1 JEO POJECT # INDEX OF SHEETS: \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:52 PM. AINSWOTH OLD HWY 7 HWY 7/HWY 2 VICINITY MAP N.T.S. POJECT LOCATION HWY 183 SHEET NO: SHEET NAME: C.1 COVE SHEET & VICINITY MAP C.2 S C.3 LOCATION MAP C.4 CONTOL C.5 GENEAL NOTES & QUANTITIES C.6 SITE ACCESS & STAGING PLAN C1. SITE PLAN C1.1 POPOSED SITE PLAN PP PLAN AND POFILE - ACCESS OAD PP2.1 PLAN AND POFILE - SD14 D1. STANDAD DETAILS NOTE: NEITHE THE OWNE (CLIENT) NO JEO CONSULTING GOUP, INC. ASSUMES ANY ESPONSIBILITY FO UTILITY LOCATIONS BEING ACCUATELY SHOWN O NOT SHOWN ON THE PLANS. A EQUEST FO UTILITY LOCATES WAS MADE FO THIS LOCATION AS PE THE ONE-CALL NOTIFICATION SYSTEM ACT. (: OC TICKET NO.: TICKET NO ). UTILITIES SHOWN AE FOM FIELD MAKINGS POVIDED IN THE FIELD BY THE UTILITY POVIDES. THE EXACT LOCATION AND/O SIZE OF UNDEGOUND FEATUES MAY NOT BE ACCUATELY, COMPLETELY AND ELIABLY DEPICTED. FIELD VEIFICATION OF UTILITIES MAY BE EQUIED. CONTACTO(S) SHALL NOTIFY THE ESPECTIVE UTILITY COMPANIES BEFOE COMMENCING ANY WOK. : 2//218 S _SD-14.dwg 7 PECENT EVIEW COVE SHEET & VICINITY MAP C //218 7% INI 7% Date

2 LINESTYLES UTILITIES VEGETATION PAVEMENT S AND HATCH HATCH \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:52 PM. BEAK LINE CABLE TELEVISION CENTELINE OF OAD CONTOU MINO (EX) CONTOU MAJO (EX) CONTOU MINO (EX SCEENED) CONTOU MAJO (EX SCEENED) CONTOU MINO (P) CONTOU MAJO (P) LIMITS OF CULVET ELECTIC (OVEHEAD) ELECTIC (UNDEGOUND) FENCE (WOODEN) FENCE (WIE O UNKNOWN) FENCE (CHAINLINK) FENCE (SECUITY) FIBE OPTIC LINE FLOWLINE (BEAKLINE) GAS LINE GUADAIL POPETY BOUNDAY POPETY LOT LINES (P) IGHT-OF-WAY LINE AILOAD IGHT-OF-WAY AILOAD TACKS ETAINING WALL SANITAY SEWE (EXIST) SANITAY SEWE (POP) SAN SEWE FOCE MAIN (EX) SAN SEWE FOCE MAIN (P) STOM SEWE (EXIST) STOM SEWE (POP) TELEPHONE LINE (UGND) TELEPHONE LINE (OVEHEAD) TEACE COPLINE TAVELED WAY WATE (EXIST) WATE (POP) FIE SEVICE SWPPP SILT FENCE INLET POTECTION STAW WATTLE CHECK STAW BALE CHECK FLOW AOW (PLAN) AEA INLET FILTE POTECTION IP AP SEEDING MATTING PAVING FEATUES PAVEMENT JOINT TANSVESE JOINT LONGITUDINAL JOINT EXPANSION/KEYED JOINT PAVEMENT MAKING PAVEMENT EBA HANDICAP TV LOC OHE UGE FO G '' SAN OW 8'' SAN 8'' FM 6'' FM (OFFSET TO PIPE SIZE) 12" ST (OFFSET TO PIPE SIZE) UGT OT 6'' W 6'' W 6'' F OW 12"ST SF STOM SEWE WATE SEPTIC TANK POWE POLE () POWE POLE (POPOSED) POWE (ELEC) PEDESTAL POWE (ELEC) PULL BOX O MANHOLE POWE (ELEC) METE TELEVISION PEDESTAL FIE HYDANT () FIE HYDANT (POPOSED) FIE HYDANT IN POFILE WATE FITTINGS CUB INLET GATE INLET CATCH BASIN STOM SEWE MANHOLE SANITAY CLEANOUT SANITAY MANHOLE POWE, ELECTICAL, LIGHT, AND TAFFIC GUY WIE ANCHO ELECTICAL HIGHLINE TOWE (METAL O CONCETE) GAS TELEPHONE AI CONDITIONING UNIT ANTENNA ANCHO POLE/POST GUY POLE LIGHT POLE TAFFIC SIGNAL TAFFIC SIGNAL BOX TELEVISION MANHOLE WATE MANHOLE WATE VALVE WATE SHUT OFF O CUB STOP WELL WATE METE WATE METE PIT YAD HYDANT WATE ELEVATION WATE TOWE 11-1/4 22-1/ COSS PLUG EDUCE TEE GAS METE GAS MANHOLE GAS FILL PIPE GAS PUMP GAS VALVE GAS VENT FIBE OPTICS PULL BOX TELEPHONE POLE TELEPHONE PULL BOX O MANHOLE TELEPHONE PEDESTAL MANHOLE (NON-SPECIFIC) UNDEGND STOAGE TANK VALVE (NON-SPECIFIC) BUSH CONIFEOUS TEE DECIDUOUS TEE MASH/WETLAND TEE MASS LINE TEE STUMP SITE & SIGNAGE SIGN BAICADE OAD SIGNS MISC FEATUES CENTE PIVOT CEMETEY GAVE CHUCH CAVE CISTEN LATINE OIL WELL GUAD POST COUNTY OAD INTESTATE HIGHWAY MILE MAKE POST STATE HIGHWAY IGHT OF WAY MAKE U.S. HIGHWAY AILOAD COSSING SIGNAL AILOAD SWITCH FLAG POLE MAILBOX POPANE TANK SATELLITE TV DISH WINDMILL CONTOL & ELEVATION TEMPOAY POINT TEST BOING POINT ELEVATION () POINT ELEVATION (POPOSED) GID TICK BENCHMAK CONTOL POINT (NON-POPETY) MONUMENT FOUND (POPETY) MONUMENT SET.. TC 1. TC ASPHALT PAVEMENT (EX.) CONCETE PAVEMENT (EX.) GAVEL (EX.) BICK PAVEMENT (EX.) ASPHALT PAVEMENT (P.) CONCETE PAVEMENT (P.) GAVEL (P.) BICK PAVEMENT (P.) GENEAL ACHITECTUAL MATEIALS UNDISTUBED EATH EATH GANULA FILL CONCETE BICK SAND MOTA, PLASTE DATUM POINT EFEENCED DEMOLITION NOTE EFEENCED PHOTOGAPH TAG OOM NAME & NO. DOO NO. WINDOW NO. WALL TYPE PLAN EVISION NOTH AOW ACHITECTUAL S COLUMN LINE COLUMN EFEENCE GID LINES EQUIPMENT O FIXTUE A B CONCETE BLOCK METAL OFFICE X WOOD, FINISH WOOD, FAMING PLYWOOD TA WOOD, FAMING INTEUPTED MEMBE EFEENCED NOTE ELEVATION BUILDING SECTION WALL SECTION DETAIL ENLAGED DETAIL EVISION INTEIO ELEVATION(S) LVL - GLU-LAM INSULATION, BATT INSULATION, IGID 1 A11 GYPSUM BOAD (DBL LINE OMITTED AT SMALL SCALE) GLASS - ELEVATION 1 A11 1 A11 X XX-X 4 XXX'-XX" 3 1 A11 1 A11 1 A : 2//218 S _SD-14.dwg 7 PECENT EVIEW S SHEET C //218 7% INI 7% Date

3 JEO_SUVEY_IMPOT-216 JEO SUVEY STYLES AND LAYES JEO DESC KEY SET AND FIGUE STYLES ALIGNMENT - (8) APPOXIMATE POJECT LOCATION ACCESS OAD TO POJECT LOCATION 883D D \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:53 PM. 428TH AVE LOCATION MAP 429TH AVE 882ND D MEADVILLE D / OLD HIGHWAY 7 432ND AVE 433D AVE : 2//218 S _SD-14.dwg 7 PECENT EVIEW C //218 7% INI 7% Date

4 HOIZONTAL AND VETICAL SUVEY CONTOL - NAD 1983 AND NAVD 1988 POINT NAME NOTHING EASTING ELEVATION LONG DESCIPTION CP SET 5/8" X 24" EBA 5'± EAST OF WEST END, SOUTH SIDE CP SET 5/8" X 24" EBA 2'± WEST OF EAST END, SOUTH SIDE CP SET 5/8" X 24" EBA 6'± WEST OF EAST END, NOTH SIDE KEY KEY KEY KEY CP KEY KEY KEY-4-6 KEY-9 KEY-1 CP 13 KEY-1 CP 11 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:55 PM. OCK KEYWAY POINT # NOTHING EASTING KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY-5 KEY-6 IPAP LIMITS POINT # NOTHING EASTING : 2//218 S _SD-14.dwg 7 PECENT EVIEW CONTOL SHEET C //218 7% INI 7% Date

5 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:56 PM. BASE BID EATHWOK /EOSION CONTOL S 1 EATHWOK CY 1 2 HYDOSEEDING AND MULCHING AC 5 3 IPAP TON : 2// //218 S _SD-14.dwg 7 PECENT EVIEW 7% INI 7% Date C.5 GENEAL NOTES & QUANTITIES

6 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:56 PM POPOSED STAGING AEA CENTELINE OF ACCESS OAD D AVE : 2// //218 S _SD-14.dwg 7 PECENT EVIEW 7% INI 7% Date C.6 SITE ACCESS & STAGING PLAN

7 GATE EDGE OF WATE APPOXIMATE CHANNEL CENTELINE, TYP SITE PLAN \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:56 PM. 3 TEES AND BUSHES (DO NOT DISTUB) : 2//218 4 EMOVE AND EPLACE BABED WIE FENCE AS NECESSAY //218 S _SD-14.dwg 7 PECENT EVIEW C1. 7% INI 7% Date

8 OCK IPAP WEI BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET POPOSED LIMIT OF GADING BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET B APPOXIMATE CHANNEL CENTELINE POPOSED LIMIT OF GADING POPOSED LIMIT OF GADING A 113+ EDGE OF WATE, TYP A 19+ B POPOSED SITE PLAN 16+ EDGE OF WATE, TYP. BELOW SECTION E-E SHEET POPOSED LIMIT OF GADING BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET OCK IPAP OCK IPAP WEI BELOW SECTION E-E SHEET ---: 2//218 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:57 PM. BELOW SECTION E-E SHEET POPOSED LIMIT OF GADING //218 S _SD-14.dwg POPOSED LIMIT OF GADING BELOW SECTION E-E SHEET 7 PECENT EVIEW C1.1 7% INI 7% Date

9 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:57 PM. POPOSED POPOSED : 25 5 HOIZ.= 5 1 VET.= STA. 2//218 EVISION EVISION EVIEW BY EVIEW APPOX. ACCESS OAD PLAN AND POFILE 2// S _SD-14.dwg PP1.1 MATCH LINE STA. 1+5 MATCH LINE STA. 1+5

10 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:58 PM. POPOSED POPOSED : 25 5 HOIZ.= 25 5 VET.= STA. 2//218 EVISION EVISION EVIEW BY EVIEW ACCESS OAD PLAN AND POFILE 2// S _SD-14.dwg PP1.2 MATCH LINE STA. 1+5 APPOXIMATE MATCH LINE STA. + MATCH LINE STA. 1+5 MATCH LINE STA. +

11 IN HL 4 4 MA TC POPOSED STAGING AEA ES T 2 A : 2// CP & BM HOIZ.= VET.= MATCH LINE STA APPOXIMATE EVISION EVISION EVIEW BY EVIEW 2// S _SD-14.dwg ACCESS OAD PLAN AND POFILE 37+ POPOSED POPOSED 55 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 1:59 PM FLOWLINE STA. PP1.3

12 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 2:1 PM. POPOSED POPOSED HOIZ.= VET.= STA : OCK IFFLE #1 OCK KEY 3 14' WIDENED CEST FO LANDOWNE COSSING OCK IFFLE #2 PE-DUG SCOU HOLE 2//218 EVISION EVISION EVIEW BY EVIEW OCK IFFLE # PLAN AND POFILE - SD14 2// S _SD-14.dwg PP2.1

13 B D1. SCOPE: 1. PLACE OCK IPAP WEI AT 2:1 SLOPE. 2. ADD OCK IPAP 8' UP ON BANKS. 14.3' 96' 6' 58' TOP OF WEI POPOSED, TYP. GOUND, TYP EX. FLOWLINE FLOW 2:1 SLOPE 2:1 SLOPE 3' FLOW EX. FLOWLINE OCK IPAP WEI (3' THICK MIN.) 5' B D1. 3:1 POPOSED WEI LONGITUDINAL SECTION A-A SCALE: N.T.S. GOUND, TYP. 3:1 PE-DIG SCOU HOLE OCK IPAP, TYP. 2:1 8' 2:1 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 2:3 PM. 3' MIN. COMPACTED BACKFILL, TYP. 1' CHANNEL WIDTH (O MATCH WIDTH) WEI COSS SECTION B-B SCALE: N.T.S. 6' 6' 2' MIN. OCK IPAP, TYP. IPAP KEYWAY SECTION C-C SCALE: N.T.S. : 2//218 S _SD-14.dwg 7 PECENT EVIEW STANDAD DETAILS D //218 7% INI 7% Date

14 \\Maui\Projects\Engineering\ Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S _SD-14.dwg, on 2//218 2:3 PM. SECTION B-B SCALE: N.T.S. 4' 2' 6' 1' A B C C C B 2' 2' 12' 27.5' 3:1 TYP. 4' 1' 3' 4' 4:1 TYP. FLOW FLOW 2:1 TYP. FLOW TYPE C OCK IPAP, TYP. 24" CMP 5% SLOPE. 3:1 TYP. POPOSED, TYP. TYPE C OCK IPAP 4.5' 3' 2' POPOSED CHANNEL BOTTOM FLOW, TYP. 2:1 TYP. 2' 1' A SECTION A-A SCALE: N.T.S. C 6' : 2// //218 S _SD-14.dwg 7 PECENT EVIEW 7% INI 7% Date STANDAD DETAILS

CITY OF ANN ARBOR ENGINEERING RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT. ITB No. 4555, FILE No WARREN STEIN BARTON

CITY OF ANN ARBOR ENGINEERING RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT. ITB No. 4555, FILE No WARREN STEIN BARTON APLE - - CAPENTE DWS FOUNDED 1824 NOTES Know what's below. ABO ENGINEEING I CH INCOPOATED 1851 I GAN IVEVIEW DIVE SANITAY SEWE AND WATE AIN EXTENSION POJECT Sheet List Table Sheet Number 1 COVE Sheet Title

More information

OUTDOOR FOOTBALL FIELD

OUTDOOR FOOTBALL FIELD www integalspo com USING AREAS: Mini football fields, pivate buildings, pivate schools and pivate entepeunes. SYSTEM DESCRIPTION: Composite steel constuction with synthetic tuf floo, oof and sides coveed

More information

CITY OF STURGIS ST. JOSEPH COUNTY, MICHIGAN WEST SOUTH STREET IMPROVEMENTS FEBRUARY 2017 VICINITY MAP WEST SOUTH STREET IMPROVEMENTS CITY OF STUGIS

CITY OF STURGIS ST. JOSEPH COUNTY, MICHIGAN WEST SOUTH STREET IMPROVEMENTS FEBRUARY 2017 VICINITY MAP WEST SOUTH STREET IMPROVEMENTS CITY OF STUGIS ST. JOSEPH COUNTY, MICHIGAN ST. JOSEPH COUNTY VICINITY MAP Know what's below. Callbefore you dig. CITY OF STUGIS INDEX OF DAWINGS DESCIPTION COVE SHEET TYPICA COSS SECTIONS, NOTES, & DETAIS PAN & POFIES

More information

JCRD-521: URBAN COUNTY ROADWAY SPECIFICATIONS

JCRD-521: URBAN COUNTY ROADWAY SPECIFICATIONS UBAN COUNTY STEET STANDADS AND SPECIFICATIONS Local Street Industrial Local Industrial Collector Minor Collector Major Collector Minor Arterial Major Arterial Typical ADT (Average Daily Traffic) 0-2,000

More information

AIRPLANE PAVEMENT MARKINGS

AIRPLANE PAVEMENT MARKINGS AIPLANE PAVEMENT MAKINGS 2 LANE OADWAY TAFFIC LANE GAVEL SHOULDES 4' SHLD 10-1 2 LANE OADWAY PAVED SHOULDES DESIGNE'S NOTE: SUVEYED PAY FO AIPLANE MAKE AS 2 LINE. SUVEYED 4 LANE OADWAY (UNDIVIDED) GAVEL

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

THORNCREEK COMMONS CONCEPTUAL SITE PLAN

THORNCREEK COMMONS CONCEPTUAL SITE PLAN THONCEEK COMMONS CONCEPTUAL SITE PLAN CITY OF WESTMINSTE CITY OF THONTON E 136TH AVE. POJECT LOCATION NOTH BIG DY CEEK THONCEEK GOLF COUSE WASHINGTON ST VICINITY MAP LAND USE TABLE LOT/TACT AEA (S.F.)

More information

D07-RW-VAR(B) PID

D07-RW-VAR(B) PID D7-RW-VAR(B) PID 43 ODOT popoe to acquie ight-of-way at two exiting culvet ytem located in Auglaize and Mece Countie. The poject i neceay to bing the exiting culvet ytem fully into the public ight-of-way

More information

Community Development Department

Community Development Department CITY OF CAMPBELL Community Development Department September, 06 NOTICE OF PUBLIC HEAING Notice is hereby given that the Planning Commission of the City of Campbell has set the time of 7:0 p.m., or shortly

More information

DETAIL "A" (INSIDE OF ENCLOSURE)

DETAIL A (INSIDE OF ENCLOSURE) ENCOSUE SEE DETAI "A" AUTOMATIC BOW-OFF VAVE WITH COSS CONNECTION CONTO ASSEMBY (DUA CHECK) #57 BEDDING OCK 4" DEEP (UP TO GADE) 6" WIDE AOUND ENCOSUE 2" TAPPING SADDE W/ 2" COP STOP AND VAVE BOX METE

More information

RAILROAD CROSSING AT TWO LANE ROADWAY

RAILROAD CROSSING AT TWO LANE ROADWAY 24" WHITE STOP LINE PEPENDICULA TO OADWAY CENTELINE AND APPOXIMATELY 15 FEET FOM NEAEST AIL MEASUED ALONG OADWAY CENTELINE O EDGE OF PAVEMENT WHICHEVE IS THE SHOTE DISTANCE AILOAD GADE COSSING DEVICE 15

More information

f i r e - p a r t s. c o m

f i r e - p a r t s. c o m A M E R I C A N F L A M E A F AF-1000 Seies Manual Gas Contol Valve APPLICATION The AF-1000 Manual Gas Contol Valve is designed fo use in gas in heath poducts, wall mount funaces, and space heating appliances.

More information

FALL PROTECTION PROGRAM

FALL PROTECTION PROGRAM FALL PROTECTION PROGRAM 13255 South St. Ceitos, CA 90703 Telephone 562-924-3364 Fax 562-924-0521 Table of Contents Fall Potection... 3 Fall Potection Is Requied... 3 Fall Potection Types... 3 Standad Guadails,

More information

KEY PLAN SITE WORK KEY NOTES SCOPE OF WORK EXISTING KFC STORE: E KFC/TACO BELL. SITE PLAN Scale: NTS PROJECT SUMMARY PROJECT GENERAL NOTES

KEY PLAN SITE WORK KEY NOTES SCOPE OF WORK EXISTING KFC STORE: E KFC/TACO BELL. SITE PLAN Scale: NTS PROJECT SUMMARY PROJECT GENERAL NOTES SCOPE OF WOK KEY PLAN INTEIO ENOVATION: DINING AEA / ESTOOM Square Feet NOT IN SCOPE: KITCHEN / BOH 0 Square Feet VICINITY MAP TYP EXISTING KFC STOE: E00 TYP KFC/TACO BELL SITE PLAN SITE WOK KEY NOTES

More information

MOT-Jefferson Street Reconstruction PID

MOT-Jefferson Street Reconstruction PID MOT-Jeffeon Steet Recontuction PID 1317 The City of Dayton popoe to impove Jeffeon Steet fom Eat Second Steet to Eat Fouth Steet conitent with it Livable Steet Policy Thi egment of Jeffeon Steet i one-way

More information

College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. CUF Walnut Hills.

College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. CUF Walnut Hills. 3.2 QUEENSGATE CONNECTIONS Hatwell College Hill Cathage Roselawn Winton Hills Kennedy Heights Mount Aiy Mill Ceek Bond Hill Pleasant Ridge Nothside Sping Gove Village Paddock Hills Roll Hill South Cumminsville

More information

10 Torque. Lab. What You Need To Know: Physics 211 Lab

10 Torque. Lab. What You Need To Know: Physics 211 Lab b Lab 10 Toque What You Need To Know: F (a) F F Angula Systems Evey lab up to this point has dealt with objects moving in the linea system. In othe wods, objects moving in a staight line. Now we ae going

More information

AGENDA REPORT. side of Walden Woods Dr., south of E. Park Rd. and north of E. Alexander St., in

AGENDA REPORT. side of Walden Woods Dr., south of E. Park Rd. and north of E. Alexander St., in F PLgNT AGENDA REPORT FLORID' DATE: Mach 28, 2016 TO: FROM: SUBJECT: City Commission Michael He, City Manage A public heaing egading the eplat of the Walden Woods Subdivision ceating a 116- lot single-

More information

MOT-Stillwater Bikeway Bridge PID 99981

MOT-Stillwater Bikeway Bridge PID 99981 MOT-Stillwate Bikeway Bidge The City of Englewood in coodination with Five Rive MetoPak popoe to povide a multi-ue tail connection between the eat and wet ide of Englewood MetoPak which i divided by the

More information

SHEET INDEX L-01 L-02 L-03 L L L-15 L-16

SHEET INDEX L-01 L-02 L-03 L L L-15 L-16 VICINITY MAP Tower oad S. H. 0 Colfax Avenue Sand I - 0 Buckley Air National Guard Base Picadilly oad East th Avenue Creek Proposed th Avenue Alignment Existing th Avenue/ SH 0 Alignment Murphy Creek E

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS 001-099 100-199 200-299 Stormwater 300-399 400-499 500-599 600-699 700-799 800-899 Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

Operator and Parts Manual

Operator and Parts Manual 5100 Model No.: 609139 609140 Pac Operator and Parts Manual TENNANT COMPANY Commercial Products 12875 ANSOM STEET HOLLAND MI 49424 U.S.A. FAX: 1 800 678 4240 CUSTOME SEVICE: 1 800-982-7658 609372 ev. 01

More information

Accel. (m/s 2 ) Time (sec) Newton s 3 rd Law and Circular Motion. Group Problem 04

Accel. (m/s 2 ) Time (sec) Newton s 3 rd Law and Circular Motion. Group Problem 04 1) A 200 kg tuck acceleates eastwads on a hoizontal oad in esponse to a gadually inceasing fictional foce fom the gound. Thee is an unsecued 50 kg block sitting on the tuck bed line. Thee is fiction between

More information

RESOLUTION No A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF

RESOLUTION No A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF li RESOLUTION No. 2749 A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF SALISBURY, MARYLAND AND WICOMICO COUNTY, MARYLAND FOR THE DELIVERY

More information

Project Proposal: Characterization of Tree Crown Attributes with High Resolution Fixed-Base Aerial Photography. by Rich Grotefendt and Rob Harrison

Project Proposal: Characterization of Tree Crown Attributes with High Resolution Fixed-Base Aerial Photography. by Rich Grotefendt and Rob Harrison Poject Poposal: Chaacteization of Tee Cown Attibutes with High Resolution Fixed-Base Aeial Photogaphy by Rich Gotefendt and Rob Haison Funding Acknowledgments of Past Wok Pesented Alaska Depatment of Natual

More information

SR-714 (Monterey Road) Martin County, Florida

SR-714 (Monterey Road) Martin County, Florida S-714 (Monterey oad) Martin County, Florida Financial Project ID:228861-1-21-01 Work Program Item No. (Old):4116331 Federal Project ID:FL62-033 Grade Separation Feasibility at Dixie Highway and FEC ailroad

More information

Data Sheet. Linear bearings

Data Sheet. Linear bearings Data Pack G Issued Septembe 1999 1502325042 Data Sheet Linea beaings Instument ball beaings and shafts The RS ange of instument quality ball bushing beaings ae fo 1 8in, 3 16in and 1 4in shafts. Each beaing

More information

Morrison Drive tel. Ottawa, ON, Canada K2H 8S fax. com

Morrison Drive tel. Ottawa, ON, Canada K2H 8S fax.   com acomaecom 302 1150 Moison Dive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom. com To Pat Seguin, P. Eng. Manage of Engineeing Page 1 CC Subject Valeie McGi, Ted Achuticz Pine Steet

More information

THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER

More information

PlacesForBikes City Ratings Methodology. Overall City Rating

PlacesForBikes City Ratings Methodology. Overall City Rating 1 PlacesFoBikes City Ratings Methodology Oveall City Rating The PlacesFoBikes City Rating Scoe is based on five factos: Rideship, Safety, Netwok, Acceleation, and Reach. Each facto is scoed on a one to

More information

Experiment #10 Bio-Physics Pre-lab Questions

Experiment #10 Bio-Physics Pre-lab Questions Expeient #10 Bio-Physics Pe-lab Questions ** Disclaie: This pe-lab is not to be copied, in whole o in pat, unless a pope efeence is ade as to the souce. (It is stongly ecoended that you use this docuent

More information

Fire-Safety Analysis Timber. FRILO Software GmbH As of 29/06/2016

Fire-Safety Analysis Timber. FRILO Software GmbH  As of 29/06/2016 Fie-Safety nalysis Timbe FRILO Softwae GmbH www.filo.com info@filo.com s of 29/06/2016 Fie-Safety nalysis Timbe Fie-Safety nalysis Timbe This documentation efes to the fie safety veifications used in

More information

"A Home for Gracious Living" (real estate brochure for Batten House)

A Home for Gracious Living (real estate brochure for Batten House) Byn Maw College Scholaship, Reseach, and Ceative Wok at Byn Maw College Achitectue, Gounds, and Histoy Facilities 1959 "A Home fo Gacious Living" (eal estate bochue fo Batten House) Let us know how access

More information

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court 46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND

More information

Overview. ALDER STREET CORRIDOR REVIEW Open House March 12, City of Campbell River BACKGROUND STUDY AREA

Overview. ALDER STREET CORRIDOR REVIEW Open House March 12, City of Campbell River BACKGROUND STUDY AREA City of Campbell Rive Oveview 1 ACKGROUND The City of Campbell Rive is eviewing oppotunities to impove Ale Steet to bette balance vehicles, paking, peestians, cyclists, an public tansit. The oveall objective

More information

UNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I

UNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I UNCUBED INTESECTIONS MINIMUM PAVED APON Paved shoulder Paved as per plans APPOACH TEATMENT DETAIL I EX adius Gravel oad Hinge Line EX adius Hinge Line 25' Taper (7.5m) 2' (0.6m) MIN Width 25' Taper (7.5m)

More information

MSC Guidelines for Independent Fuel Tanks

MSC Guidelines for Independent Fuel Tanks References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division

More information

PARK HILL HIGH SCHOOL TURF FIELD IMPROVEMENTS

PARK HILL HIGH SCHOOL TURF FIELD IMPROVEMENTS PK HILL HIGH SCHOOL TUF FIELD IMPOVEMENTS 8150 N CONGESS VENUE, KNSS CITY, MO 64152 7701 NW BY OD PK HILL HIGH SCHOOL I ON NG L E TUF FIELD IMPOVEMENTS OVELL SITE PLN FE IN P O O SS MI S S EE TE I U ST

More information

RELATED RATE WORD PROBLEMS

RELATED RATE WORD PROBLEMS Mat RELATED RATE WORD PROBLEMS Sock. A stone town into a pon pouces a cicula ipple tat epans fom te point of impact. If te aius of te ipple inceases at a ate of.5 ft/sec ow fast is te aea gowing wen te

More information

Lesson 33: Horizontal & Vertical Circular Problems

Lesson 33: Horizontal & Vertical Circular Problems Lesson 33: Hoizontal & Vetical Cicula Poblems Thee ae a wide vaiety of questions that you do if you apply you knowledge of cicula motion coectly. The tough pat is figuing out how to set them up. You need

More information

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent

More information

Culvert Safety Inspection Report

Culvert Safety Inspection Report Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc

More information

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828 WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828 CONSTRUCTION UPDATE #17 October 9 th, 2018 Hi Everyone! This is our seventeenth update to the community regarding the Western Placerville Interchanges

More information

0ur Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011

0ur Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011 0u Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011 SUBJECT: PROCUREMENT OF CALIBRATION SERVICES FOR THE EQUIPMENTS IN Cental Laboatoy (Mechanical) Dea Sis, Technical & Commecial s ae invited fo the

More information

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE

More information

CORESTA RECOMMENDED METHOD N 68

CORESTA RECOMMENDED METHOD N 68 COESTA ECOMMENDED METHOD N 68 DETEMINATION OF CABON MONOXIDE IN THE MAINSTEAM SMOKE OF CIGAS BY NON-DISPESIVE INFAED ANALYSIS (Januay 2010) 1. FIELD OF APPLICATION The method is applicable to the gas phase

More information

MODELLING THE INTERACTION EFFECTS OF THE HIGH-SPEED TRAIN TRACK BRIDGE SYSTEM USING ADINA

MODELLING THE INTERACTION EFFECTS OF THE HIGH-SPEED TRAIN TRACK BRIDGE SYSTEM USING ADINA MODELLING THE INTERACTION EFFECTS OF THE HIGH-SPEED TRAIN TRACK BRIDGE SYSTEM USING ADINA ABSTRACT Constança Rigueio Depatment of Civil Engineeing, Polytechnic Institute of Castelo Banco Potugal Calos

More information

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District

More information

College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. Walnut Hills.

College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. Walnut Hills. 3.3 MILL CREEK CORRIDOR CONNECTION Hatwell College Hill Cathage Roselawn Winton Hills Kennedy Heights Mount Aiy Mill Ceek Bond Hill Pleasant Ridge Nothside Sping Gove Village Paddock Hills Roll Hill South

More information

CARDBOARD BOAT BUILDING 101

CARDBOARD BOAT BUILDING 101 CARDBOARD BOAT BUILDING 101 by United Way of Elkhat County What floats you Cadboad boat... United Way Kick Off August 28, 2015 CONSTRUCTION RULES The ENTIRE boat must be built of cadboad, duct tape, and

More information

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO. CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23

More information

Interior Rule of the Quebec Open 2017

Interior Rule of the Quebec Open 2017 Inteio Rule of the Quebec Open 2017 Aticle 1. The Oganize The Oganize is the club d'échecs de Sainte-Foy which will be epesented by M Chales Tenblay, chaiman of the oganizing committee Le tounoi se déoulea

More information

Operating Instructions Compressors

Operating Instructions Compressors MAXIMATOR HIGH PRESSURE TECHNOLOGY HYDRAULICS PNEUMATICS TESTING EQUIPMENT Opeating Instuctions Compessos issue 08.2007 MAXIMATOR GmbH Walkeniede Staße 15 D-37449 Zoge Gemany Telefon 0 55 86 / 803-0 Telefax

More information

Installation and Operation Instructions

Installation and Operation Instructions Smoke and Heat Ventilation Pneumatic - Electonic Contol Systems Installation and Opeation Instuctions Vesion / SHEVS Contol Cente RWZ c K + G Pneumatik GmbH In de Kause 8 9 Eschweile Deutschland / Gemany

More information

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016 EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE I. CONTRACTOR MOBILIZATION Golf Course Master Plan Implementation Date: December 1, 2016 Includes the contractor mobilizing on-site with equipment, materials

More information

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council GRANT COUNTY WASHINGTON TIB NO.: 3-E-164(003)-1 CITY OFFICIALS Kathleen Allstot Bruce Reim Mayor William Coe Stephanie Knitter Valli Millard Matthew Moore Tony Mora, Jr. City Council Mark Wanke Leslie

More information

Bicycle and Pedestrian Master Plan

Bicycle and Pedestrian Master Plan Falmouth, Maine Bicycle and Pedestian Maste Plan Januay, 2003 Pepaed by The Falmouth Tails Advisoy Committee Tom Williams, Chai Daeby Amble Elizabeth Ehenfeld John Locke William Lund William Robinson Robet

More information

DUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS

DUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS DUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS Fo desciption of zone boundaies see: 68C-22.027 F.A.C fo State Manatee Potection Zones last amended 1/30/2007 68D-24.016

More information

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology Appendix F Technical Report on Cost Estimation Methodology This page is intentionally left blank. Technical Report on Cost Estimation Methodology The total costs of the projects in the Non-motorized Transportation

More information

8. Tracking, Marking and Locating. 8. Tracking, Marking & Locating your FTTx Network

8. Tracking, Marking and Locating. 8. Tracking, Marking & Locating your FTTx Network 8. Tracking, Marking & Locating your FTTx Network Single Family Units Outside Plant: Aerial Fibre Pedestal Outside Plant: Buried Fibre 3M Telecommunications provides you with solutions to distribute your

More information

CITY OF RICHMOND, VIRGINIA BIKE LANE

CITY OF RICHMOND, VIRGINIA BIKE LANE CITY OF RICHMOND, VIRGINIA DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION BIKE LANE VHB PROJECT NO. 9. INDEX OF SHEETS JAMES RIVER Title SITE Lic. CITY OF RICHMOND NAVTEQ AND Microst Corporati

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

P r o j e c t T e a m

P r o j e c t T e a m P r o j e c t T e a m Owner: Designer: Contractor: Mechanical: Electrical: GR Residential Design Gustavo Rojas 3024 Huff Av. #32 San Jose, Ca. 9528 T.B.D. N/A N/A PROJECT DATA VICINITY MAP SCOPE OF WORK

More information

Northside School Class I Bike Path, Cool, CA Application Attachments

Northside School Class I Bike Path, Cool, CA Application Attachments PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area

More information

ELECTRICAL INSTALLATION CERTIFICATE [BS 7671:2008 as amended] Details of of the the Installation. For Design. For Construction

ELECTRICAL INSTALLATION CERTIFICATE [BS 7671:2008 as amended] Details of of the the Installation. For Design. For Construction ELECTRICL INSTLLTION CERTIFICTE [BS 7671:008 as amended] Details of of the the Client Clien Client/ Details of of the the Installation : Extent of the stallation coveed by this cetificate The stallation

More information

Experiment #10 Bio-Physics Pre-lab Comments, Thoughts and Suggestions

Experiment #10 Bio-Physics Pre-lab Comments, Thoughts and Suggestions Expeient #10 Bio-Physics Pe-lab Coents, Thoughts and Suggestions The pupose of this pape is to povide you with soe infoation which ay be useful fo solving the pe-lab questions and pefoing the lab. I will

More information

British Prime Minister Benjamin Disraeli once remarked that

British Prime Minister Benjamin Disraeli once remarked that GABREL COSTA, MCHAEL HUBER, & OHN SACCOMAN Cumulative Home Run Fequency and the Recent Home Run Explosion Bitish Pime Ministe Benjamin Disaeli once emaked that thee ae thee kinds of falsehoods: lies, damned

More information

Phase Behavior Introduction to Phase Behavior F.E. Londono M.S. Thesis (2001)

Phase Behavior Introduction to Phase Behavior F.E. Londono M.S. Thesis (2001) Natual Gas Engineeing Phase Behavio Intoduction to Phase Behavio F.E. Londono M.S. hesis (001).. Blasingame, exas &M U. Depatment of Petoleum Engineeing exas &M Univesity College Station, X 77843-3116

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes 2011 Edition Page 249 Section 2F.01 Scope CHAPTER 2F. TOLL ROAD SIGNS 01 Toll highways are typically limited-access freeway or expressway facilities. A portion of or an entire route might be a toll highway,

More information

The Dockline AUGUST Board of Directors. Greetings from the Commodore. Jim Manlick

The Dockline AUGUST Board of Directors. Greetings from the Commodore. Jim Manlick The Dockline 2018 Boad of Diectos COMMODORE - Jim Manlick jmanlick@new..com 655-1460 VICE COMMODORE - Gay Kuschel gaene@hotmail.com 619-0906 REAR COMMODORE - Jim Thompson jimtsmu@icloud.com 621-2946 FLEET

More information

A Force Platform Free Gait Analysis

A Force Platform Free Gait Analysis Poceedings A Foce Platfom Fee Gait Analysis Tokio Maeda 1,2, *, Tatsuo Ishizuka 3, Sakua Yamaji 4 and Yuji Ohgi 3 1 Keio Reseach Institute at SFC, 5322 Endo, Fujisawa, Kanagawa 252-0882, Japan 2 Koseki

More information

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures Sep/16 R-2 No Drawing Jan/17 R-2A Typical Cross Sections for Granular

More information

OBSOLETE DESIGN DATA. Foam 301a. February 9, 1998

OBSOLETE DESIGN DATA. Foam 301a. February 9, 1998 February 9, 1998 Foam 301a A BLADDE TANK WITH HYDAULICALLY ACTUATED DELUGE CONCENTATE CONTOL VALVE 1. DESCIPTION A Preaction Bladder Tank Foam/Water System is a standard preaction system capable of discharging

More information

LOADS OF SEWER MANHOLES WITHIN MINING AREA

LOADS OF SEWER MANHOLES WITHIN MINING AREA Jounal of Sustainable Mining e-issn 23-396 p-issn 23-364 JOURNAL HOMEPAGE jsm.gig.eu The online vesion of the Jounal of Sustainable Mining is the pimay, efeence vesion of the jounal Zięba M. (24). Loads

More information

PUBLIC NOTICE (11-137)

PUBLIC NOTICE (11-137) Commander Eleventh District U.S. Coast Guard Island Building 50-2 Alameda, CA 94501-5100 Staff Symbol: dpw Phone: (510) 437-3515 Fax: (510) 437-5836 February 13, 2012 PUBLIC NOTICE (11-137) All interested

More information

The Properties of. Model Rocket Body Tube Transitions

The Properties of. Model Rocket Body Tube Transitions The Popeties of Moel ocket Boy Tube Tansitions Date: Septembe 6, 000 Pepae By: J.. Bohm NA 7808 CA S680 ev: (June, 005) .0 Intouction When esigning moel ockets, esignes often choose to incopoate iffeent

More information

Multi-Robot Forest Coverage

Multi-Robot Forest Coverage Multi-Robot Foest Coveage Xiaoming Zheng Sonal Jain Sven Koenig David Kempe Depatment of Compute Science Univesity of Southen Califonia Los Angeles, CA 90089-0781, USA {xiaominz, sonaljai, skoenig, dkempe}@usc.edu

More information

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS 4901 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if 1 Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) 477-5050, even if there is no apparent damage. Call 911 if gas is blowing

More information

DIRECTIONAL DRILLING SAFE WORK PRACTICE

DIRECTIONAL DRILLING SAFE WORK PRACTICE NORSEMAN SAFE WORK RACTICES DIRECTIONAL DRILLING SAFE WORK RACTICE UROSE The purpose of this practice is to promote compliance with both government and company guidelines regarding directional drilling

More information

The Study About Stopping Distance of Vehicles

The Study About Stopping Distance of Vehicles Intenational Jounal of Infomation Engineeing and Applications 018; 1(1): 18- http://www.aascit.og/jounal/infomation The Study About Stopping Distance of Vehicles Zhao Chun-xue School of Mathematics and

More information

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM VWP CONSTRUCTION INSPECTION REPORT Inspection Date: August 22, 2016 VWP Permit No. 15-1268 SPGP RO Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM Impacts: PFO PEM PSS POW

More information

Dual Fuel Supplemental Manual Models: FBD

Dual Fuel Supplemental Manual Models: FBD FBD-SUP ev C Dual Fuel Supplemental Manual Models: FBD. -.0 ANING his manual must only be used by a qualified heating installer / service technician. ead all instructions, including this manual along with

More information

the Susquehanna River. Today, PFBC protects and conserves aquatic species throughout Pennsylvania.

the Susquehanna River. Today, PFBC protects and conserves aquatic species throughout Pennsylvania. Winte 2019 Wate Flows Though Pennsylvania Wate is all aound you. It is in the gound unde you feet. It flows by you in ceeks. Wate is in the sky, inside of tees and coming out of a gaden hose. When it ains,

More information

Torque. Physics 2. Prepared by Vince Zaccone For Campus Learning Assistance Services at UCSB

Torque. Physics 2. Prepared by Vince Zaccone For Campus Learning Assistance Services at UCSB Toque Physics Toque Toque is what causes angula acceleation (just like a foce causes linea acceleation) Toque Toque is what causes angula acceleation (just like a foce causes linea acceleation) Fo a toque

More information

THE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhart County

THE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhart County THE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhat County WHEN: Fiday August 26 2016 WHERE: LaSalle Bistol Pond Elkhat INTRODUCTION The Geat Cadboad Boat Race is

More information

A. Existing Conditions

A. Existing Conditions A. Existing Conditions A 2002 conditions assessment was conducted fo the City fo use as a basis of compaison fo futue tanspotation system plan development. This chapte summaizes existing taffic and tanspotation

More information

High Axial Load Capacity, High speed, Long life. Spherical Roller Bearings

High Axial Load Capacity, High speed, Long life. Spherical Roller Bearings High Axial Load Capacity, High speed, Long life Spheical Rolle eaings Spheical Rolle eaings High axial esistance load pefomance Intenal specifications have been optimized to geatly impove axial esistance

More information

Bubble clustering and trapping in large vortices. Part 1: Triggered bubbly jets investigated by phase-averaging

Bubble clustering and trapping in large vortices. Part 1: Triggered bubbly jets investigated by phase-averaging Intenational Jounal of Multiphase Flow 33 (2007) 1088 1110 www.elsevie.com/locate/ijmulflow Bubble clusteing and tapping in lage votices. Pat 1: Tiggeed bubbly jets investigated by phase-aveaging Rade

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

Design Engineering Challenge: The Big Dig Contest Platter Strategies: Ball Liberation

Design Engineering Challenge: The Big Dig Contest Platter Strategies: Ball Liberation Poblem Set 4: Unifom Cicula Motion Design Engineeing Challenge: The Big Dig.007 Contest Platte Stategies: Ball Libeation Oeall Notes: You ae not equied to pefom the actual analysis in this poblem set,

More information

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK CURB EXPANSION JOINTS (TYP) BOULEVARD 5 t /4 TOOLED EDGES EXPANSION JOINTS (TYP) CONTRACTION JOINTS (TYP) 2 m (TYP) BOULEVARD CURB EXPANSION JOINTS (TYP) EVERY 6 m PLAN TYPICAL CONTRACTION JOINT CURB 12

More information

Performance Characteristics of Parabolic Trough Solar Collector System for Hot Water Generation

Performance Characteristics of Parabolic Trough Solar Collector System for Hot Water Generation Intenational Enegy Jounal: Vol. 7, No. 2, June 2006 137 Pefomance Chaacteistics of Paabolic Tough Sola Collecto System fo Hot Wate Geneation www.sed.ait.ac.th/eic A. Valan Aasu and T. Sonakuma Faculty

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information