GHISS 70, 90, 110, 125, 145, 160, 180, 200 MAX R AE

Size: px
Start display at page:

Download "GHISS 70, 90, 110, 125, 145, 160, 180, 200 MAX R AE"

Transcription

1 GHISS 70, 90, 110, 125, 145, 160, 180, 200 MAX R AE INSTRUCTIONS FOR USE AND OPERATING MANUAL STANDING GAS DEVICE WITH CAST-IRON SEGMENTED HEAT- EXCHANGER, SPARK IGNITION, IONISATION FLAME-CONTROL AND BI-LEVEL BURNER 1. VERZIÓ HU

2 CONFORMITY GHISS MAX R AE, bilers have been attested accrding t the fllwing Eurpean standards: 90/396/CEE gas directive 92/42/CEE efficiency directive 89/336/CEE electr-magnetic cnfrmity directive 73/23/CEE lw current directive Dear Custmer, Thank yu fr chsing the gas biler f Unical. With this, yu have becme the wner f an efficient device f high technical level and safe peratin. Cngratulatins! Check the cmplete and intact cnditin f the prduct! D nt remve and d nt damage the signs t be fund n the device! The present dcument is the perating maintenance manual. The guarantee slip lcated in the attachment is t be stamped and filled in legibly n the ccasin f the purchase and cmmissining! We request that in yur wn interest yu carefully read the infrmatin described n the fllwing pages, and keep them because yu might need them in the future. If yu take ur advice, ur prduct will serve yu reliably fr lng years. TABLE OF CONTENTS GENERAL Cnfrmity...2 Imprtant things t knw...3 Basic safety rules...3 General intrductin...4 Identificatin...4 Cnstructin...4 Technical data...6 Hydraulic peratin...7 Pump...7 Electric switching diagrams...8 Operating surface...9 HANDLING THE DEVICE Turning n...11 Setting the biler thermstat...13 Temprary shut-dwn...13 Shutting dwn fr a lnger time...14 Cleaning...14 Maintenance...14 INSTALLING THE DEVICE The dcumentatin f the prduct...14 Sizes and weight...14 The biler rm...16 Cnnecting the biler t the existing ld heating system16 Hydraulic cnnectin...16 Electric cnnectins...17 Gas cnnectin...18 Channeling cmbustin prducts...18 Filling up and draining the system...19 SERVICE INSTRUCTIONS Preparatins fr start-up...19 First start-up...19 Checking during peratin...21 Shutting dwn fr a lnger time...22 Maintenance...22 Regulatin...23 Switching t ther types f gas...24 The cleaning f the biler...25 The perating manual cntains the fllwing symbls: Warning = the activity requires greater attentin! Ban = this activity must nt be carried ut! 2 GENERAL VERSION 1 GB

3 IMPORTANT THINGS TO KNOW BASIC SAFETY RULES After yu have unwrapped the device, check whether it is intact and cmplete. Upn planning and executin, the valid requirements f the lcal gas prvider, the cnstructin industrial and envirnmental standards, and the prevailing electric and ther standards must be taken int cnsideratin and must be abided by t the full. The manufacturer cannt take respnsibility fr unprfessinal peratin and ther mechanical injuries that emerge frm unprfessinal peratin. In case f failure, if yu cannt eliminate the failure n the basis f the instructins f the manual, call the appinted brand service statin. Check the pressure f the heating system regularly, and d nt let it drp under 1 bar. If the device repeatedly shuts dwn blcking, n several ccasins call the brand service; in the meanwhile, d the fllwing: Turn ff the main switch f the device (cut ff the current). Shut f the cnnected gas and water supply. In case f frst danger, drain the heating and HWU water cycles (draining). In the interest f safe and ecnmic peratin, it is practical t have the cntrl examinatin recmmended by the manufacturer and the necessary maintenance jbs carried ut n the device by the appinted prfessinal service statin at least nce a year. The user is t pay attentin t the fact that this device uses gas, electric energy and water during its peratin, which pses sme basic safety rules: The biler must nt be used by children and nn-authrised persns. D nt use electric devices, machines, equipment, d nt turn n the light if yu can smell gas. In this case, clse the gas tap, air the rm and call the prfessinal service. D nt tuch the biler with wet hands r if yu are in yur bare feet. D nt clean the biler while it is n and is perating. Only the authrised prfessinal service statin can replace safety and ther parts in the device, and nly with the riginal factry-identical parts. D nt pull r twist the cnnectin cable f the biler while it is live. The peratin f the device requires air supplement, therefre, d nt cver r clse, and d nt narrw dwn the vents r windws that can prvide the supplement f air necessary fr burning. Because f the danger f freezing, d nt install the biler in an pen rm. D nt stre packaging materials (cardbard paper, plastic r wd) and cmbustible r explsive materials clse t the biler. This perating manual cntains all the imprtant infrmatin fr the user in cnnectin with the use f the device, therefre, it is practical t keep it clse t the biler. If the device is sld r relcated, this perating manual is always t accmpany it s that the new wner and/r mechanic can be advised prperly. 3 GENERAL VERSION 1 GB

4 GENERAL INTRODUCTION Basic mdel, atmspheric furnace chamber ht water gas biler with cast-irn segmented heat-exchanger. It is suitable fr the realisatin f the pump-system central heating f residential and public buildings and tgether with the indirectly heated ht water cntainers that can be installed next t them fr the realisatin f the ht water supply fr use, as well as fr any industrial-purpse applicatin where the C water temperature range f regulatin is suitable. Its peratin prvides the fllwing variatins f cmfrt: Winter peratin: heating and/r ht water prductin (the latter with preference) Summer peratin: nly ht water prductin (heating demand switched ff) Executin: with built-in autmatic purging valve and safety blw-ff valve. The peratin f the burner system f the device: The device has a three-pint regulatin, where the cntrl regulates the burner system f the device in such a manner that if the temperature f the biler is ver 6 C belw the set value, it keeps it at nminal utput, if between 6 C and the set value, at partial lad, if it exceeds the set value, it switches it ff. Its peratin is pssible with piped natural gas ( H r S ), (I 2H,S ). The gas fittings are prvided with pressuregage studs f the apprpriate frmatin, which are suitable fr the measuring f the cnnectin (gas netwrk) pressure and the burner pressure (befre the nzzles). The nminal, perating parameters f the biler are t be fund in the technical data table. The regulatin f the biler cntrl is digital. The devices cntain weather-dependent heating cntrl. With rm thermstats f daily and weekly prgramming, the pssibilities can be extended even further. Type f the cnduct f cmbustin prducts: B11BS IDENTIFICATION The data plate serving the identificatin f the biler can be fund after the remval f the dr f the device, n the inside wall f the left-side husing. D nt remve the data plate and d nt damage it! This data plate cntains the main parameters f the device and the individual identificatin infrmatin (type, prductin number, date f prductin, etc.). Imprtant safety functins in the peratin f the biler: 1. The pst-circulatin f the heating pump until the temperature f the biler drps under 38 C. 2. After the HWU perating mde the pump wrks until the water temperature f the biler and the temperature f the water are the same. 3. Prtectin f the biler: restricting thermstat fr the preventin f the ver-heating f the heating water. 4. Prtectin f life: flue gas restrictr thermstat fr the preventin f the flw back f the cmbustin prducts. 5. Frst-prtectin functin. 6. Prtectin against the jamming f the pump axle. Structural characteristics The heat-exchanger f the biler depending n the required utput is cnstituted by cast-irn segments. Its segmentatin with the insertin f special cne rings takes place after the segments have been pressed tgether, with treaded fastening sides. Its insulatin is textile fibre-reinfrced glass-wl quilt cvered with aluminium fil. The gas fittings are prvided with pressure-gage studs f the apprpriate frmatin, which are suitable fr the measuring f the cnnectin (gas netwrk) pressure and the burner pressure (befre the nzzles). The husing f the biler is aesthetic, cvered with electrstatic pwder-painting and wear-resistant cating. The material and cnstructin f the structural elements is such that during the curse f the prper use f the device as a result f the mechanical and heat expsure n lasting changes f shape can take place. 4 GENERAL VERSION 1 GB

5 CONSTRUCTION The cnstructin and main parts f GHISS MAX R AE type devices are the fllwing: The cnstructin and main parts f the devices are the fllwing: List f parts: 1. Biler husing 2. Deflectr 3. Autmatic purger 4. Frward pipe 5. Dip-casing 6. Manmeter 7. Pressure remte transmitter 8. Gas pipe 9. Safety valve 10. Return pipe 11. Instrument bx 12. Cast heat-exchanger 13. Burner tray 14. Gas valve 15. Nzzle hlder cllectr 16. Lifting eye 17. Supprt leg 5 GENERAL VERSION 1 GB

6 TECHNICAL DATA GHISS.. MAX R AE Unit 70 measurement Technical data Nminal heat lad kw 71/ / / / / / / /137.2 Nminal heat utput kw 64.6/ / / / / / / / Nminal efficiency (water-side) % Min-max perating water temper C 45/85 Water cubic capacity f the bile dm Number f burners / main nzzle db Number f cast segments db Heatable space lgm3 Maximum perative verpressur bar 5 (pressure class 2) Biler bdy test verpressure bar 8 Pressure lss (80/60 C) mbar Cnnecting sizes Frward, return heating water Inch 2 ½ Gas cnnectin Inch 1 1 ½ 1 ½ Gas-technical data Classificatin accrding t the use f gas: I2H,S Piped natural gas Cnnecting gas pressure mbar Burner nzzle pressure H mbar Burner nzzle pressure S mbar Burner nzzle diameter H Ø/mm Burner nzzle diameter S Ø/mm Ignitin burner nzzle diameter Ø/mm 0.36 Heating material amunt H m3/h 7.6/ / / / / / / /14.63 Heating material amunt S m3/h 8.84/ / / / / / / /17.01 Cmbustin prduct data Classificatin accrding t cmbustin prduct: B11BS Cmbustin prduct channelling Ø Cmbustin prduct temperature C Required draft f the chimney mbar 0.06 Cmbustin prduct cubic capac Nm3/h NOx class 2. (NOx - cncentratin < 200 mg /kwh) Electric data Electric cnnectin V/Hz 230/50 Electric utput W Electric prtectin IP 20 Shck-prfing class I. Ignitin flame security Inisatin Ignitin Hz/ kv 6/15 electric spark Nise level db max.50 Envelping sizes Height mm 1095 Width mm Depth mm 1170 Biler vlume (withut water) kg GENERAL VERSION 1 GB

7 HYDRAULIC OPERATION The hydraulic switching f GHISS.. MAX R AE type devices Several bilers in cascade, separated frm the cnsumers by means f a hydraulic shift lever 3 Radiatr heating system Radiatr heating system and indirect cntainer Legend: 1. Biler 2. Radiatr 3. Circulatin pump 4. Expansin tank 5. Pressure gage 6. Safety valve 7. Rebund valve 8. Indirect cntainer 9. Hydraulic shift lever 10. Mixing valve Cnsumers separated by means f a hydraulic shift lever PUMP N pump has been installed int these devices as the size f that is t be calibrated primarily fr the cnnecting heating system. The value f the pressure lss emerging n the biler can be fund in the technical table. Upn the first start-up f the biler and after a lnger perid f shut-dwn, it is practical t check with a screwdriver whether the axle f the built-in pump can be turned. 3 2 The pump must nt be perated withut water! Multiple-biler cascade cnnectin GENERAL VERSION 1 GB

8 GHISS.. MAX R AE ELECTRIC SWITCHING DIAGRAMS Legend: 1. Ht water fr use (HWU) pump 2. Heating pump 3. Rm thermstat 1-2 switch cntact, 3 neutral wire V supply vltage cnnectin, N- neutral wire, L-phase cnductr 5. Ignitin cntrl Nki- neutral wire, Lb-permanent phase, Lk-cnnected phase 6. Gas valve level 2 7. Errr signal in (7/2 errr signal ut) 8. Flue gas restrictr 9. Temperature restrictr 10. Water shrtage switch 11. Outside temperature sensr 12. HWU sensr 13. Biler temperature sensr 14. Anti-leginella disabling / enabling 15. The errr signal f restrictrs and sensrs 16. HWU peratin disabling / enabling 17. Weather-dependent regulatin disabling / enabling 18. Cntrl panel cnnectr 8 GENERAL VERSION 1 GB

9 OPERATING SURFACE GHISS.. MAX R AE Legend: 1. Steepness regulatr 2. Biler regular and parallel displacement regulatr 3. HWU regulatr 4. Mde f peratin selectr 5. Supply vltage turned n (errr indicatin) 6. Nminal utput peratin 7. Decreased utput peratin 8. Errr indicatr and release The peratin f the device with autmatic weatherdependent regulatin - Winter mde f peratin: heating and the prductin f ht water fr use. - Summer mde f peratin: the prductin f ht water fr use. - 0 switched ff mde f peratin: frst-prtectin functin and pump peridical cerced start-up functin. In the case f a cnnected exterir temperature sensr and clsed JP4 jumper, the frward water temperature will be set autmatically by the electrnic system, accrding t the prevailing exterir temperature. This regulatin can be influenced with the steepness setting turn knb (1), and the heating regulatr turn knb (2), which nw functins as a parallel shift regulatr turn knb. By setting steepness, we can influence t what extent the change f the exterir temperatures shuld influence the heating frward value. By increasing the value n the regulating knb, a particular change f the exterir temperatures is fllwed by a greater change in the temperature f the water. By turning the heating regulatr knb, we can mdify the whle regulating range, by increasing r decreasing it, which increases r decreases the permanent temperature f the heated rms. The perative prcesses take place autmatically: the electrnic device prduces sparks, the burner lights, and the gas biler starts heating up accrding t the temperature set. - The preparatin f HWU: set the required temperature value with the regulating turn knb (3). - Setting the temperature f the heating water: if the exterir temperature sensr is nt cnnected and the JP4 jumper is pen, this takes place by setting the heating temperature regulating turn knb (2) at the apprpriate value. Shutting dwn the biler: turn the mde f peratin switch in 0 psitin. In this mde f peratin, the device is still under electricity, thus it is frbidden and dangerus t ne s life t pen the switching cabinet and t und the electric cables! The perfrmance f any repair r maintenance wrk is pssible nly if the exterir main switch r the fuse f the device has been turned ff! Warning! The ignitin cable is marked with red clur, it cannt be switched with the cable f the flame-guard because then the biler will becme unable t perate. 9 GENERAL VERSION 1 GB

10 Trubleshting If ignitin des nt take place autmatically, the errr indicatr lamp press buttn (8) is lit the peratin f the burner head can be checked thrugh the peephle. Upn pressing the errr indicatr lamp press buttn, the errr indicatr lamp ges ut, the autmatic ignitin prcess is repeated. If the biler has nt been perative fr a lng time r has nt been perated ever, it is natural t repeat the prcess several times as the gas system filled with air has t be ventilated. In the event f several unsuccessful attempts, call the clleagues f Unical Márkaszerviz. These types wrk prperly nly in the event f phase-spt electric cnnectin! The peratin f the gas device The temperature f the heating water can be regulated between C but accrding t the heating demand, the perating temperature f the biler is t be chsen in such a manner that the temperature f the return heating water is nt lwer than 45 C. Belw this temperature, the cmbustin prduct may get cndensed, and the settling steam may lead t the crrsin and failure f the biler bdy. During peratin, keep the dr f the gas biler clsed! After lighting, the gas burner perates at lw utput fr 30 secnds, then it switches t nminal utput. At 38 C f the biler water, the circulatin pump switches n. When the temperature f the water appraches the set value by 6 C, the device switches t decreased utput. Upn reaching the set water temperature, the main burner switches ff. If the frward temperature drps 4 C belw the set value, it switches n again with decreased utput. If the frward water temperature keeps decreasing, by 7 C under the set value, it switches t full utput again. Naturally, the heating prcess described nly takes place if the rm thermstat is turned n. When the rm thermstat is turned ff, a heating cycle is finished and a 300-secnd lng interval is started, within which the heating pump pst-circulates fr 120 secnds r until the heating water drps under 38 C. The bilers have a frst-prtectin functin. The temperature f the frward water drps under 8 C, a 120-secnd lng watercirculatin is started, after which, if the temperature f the water increases abve 8 C, the pump stps, but if the temperature f the water still remains under 8 C, the circulatin cycle starts again. When the temperature f the water drps under 5 C, the decreased utput f the burner starts, then after 30 secnds, it perates with full utput until it reaches 39 C. Abve 39 C, it heats with decreased utput until it reaches 45 C, when the burner switches ff, and the pump pst-circulates fr anther 120 secnds. In case f a cnnected indirect cntainer, the device has an Antileginella functin. The functin can be switched n by putting the shrt-circuit caps n the JP1-JP2 jumper legs. With the functin turned n, nce a week the device heats up the biler t 65 C. When it is turned n, the device starts with this functin, and starts the weekly cycles frm here. The device is equipped with a temperature restrictr(s), by which security (lcked) turning ff is perfrmed during the peratin f the biler: 1. In the case f unsuccessful ignitin r missing flame, 2. In case f the interventin f the water temperature separatr 96 C, its display is indicatr In case f the interventin f the flue gas temperature separatr thermstat 90 C, its display is indicatr In the event the water pressure switch is turned ff. It is strictly FORBIDDEN t eliminate the safety, interventin fixtures! Signs f disrder The LED n the perating surface (5) warns f the pssible failure and lcked stppage f the NTC sensrs and restrictrs by blinking. Attentin! The device is allwed t be restarted nly after the reasn leading t its stppage has been eliminated! Fr the re-start, the dr f the device is t be pened, and the lcking-release buttn lcated n the left side f the first cnnecting sheet must be pressed. D nt miss t use the appinted service statin! D nt endanger yur safety and the safety f yur envirnment by unprfessinal interventins! The flw-back f the cmbustin prduct may lead t death! The replacement f brken parts can be carried ut nly by the appinted prfessinal service statin and nly with riginal factry parts! The replacement f brken safety separatr thermstats can be carried ut nly after the peratin test f the new part has been perfrmed! Attentin! Unical Kft. assumes n respnsibility fr damage caused by neglecting the abve warnings! 10 GENERAL VERSION 1 GB

11 TURNING ON Autmatic mde f peratin These devices d nt require the manual handling f the gas valve as the device wrks autmatically by simply setting the perating devices placed n the frnt sheet f the biler t the desired value, accrding t the fllwing. - Turn n the exterir mains switch. - Open the gas tap and the water-side clsing fixtures. - In the case f the cnnectin f an exterir temperature sensr, set the values f steepness and parallel shifting accrding t the nature f the heating system and the building. (1, 2) - In case f the manual mde f peratin, if there is n exterir sensr, set the biler regulatr thermstat (2) accrding t the desired temperature. - Set the mde f peratin switch (4) accrding t the desired mde f peratin: Winter mde f peratin heating and the prductin f ht water fr use at the indirect cntainer cnnected t the biler. Summer mde f peratin - the prductin f ht water fr use at the indirect cntainer cnnected t the biler. The fllwing prcesses take place autmatically: the electrnic system prduces sparks, the burner lights, and the gas biler starts heating-up accrding t the set temperature value. The setting f the desired ht water temperature at the cnnected indirect cntainer, with the ht water fr use regulatr (3). 11 HANDLING THE DEVICE VERSION 1 GB

12 After a lng pause f peratin, it may happen that the device des nt start up. In this case the fllwing is t be checked and perfrmed: Check whether the taps f the gas and water, as well as f the heating system are pen. Check if the heating system is filled up, there has t be at least 1 bar pressure. Turn ff the exterir separatr switch f the biler, then back n again. Check the setting f the rm thermstat and turn it ff and n. In the case f manual mde, if there is n utside sensr, set the biler regulatr thermstat (2) at the desired temperature. Set the mde f peratin switch int winter mde (4). In the summer mde, the biler nly perfrms the prductin f ht water fr use if there is an indirect cntainer cnnected. Otherwise the device des nt wrk in the summer mde setting. 12 HANDLING THE DEVICE VERSION 1 GB

13 The peratin f the biler is started and lasts until the biler water temperature reaches the set temperature value, r the rm thermstat switches ff. In the event f an ignitin errr, the illuminated reset push buttn lights up with red light. The prcess f re-starting is the fllwing: - Press the reset push buttn, - Wait until the ignitin prcedure is repeated, and peratin is started. If the ignitin prcedure is unsuccessful again, restarting can be repeated after a minute r tw. The number f repeated re-starting can be maximum 3. After this call the brand service. SETTING THE BOILER THERMOSTAT When the utside temperature changes, the heating temperature is als t be changed. The clder the utside temperature is, the htter heating water we need. With weather-dependent regulatin this takes place autmatically. In the case f manual mde f peratin, t increase the temperature f the heating water, the heating temperature regulatr buttn is t be turned clckwise; turning it anti-clckwise decreases the temperature f the biler. T avid cndensatin, the frward temperature set must be at least such that the temperature f the return water is abve 40 C. TEMPORARY SHUT-DOWN If, because f a hliday, excursin r sme ther reasn, yu want t turn ff the biler, yu have t d the fllwing: Turn the mde f peratin switch f the biler t 0 psitin, the mains indicatr is lit. Yu have nthing else t d: in the stand-by mde f peratin nly the prtective functins f the biler perate, which are frst prtectin and the axel mvement f the pump. 13 HANDLING THE DEVICE VERSION 1 GB

14 SHUTTING DOWN FOR A LONGER PERIOD OF TIME In this case the fllwing is t be dne: Turn the mde f peratin switch f the biler t 0 psitin, the mains indicatr is lit. If there is danger f freezing, drain the water frm the heating and HWU systems. CLEANING The utside husing f the biler can be cleaned with a sft, wet clth with sme detergent. In case f stubbrn siling, remval can be executed with a clth dampened in the mixture f 50% denaturated alchl and water. Turn ff the exterir separatr switch f the biler. Clse the water tap. The cleaning f the biler bdy and smke ducts is t be carried ut by the prfessinal service statin, at regular intervals. D nt use rugh scuring agents! Befre yu start the cleaning f the biler, turn ff the main switch f the biler and the exterir separatr switch. MAINTENANCE The regular maintenance and check-up f gas devices is specified by EU directives and standards. Prfessinal and experienced service statins trained fr the mdel secure the fllwing fr yur device: Greater security; Abiding by the legal requirements; Decreasing the chances f technical failures. THE DOCUMENTATION OF THE PRODUCT The manual and list f services belnging t the prduct is placed n tp f the device, in a plastic bag, inside the packaging. After the device has been unwrapped, yu will find the dcumentatin; read it carefully and abide by the advice and instructins written there. 14 HANDLING THE DEVICE VERSION 1 GB

15 SIZES GHISS.. MAX R AE GHISS MAX A B C ØD INSTALLING THE DEVICE VERSION 1. HU

16 THE BOILER ROOM UNICAL GHISS MAX bilers are allwed t be fitted nly in rms where the necessary supply f air (ventilatin), required by the standards, is prvided fr the device, and which meet the fire safety and ther requirements. CONNECTING THE BOILER TO THE EXISTING OLD HEATING SYSTEM If we cnnect the biler with an ld heating system, the fllwing is t be abided by: The diameter and height f the chimney is t meet the new requirements, it must be f the sufficient cleanness, and prvide the necessary amunt f draught. Water quality values The electric system is t meet the regulatin requirements f PH the biler. Electric cnductibility < 200 mv/cm (25 C) The pipes and fixtures f natural gas and gas are t secure the Chlride in < 50 ppm amunt and pressure f fuel required fr the biler accrding t Sulphuric acid in < 50 ppm the standards. The clsed expansin tank f the system is t be f the Sum ttal irn cntents < 0,3 ppm sufficient size and pre-tensin pressure s that it can Alkaline metals < 50 ppm cmpensate fr the changes f pressure f the system due t Hardness f water 35 F changes in temperature. Sulphur in nne The utput f the heating circulatin pump, as well as the place Ammnia in nne and directin f installatin are t meet the new requirements. Silicn in < 50 ppm The hydraulic system is t be free f air and sediment. This can be achieved by means f the thrugh cleaning f the system befre cnnectin. Better results can be achieved by means f washing thrugh with chemicals. The requirements twards the chemical cmpsitin f the water f the system can be fund in the table. HYDRAULIC CONNECTION The cnnectin place f the heating system and the system f water fr use t the bilers is illustrated by the fllwing figure. Chsing the type that best fits the heating system f the building is the task f the designer. If need be, the heating system can als be filled up with anti-freeze liquid. 16 INSTALLING THE DEVICE VERSION 1. HU

17 ELECTRIC CONNECTIONS The devices have the fllwing electric cnnectins. Mains cnnectin 230 V 50 Hz, rm thermstat cnnectin, heating and ht water fr use pump cnnectin, exterir sensr cnnectin. These cnnectins can be fund inside the instrument bx, are f serial cnnectin, and are equipped with prper labels. Access is prvided in the fllwing way: Remve the tp f the biler, which is fastened by snaps. Unscrew the screws f the lid f the instrument bx, and yu will have access t the cnnecting switches. There is a 230 V 50 Hz present n the cnnectins f the device, therefre, t avid accidents, befre yu remve the lid f the instrument bx, turn ff the exterir separatr switch! The cnnectin f the rm thermstat may be n tw cables r if the peratin f the thermstat requires it f three cables. The exterir sensr is t be cnnected with a duble-cre cable. When cnnecting the pumps, pay attentin t the fact that the cnnectins can be laded with maximum 1A! If yu have t perate a strnger r a 3-phase pump, the exit is t be separated by means f a relay r magnetic switch. 17 SERVICE INSTRUCTIONS VERSION 1. GB

18 The fllwing rules are t be abided by at the electric cnnectins: 1. Cnnect the mains cable plarity crrect t the electric netwrk. The length f this can be maximum 3 m. 2. Marking at the cnnectin: L phase cnductr, N nil cnductr. 3. The recmmended crss sectin f the cnnecting cables is 1.5 mm 2, a hse cnductr free f injuries. 4. Cnnectin is t be carried ut accrding t the electric cnnectin diagram. 5. The cnnectin f the prtective cnductr is cmpulsry. Gas r water pipes must nt be used fr the prtective cable! The biler and the pipe-system must be cnnected with the shck-prtectin system with standard prtective cnductr. The manufacturer undertakes n liability fr incrrect installatin! CHANNELING THE COMBUSTION PRODUCTS Cnnect the biler with the chimney accrding t the valid standards and specificatins. Cnnectin is t be executed with stiff pipes, prviding sufficient caulking, als cunting n pssibly frming cndensatin water. The mechanical fastening f the cnnecting pipes is t be secured against mvement and slipping ut. The bilers are equipped with flue gas restricting thermstats, which if the flue gas flws back switches ff the peratin f the biler in a lcked manner. The use f an un-insulated exterir chimney pses ptential dangers. The cnnectin f GHISS MAX devices t the chimney. GAS CONNECTION Only piped natural gas can be cnnected t the device. Befre yu carry ut the cnnectin, the fllwing is t be executed: Check the cleanness f the gas pipe and if necessary, a filter is t be installed befre the biler. The gas cnnectin is t prvide gas f the apprpriate amunt and pressure, and the prper functining f the measuring and security systems is t be checked. After yu have cnnected the device with the gas system, check the intact cnditin f the seal and whether the standards are abided by. The cnnecting size f the gas pipeline between 70 and 160 is 1, and between 180 and 200 is 1 ½. The air necessary fr the peratin f the biler is t be prvided thrugh dr and windws n the walls f the rm r ventilatin grates! Prviding air, ventilatin - The replacement f the air f the rm where the device is shuld be at least five-fld per hur! With devices with an utput f ver 140 kw, if the value f the lad n the air is ver 1100 W/m 3, lamellar - pening surfaces are t be prvided n the walls r the rf. If the nature f the building des nt allw this, it is cmpulsry t use a gas sensr. Over specific lad f 2800 W/m 3 n the air 2 gas sensrs perating independent f each ther are t be installed! - If the air-supply f the rm takes place thrugh an pening prvided with a clsing fixture (flap, mbile shutters, etc.) r thrugh a pipe, the gas supply f the device is t be lcked with this. - With artificial ventilatin, the gas supply f the device is t be lcked with the ventilatin device in such a manner that in the event f the absence f the ventilatin air the device culd nt be perated. - Only blw-in (ver-pressure) ventilatin can be used fr artificial ventilatin. 18 SERVICE INSTRUCTIONS VERSION 1. GB

19 FILLING UP AND DRAINING THE SYSTEM N filling-draining tap has been installed int these devices, therefre, upn the establishment f the heating system, the installatin f this must be prvided at the lwest pint f the return pipe. Befre yu start t fill up, the fllwing is t be dne: Turn ff the main switch f the biler. Open the filling tap until the pressure f the system reaches 1.5 bar. Clse the filling tap. Turn n the biler. Draining: Befre yu start draining, turn ff the biler. Open the draining tap. PREPARATIONS FOR START-UP Befre yu turn n the device, remve the dr f the biler and check the fllwing: The taps f the heating system and the gas cnnectin are pen. The type and cnnectin pressure f the gas is suitable fr the device. The pressure f the heating system when cld is ver 1 bar, and it has t be free f air. The pressure f the expansin tank befre the system is filled up, must be 0,8 ~ 1 bar. The cnnectin f the electric system is suitable fr the device. The cnnectin f the cmbustin prduct cnducting channel (chimney) is suitable. FIRST START-UP D the fllwing fr the start-up f the device: Turn n the exterir separatr switch. Set the rm thermstat fr the desired value. Set the mde f peratin switch in winter psitin. In the summer psitin, the biler nly prduces ht water fr use, if there is an indirect cntainer cnnected and the JP3 jumper is shrt-circuited. Otherwise the device des nt wrk in summer psitin. Set steepness and the parallel shifting regulatr at weather-dependent mde f peratin, and the biler regulatr thermstat at manual mde f peratin, fr the desired temperature. 19 SERVICE INSTRUCTIONS VERSION 1. GB

20 The ignitin prcedure f the biler starts, sparks are prduced autmatically, then perates cntinuusly until the biler r the rm thermstat switches ff. In the event f an ignitin fault, the illuminated re-set push buttn is lit in red. The prcess f re-starting is the fllwing: - Press the re-set push buttn, - Wait until the ignitin prcedure is repeated and peratin starts. It may happen that during cntinuus peratin the biler stps and the errr indicatr light flashes (the tp ne). Fr re-setting, d the fllwing: Remve the dr f the biler, fastened by snaps. On the first cnnecting sheet, there are tw hexagnal plastic prtective caps. Twist them ff, and under them are tw push buttns. The left-side is the flue-gas restrictr, the right-side is the temperature restrictr thermstat. Push in the buttns as far as they g. At the thermstat that was turned ff, yu will hear a click upn pushing, and the errr-indicatr light ges ut, and the ignitin f the device is restarted. 20 SERVICE INSTRUCTIONS VERSION 1. GB

21 CHECKING DURING OPERATION After start-up, the fllwing is t be checked: The mde f peratin switch f the biler ff, then switching t winter mde f peratin. The peratin f the biler cntrl (parallel shifting) by turning the biler temperature buttn left, then right. The peratin f the rm thermstat by turning it ff and n. After the rm thermstat has been turned ff and n, the biler restarts nly after 5 minutes! The peratin f the pump. The peratin f the exterir separatr switch by turning it ff and n. If everything is perating perfectly, then checking the draught f the chimney and the firingtechnical calibratin fllws. 21 SERVICE INSTRUCTIONS VERSION 1. GB

22 SHUTTING DOWN FOR A LONGER TIME In this case, the fllwing is t be dne: Turn ff the mde f peratin switch f the biler. Turn ff the exterir separatr switch f the biler. Turn ff the gas tap. If there is danger f freezing, drain the water frm the heating and HWU systems. MAINTENANCE On the basis f standards and regulatins, the gas device requires regular maintenance and peridical check-ups. This increases the peratinal safety f the system, and thrugh the maintenance, it is secured that the device always perate with utmst efficiency, and thus the cnsumptin f gas is the lwest. Befre yu start maintenance: Turn ff the separatr main switch. Turn ff the tap f gas-cnnectin. 22 SERVICE INSTRUCTIONS VERSION 1. GB

23 REGULATION In the factry, the bilers are calibrated fr piped natural gas (G20), which is indicated n the bilers with a sign! The value set may diverge frm the value given by ±5%. The calibratin values can be fund in the table belw. These are needed because after a pssible repair it is necessary t carry ut calibratin; calibratin is als necessary if the gas type has t be switched. The gas-technical calibratin f the gas device and switching t anther type f gas can nly be carried ut by the members f a prfessinal service statin! The methd f switching t ther types f gas will be intrduced belw. GHISS 70 GHISS 90 GHISS 110 GHISS 125 GHISS 145 GHISS 160 GHISS 180 GHISS 200 G20 G25.1 G20 G25.1 G20 G25.1 G20 G25.1 G20 G25.1 G20 G25.1 G20 G25.1 G20 G25.1 Wbbe index [MJ/m3] Nminal pressure [mbar] Minimum pressure [mbar] Number f nzzles [db] Nzzle size Ø [mm] Nzzle pressure [mbar] Gas cnsumptin [m3/h] The data f the table have been prvided fr 15 C and 1013 mbar air pressure. The pressure f the nzzle can be checked in tw places. First, n the gas valve cntrl studs, but this can be used nly n devices with ne gas valve; the ther is the cntrl stud at the end f the nzzle hlder cllectr. The cnnectin pressure can be checked at the stud marked B n the gas valve. Cnnect the pressure gage n the measuring stud. Start up the biler in the manner intrduced abve. The regulatin f the gas burner: Lsening the screw f the measuring stud n the gas cllectr. Cnnecting the pressure gage r U-pipe manmeter. Turn n the gas device and set the temperature regulatr at maximum. Remve the clsing cap f the gas valve. 1, In the event f ne gas valve: Set the gas pressure t the value given in the table - based n 100% utput - when the display f the device indicates peratin with nrmal utput. Yu can carry ut the setting by turning the hexagnal (utside) screw f the gas valve. If yu turn it t the right (inside), the pressure f gas increases, if t the left, it decreases. Pull ff ne f the cnnectrs f the mdulatin cil f the gas valve, and set the pressure value belnging t the decreased utput. Yu can carry this ut by twisting the medium, grved-head screw. The value f this is determined by lcal features. Recmmended value: between 5 and 8 mbar. Attentin, the cnnectin leg pulled ff might be live, s it must nt be tuched as it may cause electric shck! After calibratin, place back the cnnectr. 2, In the event f tw gas valves: Open ne f the valves t the maximum (turn the hexagnal screw as far as it ges, then a quarter-turn back), then set the gas pressure n the secnd valve t the value specified - n the basis f 100% utput - when the display f the device indicates peratin with nrmal utput. Pull ff ne f the cnnectrs f the mdulatin cil f bth gas valves, and set the pressure value belnging t the decreased utput n the secnd (ancillary) valve. If, during the calibratin, yu cannt decrease the value f gas pressure sufficiently, calibratin is t be cmpleted n the first valve. The value f this is determined by lcal features. Recmmended value: between 5 and 8 mbar. Attentin, the cnnectin leg pulled ff might be live, s it must nt be tuched as it may cause electric shck! After calibratin, place back the cnnectr. 23 SERVICE INSTRUCTIONS VERSION 1. GB

24 Twist back the clsing screw f the gas valve. Turn ff the gas device, remve the gage and clse dwn the measuring stud f the gas cllectr. Turn n the gas device, after lighting up, check the cmpactness f gas alng the full gas line. SWITCHING TO OTHER TYPES OF GAS During prductin, the bilers were manufactured and calibrated fr natural gas type G20. Switching the device t anther type f gas and its gastechnical calibratin can nly be carried ut by the prfessinal service statin! Switching t anther type f gas, e.g. G30 (prpane) requires the fllwing steps: The replacement f nzzles Remve the dr f the biler Screw ut the nzzles frm the cllectr and in their place screw in the nzzles f the sizes in harmny with the gas type. Use the washers! Gas-technical regulatin After the replacement f the nzzle, carry ut the gas pressure calibratin f the nzzles in the manner described in the chapter entitled The calibratin f the gas burner. When calibrating the device fr anther gas type, the size f the nzzle and the value f gas pressure are t be the same as the values specified in the table intrduced abve! Check the cmpactness f the whle pipe system. Remve the Calibrated fr G20 sign psted under the gas cnnectin, and pst the label referring t the current gas type in its place. 24 SERVICE INSTRUCTIONS VERSION 1. GB

25 THE CLEANING OF THE BOILER The exterir husing f the biler can be cleaned with a sft, wet clth dampened with detergent. In case f stubbrn siling, remval can be executed with a clth dampened in the mixture f 50% denaturated alchl and water. It is frbidden t use paint r ther, aggressive thinners! Yu will have access t the inside parts after the remval f the dr and the lid. If the instrument bx is t be remved, it can be pulled ut in B directin (frward) after the snaps marked with A have been released. T remve the gas burner, release flare nut number 1, then, after the twisting ut f screws 2 f the burner tray, it can be lifted ut frward. The remved burners can be cleaned, and the inside surface f the cast heat exchanger becmes accessible. Check the cleanness f the surfaces f the heatexchanger and if yu can find settled st, clean it. If the layer f siling is t thick, use stremval chemicals that are cmmercially available. Lgically, assembly is the ppsite f the steps f disassembly. 25 SERVICE INSTRUCTIONS VERSION 1. GB

26 26 SERVICE INSTRUCTIONS VERSION 1. GB

GHISS 16, 24, 32, 40, 48, 56 R AP GHISS 16, 24, 32, 40, 48, 56 R AE GHISS 16, 24, 32, R AP PV GHISS 16, 24, 32, R AE PV GHISS 16, 24, 32, 40, B AP

GHISS 16, 24, 32, 40, 48, 56 R AP GHISS 16, 24, 32, 40, 48, 56 R AE GHISS 16, 24, 32, R AP PV GHISS 16, 24, 32, R AE PV GHISS 16, 24, 32, 40, B AP GHISS 16, 24, 32, 40, 48, 56 R AP GHISS 16, 24, 32, 40, 48, 56 R AE GHISS 16, 24, 32, R AP PV GHISS 16, 24, 32, R AE PV GHISS 16, 24, 32, 40, B AP GHISS 16, 24, 32, 40, B AE GHISS 16, 24, 32, B AP PV GHISS

More information

Instructions for use. turbomax pro 24 E 28/2 E

Instructions for use. turbomax pro 24 E 28/2 E nstructins fr use turbmax pr 4 E 8/ E GB Table f cntents; General infrmatin Table f cntents General infrmatin....................... Fr yur infrmatin........................... Key t symbls...............................

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins 2. Specificatins and main dimensins 3. Parts included 4. Cntrl bx 5. Installatin 6. Adjusting the strke length f the lift 7. Operatin mdes

More information

Gema s OptiColor System

Gema s OptiColor System Gema s OptiClr System The Gema OptiClr system is a simple, lw cst quick clr change slutin fr manual gun users that have multiple hppers set up t spray varius clrs. The OptiClr Manifld allws the user t

More information

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work Field Instructin 5.2 Ples Inspectin and Supprt Prir t Cmmencement f Wrk Purpse This instructin utlines the minimum inspectin and supprting requirements fr wrk n ples. Safety Befre cmmencement f wrk, a

More information

INSTRUCTIONS FOR USE. TURBOmax Plus 824/2 E, 828/2 E THERMOcompact 615/2 E, 620/2 E, 624/2 E, 628/2 E

INSTRUCTIONS FOR USE. TURBOmax Plus 824/2 E, 828/2 E THERMOcompact 615/2 E, 620/2 E, 624/2 E, 628/2 E NSTRUTONS FOR USE TURBOmax Plus 824/2 E, 828/2 E THERMOcmpact 65/2 E, 62/2 E, 624/2 E, 628/2 E The cde f practice fr the installatin, cmmissining & servicing f central heating systems TABLE OF ONTENTS

More information

Rev B Medivators Inc.

Rev B Medivators Inc. Site Requirements MEDIVATORS, RAPICIDE, and ADVANTAGE are registered trademarks f Medivatrs Inc. ADASPOR is a registered trademark f Medivatrs Inc. Windws is a registered trademark f Micrsft Crpratin.

More information

Nordson AP-300/600 Plasma Systems Operational Manual July 2017

Nordson AP-300/600 Plasma Systems Operational Manual July 2017 Nrdsn AP-300/600 Plasma Systems Operatinal Manual July 2017 User s Manual Page 1 A. 2.1 System Start-up T start the system first check the fllwing: 1. The pump in the back is turned n and running 2. Check

More information

VOLTMAX Design Specifications

VOLTMAX Design Specifications VOLTMAX Design Specificatins Revisin 0 May 2017 The VOLTMAX line f electric bilers was develped t efficiently supply hydrnic heating systems in cmmercial, institutinal and industrial applicatins. The biler

More information

Technical Documentation

Technical Documentation Quality f the future. Technical Dcumentatin Manual Black Bx Light Order-N.: 0255-004 Sparkasse Pfrzheim Calw (BLZ 666 500 85) Kt.-Nr. 791326 UniCredit Bank AG Karlsruhe (BLZ 660 202 86) Kt.-Nr. 15653957

More information

Lab rotation on vacuum techniques and thermal imaging

Lab rotation on vacuum techniques and thermal imaging Lab rtatin n vacuum techniques and thermal imaging Objectives Manually perate a high vacuum system thrugh pump dwn and vent rutines. Learn apprpriate vacuum system terminlgy rughing, backing, freline,

More information

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings

More information

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations: INSTALLATION AND MAINTENANCE MANUAL Explsin Prf Lw Prfile Linear LED Light EPL-24-50LED Series MODELS 2 & 4 Versins SUITABLE FOR WET LOCATIONS in the fllwing lcatins r unclassified lcatins: Fr Use In:

More information

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014 Dcument: Functinal Analysis Prject: Weather Balln Altitude Cntrl System Submitted t: Hngwei Ga Submitted by: Tim Basta, Trevr Clark, Sctt Miller Date: 9/15/2014 Intrductin The fllwing functinal specificatin

More information

Fume Hood User Guidelines

Fume Hood User Guidelines Fume Hd User Guidelines 1. Intrductin A fume hd cabinet is an enclsed wrking chamber fitted with an exhaust ventilatin system. The primary functin f the fume hd cabinet is t prtect individuals wrking with

More information

APCF1 Model Tripod.

APCF1 Model Tripod. APCF1 Mdel Tripd www.ravellipht.cm Prduct Overview The Ravelli APCF1 is a Prfessinal Quality Carbn Fiber Tripd prviding a slid base fr high-end phtgraphic equipment. This mdel is a mix f carbn fiber and

More information

Lab Pilot Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS

Lab Pilot Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS Lab Pilt Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS Befre yu start... 1. Autclave antifam and base slutin (in glass bttles) alng with three feeder tubing lines with hypdermic needles attached

More information

WORKSTATIONS mysite User Guide. mysite Workstation System User Guide

WORKSTATIONS mysite User Guide. mysite Workstation System User Guide Wrkstatin System Issue 1 Page 1 f 6 Sectin 1 INTRODUCTION 1.1 Intrductin Precisin s wrkstatin system ffers a fresh lk in design, functinality and perfrmance, prviding a cmplete slutin fr any ffice. Fixed

More information

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD. FORENSICS OPERATING MANUAL 1 2731 Bartram Rd Bristl, PA 19007 USA POSITIVE PRESSURE MANIFOLD POSITIVE PRESSURE MANIFOLD MANUAL POSITIVE PRESSURE EXTRACTION OPERATION INSTRION Thery f Operatin 2 The Psitive

More information

Brazed Plate Heat Exchanger Operating & Instruction Manual U K Exchangers Ltd Unit 55, Stilebrook Road Olney Buckinghamshire MK46 5EA

Brazed Plate Heat Exchanger Operating & Instruction Manual U K Exchangers Ltd Unit 55, Stilebrook Road Olney Buckinghamshire MK46 5EA Brazed Plate Heat Exchanger Operating & Instructin Manual U K Exchangers Ltd Unit 55, Stilebrk Rad Olney Buckinghamshire MK46 5EA Tel: (01234) 244320 Fax: (01234) 714978 Email: sales@ukeltd.cm Web: www.uk-exchangers.cm

More information

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare patient educatin prgram 4156 Suth 52 nd Street, Omaha, NE 68117 800-747-7334 402-734-6741 ChildrensOmaha.rg/HmeHealthcare We knw children CHILDREN S HOME HEALTHCARE LTV 1150 Ventilatr Instructins Yur child

More information

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field COLORS Object: Successfully run yur chice f ne f the tw ver-lapping mini-agility curses n the same field Scring: All bstacles must be perfrmed successfully t qualify unless within the faults allwed Levels

More information

PA-65-x Multi-Range Air Differential Pressure Transmitter

PA-65-x Multi-Range Air Differential Pressure Transmitter Date f Issue: 06/01/2015 Page 1 f 5 PA-65-x Multi-Range Air Differential Pressure Transmitter Features: Benefits: Field selectable multi-ranges Field selectable multi-utput Simple 5 step set-up LCD Display

More information

Content. Support Pack. Support Pack

Content. Support Pack. Support Pack Supprt Pack Supprt Pack Cntent Supprt Pack p4 High Flw Oxygen Therapy, Instructins fr use p4 AquaNASE, Fitting guide p CPAP, Instructins fr use p6 BPAP, Instructins fr use p7 V2TM Face Mask, Fitting guide

More information

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full BaseStatin 1000 Irrigatin Cntrller Keeping a Pnd r Cistern Full If yu have a pnd r a cistern that is fed frm an external water surce, yu can use a Baseline bisensr sil misture sensr with yur Baseline cntrller

More information

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE Are the emplyees r cntractrs wh wrk in yur facility expsed t cnfined space hazards? Have yu cnducted a thrugh assessment f yur facility

More information

Concept 305 P. Pre-installation Guide IMPORTANT!

Concept 305 P. Pre-installation Guide IMPORTANT! Pre-installatin Guide Cncept 305 P IMPORTANT! Please fllw the instructins in this guide when preparing the installatin site prir t arrival and installatin f the equipment December 8th, 2017 Editin AA,

More information

Technical Data Sheet EW1 Top coats

Technical Data Sheet EW1 Top coats Tp cats Descriptin Wanda PU 2K HS is a single layer Plyurethane tpcat which ffers gd pacity, high glss, quick dry and gd weather resistance. It is suitable fr repair r verall re-sprays. 4 Wanda PU 2K HS

More information

PULSAR ZERO Flow sensitive Unloader valve

PULSAR ZERO Flow sensitive Unloader valve Ultim aggirnament: 20/04/18 PULSAR ZERO Flw sensitive Unlader valve Technical manual: E 267 Pressure regulating valve unlader type with zer setting n delivery line: at gun clsure the water flw is bypassed

More information

RESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear.

RESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear. TED Training Emergency Dummy RESQ TRAINING INTERNATIONAL Rev 0 - July 2012 USER INSTRUCTIONS User Instructins fr TED Training Emergency Dummy by RESQ-Gear.cm USER INSTRUCTIONS TED Training Emergency Dummy

More information

Standard Operating Procedure

Standard Operating Procedure Standard Operating Prcedure Sectin 1 Lab Specific Infrmatin Cmpressed Gases Department: Cllege f Engineering Discvery Learning Labs Date SOP was written: 10/29/2018 Date SOP was apprved by PI/lab supervisr:

More information

How to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved

How to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved Hw t Install a Tilet By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t remve an existing tilet and install a new tilet. The steps described in these written instructins and

More information

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems General Industry Tlbx Talks Prviding Excellence in Regulatry Cmpliance Management Systems General Industry Tlbx Talks Table f Cntents Why Safety Meetings are Imprtant...- 3 - Guidelines fr Safety Training

More information

WA270 Water Broom Important Safety Instructions Assembly Operation Maintenance Service Information

WA270 Water Broom Important Safety Instructions Assembly Operation Maintenance Service Information WA270 Water Brm Imprtant Safety Instructins Assembly Operatin Maintenance Service Infrmatin IMPORTANT SAFETY INSTRUCTIONS IMPROPER OPERATION OR MAINTENANCE OF THIS PRODUCT COULD RESULT IN SERIOUS INJURY

More information

Technical Data Sheet DW1 Undercoats

Technical Data Sheet DW1 Undercoats Descriptin Wanda 8100 2K Primer ffers great filling and sanding prperties, excellent hld ut, fast dry, and gd adhesin n prperly prepared substrates. 4 Wanda 8100 2K Primer Wanda 2K Hardener Std 418.03093

More information

Installing the ACT D MAND KONTROLS Systems

Installing the ACT D MAND KONTROLS Systems Installing the ACT D MAND KONTROLS Systems Mdel C1-100-PF fr Standard Piping (Nn-recirculating) Pre-Fab Systems Installatins shall be in accrdance with the manufacturer s instructins per the requirements

More information

EDS Instruction Manual

EDS Instruction Manual EDS Instructin Manual The EDS Ultra series: "...an ultra-lightweight, quick-change, and reliable drink system, frm a quality engineering cmpany... Audi Sprt's Allan McNish Prgressive Mtrsprt Ltd Unit 10a

More information

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013 Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees

More information

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents Installatin Manual fr VersaScreen Pr and VersaScreen IceBlaster Gutter Prtectin Prducts Table f Cntents VersaScreen/VersaScreen Pr Installatin p. 2-4 VersaScreen IceBlaster p. 5-7 IceBlaster RE p. 5-6

More information

Large Diameter TECTITE Installation and Specifications Manual

Large Diameter TECTITE Installation and Specifications Manual Large Diameter TECTITE Installatin and Specificatins Manual TECTITE fittings are a heat free methd fr jining Cpper, CPVC and PEX tube. TECTITE prvides a clean and easy jining methd designed t save time

More information

URGENT MEDICAL DEVICE RECALL : /29/ C Z

URGENT MEDICAL DEVICE RECALL : /29/ C Z Custmer Cde Number: ##### Custmer Address City, State, Zip Cuntry Attentin: Risk Management Attentin: Reference: URGENT MEDICAL DEVICE RECALL March 09, 2012 Risk Management, Operating Rm Directr, Operating

More information

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work. Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs

More information

243 Service Regulators

243 Service Regulators Regulatr Installatin and Maintenance Instructins Service Regulatrs RM-06- Rev. Intrductin The is a large capacity general-purpse gas pressure regulatr. Its utstanding perfrmance and versatility make it

More information

Complex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy

Complex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy Cmplex Care Hub Manual: High Flw Nasal Prng (HFNP) Oxygen Therapy Table f Cntents 1. What is High Flw Therapy?... 2 2. Humidificatin... 2 2.1 What is humidificatin?... 2 2.2 Mechanical humidificatin...

More information

Plain Language Summary

Plain Language Summary Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same

More information

Come Back to Ground! 1. Introduction

Come Back to Ground! 1. Introduction Cme Back t Grund! 1. Intrductin Many ships, particularly small tugs and supply bats have used a neutral grunded distributin system fr 120 vlt single phase htel and dmestic lads. This system is identical

More information

Biochrom Libra S50, S60, S70 & S80. UV Visible Spectrophotometers Health & Safety Manual

Biochrom Libra S50, S60, S70 & S80. UV Visible Spectrophotometers Health & Safety Manual Bichrm Libra S50, S60, S70 & S80 UV Visible Spectrphtmeters Health & Safety Manual DECLARATION OF CONFORMITY This is t certify that the fllwing Bichrm manufactured prducts cnfrm t the requirements f the

More information

SMALL SIDED FOOTBALL 2012

SMALL SIDED FOOTBALL 2012 Blacktwn Districts Sccer Ftball Assciatin Incrprated. SMALL SIDED FOOTBALL 2012 GUIDELINES FOR CLUB ADMINISTRATORS, SSF CO-ORDINATORS COACH S & REFEREES Nn Cmpetitive & Small Sided Ftball Frmats & Rules

More information

Down and Out Mount Assembly & Installation Directions

Down and Out Mount Assembly & Installation Directions Dwn and Out Munt Assembly & Installatin Directins Munting the Dwn and Out Munt crrectly takes a lt f thught and a lt f planning. Please read the directins thrughly and plan ut hw the munt wuld be installed

More information

Sponge-Jet Continuous VAC- Recovery System User Manual

Sponge-Jet Continuous VAC- Recovery System User Manual Spnge-Jet Spnge Blasting System Spnge-Jet Cntinuus VAC- Recvery System User Manual Mdel CVR-P110 Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801 1-603-610-7950

More information

Owners Manual. Sunshine Solar Evacuated Tube Water Heating System. Specialists in high performance Solar Water Heaters

Owners Manual. Sunshine Solar Evacuated Tube Water Heating System. Specialists in high performance Solar Water Heaters Owners Manual Sunshine Slar Evacuated Tube Water Heating System Specialists in high perfrmance Slar Water Heaters Cngratulatins n chsing a Sunshine Slar water heater. Our water heaters are AS/NZ 2712:2007

More information

Hot Work Policy and Procedures

Hot Work Policy and Procedures 1.0 Plicy Statement The University f New Haven has develped a ht wrk plicy and prcedure in accrdance with Occupatinal Health and Safety Administratin (OSHA) regulatins. 1.1 Purpse The University f New

More information

Table of Contents. I. General Instructions. Task Information. Operator Qualification Checklist. Railroad Commission/Employer Record

Table of Contents. I. General Instructions. Task Information. Operator Qualification Checklist. Railroad Commission/Employer Record LP-Gas Student Qualifying Field Activities Installatin & Maintenance f Prpane Appliances in Recreatinal Vehicles Table f Cntents I. General Instructins II. Task Infrmatin III. Operatr Qualificatin Checklist

More information

175 knm Torque Tool and Calibration Unit

175 knm Torque Tool and Calibration Unit Client Lg: Tag N Pages 1 f 9 Prject Title Lcatin 175 knm Trque Tl and Calibratin Unit Depr P N NA 01 31.05.2012 Issued fr infrmatin T.L R.Ø. K.N Rev. N. Date Reasn fr Revisin Prepared Checked Apprved Vendr

More information

Hydraulic accumulator cut-off and protection unit type B20

Hydraulic accumulator cut-off and protection unit type B20 Hydraulic accumulatr cut-ff and prtectin unit type B20 NS20 up t 36 a D SHEE - OERION NUL WK 491 810 07.2016 LICION Hydraulic accumulatr prtectin and cut-ff unit is used fr cnnecting hydraulic accumulatr

More information

Process Safety Management Program for Contractors

Process Safety Management Program for Contractors Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f

More information

LIGHTING & POWER UNIT TYPE LPU57

LIGHTING & POWER UNIT TYPE LPU57 Title LIGHTING & POWER UNIT TYPE LPU57 USER MANUAL Dcument Number 40-374-12 Issue 03 03 DFCOM1 Added 2017.05.11 MC MC PC 02 Address and Lg Update 2017.03.23 CW CW PC 01 Original issue 2014.02.20 PC PC

More information

Urinalysis Collection Odyssey House of Utah

Urinalysis Collection Odyssey House of Utah Urinalysis Cllectin Odyssey Huse f Utah This guide will teach yu the fllwing: Prper Urinalysis Cllectin Techniques Maintaining the cllectin site Yur respnsibilities as a trained UA Tech Hw t prperly label

More information

Confined Space Entry

Confined Space Entry Cnfined Space Entry What is a Cnfined Space? A space that: Is large enugh and s cnfigured that an emplyee can enter bdily and perfrm wrk; Has limited r restricted means f entry r exit; Is nt designed fr

More information

MECHANICS & TECHNIQUES 3PO

MECHANICS & TECHNIQUES 3PO MECHANICS & TECHNIQUES 3PO FIBA Main Cmpetitins Summer 2014 2 This material includes mre practical apprach and detailed techniques fr sme key situatins n the curt and it is based n FIBA Referees Manual

More information

2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016

2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016 2016 AWWA/WEA Spring Cnference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016 Gal Discuss in detail the art f actuatrs retrfits fr the Water/Wastewater market

More information

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand.

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand. 6.9 Undergrund Cables Purpse This instructin utlines the safe apprach distances (SADs) that must be maintained and the wrking requirements fr undergrund cables. Scpe This instructin utlining the safe apprach

More information

Autoclear Superior Pack

Autoclear Superior Pack Descriptin A 2 Pack versin f Autclear Superir 250, designed fr use ver Autwave. Cnsisting f tw clearcats and ne dedicated hardener. cvers all sizes f repairs, under all applicatin cnditins, cmbined with

More information

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls

More information

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature Fire Chief Signature Date Effective: 01apr13 Revised: Page: 1 f 5 Purpse: T establish standards fr GFD peratins when facilitatings ice r water rescue incidents,including safety cnsideratins, respnsibility,

More information

Europak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number )

Europak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number ) Eurpak ExeFlexx Variable Speed Bster Sets WRAS Apprved Prduct (Apprval Number 1312078) Upt 6 pumps n a single package as standard, custm build sets available Upt 480 m³/hr as standard Main Benefits: Delivered

More information

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures

More information

Lohstr Hemer / Postfach Hemer Telefon: Fax: DEUTSCHLAND. Operating Manual.

Lohstr Hemer / Postfach Hemer Telefon: Fax: DEUTSCHLAND. Operating Manual. Lhstr. 13-58675 Hemer / Pstfach 4063-58663 Hemer Telefn: +49 2372 9274-0 Fax: +49 2372 3304 DEUTSCHLAND Operating Manual Sausage Warmer art.-n. 00-00326 + 00-00327 www.neumaerker.de 1. General Infrmatin

More information

ISOPA MDI / TDI BULK DISCHARGE & STORAGE ASSESSMENT Version February 2014

ISOPA MDI / TDI BULK DISCHARGE & STORAGE ASSESSMENT Version February 2014 Versin February 2014 The infrmatin cntained in this ISOPA MDI / TDI Bulk Discharge and Strage Assessment is believed t be accurate. ISOPA disclaims any liability in cnnectin with the use f this infrmatin

More information

Cleaning & Maintenance Advice Ordinary Glass Clear, Toned and Super Toned.

Cleaning & Maintenance Advice Ordinary Glass Clear, Toned and Super Toned. Cleaning & Maintenance Advice Ordinary Glass Clear, Tned and Super Tned. Viridian VFlat Viridian VLam Viridian IntruderGuard Viridian AssaultGuard Viridian VTugh Viridian VLam Hush Viridian LuminaClud

More information

OPERATIONS CHALLENGE 2017

OPERATIONS CHALLENGE 2017 OPERATIONS CHALLENGE 2017 COLLECTION SYSTEM EVENT During the event, yur team will cmplete the fllwing: The event simulates cnnecting a 4-inch PVC lateral sewer t an existing 8-inch PVC sewer pipe while

More information

IMPORTANT SAFETY INFORMATION

IMPORTANT SAFETY INFORMATION Installatin Instructin English UNPACKING INSTRUCTIONS! Carefully pen the cartn, remve cntents and lay ut n cardbard r ther prtective surface t avid damage.! Check package cntents against the Supplied Parts

More information

Autoclear Superior 250

Autoclear Superior 250 Nrth America Technical Data Sheet S1.05.22 Descriptin A tw cmpnent VOC cmpliant clearcat, designed fr use ver Autwave. Cnsisting f ne clearcat, ne dedicated hardener and three reducers, designed fr ptimum

More information

Sponge-Jet Feed Unit User Manual

Sponge-Jet Feed Unit User Manual Spnge-Jet Spnge Blasting System Spnge-Jet Feed Unit User Manual Mdels: 100-HP 100-HP-CE 100-HP-J 200-HP 200-HP-CE Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801

More information

B-Home Round 25 B-Essential Round 50

B-Home Round 25 B-Essential Round 50 Cde PELLET BURNERS B-Hme Rund 25 B-Essential Rund 50 Cde EBM0002-07/2016 - R2 INSTRUCTIONS FOR USE, INSTALLATION AND MAINTENANCE EN Befre installing and using the burner, read this manual carefully and

More information

Recreational Sports Racquetball Rules

Recreational Sports Racquetball Rules Recreatinal Sprts Racquetball Rules Mdificatins have been made t suit BYU-Idah Recreatinal Sprts prgrams. Rule 1: Players Racquetball is an individual sprt, as such each team shall cnsist f ne (1) player.

More information

PROSPECT UNITED SOCCER CLUB Summer Soccer - RULES OF THE GAME

PROSPECT UNITED SOCCER CLUB Summer Soccer - RULES OF THE GAME PROSPECT UNITED SOCCER CLUB Summer Sccer - RULES OF THE GAME The nrmal FIFA rules f ftball will apply except in the fllwing situatins: The Pitch The pitch shall be rectangular in shape. The length f the

More information

Winthrop University - Safety in the Chemistry Laboratory

Winthrop University - Safety in the Chemistry Laboratory Winthrp University - Safety in the Chemistry Labratry The Department f Chemistry, Physics, and Gelgy at Winthrp University makes every effrt t prvide a safe learning envirnment fr the chemistry student.

More information

Safety Folder Quick Start Guide

Safety Folder Quick Start Guide Safety Flder Quick Start Guide Intrductin Hw Hw Where t Safety Management Systems t get started the system will help yu cmply with the law and hw t get help Safety Flder Intrductin t Safety Management

More information

Policy and Procedures

Policy and Procedures Plicy and Prcedures Yur farming system can be imprved thrugh clear plicies and prcedures. Clear plicies and prcedures will structure yur farming enterprise t enable the farm t perate withut the key persn.

More information

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS IGC Dc 182/13/E EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax: +32 2 219 85 14 E-mail: inf@eiga.eu

More information

Division of Training

Division of Training Suthwest United Fire Districts Divisin f Training Minimum s Skills s Minimum s NFPA 1500 calls fr the establishment f an annual prficiency evaluatin fr all members f the department. These prficiencies

More information

GLASS LEVEL GAUGES with reflex or transparent glasses INSTALLATION & OPERATION MANUAL

GLASS LEVEL GAUGES with reflex or transparent glasses INSTALLATION & OPERATION MANUAL GLASS LEVEL GAUGES with reflex r transparent glasses INSTALLATION & OPERATION MANUAL 2/9 1 PARTICULARS AND PURPOSE OF INSTRUCTIONS The instructins in this manual are intended t illustrate and explain the

More information

Guidelines for Handling of Nuclear Gauges

Guidelines for Handling of Nuclear Gauges Manitba STANDARD PROCEDURE INSTRUCTION Title Guidelines fr Handling f Nuclear Gauges Department Supersedes SPI Dated SPI 34-36 Effective Date Safety Health and Envirnment April 15, 2009 May 12, 2011 Guidelines

More information

YKC FLYBALL QUALIFIER REGULATIONS

YKC FLYBALL QUALIFIER REGULATIONS FLYBALL REGULATIONS YKC FLYBALL QUALIFIER REGULATIONS DEFINITION The YKC hsts ne Flyball cmpetitin final at Crufts. T qualify fr this final, teams must cmpete in YKC Flyball classes held at appinted licensed

More information

Crusader Senior Girls Summer Workout Program:

Crusader Senior Girls Summer Workout Program: Crusader Senir Girls Summer Wrkut Prgram: #1 Ball Handling: It desn t matter whether yu are a pint guard, pwer frward, center, r shting guard yu must have excellent ball handling skills. Develping gd ball

More information

Job Description: School Chef

Job Description: School Chef Jb Descriptin: Schl Chef Jb Title: Chef Grade/Pay Scale: 16,969 Reprts t: Hurs: Schl Business Manager Basic number f hurs will be 30 hurs per week. The hurs f duty will be 8.00am 2.00pm Mnday t Friday,

More information

AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL

AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL Sectin 2.6.2 (Reg.) AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL Camden Cunty Schl System is cmmitted t reducing death and disability frm cardivascular disease and strke by imprving the chain f survival

More information

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020. Nrth Halifax Grammar Schl First Aid Plicy Apprved by: Principal Date apprved: Nvember 2017 Next review: Autumn Term 2020 Plicy wner: Schl Welfare Officer Created April 2014 General The Academy is required

More information

The CP-M+ range. High Efficiency Gas Fired Condensing Boilers Installation, Commissioning & Maintenance Instructions. Models:

The CP-M+ range. High Efficiency Gas Fired Condensing Boilers Installation, Commissioning & Maintenance Instructions. Models: The CP-M+ range High Efficiency Gas Fired Cndensing Bilers Installatin, Cmmissining & Maintenance Instructins Mdels: CP-M+60 CP-M+80 CP-M+100 CP-M+120 CP-M+150 CP-M+180 INS0034 Issue N 5 Nvember 2013 1

More information

Exposure Control Plan

Exposure Control Plan Expsure Cntrl Plan Expsure t Hydrgen Sulphide (H 2 S) during Manure Handling Operatins Emplyer Cmpany Infrmatin Name Address Cntact infrmatin (names and phne numbers) Purpse We have a duty t prtect ur

More information

II 2G CT3. GLASS LEVEL GAUGES with reflex or transparent glasses ATEX - Directive 94/9/EC INSTALLATION & OPERATION MANUAL

II 2G CT3. GLASS LEVEL GAUGES with reflex or transparent glasses ATEX - Directive 94/9/EC INSTALLATION & OPERATION MANUAL II 2G CT3 GLASS LEVEL GAUGES with reflex r transparent glasses ATEX - Directive 94/9/EC INSTALLATION & OPERATION MANUAL 2/10 1 PARTICULARS AND PURPOSE OF INSTRUCTIONS The instructins in this manual are

More information

Users Requirements Statement

Users Requirements Statement Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin

More information

Eastern Kentucky University and Chemical Stockpile Emergency Preparedness Program

Eastern Kentucky University and Chemical Stockpile Emergency Preparedness Program Buildings and Cllective Prtectin Systems (CPS) and Chemical Stckpile Emergency Preparedness Prgram Madisn Cunty is divided int znes, s that prtective actin recmmendatins and decisins can be made in the

More information

Glide into Spring Beyond the Basics Figure Skating Club of Southern Maryland (FSCSM) Saturday, May 20, 2017

Glide into Spring Beyond the Basics Figure Skating Club of Southern Maryland (FSCSM) Saturday, May 20, 2017 Glide int Spring Beynd the Basics Figure Skating Club f Suthern Maryland (FSCSM) Saturday, May 20, 2017 The Glide Int Spring Beynd the Basics cmpetitin will be cnducted in accrdance with the rules and

More information

Pressure reducing valve. Type UZRB6

Pressure reducing valve. Type UZRB6 Pressure reducing valve type UZRB6 NS 6 up t21 MPa up t 30 DATA SHEET - OPERA RATION MANUA NUAL dm 3/min WK 424 770 03.2015 APPLICATION Pressure reducing valve fr subplate munting type UZRB6 is used t

More information

Warranty & Service Information Proprietary Notice: Limited Warranty: Service Support:

Warranty & Service Information Proprietary Notice: Limited Warranty: Service Support: Operatins Manual PHI Management Inc. PO Bx 369 Prt Richey Flrida 34654 (813) 507-4429 Warranty & Service Infrmatin Prprietary Ntice: Infrmatin cntained in this dcument is cpyrighted by PHI MGMT, and may

More information

Description: Model Number: Robinhood Canopy RHCVI9G

Description: Model Number: Robinhood Canopy RHCVI9G Descriptin: Mdel Number: Rbinhd Canpy RHCVI9G Overview Pre-Installatin Thank yu fr purchasing a quality Rbinhd rangehd. Rbinhd has a high standard f quality cntrl and every rangehd is tested and apprved

More information

Winthrop University - Safety in the Chemistry Laboratory

Winthrop University - Safety in the Chemistry Laboratory Winthrp University - Safety in the Chemistry Labratry The Department f Chemistry, Physics, and Gelgy at Winthrp University makes every effrt t prvide a safe learning envirnment fr the chemistry student.

More information

HYDROGEN SULFIDE (H2S)

HYDROGEN SULFIDE (H2S) Hustn Cntrls, Inc Dc N: Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 6 Purpse The purpse f this prgram is t establish minimum requirements fr site specific safety, which

More information