORTH 1540 COLONIAL e Width Alligator Block/Lg. New e, No New e, No New e, No GREENACES A LR L L 1 Y Patch Repairs $ $ 18, e Width Alligator Block/Lg. BLACKHAWK A LR Y e Width Alligator Block/Lg. MURRAY HILL REIMER A LR??? M M 1 Y REIMER 1548 MAMARONECK LR M M Y e Width Alligator Block/Lg. WEAVER STREET DEAD END A LR Y 1552 REYNAL CROSSING e Width Alligator Block/Lg. WHITE PLAINS LANE A LR Y e Width COLBY LANE COLONIAL COLVIN CONTINENTAL COOPER COPPER BEECH LANE CORALYN CORELL Alligator Block/Lg. HMAC $ $ 68, HMAC $ $ 35, New e, No New e, No Red Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 15 of 82
16 Scarsdale Street Cditi Asssment THORNWOOD SPIER A LR L L Y 1560 SPIER ROCK CREEK LANE ROCK CREEK LANE A LR M L 1 Y WILDWOOD A LR M L 1 Y WILDWOOD SECOR A LR L L Y 1572 WEAVER STREET e Width Alligator Block/Lg. GRAND PARK A LR L 1 Y e Width Alligator Block/Lg. CARSTENSEN POST A LR Y ROCHAMEAU CARSTENSEN A LR Y ROCHAMEAU CHURCH LANE A LR Y CHURCH LANE WOODLAND PLACE STONEHOUSE WOODLAND PLACE A LR Y STONEHOUSE A LR Y FOX MEADOW A LR Y FOX MEADOW EAST PARKWAY A LR L 1604 e Width Alligator Block/Lg. WOODS CUL DE SAC A LR L 1608 HEATHCOTE WEAVER STREET HEATHCOTE e Width Alligator Block/Lg. WESTVIEW LANE A LR L L Y e Width Alligator Block/Lg. HEATHCOTE A LR L HMAC $ $ 11, HMAC $ $ 14, HMAC $ $ 27, HMAC $ $ 18, $ 1.00 $ New e, No New e, No New e, No New e, No New e, No New e, No HMAC $ $ 9, HMAC $ $ 14, WAKEFILELD A LR L L Y Patch Repairs $ $ 8, WAKEFILELD LEBANON 1620 A LR L L Y Patch Repairs $ $ 6, LEBANON 1624 FEYETTE A LR M M Y HMAC $ $ 8, FEYETTE LINCOLN A LR M M Y HMAC $ $ 14, LINCOLN MAMARONECK A LR M M Y HMAC $ $ 31, MAMARONEC K e Width CORNELL STREET CRANE CRAWFORD LANE CREST LANE CROSSWAY CUSHMAN Alligator Block/Lg. WHITE PLAINS LANE A LR L DEERFIELD LANE Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 16 of 82
17 Scarsdale Street Cditi Asssment e Width Alligator Block/Lg. MAMARONEC K CUL DE SAC A LR L 1644 WILDWOOD 1648 e Width Alligator Block/Lg. ROCK CREEK LANE A LR L L 1 e Width Alligator Block/Lg. POPHAM CUL DE SAC A LR No Data 1652 POST 1656 FENIMORE 1660 BIRCHALL DRIVE 1664 BRITE 1668 POST e Width Alligator Block/Lg. FAIRVIEW A LR Y e Width Alligator Block/Lg. RIDGECREST NORTH A LR Y e Width Alligator Block/Lg. MURRAY HILL A LR L M 1 Y e Width Alligator Block/Lg. FENIMORE A LR L L 1 e Width Alligator Block/Lg. FERNCLIFF A LR Y FERNCLIFF NELSON A LR Y NELSON HAMILTON JEFFERSON HAMILTON A LR Y JEFFERSON A LR Y MADISON A LR Y MADISON WOODS LANE A LR Y 1692 WOODS LANE 1696 HEATHCOTE ROCHELLE LANE A LR Y e Width DELL DEPOT PLACE DICKEL DOBBS TERRACE DOLMA DONELLAN DRAKE DUCK POND Alligator Block/Lg. SHERBROOKE A LR M M 2 Y DUNHAM $ 1.00 $ HMAC $ $ 16, New e, No HMAC $ $ 52, HMAC $ $ 37, New e, No New e, No New e, No New e, No New e, No New e, No New e, No 4" Base+1.5" e $ $ 125, Red Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 17 of 82
18 Scarsdale Street Cditi Asssment PINECREST POPHAM e Width Alligator Block/Lg. BROOKLINE A LR L L 1 Y e Width Alligator Block/Lg. HMAC $ $ 31, CHRISTIE PLACE A LR M Patch Repairs $ $ 19, CHRISTIE PLACE CRANE A LR M Patch Repairs $ $ 17, FOREST LANE e Width Alligator Block/Lg. SOUTHWOODS LANE A LR M 5 Y e Width Alligator Block/Lg. MADISON NELSON A LR M L 9 Y NELSON 1724 POST 1728 ROOSEVELT A LR M L 3 Y ROOSEVELT A LR M M Y e Width Alligator Block/Lg. HMAC $ $ 37, HMAC $ $ 26, HMAC $ $ 20, HMAC $ $ 10, FENIMORE CUL DE SAC A LR L L 1 Y Patch Repair. $ $ 18, GREENDALE e Width Alligator Block/Lg. WINDMILL LANE A LR L Y WINDMILL LANE PARK A LR L Y e Width Alligator Block/Lg. HMAC $ $ 18, HMAC $ $ 14, LEE BROWN A LR L Y Patch Repairs $ $ 6, e Width Alligator Block/Lg. FAIRVIEW DEAD END A LR 85 5 L No e Width Alligator Block/Lg DEAD END DICKEL A LR Y 1748 DICKEL POST A LR Y e Width EAST PARKWAY EASTWOODS LANE EDGEWOOD ELM ETON EWART FAIRVIEW COURT FAIRVIEW FARLEY Alligator Block/Lg. New e, No New e, No Red Red Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 18 of 82
19 Scarsdale Street Cditi Asssment POST 1756 GREENACRES A LR L M Y Patch Repair. $ $ 12, e Width Alligator Block/Lg. LINCOLN DEAD END A LR L L Y Patch Repairs $ $ 11, CROSSWAY 1764 CARTHAGE BRONX RIVER PARK e Width Alligator Block/Lg. CARTHAGE A LR L L Y Patch Repair. $ $ 14, NORTH FOR 245 A LR L L Y Patch Repair. $ $ 3, e Width FARRAGUT FAYETTE FENIMORE Alligator Block/Lg. FOX MEADOW A LR L No FOX MEADOW OAK WAY A LR L Y No Red Red Red 1776 OAK WAY ELM A LR L No 1780 ELM BRITE A LR L No BRITE DONELLAN OAKSTWAIN BREWSTER DOBBS TERRACE DONELLAN A LR L No OAKSTWAIN A LR Y No BREWSTER A LR L No DOBBS TERRACE A LR L Y No RIDGECREST WEST A LR L $ $ 1, RIDGECREST WEST POST A LR M Patch Repairs $ $ 1, e Width Alligator Block/Lg POST DRAKE A LR M M Y 1812 DRAKE 1812 e Width Alligator Block/Lg. EASTWOODS LANE A LR L L e Width Alligator Block/Lg. OLMSTED KENT A LR L M Y 1814 KENT OGDEN A LR??? M M Y 1816 OGDEN WAYSIDE LANE A LR??? 95 Y WAYSIDE LANE CRANE LR L L OLMSTED PADDINGTON FERNCLIFF FOREST LANE FOX MEADOW PADDINGTON LR??? 95 Y CHESTERFIELD LR??? 95 Y HMAC $ $ 47, HMAC $ $ 32, HMAC $ $ 15, HMAC $ $ 65, New-No HMAC $ $ 58, New e, No New e, No Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 19 of 82
20 Scarsdale Street Cditi Asssment CHESTERFIEL D HIGHLAND WAY 1828 SECOR 1832 HIGHLAND WAY LR??? 95 Y FENIMORE LR L Y e Width Alligator Block/Lg. MAMARONECK A L Y e Width Alligator Block/Lg. PALMER SECOR A LR Y 1836 e Width Alligator Block/Lg. FAVERFORD PENN BLVD A LR M M Y 1840 PENN BLVD STRATTON STRATTON A LR M M Y HARVEST DRIVE A LR S M 1 Y HARVEST DRIVE CROSSWAY A LR S M 1 Y 1852 GARTH e Width Alligator Block/Lg. TO PARKING LOT A LR M M Y e Width Alligator Block/Lg. MAMARONEC K OXFORD A LR L 1 OXFORD 1864 POPHAM 1868 HAVERFORD 1872 WHITE PLAINS LANE A LR L L Y e Width Alligator Block/Lg. New e, No $ 1.00 $ New e, No New e, No HMAC $ $ 13, HMAC $ $ 16, HMAC $ $ 22, " Base+1.5" e $ $ 228, HMAC $ $ 11, $ 1.00 $ HMAC $ $ 63, EASTCHESTER LINE A LR L L Y No e Width Alligator Block/Lg. SWATHMORE A LR S M 8 Y e Width Alligator Block/Lg. CARMAN BOULEVARD A LR L L Y 1876 BOULEVARD 1880 SPRAGUE FOXHALL PLACE FOXHALL FRANKLIN FREIGHT WAY GARDEN GARTH GATE HOUSE GAYLOR HMAC $ $ 51, SPRAGUE A LR L Y ONE WAY No EASTCHESTER LINE A LR L Y GILMORE COURT HMAC $ $ 13, $ 1.00 $ Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 20 of 82
21 Scarsdale Street Cditi Asssment e Width Alligator Block/Lg. WALWORTH CUL DE SAC A LR L M Y 1888 BREWSTER e Width Alligator Block/Lg. BREWSTER A LR L L e Width Alligator Block/Lg POST VALLEY A LR L L Y MAMARONEC K e Width Alligator Block/Lg. LAWRENCE A LR L Y HMAC $ $ 5, HMAC $ $ 11, HMAC $ $ 25, $ 1.00 $ LAWRENCE LINCOLN A LR L Y Patch Repairs $ $ 9, CORNELL ST CITY LIMITS FARLEY KINGSTONE e Width Alligator Block/Lg. GRIFFEN A LR M L 1 Y e Width Alligator Block/Lg. FOUNTAIN TERRACE A LR L Y HMAC $ $ 20, BRAYTON A LR L Y No BRAYTON COLVIN A LR L Y COLVIN HUNTINGTON WALWORTH 1932 HUNTINGTON A LR L Y WALWORTH A LR L L Y $ 1.00 $ $ 1.00 $ $ 1.00 $ HMAC $ $ 46, FOUNTAIN TERRACE A LR L 1 Y Patch Repairs $ $ 6, e Width Alligator Block/Lg. OXFORD ETON A LR M L Y 1936 ETON 1940 WINDMILL LANE 1944 WINDMILL LANE A LR M L 3 Y FAIRVIEW A LR Y e Width Alligator Block/Lg. 4" Base+1.5" e $ $ 136, " Base+1.5" e $ $ 185, New e, No WEAVER STREET GRAND PARK A LR L No 1948 GRAND PARK 1952 NORMANDY LANE GORHAM COURT GORHAM GRAHAM GRAND PARK GREENACRES GREENDALE GRIFFEN NORMANDY LANE A LR L No BMOOR A LR L No Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 21 of 82
22 Scarsdale Street Cditi Asssment BMOOR MURDOCK CARRIAGE HOUSE LANE MURDOCK A LR L No CARRIAGE HOUSE LANE A LR L No MAMARONECK A LR L No e Width Alligator Block/Lg EDGEWOOD RODNEY A LR L L 1 Y Patch Repairs $ $ 2, RODNEY RICHELIEU 1972 A LR L M 1 Y HMAC $ $ 25, RICHELIEU DRAKE A LR L M 1 Y HMAC $ $ 22, COHAWNEY e Width Alligator Block/Lg. CHESTERFIELD A LR L Y Patch Repairs $ $ 10, CUL DE SAC BUTLER A LR L L Y Patch Repairs $ $ 3, HARCOURT OGDEN A LR L Y Patch Repairs $ $ 5, OGDEN WHIG A LR L L Y HMAC $ $ 20, OLMSTED 1996 WHIG A LR L M Y HMAC $ $ 34, OLMSTED BUTLER A LR M L Y Patch Repairs $ $ 7, e Width Alligator Block/Lg. WHEELOCK CUL DE SAC A LR L M Y 2012 BREWSTER CHURCH LANE 2016 e Width Alligator Block/Lg. HAMPTON A LR L M 1 Y HAMPTON A LR L L Y e Width Alligator Block/Lg. MAMARONEC K ARCHER LANE A LR L L Y 2020 RURAL DRIVE 2024 FRANKLIN FRANKLIN A LR M L 3 Y HILLVIEW DRIVE A LR L L 1 Y HMAC $ $ 11, HMAC $ $ 26, HMAC $ $ 25, HMAC $ $ 44, HMAC $ $ 14, HMAC $ $ 9, HILLVIEW DRIVE WINDWARD A LR L L Y Patch Repairs $ $ 3, WINDWARD CROSSWAY A LR L L Y HMAC $ $ 33, CHASE e Width HAMILTON HAMPTON HANOVER HARCOURT HARVEST DRIVE HARWOOD COURT Alligator Block/Lg. SPENCER PLACE A LR L No HATHAWAY Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 22 of 82
23 Scarsdale Street Cditi Asssment CHURCH LANE SOUTH FRANKLIN SWARTHMOR E ROD GATE HOUSE 2056 SECOR 2072 e Width LOCKWOOD A LR e Width Alligator Block/Lg. Alligator Block/Lg. SWARTHMORE ROD A LR L L 1 Y GATE HOUSE A LR L L Y WEAVER STREET A LR L L Y e Width WHITE PLAINS LANE A LR e Width Alligator Block/Lg. Alligator Block/Lg. HEATHCOTE DEAD END A LR L SHERBROOK RD e Width Alligator Block/Lg. RAVELLIN G $ 1.00 $ HMAC $ $ 13, $ 1.00 $ $ 1.00 $ RAVELLIN G No $ 1.00 $ POST / DRAK A LR L No SHERBROOK RD MORRIS LANE A LR L No MORRIS LANE KELWYNNE PALMER KELWYNNE A LR L No PALMER A LR L Y No CARTHAGE A LR L Y No CARTHAGE CROSSWAY LR??? L Y 2084 CROSSWAY 2088 $ 1.00 $ STRATTON A LR L Y Patch Repairs $ $ 14, e Width Alligator Block/Lg. OLMSTED BUTLER A LR L L 1 Y Patch Repairs $ $ 14, e Width Alligator Block/Lg. FOX MEADOW OAK LANE A LR L Y PARKFIELD 2100 CROSSWAY FOX MEADOW A LR Y e Width HAVERFORD HAZELTON DRIVE HEATHCOTE CUL DE SAC HEATHCOTE HICKORY LANE HIGHLAND WAY HILLVIEW DRIVE Alligator Block/Lg. $ 1.00 $ New e, No HARVEST DRIVE A LR L M Y Patch Repair. $ $ 20, HORSEGUARD LANE Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 23 of 82
24 Scarsdale Street Cditi Asssment e Width Alligator Block/Lg. PADDINGTON BRITE A LR L L 2 Y e Width Alligator Block/Lg POST SAGE TERRACE A LR Y HMAC $ $ 42, New e, No SAGE TERRACE PUTNAM A LR L No PUTNAM 2120 WEAVER STREET 2124 HEATHCOTE 2128 DRAKE 2132 GREENACRES A LR L L Y e Width Alligator Block/Lg. MEADOW A LR L L e Width Alligator Block/Lg. PALMER A LR Y e Width Alligator Block/Lg. RICHELIEU A LR L M Y RICHELIEU RODNEY A LR L L Y 2136 e Width Alligator Block/Lg. CARMAN BOULEVARD A LR L M Y 2140 BOULEVARD 2144 SPRAGUE HEATHCOTE SPRAGUE A LR L M 2 Y EASTCHESTER LINE A LR L L 1 Y e Width Alligator Block/Lg. HMAC $ $ 45, $ 1.00 $ New e, No HMAC $ $ 22, HMAC $ $ 27, HMAC $ $ 11, HMAC $ $ 22, HMAC $ $ 22, BIRCHALL A LR L L Y Patch Repairs $ $ 4, BIRCHALL DEAD END A LR L L Y Patch Repairs $ $ 11, BUTLER CHESTERFIEL D 2164 e Width Alligator Block/Lg. CHESTERFIELD A LR L L 1 Y Patch Repairs $ $ 7, COHAWNEY A LR L L Y HMAC $ $ 28, e Width HUNTINGTON HUTCHINSON INNES JEFFERSON JOHNSON KELWYNNE KENSINGTON KENT Alligator Block/Lg. FOX MEADOW OGDEN A LR L L Y Patch Repairs $ $ 19, Red Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 24 of 82
25 Scarsdale Street Cditi Asssment POST e Width Alligator Block/Lg. BREWSTER A LR Y BREWSTER BRITE A LR L L 1 Y BRITE 2180 GREENACRES A LR L L Y e Width Alligator Block/Lg. RICHBELL DEAD END A LR L Y 2184 e Width Alligator Block/Lg. FOX MEADOW CUL DE SAC A LR Y 2188 e Width Alligator Block/Lg. GRAHAM LINCOLN A LR L L Y 2192 e Width Alligator Block/Lg. MAMARONEC K DEAD END A LR L L 3 Y 2196 CROSSWAY 2200 e Width Alligator Block/Lg. New e, No HMAC $ $ 15, HMAC $ $ 32, $ 1.00 $ New e, No HMAC $ $ 32, HMAC $ $ 47, CARTHAGE A LR L L Y Patch Repairs $ $ 9, e Width Alligator Block/Lg. EASTCHESTE R LINE DEAD END A LR L Y Patch Repairs $ $ 7, PORTER 2204 POST A LR L Y Patch Repairs $ $ 6, e Width Alligator Block/Lg. MAMARONEC K CUL DE SAC A LR L PALMER e Width Alligator Block/Lg. LAWRENCE A LR L L LAWRENCE GRAHAM A LR L L Y GRAHAM VANDERBILT KINGSTON LAKIN LARCH LANE LAWRENCE LEATHERSTOCKING LEBANON LEE LENOX PLACE LINCOLN VANDERBILT A LR M M Y FARRAGUT A LR M L 1 Y $ 1.00 $ $ 1.00 $ $ 1.00 $ HMAC $ $ 9, HMAC $ $ 9, Red Red Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 25 of 82
26 Scarsdale Street Cditi Asssment FARRAGUT CARTHAGE A LR M L Y CARTHAGE CROSSWAY A LR M L 1 Y 2236 RURAL DRIVE CROSSWAY A LR L L Y e Width Alligator Block/Lg. SCHOOL LANE POPHAM A LR L M Y SCHOOL LANE HATHAWAY A LR L M Y HATHAWAY AXTELL DRIVE A LR M M 2 Y AXTELL DRIVE CHURCH LANE A LR L S 2 Y CHURCH LANE TISDALE A LR L M 2 Y EASTCHESTE R LINE e Width Alligator Block/Lg. SPRAGUE A LR S Y SPRAGUE BOULEVARD A LR M Y GRAND BOULEVARD CARMAN A LR M Y 2272 HEATHCOTE EASTCHESTE R LINE e Width Alligator Block/Lg. WAKEFIELD A LR L L 1 Y e Width Alligator Block/Lg. SPRAGUE A LR L M Y SPRAGUE BOULEVARD A LR L M Y GRAND BOULEVARD CARMAN A LR M M Y CARMAN TUNSDALE A LR L M Y TUNSTALL BARRY A LR L M Y 2296 BARRY EDGEWOOD EDGEWOOD A LR L M Y RICHELIEU A LR L M Y RICHELIEU DRAKE A LR M M Y 2308 e Width Alligator Block/Lg. BLACK BIRCH LANE DEAD END A LR L M Y 2312 e Width LOCKWOOD LYONS MACDONALD PLACE MADISON MAGNOLIA MAMARONECK Alligator Block/Lg. HMAC $ $ 14, HMAC $ $ 25, HMAC $ $ 29, HMAC $ $ 26, HMAC $ $ 7, HMAC $ $ 6, HMAC $ $ 6, HMAC $ $ 8, HMAC $ $ 16, HMAC $ $ 22, HMAC $ $ 12, HMAC $ $ 11, HMAC $ $ 22, HMAC $ $ 22, HMAC $ $ 12, HMAC $ $ 8, HMAC $ $ 8, HMAC $ $ 9, HMAC $ $ 31, HMAC $ $ 24, HMAC $ $ 30, GRIFFEN CLONIAL A LR L No Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 26 of 82
27 Scarsdale Street Cditi Asssment CLONIAL STRATTON STRATTON A LR L No HARVEST DRIVE A LR L No HARVEST DRIVE CROSSWAY A LR L Y No 2328 CROSSWAY SAXSON WOODS MYRTLEDAL SAXSON WOODS A LR L No MYRTLEDAL A LR L No PALMER A LR M L No PALMER SECOR A LR Y 2344 SECOR FOXHALL PLACE BROOKBY CANTERBURY CATHERINE LEATHERSTO CKING LANE e Width Alligator Block/Lg. FOXHALL PLACE A LR Y BROOKBY A LR M M Y New e, No New e, No HMAC $ $ 20, CANTERBURY A LR L L Y Patch Repairs $ $ 2, CATHERINE A LR L L Y Patch Repairs $ $ 4, LEATHERSTOC KING LANE A LR L No MOHICAN TRAIL A LR L L Y MOHICAN TRAIL MURRAY A LR L L Y MURRAY SHELDRACK SHELDRAKE A LR L L Y CUSHMAN A LR L L CUSHMAN GARDEN A LR L L GARDEN PARK A LR L L 2384 PARK 2388 CAMBRIDGE A LR L No CAMBRIDGE POST A LR L No e Width Alligator Block/Lg. $ 1.00 $ $ 1.00 $ $ 1.00 $ $ 1.00 $ $ 1.00 $ $ 1.00 $ SECOR CIRCLE A LR L Y Patch Repair. $ $ 22, COLONIAL HUTCHINSON HERKIMER BMORE NORMANDY LANE e Width Alligator Block/Lg. BLACKHAWK A LR Y e Width MARJORY LANE MAYFLOWER MEADOW Alligator Block/Lg. New e, No HERKIMER A LR L L Y Patch Repairs $ $ 4, BMORE A LR L L 2 Y Patch Repairs $ $ 5, NORMANDY LANE A LR L L Patch Repairs $ $ 4, OLD LYME A LR M M 2 Y HMAC $ $ 27, MOHICAN TRAIL Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 27 of 82
28 Scarsdale Street Cditi Asssment e Width Alligator Block/Lg. MAMARONEC K DEAD END A LR L L 2420 e Width Alligator Block/Lg. RODNEY DEAD END A LR M M 1 Y e Width Alligator Block/Lg FARLEY GORHAM A L M M Y GORHAM KINGSTON BIRCHALL DRIVE HEATHCOTE ROCHELLE LANE 2448 CUL DE SAC KINGSTON A L L M Y HUNTINGTON A L L M Y e Width Alligator Block/Lg. $ 1.00 $ HMAC $ $ 18, HMAC $ $ 20, HMAC $ $ 30, HMAC $ $ 18, MURRAY HILL A LR L Y No BIRCHALL DRIVE A LR L Y No HEATHCOTE A LR L L Y Patch Repairs $ $ 6, e Width Alligator Block/Lg. MAMARONECK A LR L 2 Y MAMARONEC K MORRIS LANE A LR L L Y MORRIS LANE POST A LR L Y No BANSOM MAMARONEC K e Width Alligator Block/Lg. $ 1.00 $ $ 1.00 $ RIDGEDALE A LR L Y No RIDGEDALE A LR L Y No BANSOM CUL DE SAC A LR L Y No EASTCHESTE R LINE e Width Alligator Block/Lg. SPRAGUE A LR L Y Patch Repairs $ $ 6, SPRAGUE BOULEVARD A LR L Y GRAND BOULEVARD CARMAN A LR L Y CARMAN TUNSTALL A LR L Y TUNSTALL BARRY A LR L Y 2492 BARRY MONTGOMERY MONTROSE MORRIS LANE MURRAY HILL MYRTLEDALE NELSON EDGEWOOD A LR L Y EDGEWOOD RODNEY LR S M 1 Y $ 1.00 $ 1, $ 1.00 $ $ 1.00 $ $ 1.00 $ $ 1.00 $ HMAC $ $ 12, Red Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 28 of 82
29 Scarsdale Street Cditi Asssment RODNEY RICHELIEU A LR M L Y RICHELIEU DRAKE A LR L M Y 2504 CORALYN 2508 e Width Alligator Block/Lg. HAZELTON A LR Y e Width NORMA PLACE NORMANDY LANE Alligator Block/Lg. HMAC $ $ 19, HMAC $ $ 18, New e, No School culde sac MEADOW RD A LR L L Y Patch Repairs $ $ 6, Red Red 2512 GRIFFIN AVE DEAD END A LR L Y No BUTLER CHESTERFIEL D COHAWNEY 2524 e Width Alligator Block/Lg. CHESTERFIELD A LR L L Y Patch Repairs $ $ 9, COHAWNEY A LR??? L L Y HMAC $ $ 27, FENIMORE A LR L L Y Patch Repairs $ $ 5, e Width Alligator Block/Lg. FENIMORE CUL DE SAC A LR M L 3 Y 2528 FENIMORE 2532 WOODLAND PLACE BREWSTER e Width Alligator Block/Lg. HMAC $ $ 18, BREWSTER A LR L L Y Patch Repairs $ $ 7, e Width Alligator Block/Lg. AUTENRIETH A LR L Y No e Width HAMPTON A LR HAMPTON BRITE A LR BRITE Alligator Block/Lg. New e, No New e, No FOX MEADOW A LR L No FOX MEADOW KENT A LR L M Y 2552 KENT 2556 WEAVER STREET HMAC $ $ 25, BRONX RIVER PARK A LR L L Y Patch Repairs $ $ 6, e Width OAK LANE OAK WAY OAKSTWAIN OAKWOOD PLACE OGDEN OLD LYME Alligator Block/Lg. MEADOW A LR L L Y OLMSTED HMAC $ $ 59, Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 29 of 82
30 Scarsdale Street Cditi Asssment e Width Alligator Block/Lg. FOX MEADOW TORY LANE A LR L Y $ 1.00 $ Red 2564 TORY LANE BRITE A LR L L Y Patch Repairs $ $ 5, BRITE HAMPTON HAMPTON A LR L L Y BREWSTER A LR L Y BREWSTER HICKORY LANE A LR L Y HICKORY LAND WHITE PLAINS A LR L Y 2584 e Width Alligator Block/Lg. CAYUGA DEAD END A LR L L Y 2588 e Width Alligator Block/Lg. SCHOOL LANE CIRCLE A LR L L Y 2592 CIRCLE POPHAM A LR L L Y 2596 e Width Alligator Block/Lg. $ 1.00 $ $ 1.00 $ $ 1.00 $ $ 1.00 $ $ 1.00 $ HMAC $ $ 27, $ 1.00 $ OLMSTED WHIG A LR L L 3 Y Patch Repairs $ $ 11, e Width Alligator Block/Lg PARK GARDEN A LR L M Y Patch Repairs $ $ 12, GREENDALE PARK LR??? L L Y 2604 POST 2608 BUTLER GREENDALE A LR L No e Width Alligator Block/Lg. $ 1.00 $ HORSEGUARD LANE A LR L L 2 Y Patch Repairs $ $ 20, HORSEGUAR D LANE OLMSTED A LR L L Y Patch Repairs $ $ 13, OLMSTED 2616 OGDEN A LR L M 2 Y HMAC $ $ 61, OGDEN WAYSIDE LANE A LR L M 2 Y HMAC $ $ 31, e Width ONEIDA OVERHILL OVERLOOK OXFORD PADDINGTON PARK Alligator Block/Lg MAMARONEC K OXFORD A L L L 4 Y Patch Repairs $ $ 10, OXFORD 2628 ETON A L L L 3 Y HMAC $ $ 39, ETON WHITE PLAINS LANE A L M L 8 Y HMAC $ $ 26, PARKFIELD Red Red Red Red Red Red Village of Scarsdale Pavement Asssment Report 11/29/ 2017 Page 30 of 82
Residential Sanitation Collection Day. M/Th- Monday/ Thursday Collection T/F- Tuesday/Friday Collection
Residential Sanitation Collection Day M/Th- Monday/ Thursday Collection T/F- Tuesday/Friday Collection STREET M/Th T/F Alida Road Archer Lane Ardmore Road Aspen Road Autenrieth Road Axtell Drive Bansom
More informationPavement Management Program
Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department
More informationPavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015
Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic
More informationNon-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s
Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationCity of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar
City of Coquitlam System Road Condition Analysis Parameters % Cracking Structural (Deflection) Rideability (Roughness) Rutting Traffic Volumes % Trucks Different Policy Models Min Cost - based on a minimum
More informationDEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND
DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND Presenter: Tyrone Toole, ARRB Group Scope Background Objectives Road network data and analysis Current and potential investment
More informationCity of Davis Pavement Management Program
City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles
More informationSingle Lane Closures, expect delays. Anticipated Schedule: Start Completion Current Stage: August
Bennett Road From Hartwell Rd to Jordan Lake Rd & from Harwood Rd to M-66 Skip paving, wedging, crack seal, & chip seal $97,000 May Bonanza Road Over Tupper Creek Resurface bridge deck and approaches $19,600
More informationC ITY OF B EDFORD H EIGHTS
C ITY OF B EDFORD H EIGHTS T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 13 5. PART III: Maintenance &
More informationMCALISTER SPAULDING 01 AM MCALISTER SPAULDING 02 AM MCALISTER SPAULDING 03 AM
MCALISTER SPAULDING 01 AM MCALISTER SPAULDING 02 AM MCALISTER SPAULDING 03 AM 1 7:38 AM SUFFIELD MIDDLE SCHOOL 1 7:39 AM SUFFIELD MIDDLE SCHOOL 1 7:48 AM SUFFIELD MIDDLE SCHOOL 2 7:49 AM 1479 SPRUCE STREET
More informationProject Update May 2018
Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationTOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2
TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2 FRANKLIN REGIONAL COUNCIL OF GOVERNMENTS 425 Main Street, Greenfield, MA 01301 413-774-3167 June 2004 TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationDriving Indiana s Economic Growth
Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David
More informationValley View School Directions to Opponents Basketball, Softball, Baseball, Track and Field
Valley View School Directions to Opponents Basketball, Softball, Baseball, Track and Field Note: With spring sports - the site of the athletic contest may not be at the school. Bedminster School - Basketball
More informationVDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010
VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data
More information50 Year Roads: Don't Accept Anything Less
50 Year Roads: Don't Accept Anything Less Prepared By Thomas O. Malerk Director of Transportation Engineering Florida Concrete & Products Association NACE Annual Meeting April 22, 2015 Presented by Roger
More informationGDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page
GDOT Fiscal 2015 Year 2017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles K. Joe Carpenter, Jr., P.E. Body Text Director Division of P3/Program Delivery June 15, 2016 Transportation
More information2018 ROAD MAINTENANCE PROGRAM
2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process
More informationCRANE ROAD/FOX MEADOW ROAD WEST QUAKER RIDGE AREA. VILLAGE OF SCARSDALE Scarsdale, New York
Results you can rely on TRAFFIC AND PEDESTRIAN SUMMARY REPORT POPHAM ROAD/CHASE ROAD/OVERHILL ROAD CRANE ROAD/FOX MEADOW ROAD WEST QUAKER RIDGE AREA SCARSDALE, NEW YORK Prepared for VILLAGE OF SCARSDALE
More informationCity of West Des Moines PAVEMENT MANAGEMENT SYSTEM
City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION FLEXIBLE PAVEMENT CONDITION SURVEY HANDBOOK March 2012 STATE MATERIALS OFFICE Table of Contents Title Page List of Tables... i List of Figures... ii Executive Summary...
More informationLIHTC Properties in. LIHTC (Drew Ferguson - R) Through rdSource: Satelli te
LIHTC Properties in Georgia's LIHTC 3rdSource: District LIHTC (Drew Ferguson - R) Through 2015 Satelli te Placed ASHTON COURT APTS 125 PARKER PL LAGRANGE GA 30240 2000 2002 New Construction 70 56 CARROLLTON
More informationCITY OF SOUTH DAYTONA
CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationCity of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.
City of Lakewood Public Works Transportation Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. June 15, 2017 Transportation Photos S. Tacoma Way: looking north between
More informationKeeping good roads good
Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology
More informationLake Waterford Community Association Meeting. November 15, 2016
Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements
More informationNew Mexico Transportation Funding Challenges
New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES
More information2012 Capital Budget Capital Improvement Program
2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways
More informationPrepared by Atkinson Police Department Last Update: March 5, 2011
ATKINSON STREET INDEX Prepared by Atkinson Police Department Last Update: March 5, 2011 17th Way (Country Club Condominiums) Off Country Club Drive, go past Clubhouse Drive to the 2nd right to Eagle Drive.
More informationOverview Background and Current Issues ARRA Key 2009 Accomplishments Going Forward
Maryland State Report: Pavement Preservation Activities 2009 November 3, 2009 Overview Background and Current Issues ARRA Key 2009 Accomplishments Going Forward Beginning of 2009 Essentially no preservation
More informationStreets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013
Streets Presentation Public Works Department Jill Mercurio, P.E. City Engineer November 19, 2013 Street Repairs A Guide to Potholes & Pavement Failure Pavement Condition Index (PCI) Different Types of
More informationAsphalt Recycling and Pavement Preservation in Hillsborough County, Florida
Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Manager coxw@hillsboroughcounty.org 813.272.5912 Public Works Department Systems Planning Discussion Points Hillsborough
More informationWELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.
City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for
More informationFairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,
More informationThe City of Port Moody 2013 Paved Road Network Condition Assessment
The City of Port Moody 2013 Paved Road Network Condition Assessment February 2014 Contents Objectives Data Collection Road Network Present Conditions in 2013 Road Network Assessment and Comparison to other
More informationSecondary Road Program
Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved
More informationDirections to Competition Venues:
Directions to Competition Venues: VILLANOVA UNIVERSITY LDR/W, Powerlifting, Soccer (Individual Skills, 7v7, 11v11), Volleyball 800 Lancaster Avenue, Villanova, PA, 19085 From the West Take the Pennsylvania
More informationBIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments
ON ROAD NETWORKS: URBAN & RURAL Non-motorized Transportation Networks Madison County Council of Governments 16 E. 9 th Street Anderson, IN 46016 99 th ANNUAL PURDUE ROAD SCHOOL MARCH 5-7, 2013 PRESENTATION
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationTraffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library
Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Presentation Format Project Goals and Overview Sidewalk
More informationGuidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects
Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationAppendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P (Version 2) Bikeway Projects in Currently Approved Plans Key: Removals Scope Changes Question Keep this in plan? = Included on map O = Not Included on map Planned Improvements from Sector &
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationCHAPTER 6: TRANSPORTATION TABLE OF CONTENTS
CHAPTER 6: TRANSPORTATION TABLE OF CONTENTS Introduction... 6-1 Summary of Existing Conditions... 6-1 Streets and Highways... 6-1 Pavement Surface Evaluations and Rating (PASER)... 6-2 Public Transportation...
More informationPASER Road Survey. For Berrien County, Michigan
The State of Michigan Transportation 2003-2014 PASER Road Survey For Berrien County, Michigan Prepared by the Southwest Michigan Planning Commission 376 W Main St Benton Harbor, MI 49022 (269) 925-1137
More informationland transport road assets
land transport road assets land transport road assets Westland District West Coast Region Information as at June 2006 land transport road assets 2 Purpose of this publication Land Transport New Zealand
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationGDOT GDOT PowerPoint. Title Page
GDOT 20152017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles Matt Bennett Body Text Program Manager June 14, 2017 Transportation Funding Act of 2015 (HB170) 2015 GDOT Your
More informationAPPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES
APPENDIX I-A STATE ROUTES Interstate 5 SR 33 SR 41 SR 43 SR 137 SR 198 SR 269 (See under City of Avenal) (See Figure 4-2 and 4-3 for Rural and Urban Functional Classifications) Appendix A Page A-1 INTERSTATE
More informationTacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force
1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria
More informationCity Council Work Session
City Council Work Session March 7, 2019 Strategies to address traffic flow in lebanon City Council Goals Infrastructure and Utilities To improve the quality of life of our customers by providing clean,
More informationNOTE: THIS BUS ONLY PICKS UP STUDENTS WITH MILL STREET ADDRESSES
PORT WASHINGTON SAUKVILLE SCHOOL DISTRICT SCHOOL ROUTES FOR 2017 2018 ROUTE # 1 - FIRST STOP WILL BE 6:30 FIRST STOP WILL BE ON SOMMERS LANE, WEST ON APPLEWOOD, BACK TO SOUTH ON NORTHWOODS, GO INTO YMCA
More informationOtter Tail County 2040 Transportation Plan. Asset Management Peer Exchange
Otter Tail County 2040 Transportation Plan Asset Management Peer Exchange Study Purpose and Goals 1. Leverage existing tools 2. Analyze existing road conditions 3. Comparison of funding versus road conditions
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationExpressFall/Winter 2017
Evansville MPO Fall/Winter 017 Transportation Planning for Henderson, Vanderburgh, and Warrick counties Metropolitan Transportation Plan 0 The Evansville MPO is gearing up to begin updating Metropolitan
More informationREAL WORLD PAVEMENT PRESERVATION SOLUTIONS
Cycle INTRODUCTION Page 1 Cycle Page 2 INTRODUCTION Introduction Do the Right Thing... Definitions Preventive Maintenance vs. Reactive Maintenance Cycle Page 3 INTRODUCTION Do the Right Thing The right
More informationIntroduction to Full Depth Asphalt Repairs. Setting Work Processes for a Quality Job Start in time to finish prior to Winter!
Introduction to Full Depth Asphalt Repairs Setting Work Processes for a Quality Job Start in time to finish prior to Winter! Asphalt Pothole and Patching Repairs Smaller Repairs! Where do Potholes come
More information2. TRANSPORTATION ELEMENT.
2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation
More informationBRIDGE REPLACEMENT AND REHABILITATION PROGRAM
BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,
More informationMPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017
MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business
More informationMulti Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY
Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities
More informationPavement Management 2011 Status Report
Pavement Management 2011 Status Report October 2011 Chapter 1: Table of Contents 1. Introduction... 1 1.1 Pavement Management Systems - Background... 1 1.2 Evaluation Criteria for CCC Data Collection...
More informationPM2 Pavement SOP Overview. RPUG 2017 Denver, CO November 15, 2017
PM2 Pavement SOP Overview RPUG 2017 Denver, CO November 15, 2017 1 Introduction/Overview SOP Background Metrics, Thresholds, and Measures Targets and Measures Required HPMS Data Elements Bridge Exclusion
More informationExecutive Summary. Introduction
Executive Summary Introduction The future of our local economy is uncertain, but one thing we know we must manage our infrastructure smarter. State and local agencies are facing challenging times. There
More informationland transport road assets
land transport road assets land transport road assets Otago Region Information as at June 2007 land transport road assets 2 Purpose of this publication Land Transport New Zealand annually publishes comparative
More informationWOODLAND HIGH SCHOOL PROSPECT ROUTES
BUS 1 18, 36 Salem Road STRAITSVILLE & PLATT STRAITSVILLE & BROOKWOOD 106, 113, 117 STRAITSVILLE STRAITSVILLE & LAKEVIEW COACHLIGHT & COACHLIGHT COACHLIGHT & FIELDSTONE 179,180, 184, 190 194 STRAITSVILLE
More informationPlanned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle
More informationConnectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail
C1 Whitefish River - Kay Beller Park to BNSF Loop Extend the along the river between 2nd St and Railway St providing a key connection for multiple trail networks. Include a Bike Channel adjacent to stairs
More informationShort and Long Term Needs
Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 8, 2006 Date: June 29, 2006 SUBJECT: Approval of Spring Traffic-Calming Projects C. M. RECOMMENDATION: 1. Approve traffic-calming projects
More informationNJTPA DRAFT Transportation Improvement Program Fiscal Years
County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.
More informationDEKALB COUNTY. 22. Priority Projects for DeKalb County
DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other
More informationconnections 2040 the waco metropolitan transportation plan amendment 2
connections 2040 the waco metropolitan transportation plan amendment 2 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted December 14, 2017 amendment
More informationParewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18
RDC ROADING REPORT: FEBRUARY 2018 1. MAINTENANCE, OPERATIONS AND RENEWALS This year s resealing programme of 61 km has been completed. Pre-reseal repairs for the 2018/19 year have been programmed. Installing
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationProposed Road Program. Executive Summary
Proposed 2015-2019 Road Program Executive Summary Executive Summary Pavement Condition Study & 2015-2019 Proposed Road Program Option 1 Maintain Current Pavement Condition Year Preliminary Budget (2015
More informationBoard of County Commissioners. Regular Meeting Thursday, December 15, :30 P.M. School Board Administrative Complex
Board of County Commissioners Regular Meeting Thursday, December 15, 2016 5:30 P.M. School Board Administrative Complex ROAD PRIORITIZATION Kevin Kirby, Assistant County Manager December 15, 2016 FIVE
More informationSAFE ROUTES TO SCHOOL
SAFE ROUTES TO SCHOOL Edgewood Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries Enrollment
More informationThe Transportation Improvement Program
Waco Metropolitan Planning Organization The Transportation Improvement Program Waco Urbanized Area For Fiscal Years 2015 Through 2018 Proposed Amendment 4 FY 2016 PHASE: E COUNTY: McLennan LIMITS FROM:
More information(Revised 10/5/2017) SOLOMON/PLAINS JR. HIGH SCHOOL STA BUS LINES
(Revised 10/5/2017) SOLOMON/PLAINS JR. HIGH SCHOOL STA BUS LINES Bus #44 Starts 7:10 Mineral Springs Entrance Austin & Scott St. Virginia & Scott St. to High *Return on Bus #64 Scott & Virginia Scott &
More informationRigby / Jefferson County Transportation Plan
Rigby / Jefferson County Transportation Plan 105085/07-863 Chapter 1 - Introduction... 1 Chapter 2 - Rigby / Jefferson County Highway System... 5 Chapter 3 Condition of the Existing Roadway System...
More informationApplications for Funding
Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for
More informationPage 1 of 5 11/18/2013 9:17 AM
Refurbished H:\ACCOUNTING\BUDGETS\2014-2015 NEW\2014-2015 Budget Projection Worksheet.xlsx Page 1 of 5 11/18/2013 9:17 AM Total Annual Reserve Estima Remai Replacement Required ted ning and/or Refurbish
More informationPASER Road Survey. For Berrien County, Michigan
The State of Michigan Transportation 2003-2010 PASER Road Survey For Berrien County, Michigan Prepared by the Southwest Michigan Planning Commission 185 E. Main St. Suite 701 Benton Harbor, MI 49022 (269)
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationWhy We do Preventive Maintenance
Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -
More informationRequest for Authorization to Open Public Comment Period
Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New
More informationBicycle Transportation Budget Plan: Lawrence, KS
Bicycle Transportation Budget Plan: Lawrence, KS Bicycle Objectives Lawrence Planning Documents Establish a dedicated funding plan to complete the implementation of a bikeway system plan, and for maintenance
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More informationNorth Hampton # 1 AM First Stop 7:40
North Hampton # 1 AM First Stop 7:40 Right onto Route # 1 Right onto Atlantic Avenue (at 2 nd set of lights) Left onto Woodland Road Stop at River Rd and Maple Rd Right onto Maple Rd Stop at # 71-1 st
More informationWalk Description. Directions
Title: Saffron Trail: Battlesbridge to Chelmsford Distance: 14¾ miles Time taken: 6 hours Start Point: Outside the Barge Inn, Battlesbridge OS Explorer Map: 175 & 183 Grid Ref.: TQ 780 947 Transport: Rail:-
More informationTEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements
TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared
More information