CITY OF STURGIS ST. JOSEPH COUNTY, MICHIGAN WEST SOUTH STREET IMPROVEMENTS FEBRUARY 2017 VICINITY MAP WEST SOUTH STREET IMPROVEMENTS CITY OF STUGIS
|
|
- Joshua Alexander
- 5 years ago
- Views:
Transcription
1 ST. JOSEPH COUNTY, MICHIGAN ST. JOSEPH COUNTY VICINITY MAP Know what's below. Callbefore you dig. CITY OF STUGIS INDEX OF DAWINGS DESCIPTION COVE SHEET TYPICA COSS SECTIONS, NOTES, & DETAIS PAN & POFIES INTESECTION DETAIS DETAIS DETAIS TAFFIC CONTO PAN PEMANENT SIGNING & PAVEMENT MAKING PAN SHEET NO. C C2-C4 D D2 D D4 D5 POJECT OCATION P.O.B. STA 0+90 P.O.E. STA TAFFIC DATA POSTED SPEED 0 MPH DESIGN SPEED 5 MPH PESENT ADT () 4,47 -.6% COMM FUTUE ADT (207) 9, % COMM (ESTIMATED) POPOSED CONSTUCTION AEA POPOSED DETOU N OCATION MAP F&V POJECT NO. davidd ADDENDUM SET /2/
2 /W EX 66'.O.W. VAIES ' - 6' /W EXISTING FEATUES CONSTUCTION NOTES SOI EOSION CONTO MEASUES TO POTECT SOPES AND DITCHES, SEED / MUCH SHA BE PACED AS SOON AS POSSIBE AND AS DIECTED BY THE ENGINEE. TEMPOAY SOI EOSION AND SEDIMENTATION CONTO MEASUES SHA BE UTIIZED DUING CONSTUCTION AS DIECTED BY ENGINEE. PAN EEVATIONS EEVATIONS SHOWN IN THESE PANS AE BASED ON USGS DATUM NAV88. /W /W /W TIE, EPOXY ANCHOED ('-7" SPACING IN EX CONC CUB AND GUTTE) EXISTING TYPICA COSS SECTION - WEST SOUTH STEET STA 0+90 (P.O.B.) TO STA (P.O.E.) EX 66'.O.W. 6' SOID WHITE PAVEMENT MAKING 0' VAIES 0' POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA 0+90 (P.O.B.) TO STA +27 EX 66'.O.W. DOUBE YEOW PAVEMENT MAKING ' DOUBE YEOW PAVEMENT MAKING EX 66'.O.W. AGGEGATE BASE, 8 inch, 22A POP WM CONC PAVT, NONEINF, 7 inch 6' STA +27 TO STA 2+76 VAIES '-6' STA 2+76 TO STA +52 SOID WHITE PAVEMENT MAKING 0' VAIES 0' TIE (TYP) INCUDED IN PAY ITEM CONC PAVT, NONEINF, 7 inch POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA +27 TO STA +52 DOUBE YEOW PAVEMENT MAKING AGGEGATE BASE, 5 inch, 22A CONC PAVT, NONEINF, 7 inch POP WM TIE, EPOXY ANCHOED ('-7" SPACING IN EX CONC CUB AND GUTTE) /W /W /W CONSTUCTION SEQUENCE INSTA & MAINTAIN SESC CONTO MEASUES CONSTUCTION SAFETY AND SECUITY CONSTUCT OADS CEAN STOM WATE MANAGEMENT FACIITIES FINISH GADING/SEEDING INSPECT FO PEMANENT MEASUES FUNCTIONING EMOVE TEMPOAY MEASUES SOI EOSION / SEDIMENTATION CONTO OPEATION TIME SCHEDUE FEB MA AP MAY NOTE: A ITEMS ISTED ON THE MAY NOT BE PESENT ON DAWING. YEA JUN JU AUG SEP OCT NOV DEC UNDEGOUND UTIITIES FO POTECTION OF UNDEGOUND UTIITIES, THE CONTACTO SHA DIA O 8 A MINIMUM OF THEE WOKING DAYS EXCUDING SATUDAYS, SUNDAYS & HOIDAYS PIO TO EXCAVATING IN THE VICINITY OF UTIITY INES. A "MISS DIG" PATICIPATING MEMBES WI THUS BE OUTINEY NOTIFIED. THIS DOES NOT EIEVE THE CONTACTO OF THE ESPONSIBIITY OF NOTIFYING THE UTIITY OWNES WHO MAY NOT BE PAT OF THE "MISS DIG" AET SYSTEM. ADJUSTING MONUMENT BOXES IT IS THE INTENT THAT A GOVENMENT CONES ON THIS POJECT BE PESEVED AND THAT, WHEE NECESSAY, MONUMENT BOXES BE PACED O ADJUSTED, WHETHE SHOWN O NOT. ADJUSTMENT OF CATCH BASINS IT IS THE CONTACTO'S ESPONSIBIITY TO PACE THE OCATION AND EEVATION OF A CATCH BASIN CASTINGS POPEY AIGNED WITH THE POPOSED CUB. ADJUSTMENT OF CASTINGS ON NEW STUCTUES IS INCUDED IN PAYMENT FO THE DAINAGE STUCTUE COVE SPECIFIED. ADJUSTMENT OF CASTINGS ON EXISTING STUCTUES WI BE PAID AS D STUCTUE COVE, ADJ, CASE. THESE ITEMS INCUDE A BOCK O GADE INGS NECESSAY FO POPE ADJUSTMENT. SAVAGE THE CITY ESEVES THE IGHT TO SAVAGE A EXISTING MATEIAS (CASTINGS, HYDANTS, SIGNS, ETC). MATEIAS DESIED TO BE SAVAGED SHA BE STOCKPIED ON SITE FO CITY PICKUP. PUBIC UTIITIES THE EXISTING UTIITIES ISTED BEOW AND SHOWN ON THESE PANS EPESENT THE BEST INFOMATION AVAIABE. THIS INFOMATION DOES NOT EIEVE THE CONTACTO OF THE ESPONSIBIITY TO SATISFY HIMSEF AS TO THEI ACCUACY O OF HIS ESPONSIBIITY IN CASE UTIITIES HAVE BEEN CONSTUCTED O EMOVED. GAS CABE TV TEEPHONE AAON AWENCE SEWE & WATE BAY COX 70 SAUK IVE DIVE CODWATE, MI N. NOTTAWA STEET STUGIS, MI 4909 AJawrence@michigangasutilities.com JEFFY AKE CHATE CABEVISION 476 COMMECIA AVENUE POTAGE, MI JEEMY MCCOD FONTIE 60 N US THEE IVES, MI THE CONTACTO SHA EXPOSE AND VEIFY OCATION AND DEPTH OF EXISTING UNDEGOUND UTIITIES PIO TO CONSTUCTION OF NEW UTIITY. CONFICTS IN GADES SHA BE EPOTED TO ENGINEE AND ADJUSTMENTS SHA BE MADE AT NO ADDITIONA COST TO OWNE. THE OWNES OF EXISTING SEVICE FACIITIES THAT AE WITHIN THE GADING O STUCTUE IMITS WI MOVE THEM TO OCATIONS DESIGNATED BY THE ENGINEE O WI EMOVE THEM ENTIEY FOM THE OAD IGHT-OF-WAY. OWNES OF PUBIC UTIITIES WI NOT BE EQUIED TO MOVE ADDITIONA POES O STUCTUES IN ODE TO FACIITATE THE OPEATION OF CONSTUCTION EQUIPMENT UNESS IT IS DETEMINED BY THE ENGINEE THAT SUCH POES O STUCTUES CONSTITUTE A HAZAD TO THE PUBIC O AE EXTAODINAIY DANGEOUS TO THE CONTACTO'S OPEATIONS. CUB DIMENSIONS A CUB DIMENSIONS SHA BE FOM BACK OF CUB UNESS OTHEWISE INDICATED. AWN SPINKE SYSTEMS AND ANDSCAPING EECTIC JOSHUA CZAJKOWSKI OPEATIONS MANAGE 0 N. NOTTAWA STEET STUGIS, MI OWNES OF EXISTING AWN SPINKE SYSTEMS AND/O ANDSCAPING SHA BE NOTIFIED IN WITING (WITH A COPY SENT TO THE ENGINEE) BY THE CONTACTO TWO WEEKS IN ADVANCE OF ANY WOK TO BE DONE THAT WI AFFECT THOSE SYSTEMS AND/O ANDSCAPING. IF THE POPETY OWNE FAIS TO EOCATE THE AWN SPINKE SYSTEM PIO TO THE CONTACTO BEGINNING WOK, AND IF THE CONTACTO CUTS THE SYSTEM DUING THE CONSTUCTION, THE CONTACTO SHA CAP THE SYSTEM PIPE AND WITNESS THE OCATION OF THE CAP WITH A WOODEN STAKE FO THE POPETY OWNES USE. THE CONTACTO SHA PACE THE SAVAGED SPINKE HEADS ON THE POPETY OWNES POPETY. IF THE POPETY OWNE FAIS TO EOCATE THE ANDSCAPING PIO TO THE CONTACTO BEGINNING WOK, THE CONTACTO SHA CAEFUY SAVAGE THE ANDSCAPING ITEMS AND STOCKPIE THEM ON THE POPETY OWNES POPETY FO THE POPETY OWNE. ANY OTHE MODIFICATION TO THE AWN SPINKE SYSTEMS AND/O ANDSCAPING, IS THE ESPONSIBIITY OF THE OWNE AND IS NOT PAT OF THIS CONTACT. THIS WOK IS INCUDED IN OTHE ITEMS OF THE POJECT. CONCETE WOK THE CONTACTO SHA NOTIFY THE ENGINEE OF PANS TO POU CONCETE A MINIMUM OF 24 HOUS BEFOE THE POU. THE CONTACTO SHA POVIDE A MINIMUM OF ONE HOU BETWEEN FOMING A SECTION OF FATWOK AND POUING THE SECTION TO AOW FO INSPECTION OF THE GADES, GADING, AND SUB-BASE. FAIUE TO POVIDE NOTICE AND TIME FO INSPECTION WI BE CONSIDEED CAUSE TO EJECT THE PODUCT O CAUSE TO EQUIE ESCHEDUING OF THE WOK, WITH NO ADJUSTMENTS TO THE COMPETION DATES. EVISION: Addendum /2/ TS Issued For Bids 2/0/ TS Issued For Permits /0/ TS /W /W /W TIE, EPOXY ANCHOED ('-7" SPACING IN EX CONC CUB AND GUTTE) TIES PACED IN NEW CONC CUB AND GUTTE INCUDED IN PAY ITEM CONC PAVT, NONEINF, 7 inch POP STM - STA 4+05 TO STA 6+45 (VAIES 0'- T) POP 24" STM - STA 6+45 TO STA 25+6 (VAIES -.8' T) 9' POP 60" STM - STA 2+6 TO STA 2+68 SOID WHITE PAVEMENT MAKING (TYP.) POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA +52 TO STA VAIES ' - 8' / SHOUDE EX 66'.O.W. AGGEGATE BASE, 5 inch, 22A ' DOUBE YEOW PAVEMENT MAKING SOID WHITE PAVEMENT MAKING (TYP.) POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA TO STA EX 66'.O.W. IMITS OF OADWAY GADING VAIES 2-6' VAIES ' - 8' / SHOUDE POPOSED TYPICA COSS SECTION - WHITE STEET STA 0+8 TO STA 2+68 EX 66'.O.W. IMITS OF OADWAY GADING 40' B-B TIE (TYP) INCUDED IN PAY ITEM CONC PAVT, NONEINF, 7 inch AGGEGATE BASE, 8 inch, 22A ' 0' POP WM - STA +57 TO STA 7+62 POP 8" WM - STA TO STA 25+9 TIE, EPOXY ANCHOED ('-7" SPACING IN EX CONC CUB AND GUTTE) TIES PACED IN NEW CONC CUB AND GUTTE INCUDED IN PAY ITEM CONC PAVT, NONEINF, 7 inch /W /W /W COUSE PAY ITEM EST. YIED HMA APPICATION TABE PEFOMANCE GADE HMA, VSP 220#/SYD PG BASE COUSE EMAKS 2 HMA, VSP 220#/SYD PG SUFACE COUSE AWI = 220 MIN HAND PATCHING TON PG SESC EFE TO MDOT STANDAD PAN FO SOI EOSION AND SEDIMENTATION CONTO MEASUES -96-E: HMA, VSP: PACE IN 2 EQUA IFTS OF 65 B/SYD IN DIVE APPOACHES NOTE: BOND COAT SHA BE APPIED BETWEEN SUCCESSIVE COUSES OF HMA (PAYMENT INCUDED IN HMA MIX). APPICATION ATE GA/SYD SS-IH, AS DIECTED BY ENGINEE PEMANENT SEEDING EOSION CONTO, SIT FENCE EOSION CONTO, INET POTECTION, FABIC DOP MUCHING/MUCH ANCHOING MUCH BANKET CONCETE JOINTS CONTACTO WI SUBMIT A JOINT AYOUT PAN FO ENGINEE APPOVA PIO TO MAININE CONCETE PAVING SAWCUTTING PAVEMENT SAWCUTTING EXISTING PAVEMENT AT EMOVA IMITS WHEE INDICATED ON THE PANS AND AS DIECTED BY THE ENGINEE SHA BE INCUDED IN THE APPICABE EMOVA PAY ITEM. DIVEWAYS EXISTING DIVEWAYS SHA BE EMOVED AND EPACED, WHEE SHOWN ON PANS O AS DIECTED BY ENGINEE. GADING AND PEPAATION FO NEW DIVEWAY SHA BE INCUDED IN OADWAY GADING. CONTACTO SHA MAINTAIN ACCESS TO DIVEWAYS DUING CONSTUCTION WITH 22A AGGEGATE O HMA MIINGS INCUDED IN OADWAY GADING. NOTICE TO ESIDENTS CONTACTO SHA NOTIFY ESIDENTS IN WITING 24 HOUS IN ADVANCE OF DISUPTION TO SEVICE SUCH AS DIVEWAY COSING O UTIITY SEVICE. CUB AND GUTTE PACEMENT OF AND PAYMENT FO CONCETE CUB AND GUTTE INCUDES PACING TWO 24" #4 EPOXY COATED EBA DOWES EPOXY ANCHOED INTO EXISTING CUB AND GUTTE AT POINTS OF CONNECTION. STUCTUE COVES STOM MANHOE COVE B (EJ060 WITH SOID COVE) CATCH BASIN (F4 CUB) COVE K (EJ700 WITH M GATE) CATCH BASIN (ADA) (EJ500 Z FAME WITH 505 M GATE) SANITAY SEWE COVE Q (EJ045 O EJ046 OW POFIE FAME) CATCH BASIN (F6 CUB) COVE C (EJ 7066 WITH M GATE) SET CATCH BASIN COVE E EVATIONS 0.0 BEOW GUTTE GADE. SUFACE ESTOATION AEAS DISTUBED BY CONSTUCTION, SUFACE SHA BE GADED SMOOTH AND ESTOED WITH 4" OF NEW TOPSOI, HYDOSEEDED, FETIIZED, AND MUCHED. SOPES OF :2 O STEEPE SHA ECEIVE MUCH BANKET PEGGED IN PACE. AEAS BETWEEN THE CUB AND SIDEWAK SHA BE FIED, GADED SMOOTH AND ESTOED AS NOTED ABOVE. ESTOATION SHA BE FOM BACK OF CUB TO IGHT OF WAY AS DIECTED BY ENGINEE. ESTOATION OF DISTUBED AEAS OUTSIDE OF THE STEET IGHT-OF-WAY WI NOT BE PAID FO SEPAATEY UNESS SHOWN ON THE PANS O AS DIECTED BY ENGINEE. MAINTAINING TAFFIC CONTACTO SHA MAINTAIN ACCESS FO OCA ESIDENTS AND EMEGENCY VEHICES DUING CONSTUCTION. CONTACTO SHA POVIDE TEMPOAY AGGEGATE O HMA MIINGS AT DIVEWAYS AS NECESSAY TO MAINTAIN ACCESS, INCUDED IN PAY ITEM OADWAY GADING. MISCEOUS QUANTITIES THE FOOWING QUANTITIES HAVE BEEN ESTIMATED TO BE EQUIED FO THE POJECT AND SHA BE USED AS DIECTED BY THE ENGINEE DUING CONSTUCTION: S MOBIIZATION MAX 0% 200 FT EOSION CONTO, SIT FENCE 4 EA EOSION CONTO, INET POTECTION, FABIC DOP 00 CYD SUBGADE UNDECUTTING, TYPE II 00 CYD TENCH UNDECUT AND BACKFI 9 TON HAND PATCHING 4 EA BEND, 45 DEG, 4 inch 4 EA BEND, 45 DEG, 6 inch 8 EA BEND, 45 DEG, 8 inch 8 EA BEND, 45 DEG, 2 inch EA MONUMENT BOX, ADJUST EA D STUCTUE, ECONSTUCT 40 FT SEWE, EM, 24 inch TO 48 inch EA UTIITY HH, ADJ 80 FT SANITAY ATEA, 6 inch, EOCATE 2 EA SANITAY ATEA, ECONNECT 750 FT VIDEO TAPE SAN SEWE TYPICA COSS SECTIONS, NOTES, & DETAIS TS WT KFP DWD DAWING INFOMATION: _C 0027 davidd COWN UNOUT TO MATCH EXISTING 9' POP 60" STM AGGEGATE BASE, 8 inch, 22A POPOSED TYPICA COSS SECTION - WHITE STEET STA 2+68 TO STA +00 CUB AND GUTTE, CONC, DET F4 F&V POJECT NO. C
3 /W EX 66'.O.W. /W EXISTING FEATUES CONSTUCTION NOTES VAIES ' - 6' SOI EOSION CONTO MEASUES TO POTECT SOPES AND DITCHES, SEED / MUCH SHA BE PACED AS SOON AS POSSIBE AND AS DIECTED BY THE ENGINEE. TEMPOAY SOI EOSION AND SEDIMENTATION CONTO MEASUES SHA BE UTIIZED DUING CONSTUCTION AS DIECTED BY ENGINEE. PAN EEVATIONS EEVATIONS SHOWN IN THESE PANS AE BASED ON USGS DATUM NAV88. /W EXISTING TYPICA COSS SECTION - WEST SOUTH STEET STA 0+90 (P.O.B.) TO STA (P.O.E.) EX 66'.O.W. /W UNDEGOUND UTIITIES FO POTECTION OF UNDEGOUND UTIITIES, THE CONTACTO SHA DIA O 8 A MINIMUM OF THEE WOKING DAYS EXCUDING SATUDAYS, SUNDAYS & HOIDAYS PIO TO EXCAVATING IN THE VICINITY OF UTIITY INES. A "MISS DIG" PATICIPATING MEMBES WI THUS BE OUTINEY NOTIFIED. THIS DOES NOT EIEVE THE CONTACTO OF THE ESPONSIBIITY OF NOTIFYING THE UTIITY OWNES WHO MAY NOT BE PAT OF THE "MISS DIG" AET SYSTEM. ADJUSTING MONUMENT BOXES IT IS THE INTENT THAT A GOVENMENT CONES ON THIS POJECT BE PESEVED AND THAT, WHEE NECESSAY, MONUMENT BOXES BE PACED O ADJUSTED, WHETHE SHOWN O NOT. ADJUSTMENT OF CATCH BASINS IT IS THE CONTACTO'S ESPONSIBIITY TO PACE THE OCATION AND EEVATION OF A CATCH BASIN CASTINGS POPEY AIGNED WITH THE POPOSED CUB. ADJUSTMENT OF CASTINGS ON NEW STUCTUES IS INCUDED IN PAYMENT FO THE DAINAGE STUCTUE COVE SPECIFIED. ADJUSTMENT OF CASTINGS ON EXISTING STUCTUES WI BE PAID AS D STUCTUE COVE, ADJ, CASE. THESE ITEMS INCUDE A BOCK O GADE INGS NECESSAY FO POPE ADJUSTMENT. /W 6' STA 0+90 (P.O.B.) TO STA 2+76 VAIES '-6' STA 2+76 TO STA +57 0' VAIES 0' SOID WHITE PAVEMENT MAKING POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA 0+90 (P.O.B.) TO STA +60 EX 66'.O.W. DOUBE YEOW PAVEMENT MAKING AGGEGATE BASE, 8 inch, 22A POP WM /W NOTE: A ITEMS ISTED ON THE MAY NOT BE PESENT ON DAWING. SAVAGE THE CITY ESEVES THE IGHT TO SAVAGE A EXISTING MATEIAS (CASTINGS, HYDANTS, SIGNS, ETC). MATEIAS DESIED TO BE SAVAGED SHA BE STOCKPIED ON SITE FO CITY PICKUP. PUBIC UTIITIES THE EXISTING UTIITIES ISTED BEOW AND SHOWN ON THESE PANS EPESENT THE BEST INFOMATION AVAIABE. THIS INFOMATION DOES NOT EIEVE THE CONTACTO OF THE ESPONSIBIITY TO SATISFY HIMSEF AS TO THEI ACCUACY O OF HIS ESPONSIBIITY IN CASE UTIITIES HAVE BEEN CONSTUCTED O EMOVED. GAS CABE TV TEEPHONE AAON AWENCE SEWE & WATE BAY COX 70 SAUK IVE DIVE CODWATE, MI N. NOTTAWA STEET STUGIS, MI 4909 AJawrence@michigangasutilities.com JEFFY AKE CHATE CABEVISION 476 COMMECIA AVENUE POTAGE, MI JEEMY MCCOD FONTIE 60 N US THEE IVES, MI EECTIC JOSHUA CZAJKOWSKI OPEATIONS MANAGE 0 N. NOTTAWA STEET STUGIS, MI /W /W /W ' POP STM - STA 4+05 TO STA 6+45 (VAIES 0'- T) POP 24" STM - STA 6+45 TO STA 25+6 (VAIES -.8' T) 9' POP 60" STM - STA 2+6 TO STA 2+68 POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA +60 TO STA VAIES ' - 8' / SHOUDE DOUBE YEOW PAVEMENT MAKING SOID WHITE PAVEMENT MAKING (TYP.) EX 66'.O.W. AGGEGATE BASE, 8 inch, 22A POPOSED TYPICA COSS SECTION - WEST SOUTH STEET STA TO STA VAIES ' - 8' / SHOUDE ' COWN UNOUT TO MATCH EXISTING DOUBE YEOW PAVEMENT MAKING SOID WHITE PAVEMENT MAKING (TYP.) EX 66'.O.W. IMITS OF OADWAY GADING VAIES 2-6' POPOSED TYPICA COSS SECTION - WHITE STEET STA 0+8 TO STA 2+68 EX 66'.O.W. IMITS OF OADWAY GADING 40' B-B AGGEGATE BASE, 8 inch, 22A ' 0' POP WM - STA +57 TO STA 7+62 POP 8" WM - STA TO STA 25+9 /W /W /W CONSTUCTION SEQUENCE INSTA & MAINTAIN SESC CONTO MEASUES CONSTUCTION SAFETY AND SECUITY CONSTUCT OADS CEAN STOM WATE MANAGEMENT FACIITIES FINISH GADING/SEEDING INSPECT FO PEMANENT MEASUES FUNCTIONING EMOVE TEMPOAY MEASUES COUSE PAY ITEM EST. YIED HMA APPICATION TABE PEFOMANCE GADE HMA, VSP 220#/SYD PG BASE COUSE EMAKS 2 HMA, VSP 220#/SYD PG SUFACE COUSE AWI = 220 MIN HAND PATCHING SOI EOSION / SEDIMENTATION CONTO OPEATION TIME SCHEDUE FEB MA TON PG HMA, VSP: PACE IN 2 EQUA IFTS OF 65 B/SYD IN DIVE APPOACHES NOTE: BOND COAT SHA BE APPIED BETWEEN SUCCESSIVE COUSES OF HMA (PAYMENT INCUDED IN HMA MIX). APPICATION ATE GA/SYD SS-IH, AS DIECTED BY ENGINEE. AP MAY YEA JUN JU AUG SEP SESC OCT NOV EFE TO MDOT STANDAD PAN FO SOI EOSION AND SEDIMENTATION CONTO MEASUES -96-E: PEMANENT SEEDING EOSION CONTO, SIT FENCE EOSION CONTO, INET POTECTION, FABIC DOP MUCHING/MUCH ANCHOING MUCH BANKET DEC THE CONTACTO SHA EXPOSE AND VEIFY OCATION AND DEPTH OF EXISTING UNDEGOUND UTIITIES PIO TO CONSTUCTION OF NEW UTIITY. CONFICTS IN GADES SHA BE EPOTED TO ENGINEE AND ADJUSTMENTS SHA BE MADE AT NO ADDITIONA COST TO OWNE. THE OWNES OF EXISTING SEVICE FACIITIES THAT AE WITHIN THE GADING O STUCTUE IMITS WI MOVE THEM TO OCATIONS DESIGNATED BY THE ENGINEE O WI EMOVE THEM ENTIEY FOM THE OAD IGHT-OF-WAY. OWNES OF PUBIC UTIITIES WI NOT BE EQUIED TO MOVE ADDITIONA POES O STUCTUES IN ODE TO FACIITATE THE OPEATION OF CONSTUCTION EQUIPMENT UNESS IT IS DETEMINED BY THE ENGINEE THAT SUCH POES O STUCTUES CONSTITUTE A HAZAD TO THE PUBIC O AE EXTAODINAIY DANGEOUS TO THE CONTACTO'S OPEATIONS. CUB DIMENSIONS A CUB DIMENSIONS SHA BE FOM BACK OF CUB UNESS OTHEWISE INDICATED. AWN SPINKE SYSTEMS AND ANDSCAPING OWNES OF EXISTING AWN SPINKE SYSTEMS AND/O ANDSCAPING SHA BE NOTIFIED IN WITING (WITH A COPY SENT TO THE ENGINEE) BY THE CONTACTO TWO WEEKS IN ADVANCE OF ANY WOK TO BE DONE THAT WI AFFECT THOSE SYSTEMS AND/O ANDSCAPING. IF THE POPETY OWNE FAIS TO EOCATE THE AWN SPINKE SYSTEM PIO TO THE CONTACTO BEGINNING WOK, AND IF THE CONTACTO CUTS THE SYSTEM DUING THE CONSTUCTION, THE CONTACTO SHA CAP THE SYSTEM PIPE AND WITNESS THE OCATION OF THE CAP WITH A WOODEN STAKE FO THE POPETY OWNES USE. THE CONTACTO SHA PACE THE SAVAGED SPINKE HEADS ON THE POPETY OWNES POPETY. IF THE POPETY OWNE FAIS TO EOCATE THE ANDSCAPING PIO TO THE CONTACTO BEGINNING WOK, THE CONTACTO SHA CAEFUY SAVAGE THE ANDSCAPING ITEMS AND STOCKPIE THEM ON THE POPETY OWNES POPETY FO THE POPETY OWNE. ANY OTHE MODIFICATION TO THE AWN SPINKE SYSTEMS AND/O ANDSCAPING, IS THE ESPONSIBIITY OF THE OWNE AND IS NOT PAT OF THIS CONTACT. THIS WOK IS INCUDED IN OTHE ITEMS OF THE POJECT. CONCETE WOK THE CONTACTO SHA NOTIFY THE ENGINEE OF PANS TO POU CONCETE A MINIMUM OF 24 HOUS BEFOE THE POU. THE CONTACTO SHA POVIDE A MINIMUM OF ONE HOU BETWEEN FOMING A SECTION OF FATWOK AND POUING THE SECTION TO AOW FO INSPECTION OF THE GADES, GADING, AND SUB-BASE. FAIUE TO POVIDE NOTICE AND TIME FO INSPECTION WI BE CONSIDEED CAUSE TO EJECT THE PODUCT O CAUSE TO EQUIE ESCHEDUING OF THE WOK, WITH NO ADJUSTMENTS TO THE COMPETION DATES. SAWCUTTING PAVEMENT SAWCUTTING EXISTING PAVEMENT AT EMOVA IMITS WHEE INDICATED ON THE PANS AND AS DIECTED BY THE ENGINEE SHA BE INCUDED IN THE APPICABE EMOVA PAY ITEM. DIVEWAYS EXISTING DIVEWAYS SHA BE EMOVED AND EPACED, WHEE SHOWN ON PANS O AS DIECTED BY ENGINEE. GADING AND PEPAATION FO NEW DIVEWAY SHA BE INCUDED IN OADWAY GADING. CONTACTO SHA MAINTAIN ACCESS TO DIVEWAYS DUING CONSTUCTION WITH 22A AGGEGATE O HMA MIINGS INCUDED IN OADWAY GADING. NOTICE TO ESIDENTS CONTACTO SHA NOTIFY ESIDENTS IN WITING 24 HOUS IN ADVANCE OF DISUPTION TO SEVICE SUCH AS DIVEWAY COSING O UTIITY SEVICE. CUB AND GUTTE PACEMENT OF AND PAYMENT FO CONCETE CUB AND GUTTE INCUDES PACING TWO 24" #4 EPOXY COATED EBA DOWES EPOXY ANCHOED INTO EXISTING CUB AND GUTTE AT POINTS OF CONNECTION. STUCTUE COVES STOM MANHOE COVE B (EJ060 WITH SOID COVE) CATCH BASIN (F4 CUB) COVE K (EJ700 WITH M GATE) CATCH BASIN (ADA) (EJ500 Z FAME WITH 505 M GATE) SANITAY SEWE COVE Q (EJ045 O EJ046 OW POFIE FAME) CATCH BASIN (F6 CUB) COVE C (EJ 7066 WITH M GATE) SET CATCH BASIN COVE E EVATIONS 0.0 BEOW GUTTE GADE. SUFACE ESTOATION AEAS DISTUBED BY CONSTUCTION, SUFACE SHA BE GADED SMOOTH AND ESTOED WITH 4" OF NEW TOPSOI, HYDOSEEDED, FETIIZED, AND MUCHED. SOPES OF :2 O STEEPE SHA ECEIVE MUCH BANKET PEGGED IN PACE. AEAS BETWEEN THE CUB AND SIDEWAK SHA BE FIED, GADED SMOOTH AND ESTOED AS NOTED ABOVE. ESTOATION SHA BE FOM BACK OF CUB TO IGHT OF WAY AS DIECTED BY ENGINEE. ESTOATION OF DISTUBED AEAS OUTSIDE OF THE STEET IGHT-OF-WAY WI NOT BE PAID FO SEPAATEY UNESS SHOWN ON THE PANS O AS DIECTED BY ENGINEE. MAINTAINING TAFFIC CONTACTO SHA MAINTAIN ACCESS FO OCA ESIDENTS AND EMEGENCY VEHICES DUING CONSTUCTION. CONTACTO SHA POVIDE TEMPOAY AGGEGATE O HMA MIINGS AT DIVEWAYS AS NECESSAY TO MAINTAIN ACCESS, INCUDED IN PAY ITEM OADWAY GADING. MISCEOUS QUANTITIES THE FOOWING QUANTITIES HAVE BEEN ESTIMATED TO BE EQUIED FO THE POJECT AND SHA BE USED AS DIECTED BY THE ENGINEE DUING CONSTUCTION: S MOBIIZATION MAX 0% 200 FT EOSION CONTO, SIT FENCE 4 EA EOSION CONTO, INET POTECTION, FABIC DOP 00 CYD SUBGADE UNDECUTTING, TYPE II 00 CYD TENCH UNDECUT AND BACKFI 4 EA BEND, 45 DEG, 4 inch 4 EA BEND, 45 DEG, 6 inch 8 EA BEND, 45 DEG, 8 inch 8 EA BEND, 45 DEG, 2 inch EA MONUMENT BOX, ADJUST EA D STUCTUE, ECONSTUCT 40 FT SEWE, EM, 24 inch TO 48 inch EA UTIITY HH, ADJ 80 FT SANITAY ATEA, 6 inch, EOCATE 2 EA SANITAY ATEA, ECONNECT 750 FT VIDEO TAPE SAN SEWE EVISION: Addendum /2/ TS Issued For Permits /0/ TS Issued For Bids 2/0/ TS TYPICA COSS SECTIONS, NOTES, & DETAIS TS WT KFP DWD DAWING INFOMATION: _C-Alt 0027 davidd 9' POP 60" STM AGGEGATE BASE, 8 inch, 22A POPOSED TYPICA COSS SECTION - WHITE STEET STA 2+68 TO STA +00 CUB AND GUTTE, CONC, DET F4 F&V POJECT NO. CA
4 6' S. CENTEVIE OAD M " HMA OVE CONC BASE +27 END CONC BASE EA - GATE BOX, EM PACE SIDEWAK ' OFF OW 0 CYD - FOWABE FI ( STM SEWE) 670 FT- WATE MAIN, 2 inch, DI 4 EA - BEND, 45 DEG, 2 inch EA - GATE VAVE AND BOX, 2 inch 2 EA - WATE MAIN TAP, 2 inch EA - EDUCE, 2 inch x 8 inch EA - WATE MAIN TAP, 8 inch EA - GATE WE, EM EA - GATE VAVE AND BOX, 2 inch 2 EA - WATE MAIN TAP, 2 inch EA - CUT & PUG EX WATE MAIN EA - TEE, 2 inch X 2 inch X 6 inch EA - HYDANT, EOCATE 2 FT - WATE MAIN, DI, 6 inch EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K EOCATE POE AND GUY (BY OTHES) EA - D STUCTUE, EM (STOM MH) 20 CYD - FOWABE FI ( WATE MAIN) 220 SFT - SIDEWAK, CONC, 8 inch (EXTEND BEYOND DIVE APPOACH) 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 WATE SEVICE, AUGEED, 2 inch EA - GATE VAVE AND BOX, 2 inch EA - TEE, 2 inch x 2 inch x 2 inch 2 EA - BEND, 45 DEG, 2 inch EA - WATE MAIN TAP, 2 inch 5 FT- WATE MAIN, DI, 2 inch S. OANGE STEET 28 EA - D STUCTUE, 72 inch DIA EA - D STUCTUE COVE, TYPE B 20 FT - STOM SEWE, 24 (MATCH EX) 2 EA - SEWE TAP, 24 inch EA - D STUCTUE COVE, ADJ EA - D STUCTUE COVE, ADJ EA - D STUCTUE, 72 inch DIA EA - D STUCTUE COVE, TYPE B 45 FT - STOM SEWE, % EA - SEWE BUKHEAD, 6 inch EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K DEFECT WM UNDE POP STM SEWE AND OVE EX SAN SEWE. (MAINTAIN CEAANCE) 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA STA , 6. T IM= INV ( N) EA - D STUCTUE COVE, TYPE K 7 FT - STOM SEWE, % EA - MONUMENT BOX EA - MONUMENT PESEVATION WEST SOUTH STEET EA - D STUCTUE COVE, ADJ 62 SFT - SIDEWAK AMP, CONC, 6 inch 5 FT - DETECTABE WANING SUFACE,DI CAUTION! GAS MAIN 8 SYD - SIDEWAK, EM 25 FT - CUB AND GUTTE, EM 25 FT - CUB AND GUTTE, CONC, F4 0 SYD - PAVT, EM EA - TEE, 2 inch x 2 inch x 8 inch EA - TEE, 2 inch x 2 inch x 6 inch 2 EA - BEND, 45 DEG, 8 inch 4 EA - BEND, 45 DEG, 6 inch EA - WATE MAIN TAP, 8 inch EA - WATE MAIN TAP, 6 inch 20 FT - WATE MAIN, DI, 8 inch 20 FT - WATE MAIN, DI, 6 inch 2 EA - GATE BOX, EM SEE DETAI STA 7+50 T DIVEWAY ON SHEET C4 2 EA - GATE BOX, EM 2 EA - D STUCTUE COVE, ADJ EA - GATE BOX, EM EA - D STUCTUE, EM EA - D STUCTUE, 60 inch DIA EA - D STUCTUE COVE, TYPE B 0 FT - STM SEWE, 8 inch (MATCH EX) EA - SEWE TAP, 8 inch EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE COVE, TYPE K 5 FT - STOM SEWE, 8 inch EA - SEWE TAP, 8 inch EA - VAVE AND BOX, EM EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA STA 7+5.0, 7' T IM= INV ( N) EA - D STUCTUE COVE, TYPE K 2 FT - STOM SEWE, % EA - D STUCTUE, EM I EA - SANITAY MH, 48 inch DIA EA - D STUCTUE COVE, TYPE Q 0 FT - SAN SEWE, 8 inch 50 FT - CUB AND GUTTE, EM 50 FT - CUB AND GUTTE, CONC, DET F4 TON - HAND PATCHING 48 FT - CUB AND GUTTE, EM 48 FT - CUB AND GUTTE, CONC, DET F4 EA - GATE BOX, ADJ 7 SYD - SIDEWAK, EM 6 SFT - SIDEWAK AMP, 6 inch 5 FT - DETECTABE WANING SUFACE, DI EA - MONUMENT BOX EA - MONUMENT PESEVATION WATE SEVICE, AUGEED, 2 inch (TIE EX. 2 inch SEVICE TO EX. 8 inch WATE MAIN) 25 CYD - FOWABE FI (8" STOM) MATCH INE STA SEE SHEET C EX. 66'.O.W. WATE SEVICE, AUGEED, inch (TIE IIGATION TO EX. 8 inch WATE MAIN) EMOVE CONCETE POPOSED CONCETE HMA SUFACE, EM, 4 inch POPOSED ECONSTUCTION NOTH EMOVE & EPACE CONCETE CUB & GUTTE EMOVE FOWABE FI BM #NGS AB094 E ' NGS DISK MONUMENT IN CONC STAMPED DATUM NAVD88, VIA GPS & OPUS BM #4-A E. 90. FND BM TIE SPIKE N FACE PP, S SIDE SOUTH OANGE, 29' E OF NE CO PAKING OT (NAVD88 PE PEVIOUS F&V POJECT #5009) BM #4-B E NW CO SIGN/PANTE BOX IN BU OAK PAKING.7' ABOVE GADE, 9' S OF EECTIC MH BM #4-C E. 90. SE CO DOO # TO BU OAK MFC, NEA SE CO BDG. 0.' ABOVE GADE BM #4-D E..2 "" CUT IN S END OF CONC WAK S SIDE OF SOUTH ST IN PAKING OT 2' WEST OF TACKS, 0' E OF WHITE ST EVISION: Addendum /2/ TS Issued For Bids 2/0/ TS Issued For Permits /0/ TS MIN COVE 4' - STM 0.50% 4' - STM 0.50% POPOSED WM POP STM CB IM = STA +7.00, -2 T INV ( SE) POP STM MH IM = STA , 0' CEA POP STM CB IM = STA , 7' T POPOSED POFIE ING POFIE 240' - STM 0.20% 99' of 24" STM 0.7% POP STM MH IM = STA , T CEA POP SAN MH IM = STA , T POP STM MH IM = STA , T POP STM CB IM = STA , 7' T 2' - STM 0.4% CEA EX. DIVEWAY T EEV AT OW (TYP) EX DIVEWAY T EEV AT OW (TYP) POVIDE CEAANCE BETWEEN WATEMAIN AND SEWE QUANTITY UNIT DESCIPTION 9. STA OADWAY GADING 600 SYD HMA SUFACE, EM 80 SYD PAVT, EM 440 FT SEWE, EM, ESS THAN 24 inch 200 SYD AGGEGATE BASE, 5 inch 500 SYD AGGEGATE BASE, 8 inch 000 CYD SUBBASE, CIP 20 TON HMA, VSP 200 SYD CONC PAVT, NONEINF, 7 inch 2000 FT JOINT, CONTACTION, CP 64 FT JOINT, EXPANSION, E2 600 EA TIE, EPOXY ANCHOED 200 SFT SIDEWAK, CONC, 4 inch 85 SYD DIVEWAY, NONEINF CONC, 8 inch EA WATE SEVICE, AUGEED, inch 2 EA WATE SEVICE, AUGEED, 2 inch 00 SYD SUFACE ESTOATION 00 SYD MUCH BANKET PAN & POFIE WM COSSING: 8 inch ISOATION NOT EQUIED AT FF/ABANDONED STOM SEWE COSSING INV.96 ( NW) INV (24" N) INV ( NE) INV ( S) INV ( E) C S. OANGE ST. STA INV ( SW) POP. CENTEINE EEV'S. (TYP.) INV 889. ( W) INV.6 (24" E) INV (24" NW) INV (24" SE) CEAANCE AT STOM COSSING INV 886. (8" NE) INV (8" S) INV.9 (24" W) INV.09 (24" E) INV ( S) INV ( NE) INV (8" N) " STM 0.7% INV ( SW) INV (8" N) IT IS ANTICIPATED THAT A GAS MAIN EOCATION POJECT ON W. SOUTH STEET AND A OAD ECONSTUCTION POJECT ON S. NOTTAWA STEET (BY OTHES) WI OCCU CONCUENTY WITH THIS POJECT. W. SOUTH STEET EAST OF S. CAY AND S. CAY STEET NOTH OF W. SOUTH AE POPOSED AS PAT OF THE DETOU OUTE FO THAT POJECT. THE CONTACTO WI COODINATE HIS WOK, INCUDING A TAFFIC ESTICTIONS, WITH OTHE POJECTS TO INCU THE EAST POSSIBE INCONVENIENCE TO THE PUBIC. NO ADDITIONA PAYMENT O TIME EXTENSION WI BE MADE TO THE CONTACTO FO THIS COODINATION. 2. CONTACTO WI COODINATE EMOVA AND EPACEMENT OF CONCETE DIVES WITH CITY AND WI GAP O CONSTUCT PAT-WIDTH WHEE EQUESTED (TYP A OCATIONS).. DIVE APPOACH AT STA 7+50 T WI BE EMOVED AND ECONSTUCTED AT A WIDTH OF 4' AT THE SIDEWAK A ' FAE ON THE WEST SIDE AND 0' AT THE EAST CUB. SEE DETAI ON SHEET C4. TS WT KFP DWD DAWING INFOMATION: _C2 007 davidd F&V POJECT NO C2
5 6' S. CENTEVIE OAD M " HMA OVE CONC BASE +27 END CONC BASE EA - GATE BOX, EM PACE SIDEWAK ' OFF OW 670 FT- WATE MAIN, 2 inch, DI 4 EA - BEND, 45 DEG, 2 inch EA - GATE VAVE AND BOX, 2 inch 2 EA - WATE MAIN TAP, 2 inch EA - EDUCE, 2 inch x 8 inch EA - WATE MAIN TAP, 8 inch EA - GATE WE, EM EA - GATE VAVE AND BOX, 2 inch 2 EA - WATE MAIN TAP, 2 inch EA - CUT & PUG EX WATE MAIN EA - TEE, 2 inch X 2 inch X 6 inch EA - HYDANT, EOCATE 2 FT - WATE MAIN, DI, 6 inch EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K 0 CYD - FOWABE FI ( STM SEWE) EOCATE POE AND GUY (BY OTHES) EA - D STUCTUE, EM (STOM MH) 20 CYD - FOWABE FI ( WATE MAIN) 220 SFT - SIDEWAK, CONC, 8 inch (EXTEND BEYOND DIVE APPOACH) 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 WATE SEVICE, AUGEED, 2 inch EA - GATE VAVE AND BOX, 2 inch EA - TEE, 2 inch x 2 inch x 2 inch 2 EA - BEND, 45 DEG, 2 inch EA - WATE MAIN TAP, 2 inch 5 FT- WATE MAIN, DI, 2 inch S. OANGE STEET 28 EA - D STUCTUE, 72 inch DIA EA - D STUCTUE COVE, TYPE B 20 FT - STOM SEWE, 24 (MATCH EX) 2 EA - SEWE TAP, 24 inch EA - D STUCTUE COVE, ADJ EA - D STUCTUE COVE, ADJ EA - D STUCTUE, 72 inch DIA EA - D STUCTUE COVE, TYPE B 45 FT - STOM SEWE, % EA - SEWE BUKHEAD, 6 inch EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K DEFECT WM UNDE POP STM SEWE AND OVE EX SAN SEWE. (MAINTAIN CEAANCE) 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA STA , 6. T IM= INV ( N) EA - D STUCTUE COVE, TYPE K 7 FT - STOM SEWE, % EA - MONUMENT BOX EA - MONUMENT PESEVATION WEST SOUTH STEET EA - D STUCTUE COVE, ADJ 62 SFT - SIDEWAK AMP, CONC, 6 inch 5 FT - DETECTABE WANING SUFACE,DI CAUTION! GAS MAIN 8 SYD - SIDEWAK, EM 25 FT - CUB AND GUTTE, EM 25 FT - CUB AND GUTTE, CONC, F4 0 SYD - PAVT, EM EA - TEE, 2 inch x 2 inch x 8 inch EA - TEE, 2 inch x 2 inch x 6 inch 2 EA - BEND, 45 DEG, 8 inch 4 EA - BEND, 45 DEG, 6 inch EA - WATE MAIN TAP, 8 inch EA - WATE MAIN TAP, 6 inch 20 FT - WATE MAIN, DI, 8 inch 20 FT - WATE MAIN, DI, 6 inch 2 EA - GATE BOX, EM SEE DETAI STA 7+50 T DIVEWAY ON SHEET C4 2 EA - GATE BOX, EM 2 EA - D STUCTUE COVE, ADJ EA - GATE BOX, EM EA - D STUCTUE, EM EA - D STUCTUE, 60 inch DIA EA - D STUCTUE COVE, TYPE B 0 FT - STM SEWE, 8 inch (MATCH EX) EA - SEWE TAP, 8 inch EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE COVE, TYPE K 5 FT - STOM SEWE, 8 inch EA - SEWE TAP, 8 inch EA - VAVE AND BOX, EM EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA STA 7+5.0, 7' T IM= INV ( N) EA - D STUCTUE COVE, TYPE K 2 FT - STOM SEWE, % EA - D STUCTUE, EM I EA - SANITAY MH, 48 inch DIA EA - D STUCTUE COVE, TYPE Q 0 FT - SAN SEWE, 8 inch 50 FT - CUB AND GUTTE, EM 50 FT - CUB AND GUTTE, CONC, DET F4 TON - HAND PATCHING 48 FT - CUB AND GUTTE, EM 48 FT - CUB AND GUTTE, CONC, DET F4 EA - GATE BOX, ADJ 7 SYD - SIDEWAK, EM 6 SFT - SIDEWAK AMP, 6 inch 5 FT - DETECTABE WANING SUFACE, DI EA - MONUMENT BOX EA - MONUMENT PESEVATION WATE SEVICE, AUGEED, 2 inch (TIE EX. 2 inch SEVICE TO EX. 8 inch WATE MAIN) 25 CYD - FOWABE FI (8" STOM) MATCH INE STA SEE SHEET C EX. 66'.O.W. WATE SEVICE, AUGEED, inch (TIE IIGATION TO EX. 8 inch WATE MAIN) EMOVE CONCETE NOTH BM #NGS AB094 E ' NGS DISK MONUMENT IN CONC STAMPED DATUM NAVD88, VIA GPS & OPUS BM #4-A E. 90. FND BM TIE SPIKE N FACE PP, S SIDE SOUTH OANGE, 29' E OF NE CO PAKING OT (NAVD88 PE PEVIOUS F&V POJECT #5009) BM #4-B E NW CO SIGN/PANTE BOX IN BU OAK PAKING.7' ABOVE GADE, 9' S OF EECTIC MH BM #4-C E. 90. SE CO DOO # TO BU OAK MFC, NEA SE CO BDG. 0.' ABOVE GADE BM #4-D E..2 "" CUT IN S END OF CONC WAK S SIDE OF SOUTH ST IN PAKING OT 2' WEST OF TACKS, 0' E OF WHITE ST POPOSED CONCETE Addendum /2/ TS Issued For Bids 2/0/ TS Issued For Permits /0/ TS HMA SUFACE, EM, 4 inch EVISION: POPOSED ECONSTUCTION MIN COVE 4' - STM 0.50% 4' - STM 0.50% POPOSED WM POP STM CB IM = STA +7.00, -2 T INV ( SE) POP STM MH IM = STA , 0' CEA POP STM CB IM = STA , 7' T POPOSED POFIE ING POFIE 240' - STM 0.20% 99' of 24" STM 0.7% POP STM MH IM = STA , T CEA POP SAN MH IM = STA , T POP STM MH IM = STA , T POP STM CB IM = STA , 7' T 2' - STM 0.4% CEA EMOVE & EPACE CONCETE CUB & GUTTE EMOVE FOWABE FI EX. DIVEWAY T EEV AT OW (TYP) EX DIVEWAY T EEV AT OW (TYP) POVIDE CEAANCE BETWEEN WATEMAIN AND SEWE QUANTITY UNIT DESCIPTION 9. STA OADWAY GADING 600 SYD HMA SUFACE, EM 80 SYD PAVT, EM 440 FT SEWE, EM, ESS THAN 24 inch 050 SYD AGGEGATE BASE, 8 inch 000 CYD SUBBASE, CIP 80 TON HMA, VSP 200 SFT SIDEWAK, CONC, 4 inch 85 SYD DIVEWAY, NONEINF CONC, 8 inch EA WATE SEVICE, AUGEED, inch 2 EA WATE SEVICE, AUGEED, 2 inch 00 SYD SUFACE ESTOATION 00 SYD MUCH BANKET PAN & POFIE WM COSSING: 8 inch ISOATION NOT EQUIED AT FF/ABANDONED STOM SEWE COSSING INV.96 ( NW) INV (24" N) INV ( NE) INV ( S) INV ( E) C S. OANGE ST. STA INV ( SW) POP. CENTEINE EEV'S. (TYP.) INV 889. ( W) INV.6 (24" E) INV (24" NW) INV (24" SE) CEAANCE AT STOM COSSING INV 886. (8" NE) INV (8" S) INV.9 (24" W) INV.09 (24" E) INV ( S) INV ( NE) INV (8" N) " STM 0.7% INV ( SW) INV (8" N) IT IS ANTICIPATED THAT A GAS MAIN EOCATION POJECT ON W. SOUTH STEET AND A OAD ECONSTUCTION POJECT ON S. NOTTAWA STEET (BY OTHES) WI OCCU CONCUENTY WITH THIS POJECT. W. SOUTH STEET EAST OF S. CAY AND S. CAY STEET NOTH OF W. SOUTH AE POPOSED AS PAT OF THE DETOU OUTE FO THAT POJECT. THE CONTACTO WI COODINATE HIS WOK, INCUDING A TAFFIC ESTICTIONS, WITH OTHE POJECTS TO INCU THE EAST POSSIBE INCONVENIENCE TO THE PUBIC. NO ADDITIONA PAYMENT O TIME EXTENSION WI BE MADE TO THE CONTACTO FO THIS COODINATION. 2. CONTACTO WI COODINATE EMOVA AND EPACEMENT OF CONCETE DIVES WITH CITY AND WI GAP O CONSTUCT PAT-WIDTH WHEE EQUESTED (TYP A OCATIONS).. DIVE APPOACH AT STA 7+50 T WI BE EMOVED AND ECONSTUCTED AT A WIDTH OF 4' AT THE SIDEWAK A ' FAE ON THE WEST SIDE AND 0' AT THE EAST CUB. SEE DETAI ON SHEET C4. TS WT KFP DWD DAWING INFOMATION: _C2-Alt 007 davidd F&V POJECT NO C2A
6 EA - GATE VAVE AND BOX, EM EA - HYDANT, EM EA - TEE, 6 inch x 6 inch x 6 inch 2 EA - GATE VAVE AND BOX, 6 inch EA - HYDANT, EOCATE STA 20+97, 40' T EA - GATE BOX, ADJ 2 EA - WATE MAIN TAP, 6 inch 72 FT - WATE MAIN, DI 6 inch MATCH INE STA SEE SHEET C2 BM #4-C E. 90. SE CO DOO # TO BU OAK MFC, NEA SE CO BDG. 0.' ABOVE GADE EA - D STUCTUE COVE, ADJ EA - MONUMENT BOX EA - MONUMENT PESEVATION ( OCATIONS) POP WM PAIIE STEETAIOAD ' MIN CEA POP STM MH IM = 90.0 STA ,.8' T EA - D STUCTUE, EM EA - D STUCTUE, 48 inch DIA EA - D STUCTUE COVE, TYPE B 0 FT - STOM SEWE, % EA - SEWE TAP, 2 inch EA - D STUCTUE, EM 25 FT - CUB AND GUTTE, EM 25 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE, 48 inch DIA EA - D STUCTUE COVE, TYPE B 0 FT - STOM SEWE, 5 inch EA - SEWE TAP, 5 inch EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K 40 FT - STOM SEWE, % 25 CYD - FOWABE FI EA - D STUCTUE, EM 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K 4 FT - STOM SEWE, % 0' of 24" STM 0.7% 220 FT - WATE MAIN, DI, 8 inch, T DET B EA - GATE BOX, EM EA - TEE, 8 inch x 8 inch x 6 inch 25 FT - WATE MAIN, DI, 6 inch EA - WATE MAIN TAP, 6 inch EA - D STUCTUE, EM EA - D STUCTUE, 9' DIA EA - D STUCTUE COVE, TYPE B POPOSED POFIE ING POFIE EA - WATE MAIN TAP, 8" inch 2 EA - GATE VAVE AND BOX, EM POP STM MH IM = 90. STA , 5.0' T POP STM CB IM =.6 STA , 6. T POP STM CB IM =.96 STA , 6. T +00 SEE SHEET C4 WHITE STEET POP STM MH IM =.8 STA , 5.0' T 64' - STM 0.50% CEA 0' MIN WEST SOUTH STEET BM #4-D E..2 "" CUT IN S END OF CONC WAK S SIDE OF SOUTH ST IN PAKING OT 2' WEST OF TACKS, 0' E OF WHITE ST CEA EA - D STUCTUE, EM 2 EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA STA , 7' T IM= INV ( N) EA - D STUCTUE, 48 inch DIA 2 EA - D STUCTUE COVE, TYPE K FT - STOM SEWE, % EA- EOCATE FAG POE (WHEE SPECIFIED BY CITY) 2 EA - GATE BOX, EM SEE D FO SHUB PACEMENT CAUTION! GAS MAIN, UTIITY VAVE, ADJ (BY OTHES) POP STM CB IM = STA , -6' T 20 CYD - AGGEGATE BASE, M POP STM MH IM =.0 STA , T MIN COVE EA - D STUCTUE, 9' DIA EA - D STUCTUE COVE, TYPE B 20 FT - STOM SEWE, 54 inch 2 EA - SEWE TAP, 54 inch 2 EA - BEND, 45 DEG, 8 inch EA - GATE WE, EM EA - EDUCE, 8 inch X 6 inch EA - WATE MAIN TAP, 6 inch MICHIGAN SOUTHEN MICHIGAN SOUTHEN AIOAD EA - GATE BOX, EM EA - TEE, 8 inch x 8 inch x 4 inch EA - GATE VAVE AND BOX, 4 inch 25 FT - WATE MAIN, DI, 4 inch EA - WATE MAIN TAP, 4 inch 70 FT - CUB AND GUTTE, EM 70 FT - CUB AND GUTTE, CONC, DET F4 SEE C5 FO SHUB PACEMENT POP STM CB IM = STA , 7' T POP STM CB IM =.0 STA , 6. T EA - D STUCTUE, EM EA - D STUCTUE, 24 inch STA 27+75, 6. T IM INV ( SW) EA - D STUCTUE COVE, TYPE C 5 FT - STOM SEWE, 2 inch EA - SEWE TAP, 0 inch JEFFESON STEET POE EA - D STUCTUE COVE, ADJ (STM MH, STA 26+67, 2.T) EA - D STUCTUE, EM EA - D STUCTUE, 24 inch STA 27+77, 6. T IM.00 INV ( NW) EA - D STUCTUE COVE, TYPE C 5 FT - STOM SEWE, 2 inch EA - SEWE TAP, 0 inch PEMIT AND COODINATION WITH MICHIGAN SOUTHEN AIOAD EQUIED FO COSSING IMPOVEMENTS. INCUDE IN PAY ITEM AIOAD COODINATION AND FAGGING EMOVE CONCETE POPOSED CONCETE HMA SUFACE, EM, 4 inch POPOSED ECONSTUCTION NOTH EMOVE & EPACE CONCETE CUB & GUTTE EMOVE FOWABE FI EX. DIVEWAY T EEV AT OW (TYP) EX DIVEWAY T EEV AT OW (TYP) POVIDE CEAANCE BETWEEN WATEMAIN AND SEWE QUANTITY UNIT DESCIPTION 7.9 STA OADWAY GADING 200 SYD HMA SUFACE, EM 80 SYD PAVT, EM 460 FT SEWE, EM, ESS THAN 24 inch 2200 SYD AGGEGATE BASE, 5 inch 200 SYD AGGEGATE BASE, 8 inch 850 CYD SUBBASE, CIP 20 TON HMA, VSP 2200 SYD CONC PAVT, NONEINF, 7 inch 00 FT JOINT, CONTACTION, CP 26 FT JOINT, EXPANSION, E2 00 EA TIE, EPOXY ANCHOED 650 SFT SIDEWAK, CONC, 4 inch 20 SYD DIVEWAY, NONEINF CONC, 8 inch 400 SYD SUFACE ESTOATION 200 SYD MUCH BANKET EVISION: DESIGN.BUID.OPEATE. Addendum /2/ TS Issued For Bids 2/0/ TS PAN & POFIE Issued For Permits /0/ TS INV (24" W) INV 894. ( N) C PAIIE ST. STA INV 889. (24" E) " STM 0.8% INV (24" W) INV.50 (5" N) INV (24" E) 90.4 INV ( E) POP. CENTEINE EEV'S. (TYP.) INV (24" W) INV ( W) INV ( SW) INV (60" S).98 INV (60" E) 88' - 60" STM 0.7% C WHITE ST. STA WM COSSING.50 INV ( S) INV ( E).7 CEA (TYP) 4" WM COSSING INV (60" W) INV ( W) INV (54" N) INV (54" S).8 POPOSED 8" WM CEA.57 C AIOAD TACKS STA INV ( S).8 INV ( W) IT IS ANTICIPATED THAT A GAS MAIN EOCATION POJECT ON W. SOUTH STEET AND A OAD ECONSTUCTION POJECT ON S. NOTTAWA STEET (BY OTHES) WI OCCU CONCUENTY WITH THIS POJECT. W. SOUTH STEET EAST OF S. CAY AND S. CAY STEET NOTH OF W. SOUTH AE POPOSED AS PAT OF THE DETOU OUTE FO THAT POJECT. THE CONTACTO WI COODINATE HIS WOK, INCUDING A TAFFIC ESTICTIONS, WITH OTHE POJECTS TO INCU THE EAST POSSIBE INCONVENIENCE TO THE PUBIC. NO ADDITIONA PAYMENT O TIME EXTENSION WI BE MADE TO THE CONTACTO FO THIS COODINATION. 2. CONTACTO WI COODINATE EMOVA AND EPACEMENT OF CONCETE DIVES WITH CITY AND WI GAP O CONSTUCT PAT-WIDTH WHEE EQUESTED (TYP A OCATIONS). TS WT KFP DWD DAWING INFOMATION: _C 0027 davidd F&V POJECT NO. C
7 EA - GATE VAVE AND BOX, EM EA - HYDANT, EM EA - TEE, 6 inch x 6 inch x 6 inch 2 EA - GATE VAVE AND BOX, 6 inch EA - HYDANT, EOCATE STA 20+97, 40' T EA - GATE BOX, ADJ 2 EA - WATE MAIN TAP, 6 inch 72 FT - WATE MAIN, DI 6 inch MATCH INE STA SEE SHEET C2 BM #4-C E. 90. SE CO DOO # TO BU OAK MFC, NEA SE CO BDG. 0.' ABOVE GADE EA - D STUCTUE COVE, ADJ EA - MONUMENT BOX EA - MONUMENT PESEVATION ( OCATIONS) PAIIE STEETAIOAD ' MIN CEA EA - D STUCTUE, EM EA - D STUCTUE, 48 inch DIA EA - D STUCTUE COVE, TYPE B 0 FT - STOM SEWE, % EA - SEWE TAP, 2 inch EA - D STUCTUE, EM 25 FT - CUB AND GUTTE, EM 25 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE, 48 inch DIA EA - D STUCTUE COVE, TYPE B 0 FT - STOM SEWE, 5 inch EA - SEWE TAP, 5 inch EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K 40 FT - STOM SEWE, % 25 CYD - FOWABE FI EA - D STUCTUE, EM 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F4 EA - D STUCTUE, 24 inch DIA EA - D STUCTUE COVE, TYPE K 4 FT - STOM SEWE, % 220 FT - WATE MAIN, DI, 8 inch, T DET B EA - GATE BOX, EM EA - TEE, 8 inch x 8 inch x 6 inch 25 FT - WATE MAIN, DI, 6 inch EA - WATE MAIN TAP, 6 inch EA - D STUCTUE, EM EA - D STUCTUE, 9' DIA EA - D STUCTUE COVE, TYPE B EA - WATE MAIN TAP, 8" inch 2 EA - GATE VAVE AND BOX, EM +00 SEE SHEET C4 WHITE STEET 0' MIN WEST SOUTH STEET BM #4-D E..2 "" CUT IN S END OF CONC WAK S SIDE OF SOUTH ST IN PAKING OT 2' WEST OF TACKS, 0' E OF WHITE ST CEA EA - D STUCTUE, EM 2 EA - D STUCTUE, EM EA - D STUCTUE, 24 inch DIA STA , 7' T IM= INV ( N) EA - D STUCTUE, 48 inch DIA 2 EA - D STUCTUE COVE, TYPE K FT - STOM SEWE, % EA- EOCATE FAG POE (WHEE SPECIFIED BY CITY) 2 EA - GATE BOX, EM SEE D FO SHUB PACEMENT CAUTION! GAS MAIN, UTIITY VAVE, ADJ (BY OTHES) EA - D STUCTUE, 9' DIA EA - D STUCTUE COVE, TYPE B 20 FT - STOM SEWE, 54 inch 2 EA - SEWE TAP, 54 inch 2 EA - BEND, 45 DEG, 8 inch EA - GATE WE, EM EA - EDUCE, 8 inch X 6 inch EA - WATE MAIN TAP, 6 inch MICHIGAN SOUTHEN MICHIGAN SOUTHEN AIOAD EA - GATE BOX, EM EA - TEE, 8 inch x 8 inch x 4 inch EA - GATE VAVE AND BOX, 4 inch 25 FT - WATE MAIN, DI, 4 inch EA - WATE MAIN TAP, 4 inch 70 FT - CUB AND GUTTE, EM 70 FT - CUB AND GUTTE, CONC, DET F4 SEE C5 FO SHUB PACEMENT EA - D STUCTUE, EM EA - D STUCTUE, 24 inch STA 27+75, 6. T IM INV ( SW) EA - D STUCTUE COVE, TYPE C 5 FT - STOM SEWE, 2 inch EA - SEWE TAP, 0 inch JEFFESON STEET POE EA - D STUCTUE COVE, ADJ (STM MH, STA 26+67, 2.T) EA - D STUCTUE, EM EA - D STUCTUE, 24 inch STA 27+77, 6. T IM.00 INV ( NW) EA - D STUCTUE COVE, TYPE C 5 FT - STOM SEWE, 2 inch EA - SEWE TAP, 0 inch PEMIT AND COODINATION WITH MICHIGAN SOUTHEN AIOAD EQUIED FO COSSING IMPOVEMENTS. INCUDE IN PAY ITEM AIOAD COODINATION AND FAGGING EMOVE CONCETE POPOSED CONCETE NOTH DESIGN.BUID.OPEATE. Addendum /2/ TS Issued For Bids 2/0/ TS Issued For Permits /0/ TS POP WM POP STM MH IM = 90.0 STA ,.8' T 0' of 24" STM 0.7% POPOSED POFIE ING POFIE POP STM MH IM = 90. STA , 5.0' T POP STM CB IM =.6 STA , 6. T POP STM CB IM =.96 STA , 6. T POP STM MH IM =.8 STA , 5.0' T 64' - STM 0.50% CEA POP STM CB IM = STA , -6' T 20 CYD - AGGEGATE BASE, M POP STM MH IM =.0 STA , T MIN COVE POP STM CB IM = STA , 7' T POP STM CB IM =.0 STA , 6. T HMA SUFACE, EM, 4 inch POPOSED ECONSTUCTION EMOVE & EPACE CONCETE CUB & GUTTE EMOVE FOWABE FI EX. DIVEWAY T EEV AT OW (TYP) EX DIVEWAY T EEV AT OW (TYP) POVIDE CEAANCE BETWEEN WATE MAIN AND SEWE QUANTITY UNIT DESCIPTION 7.9 STA OADWAY GADING 200 SYD HMA SUFACE, EM 80 SYD PAVT, EM 460 FT SEWE, EM, ESS THAN 24 inch 2650 SYD AGGEGATE BASE, 8 inch 850 CYD SUBBASE, CIP 740 TON HMA, VSP 8 TON HAND PATCHING 650 SFT SIDEWAK, CONC, 4 inch 20 SYD DIVEWAY, NONEINF CONC, 8 inch 400 SYD SUFACE ESTOATION 200 SYD MUCH BANKET EVISION: PAN & POFIE INV (24" W) INV 894. ( N) C PAIIE ST. STA INV 889. (24" E) " STM 0.8% INV (24" W) INV.50 (5" N) INV (24" E) 90.4 INV ( E) POP. CENTEINE EEV'S. (TYP.) INV (24" W) INV ( W) INV ( SW) INV (60" S).98 INV (60" E) 88' - 60" STM 0.7% C WHITE ST. STA WM COSSING.50 INV ( S) INV ( E).7 CEA (TYP) 4" WM COSSING INV (60" W) INV ( W) INV (54" N) INV (54" S).8 POPOSED 8" WM CEA.57 C AIOAD TACKS STA INV ( S).8 INV ( W) IT IS ANTICIPATED THAT A GAS MAIN EOCATION POJECT ON W. SOUTH STEET AND A OAD ECONSTUCTION POJECT ON S. NOTTAWA STEET (BY OTHES) WI OCCU CONCUENTY WITH THIS POJECT. W. SOUTH STEET EAST OF S. CAY AND S. CAY STEET NOTH OF W. SOUTH AE POPOSED AS PAT OF THE DETOU OUTE FO THAT POJECT. THE CONTACTO WI COODINATE HIS WOK, INCUDING A TAFFIC ESTICTIONS, WITH OTHE POJECTS TO INCU THE EAST POSSIBE INCONVENIENCE TO THE PUBIC. NO ADDITIONA PAYMENT O TIME EXTENSION WI BE MADE TO THE CONTACTO FO THIS COODINATION. 2. CONTACTO WI COODINATE EMOVA AND EPACEMENT OF CONCETE DIVES WITH CITY AND WI GAP O CONSTUCT PAT-WIDTH WHEE EQUESTED (TYP A OCATIONS). TS WT KFP DWD DAWING INFOMATION: _C-Alt 007 davidd F&V POJECT NO. CA
8 BM #4-D E..2 "" CUT IN S END OF CONC WAK S SIDE OF SOUTH ST IN PAKING OT 2' WEST OF TACKS, 0' E OF WHITE ST WEST SOUTH STEET SEE SHEET C NOTH NOTH EA - D STUCTUE COVE, TYPE B EA - D STUCTUE COVE, ADJ ' 4' 0' EA - D STUCTUE COVE, ADJ 0+00 EA - SEWE BUKHEAD, 60 inch 0+8 EOCATE POE (BY OTHES) WHITE ST ' TAPE TYP. 9' ' B-B 0' 0' EA - D STUCTUE COVE, ADJ EOCATE POE () (BY OTHES) EA - TEE, 8 inch x 8 inch x 8 inch 2 EA - BEND, 45 DEG, 8 inch MATCH EX. APPOACH 0' (TYP) POP STM CB IM = STA , 6' T INV ( N) INV.96 ( NW) INV (24" N) INV ( NE) STA 7+50 T DIVEWAY WEST SOUTH STEET INV ( S) INV ( E) POP STM MH IM = STA , 0.0' POP STM MH IM = 90.0 STA , -4' T CEA INV (24" W) INV 894. ( N) INV 889. (24" E) POP WM WHITE STEET SAWCUT HMA BUMPOUT THAT MATCHES EX. WIDTH (INCUDED IN PAY ITEM HMA SUFACE, EM) POPOSED POFIE ING POFIE EA - HYDANT, EM EA - TEE, 8 inch X 8 inch X 6 inch EA - HYDANT, EOCATE STA 2+76, 26' T 5 FT - WATE MAIN, DI, 6 inch EA - EDUCE, 8 inch X 6 inch EA - WATE MAIN TAP, 6 inch 50 FT - WATEMAIN, DI, 8 inch S. OANGE ST PAIIE ST WHITE ST 0-60" STM 0.58% INV (60" N) POP 8" WM INV ( NE) POP. CENTEINE EEV'S. (TYP.) POP STM CB IM =.6 STA , 5 T MIN COVE INV (24" W) POP STM MH IM =.8 STA +2.64, 4' T CEA INV ( W) INV ( SW) INV (60" S) INV (60" E) C WEST SOUTH ST. STA +7. INV ( E) POP STM CB IM =.96 STA +.27, 5 T POP 8" WM EMOVE CONCETE POPOSED CONCETE HMA SUFACE, EM, 4 inch POPOSED ECONSTUCTION EMOVE & EPACE CONCETE CUB & GUTTE EMOVE FOWABE FI EX. DIVEWAY T EEV AT OW (TYP) EX DIVEWAY T EEV AT OW (TYP) POVIDE CEAANCE BETWEEN WATEMAIN AND SEWE QUANTITY UNIT DESCIPTION 2.2 STA OADWAY GADING 680 SYD HMA SUFACE, EM 20 SYD SIDEWAK, EM 960 SYD AGGEGATE BASE, 8 inch 00 CYD SUBBASE, CIP 200 TON HMA, VSP 6 TON HAND PATCHING 500 SYD SOPE ESTOATION 50 SYD MUCH BANKET. IT IS ANTICIPATED THAT A GAS MAIN EOCATION POJECT ON W. SOUTH STEET AND A OAD ECONSTUCTION POJECT ON S. NOTTAWA STEET (BY OTHES) WI OCCU CONCUENTY WITH THIS POJECT. W. SOUTH STEET EAST OF S. CAY AND S. CAY STEET NOTH OF W. SOUTH AE POPOSED AS PAT OF THE DETOU OUTE FO THAT POJECT. THE CONTACTO WI COODINATE HIS WOK, INCUDING A TAFFIC ESTICTIONS, WITH OTHE POJECTS TO INCU THE EAST POSSIBE INCONVENIENCE TO THE PUBIC. NO ADDITIONA PAYMENT O TIME EXTENSION WI BE MADE TO THE CONTACTO FO THIS COODINATION. 2. CONTACTO WI COODINATE EMOVA AND EPACEMENT OF CONCETE DIVES WITH CITY AND WI GAP O CONSTUCT PAT-WIDTH WHEE EQUESTED (TYP A OCATIONS). EVISION: Addendum /2/ TS Issued For Permits /0/ TS Issued For Bids 2/0/ TS PAN & POFIE TS WT KFP DWD DAWING INFOMATION: _C davidd F&V POJECT NO. C4
9 BM #4-D E..2 "" CUT IN S END OF CONC WAK S SIDE OF SOUTH ST IN PAKING OT 2' WEST OF TACKS, 0' E OF WHITE ST WEST SOUTH STEET SEE SHEET C NOTH NOTH EA - D STUCTUE COVE, TYPE B EA - D STUCTUE COVE, ADJ ' 4' 0' EA - D STUCTUE COVE, ADJ 0+00 EA - SEWE BUKHEAD, 60 inch 0+8 EOCATE POE (BY OTHES) ' TAPE TYP. 9' ' B-B 0' 0' EA - D STUCTUE COVE, ADJ EOCATE POE () (BY OTHES) EA - TEE, 8 inch x 8 inch x 8 inch 2 EA - BEND, 45 DEG, 8 inch MATCH EX. APPOACH 0' (TYP) POP STM CB IM = STA , 6' T INV ( N) INV.96 ( NW) INV (24" N) INV ( NE) STA 7+50 T DIVEWAY WEST SOUTH STEET INV ( S) INV ( E) POP STM MH IM = STA , 0.0' POP STM MH IM = 90.0 STA , -4' T CEA INV (24" W) INV 894. ( N) INV 889. (24" E) POP WM WHITE STEET SAWCUT HMA BUMPOUT THAT MATCHES EX. WIDTH (INCUDED IN PAY ITEM HMA SUFACE, EM) POPOSED POFIE ING POFIE EA - HYDANT, EM EA - TEE, 8 inch X 8 inch X 6 inch EA - HYDANT, EOCATE STA 2+76, 26' T 5 FT - WATE MAIN, DI, 6 inch EA - EDUCE, 8 inch X 6 inch EA - WATE MAIN TAP, 6 inch 50 FT - WATEMAIN, DI, 8 inch S. OANGE ST PAIIE ST WHITE ST 0-60" STM 0.58% INV (60" N) POP 8" WM INV ( NE) POP. CENTEINE EEV'S. (TYP.) POP STM CB IM =.6 STA , 5 T MIN COVE INV (24" W) POP STM MH IM =.8 STA +2.64, 4' T CEA INV ( W) INV ( SW) INV (60" S) INV (60" E) C WEST SOUTH ST. STA +7. INV ( E) POP STM CB IM =.96 STA +.27, 5 T POP 8" WM EMOVE CONCETE POPOSED CONCETE HMA SUFACE, EM, 4 inch POPOSED ECONSTUCTION EMOVE & EPACE CONCETE CUB & GUTTE EMOVE FOWABE FI EX. DIVEWAY T EEV AT OW (TYP) EX DIVEWAY T EEV AT OW (TYP) POVIDE CEAANCE BETWEEN WATEMAIN AND SEWE QUANTITY UNIT DESCIPTION 2.2 STA OADWAY GADING 680 SYD HMA SUFACE, EM 20 SYD SIDEWAK, EM 960 SYD AGGEGATE BASE, 8 inch 00 CYD SUBBASE, CIP 200 TON HMA, VSP 6 TON HAND PATCHING 500 SYD SOPE ESTOATION 50 SYD MUCH BANKET. IT IS ANTICIPATED THAT A GAS MAIN EOCATION POJECT ON W. SOUTH STEET AND A OAD ECONSTUCTION POJECT ON S. NOTTAWA STEET (BY OTHES) WI OCCU CONCUENTY WITH THIS POJECT. W. SOUTH STEET EAST OF S. CAY AND S. CAY STEET NOTH OF W. SOUTH AE POPOSED AS PAT OF THE DETOU OUTE FO THAT POJECT. THE CONTACTO WI COODINATE HIS WOK, INCUDING A TAFFIC ESTICTIONS, WITH OTHE POJECTS TO INCU THE EAST POSSIBE INCONVENIENCE TO THE PUBIC. NO ADDITIONA PAYMENT O TIME EXTENSION WI BE MADE TO THE CONTACTO FO THIS COODINATION. 2. CONTACTO WI COODINATE EMOVA AND EPACEMENT OF CONCETE DIVES WITH CITY AND WI GAP O CONSTUCT PAT-WIDTH WHEE EQUESTED (TYP A OCATIONS). EVISION: Addendum /2/ TS Issued For Permits /0/ TS Issued For Bids 2/0/ TS PAN & POFIE TS WT KFP DWD DAWING INFOMATION: _C4-Alt davidd F&V POJECT NO. C4A
10 OED CUB UP TO 8" WHEE SHOWN ON PAN O DIECTED BY ENGINEE. INCUDED IN PAY ITEM SIDEWAK AMP, CONC, 6 INCH (TYPICA A OCATIONS) M-66 (S. CENTEVIE OAD) FT - CUB AND GUTTE, EM 45 FT - CUB AND GUTTE, CONC, DET F4 28 SYD - SIDEWAK, EM 00 SFT - SIDEWAK, CONC, 4 inch 50 SFT - SIDEWAK AMP, CONC, 8 inch (TYPE ) 0 FT - DETECTABE WANING SUFACE, DI FT - CUB AND GUTTE, EM 45 FT - CUB AND GUTTE, CONC, DET F4 42 SYD - SIDEWAK, EM 00 SFT - SIDEWAK AMP, CONC, 8 inch (TYPE ) 0 FT - DETECTABE WANING SUFACE, DI EMOVE BOAD (INCUDED IN PAY ITEM OADWAY GADING) WEST SOUTH STEET 45 FT - CUB AND GUTTE, EM 45 FT - CUB AND GUTTE, CONC, DET F4 0 SYD - SIDEWAK, EM 80 SFT - SIDEWAK, CONC, 4 inch 85 SFT - SIDEWAK AMP, CONC, 6 inch (TYPE D) 5 FT - DETECTABE WANING SUFACE, DI S. OANGE STEET EA - NEPETA X FAASSENI 'SIX HIS GIANT', #2 CONT. 50 FT - CUB AND GUTTE, EM 50 FT - CUB AND GUTTE, CONC, DET F4 0 SYD - SIDEWAK, EM 00 SFT - SIDEWAK, CONC, 4 inch 70 SFT - SIDEWAK AMP, CONC, 6 inch (TYPE ) 2 FT - DETECTABE WANING SUFACE, DI OED CUB UP TO 8" WHEE SHOWN ON PAN O DIECTED BY ENGINEE. INCUDED IN PAY ITEM SIDEWAK AMP, CONC, 6 INCH (TYPICA A OCATIONS) WEST SOUTH STEET 70 FT - CUB AND GUTTE, EM 70 FT - CUB AND GUTTE, CONC, DET F4 5 SYD - SIDEWAK, EM 80 SFT - SIDEWAK AMP, CONC, 6 inch (TYPE ) 5 FT - DETECTABE WANING SUFACE, DI 60 SFT - SIDEWAK, CONC, 4 inch OED CUB UP TO 8" WHEE SHOWN ON PAN O DIECTED BY ENGINEE. INCUDED IN PAY ITEM SIDEWAK AMP, CONC, 6 INCH (TYPICA A OCATIONS) FT - CUB AND GUTTE, EM 40 FT - CUB AND GUTTE, CONC, DET F4 6 SYD - SIDEWAK, EM 65 SFT - SIDEWAK, CONC, 4 inch 75 SFT - SIDEWAK AMP, CONC, 6 inch (TYPE ) 5 FT - DETECTABE WANING SUFACE, DI 2+00 PAIIE STEET WEST SOUTH STEET EXISTING EEVATION NOTH POPOSED EEVATION POPOSED CONCETE EMOVE CONCETE Addendum /2/ TS Issued For Bids 2/0/ TS Issued For Permits /0/ TS 80 SFT - SIDEWAK AMP, CONC, 6 inch 8 FT - DETECTABE WANING SUFACE HMA SUFACE, EM, 4 inch POPOSED ECONSTUCTION EVISION: FT - CUB AND GUTTE, EM 55 FT - CUB AND GUTTE, CONC, DET F4 8 SYD - SIDEWAK, EM 75 SFT - SIDEWAK, CONC, 4 inch 90 SFT - SIDEWAK, AMP, CONC,6 inch (TYPE D) 0 FT - DETECTABE WANING SUFACE, DI STA 2+2 T TO STA 2+7 T SAWCUT EXISTING CONC SIDEWAK PAD TO POVIDE ' BETWEEN POP SIDEWAK AND BACK OF CUB SEE SIDEWAK DETAI SHEET D ' WHITE STEET WEST SOUTH STEET 5 FT - CUB AND GUTTE, EM 55 FT - CUB AND GUTTE, CONC, DET F4 2 SYD - SIDEWAK, EM 50 SFT - SIDEWAK AMP, CONC, 4 inch 60 SFT - SIDEWAK, AMP, CONC,6 inch (TYPE ) 5 FT - DETECTABE WANING SUFACE, DI ' ' HAND PATCHING 50 SFT - SIDEWAK, CONC, 4 inch 80 SFT - SIDEWAK AMP, CONC, 6 inch 8 FT - DETECTABE WANING SUFACE 5 EA - NEPETA X FAASSENI 'SIX HIS GIANT', #2 CONT. 0 EA - NEPETA X FAASSENI 'SIX HIS GIANT', #2 CONT. 20 FT - CUB AND GUTTE, EM 46 FT - DIVEWAY OPENING, CONC, DET M 20 FT - CUB AND GUTTE, CONC, DET B2 SIDEWAK AMP, CONC, 8 inch AIOAD 50 SFT - SIDEWAK, CONC, 8 inch 270 SFT - SIDEWAK AMP, CONC, 8 inch (THOUGH TUCK DOCK AND OW) 0 FT - DETECTABE WANING SUFACE SYD - DIVEWAY, NONEINF CONC, 6 inch CONTACTO TO SAW CUT AND PACE 2 FOOT TANSITION PATCH ON NOTH SIDE OF SIDEWAK SYD - DIVEWAY, NONEINF CONC, 6 inch 5 FT - CUB AND GUTTE, EM 55 FT - CUB AND GUTTE, CONC, DET F6 80 SFT - SIDEWAK, CONC, 6 inch (THOUGH DIVE APPOACHES) 0 FT - CUB AND GUTTE, EM 0 FT - CUB AND GUTTE, CONC, DET F6 CONTACTO TO SAWCUT, EMOVE AND EPACE 2 FEET OF CONCETE DIVE APPOACH S. JEFFESON STEET EMOVE & EPACE CONCETE CUB & GUTTE DETECTABE WANING SUFACE SIDEWAK ANDING DIECTION OF DAINAGE MATCH EX ANDING WEST SOUTH STEET INTESECTION DETAIS TS WT KFP DWD DAWING INFOMATION: _D 007 davidd F&V POJECT NO. D
DETAIL "A" (INSIDE OF ENCLOSURE)
ENCOSUE SEE DETAI "A" AUTOMATIC BOW-OFF VAVE WITH COSS CONNECTION CONTO ASSEMBY (DUA CHECK) #57 BEDDING OCK 4" DEEP (UP TO GADE) 6" WIDE AOUND ENCOSUE 2" TAPPING SADDE W/ 2" COP STOP AND VAVE BOX METE
More informationCITY OF ANN ARBOR ENGINEERING RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT. ITB No. 4555, FILE No WARREN STEIN BARTON
APLE - - CAPENTE DWS FOUNDED 1824 NOTES Know what's below. ABO ENGINEEING I CH INCOPOATED 1851 I GAN IVEVIEW DIVE SANITAY SEWE AND WATE AIN EXTENSION POJECT Sheet List Table Sheet Number 1 COVE Sheet Title
More informationSAND DRAW CREEK REHABILITATION - SD 14 BROWN COUNTY, NEBRASKA
8.7.8567 JEO POJECT # 14838. INDEX OF SHEETS: \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:52
More informationAIRPLANE PAVEMENT MARKINGS
AIPLANE PAVEMENT MAKINGS 2 LANE OADWAY TAFFIC LANE GAVEL SHOULDES 4' SHLD 10-1 2 LANE OADWAY PAVED SHOULDES DESIGNE'S NOTE: SUVEYED PAY FO AIPLANE MAKE AS 2 LINE. SUVEYED 4 LANE OADWAY (UNDIVIDED) GAVEL
More informationTHORNCREEK COMMONS CONCEPTUAL SITE PLAN
THONCEEK COMMONS CONCEPTUAL SITE PLAN CITY OF WESTMINSTE CITY OF THONTON E 136TH AVE. POJECT LOCATION NOTH BIG DY CEEK THONCEEK GOLF COUSE WASHINGTON ST VICINITY MAP LAND USE TABLE LOT/TACT AEA (S.F.)
More informationCollege Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. CUF Walnut Hills.
3.2 QUEENSGATE CONNECTIONS Hatwell College Hill Cathage Roselawn Winton Hills Kennedy Heights Mount Aiy Mill Ceek Bond Hill Pleasant Ridge Nothside Sping Gove Village Paddock Hills Roll Hill South Cumminsville
More informationMOT-Jefferson Street Reconstruction PID
MOT-Jeffeon Steet Recontuction PID 1317 The City of Dayton popoe to impove Jeffeon Steet fom Eat Second Steet to Eat Fouth Steet conitent with it Livable Steet Policy Thi egment of Jeffeon Steet i one-way
More informationMOT-Stillwater Bikeway Bridge PID 99981
MOT-Stillwate Bikeway Bidge The City of Englewood in coodination with Five Rive MetoPak popoe to povide a multi-ue tail connection between the eat and wet ide of Englewood MetoPak which i divided by the
More informationJCRD-521: URBAN COUNTY ROADWAY SPECIFICATIONS
UBAN COUNTY STEET STANDADS AND SPECIFICATIONS Local Street Industrial Local Industrial Collector Minor Collector Major Collector Minor Arterial Major Arterial Typical ADT (Average Daily Traffic) 0-2,000
More informationMorrison Drive tel. Ottawa, ON, Canada K2H 8S fax. com
acomaecom 302 1150 Moison Dive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom. com To Pat Seguin, P. Eng. Manage of Engineeing Page 1 CC Subject Valeie McGi, Ted Achuticz Pine Steet
More informationRAILROAD CROSSING AT TWO LANE ROADWAY
24" WHITE STOP LINE PEPENDICULA TO OADWAY CENTELINE AND APPOXIMATELY 15 FEET FOM NEAEST AIL MEASUED ALONG OADWAY CENTELINE O EDGE OF PAVEMENT WHICHEVE IS THE SHOTE DISTANCE AILOAD GADE COSSING DEVICE 15
More informationD07-RW-VAR(B) PID
D7-RW-VAR(B) PID 43 ODOT popoe to acquie ight-of-way at two exiting culvet ytem located in Auglaize and Mece Countie. The poject i neceay to bing the exiting culvet ytem fully into the public ight-of-way
More informationBicycle and Pedestrian Master Plan
Falmouth, Maine Bicycle and Pedestian Maste Plan Januay, 2003 Pepaed by The Falmouth Tails Advisoy Committee Tom Williams, Chai Daeby Amble Elizabeth Ehenfeld John Locke William Lund William Robinson Robet
More informationREADING AREA TRANSPORTATION STUDY BICYCLE AND PEDESTRIAN TRANSPORTATION PLAN ADOPTED NOVEMBER 18, 2010
READING AREA TRANSPORTATION STUDY BICYCLE AND PEDESTRIAN TRANSPORTATION PLAN ADOPTED NOVEMBER 18, 2010 READING AREA TRANSPORTATION STUDY C/o Beks County Planning Commission 633 Cout St. FL 14 Reading,
More informationOUTDOOR FOOTBALL FIELD
www integalspo com USING AREAS: Mini football fields, pivate buildings, pivate schools and pivate entepeunes. SYSTEM DESCRIPTION: Composite steel constuction with synthetic tuf floo, oof and sides coveed
More informationFALL PROTECTION PROGRAM
FALL PROTECTION PROGRAM 13255 South St. Ceitos, CA 90703 Telephone 562-924-3364 Fax 562-924-0521 Table of Contents Fall Potection... 3 Fall Potection Is Requied... 3 Fall Potection Types... 3 Standad Guadails,
More informationInterior Rule of the Quebec Open 2017
Inteio Rule of the Quebec Open 2017 Aticle 1. The Oganize The Oganize is the club d'échecs de Sainte-Foy which will be epesented by M Chales Tenblay, chaiman of the oganizing committee Le tounoi se déoulea
More informationTarget Allocation Study for Formation Ship-ToAir Missile System Based on the Missile Fire. Zone Division
Taget Aocation Study fo Fomation Ship-ToAi Missie System Based on the Missie Fie Zone Division Jihua Dou and Shouquan Dong 667#, Jiefang Road, Zhongshan Distict, Daian City, China Emai: doujihua@6com Abstact
More informationEcoMobility World Festival 2013 Suwon: an analysis of changes in citizens awareness and satisfaction
IOSR Jounal Engineeing (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 07, Issue 03(Mach 2017), V1 PP 40-48 www.iosjen.og EcoMobility Wold Festival 2013 Suwon: an analysis changes in citizens awaeness
More informationUNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I
UNCUBED INTESECTIONS MINIMUM PAVED APON Paved shoulder Paved as per plans APPOACH TEATMENT DETAIL I EX adius Gravel oad Hinge Line EX adius Hinge Line 25' Taper (7.5m) 2' (0.6m) MIN Width 25' Taper (7.5m)
More informationPARK HILL HIGH SCHOOL TURF FIELD IMPROVEMENTS
PK HILL HIGH SCHOOL TUF FIELD IMPOVEMENTS 8150 N CONGESS VENUE, KNSS CITY, MO 64152 7701 NW BY OD PK HILL HIGH SCHOOL I ON NG L E TUF FIELD IMPOVEMENTS OVELL SITE PLN FE IN P O O SS MI S S EE TE I U ST
More informationCollege Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. Walnut Hills.
3.3 MILL CREEK CORRIDOR CONNECTION Hatwell College Hill Cathage Roselawn Winton Hills Kennedy Heights Mount Aiy Mill Ceek Bond Hill Pleasant Ridge Nothside Sping Gove Village Paddock Hills Roll Hill South
More informationCORESTA RECOMMENDED METHOD N 68
COESTA ECOMMENDED METHOD N 68 DETEMINATION OF CABON MONOXIDE IN THE MAINSTEAM SMOKE OF CIGAS BY NON-DISPESIVE INFAED ANALYSIS (Januay 2010) 1. FIELD OF APPLICATION The method is applicable to the gas phase
More informationPlacesForBikes City Ratings Methodology. Overall City Rating
1 PlacesFoBikes City Ratings Methodology Oveall City Rating The PlacesFoBikes City Rating Scoe is based on five factos: Rideship, Safety, Netwok, Acceleation, and Reach. Each facto is scoed on a one to
More informationHigh Axial Load Capacity, High speed, Long life. Spherical Roller Bearings
High Axial Load Capacity, High speed, Long life Spheical Rolle eaings Spheical Rolle eaings High axial esistance load pefomance Intenal specifications have been optimized to geatly impove axial esistance
More informationf i r e - p a r t s. c o m
A M E R I C A N F L A M E A F AF-1000 Seies Manual Gas Contol Valve APPLICATION The AF-1000 Manual Gas Contol Valve is designed fo use in gas in heath poducts, wall mount funaces, and space heating appliances.
More informationProviding solutions for your most demanding applications
Aeoquip Hose Assembly Maste Catalog Poviding solutions fo you most demanding applications Teflon hose Eveflex smooth boe S-Seies... -3 SC-Seies.... -4 S-TW Seies.... -5 SC-TW Seies.... -6 HI-PSI Seies...
More informationCommunity Development Department
CITY OF CAMPBELL Community Development Department September, 06 NOTICE OF PUBLIC HEAING Notice is hereby given that the Planning Commission of the City of Campbell has set the time of 7:0 p.m., or shortly
More informationTHE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhart County
THE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhat County WHEN: Fiday August 26 2016 WHERE: LaSalle Bistol Pond Elkhat INTRODUCTION The Geat Cadboad Boat Race is
More informationKEY PLAN SITE WORK KEY NOTES SCOPE OF WORK EXISTING KFC STORE: E KFC/TACO BELL. SITE PLAN Scale: NTS PROJECT SUMMARY PROJECT GENERAL NOTES
SCOPE OF WOK KEY PLAN INTEIO ENOVATION: DINING AEA / ESTOOM Square Feet NOT IN SCOPE: KITCHEN / BOH 0 Square Feet VICINITY MAP TYP EXISTING KFC STOE: E00 TYP KFC/TACO BELL SITE PLAN SITE WOK KEY NOTES
More informationA. Existing Conditions
A. Existing Conditions A 2002 conditions assessment was conducted fo the City fo use as a basis of compaison fo futue tanspotation system plan development. This chapte summaizes existing taffic and tanspotation
More informationA tale of San Diego County s water. If you had to describe San Diego's weather, you probably would use
keep San Diego beautiful Dought-toleant plants envionmentally-sensitve Bay-Delta The 1895 viewing Sweetwate Dam, Two women A tale of San Diego County s wate If you had to descibe San Diego's weathe, you
More informationData Sheet. Linear bearings
Data Pack G Issued Septembe 1999 1502325042 Data Sheet Linea beaings Instument ball beaings and shafts The RS ange of instument quality ball bushing beaings ae fo 1 8in, 3 16in and 1 4in shafts. Each beaing
More informationDesign Engineering Challenge: The Big Dig Contest Platter Strategies: Ball Liberation
Poblem Set 4: Unifom Cicula Motion Design Engineeing Challenge: The Big Dig.007 Contest Platte Stategies: Ball Libeation Oeall Notes: You ae not equied to pefom the actual analysis in this poblem set,
More informationThe Properties of. Model Rocket Body Tube Transitions
The Popeties of Moel ocket Boy Tube Tansitions Date: Septembe 6, 000 Pepae By: J.. Bohm NA 7808 CA S680 ev: (June, 005) .0 Intouction When esigning moel ockets, esignes often choose to incopoate iffeent
More informationOperating Instructions Compressors
MAXIMATOR HIGH PRESSURE TECHNOLOGY HYDRAULICS PNEUMATICS TESTING EQUIPMENT Opeating Instuctions Compessos issue 08.2007 MAXIMATOR GmbH Walkeniede Staße 15 D-37449 Zoge Gemany Telefon 0 55 86 / 803-0 Telefax
More informationFire-Safety Analysis Timber. FRILO Software GmbH As of 29/06/2016
Fie-Safety nalysis Timbe FRILO Softwae GmbH www.filo.com info@filo.com s of 29/06/2016 Fie-Safety nalysis Timbe Fie-Safety nalysis Timbe This documentation efes to the fie safety veifications used in
More informationRESOLUTION No A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF
li RESOLUTION No. 2749 A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF SALISBURY, MARYLAND AND WICOMICO COUNTY, MARYLAND FOR THE DELIVERY
More informationExperiment #10 Bio-Physics Pre-lab Questions
Expeient #10 Bio-Physics Pe-lab Questions ** Disclaie: This pe-lab is not to be copied, in whole o in pat, unless a pope efeence is ade as to the souce. (It is stongly ecoended that you use this docuent
More informationProject Proposal: Characterization of Tree Crown Attributes with High Resolution Fixed-Base Aerial Photography. by Rich Grotefendt and Rob Harrison
Poject Poposal: Chaacteization of Tee Cown Attibutes with High Resolution Fixed-Base Aeial Photogaphy by Rich Gotefendt and Rob Haison Funding Acknowledgments of Past Wok Pesented Alaska Depatment of Natual
More informationBID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan
PROJECT PH3512 - Otsego Township - On 21st Street, 102nd Avenue (west) to 101st Avenue, then east on 101st & 102nd Avenue to 16th Street - 2.96 miles Michigan Paving & Materials Reith-Riley PH3512 HMA
More informationWatford Half Marathon. Watford Half Marathon. Sunday February 5th Starting at 10.30am. Enjoy Your Run!!! Notice to all Entrants.
atfod Half Maathon 2017 Sunday Febuay 5th Stating at 1030am REF No 527 HELD UNDER UKA RULES ORGANISED BY atfod Half Maathon Notice to all Entants elcome to the atfod Half Maathon, oganised by atfod Haies
More informationCARDBOARD BOAT BUILDING 101
CARDBOARD BOAT BUILDING 101 by United Way of Elkhat County What floats you Cadboad boat... United Way Kick Off August 28, 2015 CONSTRUCTION RULES The ENTIRE boat must be built of cadboad, duct tape, and
More informationCheat-Proof Playout for Centralized and Distributed Online Games
Cheat-Poof Playout fo Centalized and Distibuted Online Games Nathaniel E. Baughman Bian Neil Levine baughman@cs.umass.edu bian@cs.umass.edu Depatment of Compute Science Univesity of Massachusetts Amhest,
More informationPennsylvania Congestion Management System: PA 100 Corridor. June 2002
Pennsylvania Congestion Management System: PA 100 Coido June 2002 Pennsylvania Congestion Management System PA 100 Coido June 2002 DELAWARE VALLEY REGIONAL PLANNING COMMISSION Ceated in 1965, the Delawae
More informationRCA2-RN3N-I A1-P-FL-** <Series> <Stroke> <Lead> RN4NA, RP4NA, RN3NA, RP3NA, GS4NA, GD4NA,
RCP3/RC ctuato Fist Step Guide Seventh Edition Thank you fo puchasing ou poduct. ake sue to ead the Safety Guide and detailed Instuction anual (CD/DVD) included with the poduct in addition to this Fist
More informationWatford Half Marathon. Watford Half Marathon. Sunday February 4th Starting at 10.30am. Enjoy Your Run!!! Notice to all Entrants.
atfod Half Maathon 2018 Sunday Febuay 4th Stating at 1030am REF No 527 HEld UNdERUka RUlEs ORGANISED BY atfod Half Maathon Notice to all Entants elcome to the atfod Half Maathon, oganised by atfod Haies
More informationThe Study About Stopping Distance of Vehicles
Intenational Jounal of Infomation Engineeing and Applications 018; 1(1): 18- http://www.aascit.og/jounal/infomation The Study About Stopping Distance of Vehicles Zhao Chun-xue School of Mathematics and
More informationAccel. (m/s 2 ) Time (sec) Newton s 3 rd Law and Circular Motion. Group Problem 04
1) A 200 kg tuck acceleates eastwads on a hoizontal oad in esponse to a gadually inceasing fictional foce fom the gound. Thee is an unsecued 50 kg block sitting on the tuck bed line. Thee is fiction between
More information500 SERIES ADVANTAGES
K-FLO 00 SERIES Sizes -20 K-FL O B U T T E R F L Y V A L V E S 00 SERIES: SIZES -20 AWWA C0 Compiant he K-Fo 00 Series is a heavy-duty resiient seated butterfy vave ine in fu compiance with AWWA C0 for
More informationCouncil Communication
Counci Communication Discussion o Bike Path Funding and Pioities e Meeting Date: Decembe 4, 26 Depatment: Pubic Woks / Engineeing Contibuting Depatments: Finance Appoa: Matha Bennett Pimay Sta Contact:
More informationModule #7: Kit Singles
Modue #7: Kit Singes This modue deas with appying singes to the kit What that means is, you move singes stokes aound the kit using the hands and then we incopoate the kick oot The execises in this Modue
More informationSHEET INDEX L-01 L-02 L-03 L L L-15 L-16
VICINITY MAP Tower oad S. H. 0 Colfax Avenue Sand I - 0 Buckley Air National Guard Base Picadilly oad East th Avenue Creek Proposed th Avenue Alignment Existing th Avenue/ SH 0 Alignment Murphy Creek E
More informationAGENDA REPORT. side of Walden Woods Dr., south of E. Park Rd. and north of E. Alexander St., in
F PLgNT AGENDA REPORT FLORID' DATE: Mach 28, 2016 TO: FROM: SUBJECT: City Commission Michael He, City Manage A public heaing egading the eplat of the Walden Woods Subdivision ceating a 116- lot single-
More informationThe Dockline AUGUST Board of Directors. Greetings from the Commodore. Jim Manlick
The Dockline 2018 Boad of Diectos COMMODORE - Jim Manlick jmanlick@new..com 655-1460 VICE COMMODORE - Gay Kuschel gaene@hotmail.com 619-0906 REAR COMMODORE - Jim Thompson jimtsmu@icloud.com 621-2946 FLEET
More informationDUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS
DUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS Fo desciption of zone boundaies see: 68C-22.027 F.A.C fo State Manatee Potection Zones last amended 1/30/2007 68D-24.016
More information0ur Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011
0u Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011 SUBJECT: PROCUREMENT OF CALIBRATION SERVICES FOR THE EQUIPMENTS IN Cental Laboatoy (Mechanical) Dea Sis, Technical & Commecial s ae invited fo the
More informationA Force Platform Free Gait Analysis
Poceedings A Foce Platfom Fee Gait Analysis Tokio Maeda 1,2, *, Tatsuo Ishizuka 3, Sakua Yamaji 4 and Yuji Ohgi 3 1 Keio Reseach Institute at SFC, 5322 Endo, Fujisawa, Kanagawa 252-0882, Japan 2 Koseki
More informationOPTIMAL SCHEDULING MODELS FOR FERRY COMPANIES UNDER ALLIANCES
Jounal of Maine Science and Technology, Vol. 15, No. 1, pp. 53-66 (2007) 53 OPTIMAL SCHEDULING MODELS FOR FERRY COMPANIES UNDER ALLIANCES Shangyao Yan*, Chia-Hung Chen**, Hsin-Yen Chen*** and Tze-Chiang
More informationROCK HILL AQUATICS CENTER POOL SCHEDULES
ROCK HILL AQUATICS CENTER POOL SCHEDULES WARM-POOL ( 8 LANE POOL) OCTOBER 2017: CHECK LIST OF CLOSURES ON EVENT DOCUMENT Monda Tuesda Wednesda Thusda Fida Satuda Sunda 5:30 8:00 am Famil Swim 1-2, Lap
More informationSPRS. Slip Power Recovery System. L&T AUTOMATION Automation systems for optimal efficiency and productivity
SPRS Sip Powe Recovey System Conto & Automation fom L&T L&T offes system soutions fo conto, eguation and monitoing. It pans and impements dive contos and automation pojects fom concept to commissioning.
More informationLight Rail Transit heads to French Hill and Mount Scopus
Jeusalem Tanspotation Netwok The Geen Line is on the way Light Rail Tansit heads to Fench H and Mount Scopus Infastuctue woks in the oad-woks section of the steets Ahaon Katzi, Lehi, Etzel, Lohamei HaGeta'ot,
More informationBritish Prime Minister Benjamin Disraeli once remarked that
GABREL COSTA, MCHAEL HUBER, & OHN SACCOMAN Cumulative Home Run Fequency and the Recent Home Run Explosion Bitish Pime Ministe Benjamin Disaeli once emaked that thee ae thee kinds of falsehoods: lies, damned
More informationAn Auction Based Mechanism for On-Demand Transport Services
An Auction Based Mechanism fo On-Demand Tanspot Sevices Malcolm Egan, Ni Oen and Michal Jakob Abstact Recently, a new class of tanspot sevices, exemplified by Ube and Lyft has emeged. Such sevices use
More informationExperiment #10 Bio-Physics Pre-lab Comments, Thoughts and Suggestions
Expeient #10 Bio-Physics Pe-lab Coents, Thoughts and Suggestions The pupose of this pape is to povide you with soe infoation which ay be useful fo solving the pe-lab questions and pefoing the lab. I will
More informationCS3350B Computer Architecture. Lecture 6.2: Instructional Level Parallelism: Hazards and Resolutions
CS3350B Compute Achitectue Winte 2015 Lectue 6.2: Instuctional Level Paallelism: Hazads and Resolutions Mac Moeno Maza www.csd.uwo.ca/couses/cs3350b [Adapted fom lectues on Compute Oganization and Design,
More informationDepth-first search and strong connectivity in Coq
1 Depth-fist seach and stong connectivity in Coq Januay 9, 2015 2 The poblem Finding the stongly connected components of a diected gaph. Pedagogical value: The fist nontivial gaph algoithm. Pactical value:
More informationNorth Tahoe Division Projects & Assessments AUGUST 2015
1 Noth Tahoe Division Pojects & Assessments C A L I F O R N I A AUGUST 215 Noth tahoe DivisioN Pojects & assessments Page 2 Fie Adapted Community Assessment WhAT Is The FIRe ADAPTeD COmmuNITy Assessme
More informationNoncrossing Trees and Noncrossing Graphs
Noncossing Tees and Noncossing Gaphs William Y. C. Chen and Shey H. F. Yan Cente fo Combinatoics, LPMC, Nanai Univesity, 300071 Tianjin, P.R. China chen@nanai.edu.cn, huifangyan@eyou.com Submitted: Sep
More informationSR-714 (Monterey Road) Martin County, Florida
S-714 (Monterey oad) Martin County, Florida Financial Project ID:228861-1-21-01 Work Program Item No. (Old):4116331 Federal Project ID:FL62-033 Grade Separation Feasibility at Dixie Highway and FEC ailroad
More information10 Torque. Lab. What You Need To Know: Physics 211 Lab
b Lab 10 Toque What You Need To Know: F (a) F F Angula Systems Evey lab up to this point has dealt with objects moving in the linea system. In othe wods, objects moving in a staight line. Now we ae going
More informationRed-Black Trees Goodrich, Tamassia Red-Black Trees 1
Red-Black Tees 8 00 Goodich, Tamassia Red-Black Tees 1 Fom (,) to Red-Black Tees A ed-black tee is a epesentation of a (,) tee by means of a binay tee whose nodes ae coloed ed o black In compaison with
More informationThe Importance of Bicycling and Bicyclists Needs
Chapter 2 The Importance of Bicycing and Bicycists Needs The overa goa of the adopted regiona transportation pan is to provide an integrated, a-mode transportation system, which offers the efficient, effective,
More informationBristol Company Challenge
Bristo Company Chaenge Photo: Bristo Evening Post SUNDAY 11 SEPTEMBER 2011 BRISTOL HARBOURSIDE RACE START: Wave starts from 9.30am Entry cosing date Friday 8th Juy 2011 or sooner if race is fu Organised
More informationCyclostrophic Balance in Surface Gravity Waves: Essay on Coriolis Effects
Jounal of Oceanogaphy, Vol. 53, pp. 311 to 315. 1997 Shot Contibution Cyclostophic Balance in Suface Gavity Waves: Essay on Coiolis Effects KERN E. KENYON 4632 Noth Lane Del Ma, CA 92014-4134, U.S.A. (Received
More informationFollow this and additional works at:
Lehigh Univesity Lehigh Peseve Fitz Laboatoy Repots Civil and Envionmental Engineeing 1987 Weigh-in-motion and esponse study of fou insevice bidges, U.S. Depatment of Tanspotation, Fedeal Highway Administation
More informationPerformance Characteristics of Parabolic Trough Solar Collector System for Hot Water Generation
Intenational Enegy Jounal: Vol. 7, No. 2, June 2006 137 Pefomance Chaacteistics of Paabolic Tough Sola Collecto System fo Hot Wate Geneation www.sed.ait.ac.th/eic A. Valan Aasu and T. Sonakuma Faculty
More informationLesson 33: Horizontal & Vertical Circular Problems
Lesson 33: Hoizontal & Vetical Cicula Poblems Thee ae a wide vaiety of questions that you do if you apply you knowledge of cicula motion coectly. The tough pat is figuing out how to set them up. You need
More informationTrends in Cycling, Walking & Injury Rates in New Zealand
Tends in Cycling, Walking & Injuy Rates in New Zealand Walking and cycling, minutes/week SUMMAR Estimates of walking and cycling fom 9 Household Tavel suveys in New Zealand, conducted etween 1989 and 2012,
More informationthe Susquehanna River. Today, PFBC protects and conserves aquatic species throughout Pennsylvania.
Winte 2019 Wate Flows Though Pennsylvania Wate is all aound you. It is in the gound unde you feet. It flows by you in ceeks. Wate is in the sky, inside of tees and coming out of a gaden hose. When it ains,
More informationDYNAMICO DYNAMICO FOR INDOOR USE OUTDOOR USE USE AND MAINTENANCE HANDBOOK FOR. Authorized Dealer. S.r.l
Via A. Da Sangallo, 1 Paciana 06034 FOLIGNO PG ITALY P.I. IT 00574020541 CCIAA Perugia 119215 Iscr. Trib. Perugia 11907 Tel. +39 0742 22927 (r.a.) Fax +39 0742 22637 http:// www.ormesa.com E-mail: info@ormesa.com
More informationSome physical and mechanical properties of date palm trees related to cultural operations industry mechanization
Jounal of Agicultual Technology 2009, V.5(1): 17-31 Some physical and mechanical popeties of date palm tees elated to cultual opeations industy mechanization M. Shamsi and S.M. Mazloumzadeh Depatment of
More informationRearranging trees for robust consensus
Poceedings of the IEEE Conf. on Decision and Contol, Olando, FL, 011 Reaanging tees fo obust consensus Geoge Foest Young, Luca Scadovi and Naomi Ehich Leonad Abstact In this pape, we use the H nom associated
More informationTHE IMPACTS OF CONGESTION ON COMMERCIAL VEHICLE TOUR CHARACTERISTICS AND COSTS
Figliozzi 1 THE IMPACTS OF CONGESTION ON COMMERCIAL VEHICLE TOUR CHARACTERISTICS AND COSTS Miguel Andes Figliozzi Depatment of Civil and Envionmental Engineeing Maseeh College of Engineeing and Compute
More informationABriefIntroductiontotheBasicsof Game Theory
ABiefIntoductiontotheBasicsof Game Theoy Roy Smead Notheasten Univesity Septembe 18, 2013 Game theoy is a set of mathematical tools that ae used to epesent and study social inteactions. This is a vey bief
More informationIncorporating Location, Routing and Inventory Decisions in Dual Sales Channel - A Hybrid Genetic Approach
Incopoating Location, Routing and Inventoy Decisions in Dual Sales Channel - A Hybid Genetic Appoach Chia-lin Hsieh 1, Shu-hsien Liao 2, Wei-chung Ho 2 1 Depatment of Statistics and Actuaial Science, Aletheia
More informationSession 6. Global Imbalances. Growth. Macroeconomics in the Global Economy. Saving and Investment: The World Economy
Session 6. Global Imbalances. Gowth. v, and the Real Inteest Rate v Global Imbalances v Gowth v Intoduction to exchange ates and : The Wold Economy The eal inteest ate is the pice that equilibates saving
More informationStroke Types. The stick tip starts high and ends high. "A loud note that prepares for another loud note".
Soke ypes A soke ype efes o he moion of he sick o mae. A specific soke ype is used o: 1) pepae he sick o mae fo is nex noe 2) acheive a desied sound (each soke ype has a diffeen sound) egao Moions: Smooh
More informationEPHESUS CHURCH ROAD-FORDHAM BOULEVARD AREA PLANNING DISTRICT
EPHESUS CHURCH ROAD-FORDHAM BOULEVARD AREA PLAIG DISTRICT TRASPORTATIO IMPACT AALYSIS EXECUTIVE SUMMARY Pepae fo: The Town of Chapel Hill Public Woks Depatment Taffic Engineeing Pepae by: HTB oth Caolina,
More informationLecture Topics. Overview ECE 486/586. Computer Architecture. Lecture # 9. Processor Organization. Basic Processor Hardware Pipelining
EE 486/586 ompute chitectue Lectue # 9 asic Pocesso Hadwae Pipelining Refeence: ppendix : Section.1 Lectue Topics Sping 2015 Potland State Univesity Oveview Pocesso Oganization typical computing task consists
More informationGas services renewal programme
Customer information Gas services renewa programme gasnetworks.ie Introduction Gas Networks Ireand constructs and extends the natura gas network in Ireand to the highest safety standards. We deiver natura
More informationA Deceleration Control Method of Automobile for Collision Avoidance based on Driver's Perceptual Risk
A Deceleation Contol Method of Automobile fo Collision Avoidance based on Dive's Peceptual Risk Takahio Wada, Shun ichi Doi, and Shoji Hiaoka Abstact To educe ea-end cash of automobiles, it is impotant
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS
ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS 841.1 DESCRIPTION: This item shall consist of hydrostatic testing operations, of water mains in accordance with these specifications. 841.2 MATERIALS: The materials
More informationAn integrated supply chain design model with random disruptions consideration
Afican Jounal of Business Management Vol. 4(1), pp. 393-401, 18 Septembe, 010 Available online at http://www.academicounals.og/ajbm ISSN 1993-833 010 Academic Jounals Full Length Reseach Pape An integated
More informationPhase Behavior Introduction to Phase Behavior F.E. Londono M.S. Thesis (2001)
Natual Gas Engineeing Phase Behavio Intoduction to Phase Behavio F.E. Londono M.S. hesis (001).. Blasingame, exas &M U. Depatment of Petoleum Engineeing exas &M Univesity College Station, X 77843-3116
More information55CM ROUND CHARCOAL KETTLE BBQ
IMPORTANT - Please ead the instuctions caefully befoe assembling 55CM ROUND CHARCOAL KETTLE BBQ Assembly A Instuctions PLEASE RETAIN THE INSTRUCTIONS FOR FUTURE USE. Safety and Cae Advice the Wait fo it
More informationFundamental Algorithms for System Modeling, Analysis, and Optimization
Fundamental Algoithms fo System Modeling, Analysis, and Optimization Edwad A. Lee, Jaijeet Roychowdhuy, Sanjit A. Seshia UC Bekeley EECS 44/44 Fall With thanks to R. K. Bayton, K. Keutze, N. Shenoy, and
More informationExample. The information set is represented by the dashed line.
Ou ast equiibium concet The ast equiibium concet we study afte Nash eqm, Subgame Pefect Nash eqm, and Bayesian Nash eqm is Pefect Bayesian Equiibium. Pefect efes to the fact that the game wi be dynamic,
More informationA Collision Risk-Based Ship Domain Method Approach to Model the Virtual Force Field
A Collision Risk-Based Ship Domain Method Appoach to Model the Vitual Foce Field Tengfei Wang a,b,c, Xinping Yan a,b *, Yang Wang a,b, and Qing Wu a,b,c a Intelligent Tanspotation System Reseach Cente,
More informationPETTIPAUG YACHT CLUB PSA PETTIPAUG SAILING ACADEMY PETTIPAUG JUNIOR SAILING PROGRAM Parent & Sailor Handbook
PETTIPAUG YACHT CLUB PSA PETTIPAUG SAILING ACADEMY PETTIPAUG JUNIOR SAILING PROGRAM 2017 Paent & Sailo Handbook PSA SCHEDULE Date Satuday June 17 th Thusday June 22 th Monday June 26 th - August 11 th
More information