1 3.3 MILL CREEK CORRIDOR CONNECTION Hatwell College Hill Cathage Roselawn Winton Hills Kennedy Heights Mount Aiy Mill Ceek Bond Hill Pleasant Ridge Nothside Sping Gove Village Paddock Hills Roll Hill South Cumminsville East Westwood Clifton Avondale Noth Avondale Oakley Madisonville Little Duck Ceek Millvale Westwood West Pice Hill South Faimount East Pice Hill English Woodsod Noth Faimount MILL CREEK CORRIDOR CONNECTION Lowe Pice Hill Camp Washington 75 Queensgateen CUF West End OTR Mount Aubun Pendleton CBD/ Rivefont 71 Mount Adams Walnut Hills Evanston East Walnut Hills Hyde Pak Mount Lookout Columbia Tusculum Little Miami Rive Sedamsville Mount Washington East End Riveside Ohio Rive
2 ALTERNATIVE: A SEGMENT A:1-2 Limits CSX Tack to Gest Steet Adjacent Roadway Evans Steet Length 1,980 ft Recommended Facility Type SU2: Shaed-Use Path along Roadway SEGMENT DESCRIPTION This segment will be a shaed-use path along the east side of Evans Steet. CONSTRAINTS AND OBSERVATIONS Geneal: Tail Location & Width Thee is a sidewalk along the entie easten side of Evans Steet. The sidewalk width vaies fom appoximately 5 feet to 12 feet. The 12 foot width walk could be utilized as the tail but it wouldn t meet all the design citeia fo the tail since it would not have a five foot buffe fom the oadway. Additionally, thee ae utility poles and signs that educe the effective width of the sidewalk to less than 10 feet. The 5 foot width walk could not suppot an off oad tail. All of the popety adjacent to the east side of Evans Steet is publicly owned: Evans Receation Aea (Cincinnati), Cincinnati Police Academy (Cincinnati), and MSD (Hamilton County). Except fo the constaints noted below, thee is sufficient width to widen the existing sidewalk o eplace it with an asphalt path with a five foot minimum buffe fom the oadway. A1: Raiload Cossing The tail will coss one set of CSX aiload tacks. This is an existing pedestian cossing adjacent to Evans Steet. The cossing is asphalt paved. A2: Evans Receation Aea Impacts Widening o eplacing the existing 12 sidewalk adjacent to Evans Receation Aea could have impacts on the pak facilities such as a baseball field immediately adjacent to the sidewalk. Existing aiload cossing ove Evans Steet Image Souce: Google Maps,
3 A3: Eighth Steet Viaduct Undepass The sidewalk width is constained unde the Eighth Steet Viaduct by a floodgate and utility pole on the south side. The viaducts pies and a potion of the floodwall ae also immediately at the back of walk limiting any widening possibilities. Evans Steet is appoximately 36 feet wide in this location. Thee ae two though lanes and paking is pemitted in some locations. No paking signs ae posted fo the east side of Evans Steet diectly beneath the viaduct. Thee would be an oppotunity to educe the steet width to accommodate a wide tail though this section since paking is not pemitted. A4: Gest Steet Cossing The path would need to coss Gest Steet at an unsignalized location. Two lanes of taffic would be cossed. The speed limit of the oadway is unposted so it is pesumed to be 25 mph. The ADT of Gest Steet is appoximately 7,200 vehicles pe day. A high visibility coss walk should be povided to mak the cossing location with tail cossing signs. Additional measues such as active waning devices o pedestian beacons may not be needed since the speed limit is less than 40 mph, the oadway has fewe than fou lanes, and the ADT is less than 12,000 vehicles pe day. 2 Evans Steet facing noth Image Souce: Google Maps, 2015 Intesection of Evans and Gest Steets facing noth 1 OKI Taffic Counts, AASHTO Guide fo the Development of Bicycle Facilities, Chapte 5: Design of Shaed Use Paths, Section Design of Mid-Block Cossings. 3 CAGIS 68
4 ALTERNATIVE: A SEGMENT A:2-3 Limits Evans Steet to Summe Steet Adjacent Roadway Gest Steet Length 500 ft. Recommended Facility Type SU2: Shaed-Use Path along Roadway SEGMENT DESCRIPTION This segment will be a shaed-use path along the noth side of Gest Steet. CONSTRAINTS AND OBSERVATIONS Geneal: Tail Location & Width Thee is an existing 12 wide sidewalk along the noth side of Gest Steet. This sidewalk could be utilized as the tail but it would not meet all of the standad design citeia since it would not have a minimum five foot buffe fom the oadway. Thee ae also utility poles and signs adjacent to the oadway educing the effective width of the sidewalk to less than 10 feet. The popety noth of Gest Steet is publicly owned (Cincinnati) between Evans Steet and Woodow Steet. Thee is sufficient width in this block to widen the existing sidewalk o eplace it with an asphalt path with a five foot minimum buffe fom the oadway. A5: Pivate Popety and Paking Impacts Between Woodow Steet and Summe Steet, the popety noth of Gest Steet is pivately owned by The Koge Gocey & Baking Company. The lot is cuently undeveloped and used fo paking. Any widening of the sidewalk o econstuction with a five foot buffe would equie popety acquisition. Image Souce: Google Maps, 2015 Intesection of Gest and Evans facing west Pivate popety fonting Gest Steet Image Souce: Google Maps,
5 ALTERNATIVE: A SEGMENT A:3-4 Limits Gest Steet to noth end of Summe Steet Adjacent Roadway Summe Steet Length 1,000 ft. Recommended Facility Type Shaed-Use Path along Roadway, Bicycle Lanes o Shaows SEGMENT DESCRIPTION This segment will be a shaed-use path along the east side of Summe Steet. CONSTRAINTS AND OBSERVATIONS Geneal: Coido Dimensions Summe Steet is appoximately 30 feet wide. The ight of way width is 50 feet. Thee ae sidewalks along both sides except at the noth end of the coido (see Constaint A6). The sidewalks ae appoximately fou to five feet wide with a thee to fou foot buffe fom the oadway. Paking is pemitted intemittently along both sides of the oadway. Utility poles ae located along the east side of the oadway. The ADT of this oadway is not available but expected to be vey low. Tuck pecentage is also unknown but expected to be high because of commecial and industial opeations accessed fom the noth end of Summe Steet. Fo the puposes of the peliminay engineeing analysis an ADT of 500 vehicles pe day and a tuck pecentage of 10% was assumed. On-oad o off-oad facilities could be accommodated along this oadway with vaying degees of impacts. Image Souce: Google Maps, 2015 Summe Steet facing noth On-Road Facilities: With pedestians using the existing sidewalks, bicyclists could eithe be accommodated using shaows o bicycle lanes. Bicycle lanes would equie emoving paking fom the steet and eassigning the oadway width to two-ten foot lanes and two-five foot bicycle lanes. With shaows and on-steet paking, the bicycle level of sevice is estimated to be C (modeately high). With bicycle lanes and no on-steet paking, the level of sevice is estimated be B (vey high). Off-Road Facilities: Constucting a tail on one side of the oadway would equie emoving paking fom the oadway, educing the oadway width to 22 feet (two-eleven foot lanes). The eight feet emoved fom the oadway plus the existing thee foot buffe and fou foot sidewalk would povide a total of 15 feet whee a ten foot tail could be constucted with a five foot buffe to the oadway. The west side of the oadway would have fewe utility impacts. 70
6 A6: Naow Coido, Pivate Popety, Tuck Activity, & Poo Visibility At the noth end of Summe Steet, the oadway entes pivate popety owned by DNGJR LLC and Buce E. Robets Tust. The coido naows to appoximately 25 feet between the face of a building on the west side and MSD s secuity fence on the east side. Lage HVAC and electical equipment is located appoximately five feet behind the MSD fence. Sidewalks ae discontinued in this aea since it is outside the ight of way. This potion of the oadway seves as an access diveway to seveal pivate commecial and industial companies. Heavy tuck taffic is common. The diveway tuns westwad immediately noth of a building on the west side of the oadway. The building limits the visibility of vehicles appoaching fom aound the cone. The constaints pesent at the noth end of Summe Steet likely make it infeasible fo a bicycle and pedestian oute within the existing oadway section. The available width may be inadequate to safely accommodate heavy tuck taffic, bicyclists and pedestians while also poviding a buffe to the building and fence. Thee should be a minimum of five feet to the vetical faces of the building and the fence, leaving an effective width of 15 feet. The tuck taffic would need nealy all of that space leaving nothing exta fo a sepaated bicycle o pedestian facility. Bicyclists and pedestians likely cannot safely shae the limited space with tucks because of the limited visibility aound the building cone. Finally, because the land is pivately owned, it may be difficult to acquie the necessay easements, paticulaly if the bicycle and pedestian taffic would advesely affect the pivate opeations. On the east side of the MSD secuity fence thee is an oppotunity to povide access fo tail uses although it would not meet the nomal tail citeia. Thee is an existing sidewalk between the fence and the MSD Administation building. The sidewalk is appoximately seven feet in width. Thee ae existing benches, utility pipes, and dooways that open out to the sidewalk. The poject team has met with MSD and eceived peliminay appoval to use this space to povide a link fom Summe Steet to Segment A:4-5 and aound the constaints noted above. This space will need to be modified to allow public access though the MSD fence. Bicyclists will need to dismount and walk though this section. Appopiate signing and physical measues, such as a naow chicane fence o simila gating featue may be needed to ensue bicyclists do walk though the space in lieu of iding. Image Souce: Google Maps, 2015 Summe Steet at end of public ROW facing noth 71
7 ALTERNATIVE: A SEGMENT A: 4-5 Limits Noth end of Summe Steet to Noth side of MSD Adjacent Raiload CSX Length 1,840 ft. Recommended Facility Type Shaed-Use Path SEGMENT DESCRIPTION This segment will be a shaed-use path along the east side of the active CSX aiload and the west bode of MSD. CONSTRAINTS AND OBSERVATIONS Geneal: Poximity to Active Raiload and Use of Raiload Popety The CSX Raiload is active within this segment with sevice to S&B Industies located along the west side of the tacks. The tail will need to paallel the ail line thoughout most of this segment. CSX equests that the tail be a minimum of 25 feet fom the aiload. Except as noted in the constaints below, the minimum offset can be met. Because of the constaints noted below, the tail will need to be patially o fully on the aiload popety in some locations. A7: Utility Equipment / Pivate Paking Impacts An existing utility box (possibly an electic tansfome) is located less than 9 feet fom the paking aea/diveway fo the commecial business to the south (DNGJR, LLC). The box is likely immovable so the tail may need to shift southwad into the pivate paking aea. A8: Paking Lot Impacts The available width between the existing MSD paking lot and the paking aea/diveway fo the commecial business to the south (DNGJR, LLC) is appoximately 9 feet. A twenty foot space between paking aeas would be ideal to povide a ten foot path with a five foot buffe to the paking aeas on eithe side. One o both paking aeas may need to be educed to accommodate the tail and the buffes. This may impact thee paking spaces on the MSD paking lot o a eduction in diveway width on the pivate lot. 72 Image Souce: Google Maps, 2015 Image Souce: Google Maps, 2015 Existing pivate utilities at the end of Summe Steet Pivate paking lot at the end of Summe Steet
8 A9: Paking Lot Impacts / Raiload Poximity / Tail Width At the noth end of the MSD paking lot, the width between the paking aea and the aiload tacks naows to appoximately 38 feet. The tail should be located 27 feet fom the ail (25 feet to a fence + 2 foot fence buffe), leaving 11 feet fo the tail and a paking lot buffe. The tail o buffe spaces may need to naow in this aea to maintain the equied offset fom the aiload o the paking lot could be econfigued. A10: Raiload Poximity / MSD Facility Poximity / Raiload Popety The limits of this constaint ae fom A9 to the end of the segment. Immediately noth of the paking aea noted in A9, the coido becomes constained by MSD facilities on the east and the CSX tack on the west. MSD has multiple buildings, equipment, paking lots and stoage aeas located immediately adjacent to thei westen bode. The bode is lined by a secuity fence which is located 36 to 39 feet fom the CSX tack. To avoid conflicts with the MSD facilities, the tail could ente CSX popety noth of A9 and follow the westen side of the MSD fence. In most locations, the tail can maintain a minimum offset of 25 feet fom the tack, howeve the tail width may need to be educed to 8 feet to meet the offset equiement. The tail would likely have fencing along both sides fo secuity of the MSD and CSX facilities. This may ceate a long, naow, and enclosed coido that could be intimidating to tail uses. The length of fencing on both sides would be appoximately 1,500 feet (0.3 miles). An easement and use ageement fom CSX will be equied. Image Souce: Google Maps, 2015 Pivate Paking Lot at the end of Summe Steet facing nothwest 73
9 ALTERNATIVE: A SEGMENT A: 5-6 Limits Noth side of MSD to State Avenue nea Intesection with Haison Avenue Adjacent Raiload Inactive CSX Length 3,150 ft. Recommended Facility Type Shaed-Use Path SEGMENT DESCRIPTION This segment would be along the inactive CSX coido immediately noth of MSD. The existing ails would be emoved to accommodate the tail. CONSTRAINTS AND OBSERVATIONS Geneal: Raiload Popety An easement and use ageement fom CSX will be equied. CSX may equie envionmental analyses and potential cleanup at cetain locations. Mill Ceek Coido facing south Mill Ceek Coido facing south ALTERNATIVE: A Enginee s Estimate of Cost Altenative Segment Limits Estimated Cost A:1 2 Evans to Gest $ 250,000 A:2 3 Gest Steet $ 40,000 A:3 4 Summe Steet $ 460,000 A A:4 5 Summe Steet to Noth of MSD $ 770,000 A:5 6 Noth of MSD to State Avenue $ 1,000,000 A:6 7 State Avenue to Ficke Road $ 2,570, TOTAL $ 5,090,000
10 ALTERNATIVE: B SEGMENT B: 3-9 Limits Evans Steet to State Avenue Adjacent Roadway Gest Steet Length 1,200 ft. Recommended Facility Type Bicycle Lanes with Sidewalk SEGMENT DESCRIPTION Bicycle facilities would be on-oad within this segment while pedestians would use the existing sidewalks. The existing bicycle lanes on Gest Steet, which cuently end at Woodow Steet would be extended to State Avenue. CONSTRAINTS AND OBSERVATIONS Geneal: Coido Width West of Summe Steet, existing buildings on the noth and south sides of Gest Steet limit the oppotunity to continue a shaed use path along the oadway as ecommended fo segment A:2-3. The existing sidewalk width is appoximately 10 to 12 feet fom the cub to the face of building. Utility poles, aiload waning devices, and tees ae located immediately adjacent to the oadway. Multiple dooways and gaages open onto the sidewalk. Bicycle lanes ae ecommended fo this segment because of these constaints, the available oadway width of 36 feet, and the pesence of an existing bicycle lane to the east. Geneal: Bicycle Level of Sevice The bicycle level of sevice fo a bicycle lane on Gest Steet is estimated to be B (Vey High) using the FHWA Bicycle Compatibility Index and Level of Sevice Computation speadsheet. The following infomation was used to make the computation: Image Souce: Google Maps, 2015 Gest Steet facing east The oadway width of 36 feet can accommodate two twelve foot lanes and two six foot bicycle lanes. The speed limit is unposted so it is likely 25 mph by default. The ADT of the oadway was 7208 in The pecentage of lage tucks is not known, howeve it is assumed to be 1.5% based on guidance fom FHWA 6. Paking is not pemitted along the oadway. 5 OKI Taffic Counts 6 FHWA Bicycle Compatibility Index: A Level of Sevice Concept, Implementation Manual, FHWA-RD , Table 4. Recommended tuck pecentages by functional classification fo steets whee such infomation is not available. 75
11 ALTERNATIVE: B SEGMENT B: 9-6 Limits Gest Steet to CSX Tack Adjacent Roadway State Avenue Length 5,970 ft. Recommended Facility Type Shaed Lane with Sidewalk and Paking Shaed Use Path Along Roadway Two-Way Cycle Tack with Sidewalk SEGMENT DESCRIPTION The existing oadway width vaies fom 36 feet to 40 feet and includes one 10 foot lane in each diection with 8 foot paking lanes on both sides. The existing width fom the cub to the ight of way vaies widely thoughout the coido. Sidewalk widths vay fom 4 feet with a 2 foot tee lawn to 12 without a tee lawn. The following geneal constaints ae pesent thoughout the coido: Paking is pemitted on both sides of the oadway. Utility poles and fie hydants ae pesent on both sides of the oadway nea the cub. Retaining walls ae pesent intemittently on both sides of the oadway at the back of walk. Catch basins ae located thoughout the coido to collect stom wate at the cub. Houses and commecial buildings ae located immediately at the back of walk o within a few feet. State Avenue is classified as a mino ateial 7 and has a taffic volume between 6,000 and 12,000 vehicles pe day. 8 The oadway is owned and maintained by Hamilton County 9. The speed limit is 35 mph. Tuck pecentage is estimated to be 2%. 10 The coido is a Meto bus oute. The Mill Ceek Tail in this segment could be accommodated by thee diffeent types of facilities. Two potential types would have bicycle taffic onoad with pedestians using the existing sidewalk. The thid facility type would econstuct the existing sidewalk as a shaed use path. The oadway could be econfigued as shown below to accommodate bicycle taffic in a two-way cycle tack on the east side of the oadway. Each of these potential facility types will be analyzed sepaately on the following pages. 7 ODOT Tanspotation Infomation Mapping System (TIMS) 8 OKI Taffic Counts (6,540 vpd nea Enst Steet, 2009) & ODOT Tanspotation Infomation Mapping System (11,784 nea Saatoga Steet, 2013) 9 ODOT Tanspotation Infomation Mapping System (TIMS) 10 FHWA Bicycle Compatibility Index: A Level of Sevice Concept, Implementation Manual, FHWA-RD , Table 4. Recommended tuck pecentages by functional classification fo steets whee such infomation is not available. 76
12 Shaed Lane with Sidewalk and Paking In this scenaio, bicyclists would shae the existing oadway with motoists while pedestians would use the existing sidewalk. Shaed lane makings (shaows) would be painted on the oadway to alet motoists to the pesence of bicyclists on the oadway and to help indicate a bicyclists pope position on the steet. The oadway configuation could be as shown below: CONSTRAINTS AND OBSERVATIONS Geneal: Bicycle Level of Sevice The estimated bicycle level of sevice fo a shaed lane within this segment would be between D (Modeately Low) and E (Vey Low) depending on taffic volume. Casual bicyclists and childen ae unlikely to use this facility. Geneal: Feasibility of Implementation This option would be vey feasible to implement since it would not impact paking o have any conflicts with the existing constaints noted above. The cost to implement would also be elatively inexpensive since it only involves painting shaed lane makings on the oadway. Shaed Use Path Along Roadway This option would eliminate paking along the east side of State Avenue and widen the existing sidewalk to accommodate a shaed use path with a buffe to the oadway. The oadway configuation could be as shown below: CONSTRAINTS AND OBSERVATIONS Geneal: Utility and Stom Impacts This option would impact nealy 50 utility poles along the east side of State Avenue. Appoximately 23 catch basins would have to be elocated. Fou fie hydants would be impacted. 77
13 Geneal: Paking Removal Paking on the east side of State Avenue would be emoved. A paking study may need to be completed to estimate the impact to esidents and businesses along the coido. Geneal: Paking Lane Width The width of the paking lane would be seven feet. This is a naow width fo a paking lane and may impact the safety of paked vehicles. Geneal: Feasibility of Implementation This option would be expensive to implement because of the numbe of utility and stom elocations in addition to the constuction of the path. In addition, appoval to emove the paking lane on the east side may be difficult to obtain. Two-Way Cycle Tack with Sidewalk State Avenue would be econfigued with a two-way cycle tack on the east side fo bicycle taffic. Two-Way Cycle Tacks have a limited application on many oadways because one diection of the bicycle taffic opposes the adjacent moto vehicle taffic. This can esult in conflicts at diveways and side steets whee tuning vehicles may not anticipate opposing bicycle taffic. The east side of State Avenue is, howeve, an ideal candidate (nice!) fo such a facility because thee ae vey few diveways and side steets to coss. The two side steets (West Libety Steet and Saatoga Steet) ae vey low volume oads only seving a few houses. The oadway configuation would be as shown below: CONSTRAINTS AND OBSERVATIONS Geneal: Tavel Lane Width The width of the tavel lane is nine feet. Nine foot tavel lanes exist on many oadways but may not be appopiate fo State Avenue. The oadway s classification as a mino ateial limits the minimum design lane width to 11 feet fo design speeds less than 50 mph. Geneal: Paking Removal Paking on the east side of State Avenue would be emoved with a two-way cycle tack. A paking study may need to be completed to estimate the impact to esidents and businesses along the coido. Geneal: Paking Lane Width The width of the paking lane would be seven feet. This is a naow width fo a paking lane and may impact the safety of paked vehicles. Geneal: Feasibility of Implementation This option would not be difficult o expensive to implement fom a constuction standpoint. Howeve, since the width of the tavel lanes do not meet minimum design citeia, appoval fom the maintaining agency may be difficult to obtain. Futhe, appoval to emove the paking lane on the east side may also be challenging. ALTERNATIVE: B Enginee s Estimate of Cost Altenative Segment Limits Estimated Cost A:1 2 Evans to Gest $ 250,000 B:2 3 Existing Gest Steet Bike Lanes $ B B:3 8 Extension of Gest Steet Bike Lanes to State Avenue $ 3,000 B:8 6 State Avenue Cycle Tack $ 52,000 A:6 7 State Avenue to Ficke Road $ 2,680, TOTAL $ 2,985,000
14 ALTERNATIVE: C SEGMENT A: 2-4 Limits Gest Steet to Noth End of Summe Steet Adjacent Roadway Evans Steet & Hopkins Steet Length 1,400 ft. Recommended Facility Type Shaed Use Path Along Roadway SEGMENT DESCRIPTION This segment would ceate a shaed use path along Evans Steet and Hopkins Steet by conveting the oadways to one-way and using the othe side of the oadway fo the shaed use path. At the west end of Hopkins Steet, the tail would tun noth and ente MSD popety. The tail would go though an existing paking aea and then connect with Altenative A at the noth end of Summe Steet. CONSTRAINTS AND OBSERVATIONS C1: One-Way Steet Evans Steet would be conveted to one-way noth bound, Hopkins Steet would be one-way west bound and Woodow Steet would be one-way south bound. All in-bound taffic to MSD would use Evans Steet while out-bound taffic would use Woodow Steet. The othe lane of taffic would be conveted to a shaed use path. Appoval to make these opeational changes would need to be obtained fom the City of Cincinnati and MSD. C2: Entance to MSD Secue Aea The MSD secuity fence cuently uns along the noth side of Hopkins Steet and joins to the noth side of the main administation building. The tail would need to go though this fenced aea to un along the noth side of the administation building. Futhe discussion with MSD officials will be needed to detemine how this can be accomplished without compomising secuity. Evans Steet facing noth Evans Steet facing noth C3: Paking Lot Impacts The tail would tavese the south side of an existing paking lot. The ciculation oadway along the noth side of the administation building may need to be elocated nothwad to accommodate the tail. This may esult in the loss of appoximately 10 paking spaces. Woodow Steet facing west 79
15 ALTERNATIVE: C Enginee s Estimate of Cost Altenative Segment Limits Estimated Cost A:1 2 Evans to Gest $ 250,000 C:2 4 Gest Steet to Summe Steet via Evans Steet $ 394,000 C A:4 5 Summe Steet to Noth of MSD $ 770,000 A:5 6 Noth of MSD to State Avenue $ 1,000,000 A:6 7 State Avenue to Ficke Road $ 2,680,000 TOTAL $ 5,094,000 80
16 QUEEN CITY MILL CREEK CORRIDOR RECOMMENDED ALIGNMENT CINCINNATI CONNECTS MAP LEGEND MO MILL CREEK CORRIDOR - RECOMMENDED ALIGNMENT 3 MILLCREEK Recommended Alignment Futue Connection (Lick Run Geenway) BEEKMAN Mill Ceek Geenway Tail (Existing) I-75 SB I-75 NB MARTIN LUTHER KING JR LUDLOW CLIFTON HOPPLE Mill Ceek Coido (Altenative A) Futue Tail Connections (Lick Run Geenway) Existing Tail Connection (Mill Ceek Geenway Tail) SPRING GROVE WESTWOOD 2 WESTERN HILLS Miles Poject Patnes: Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way GLENWAY WARSAW STATE Futue Pice Landing Pak DEPOT SUMMER EVANS 1 8TH GEST Evan s Receation Aea 6TH I-75 NB This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek. 81
17 RUPP MILL CREEK CORRIDOR RECOMMENDED ALIGNMENT CONNECTING MILL CREEK TO UPTOWN The connection between the Mill Ceek Geenway Tail and Uptown will utilize existing and poposed bicycle facilities along Ludlow Ave, Cental Pakway, and Matin Luthe King. Appoximately 320lf of Old Ludlow Ave will connect the existing Mill Ceek Geenway Tailhead located along William P. Dooley Bypass with the existing bike lanes on Ludlow Avenue. Fom thee the tail will emain on-oad until it connects with a new sidepath being built by the City of Cincinnati. The sidepath will stat at Monmouth Ave and un along the west side of Cental Pakway and will continue east along the noth side of Matin Luthe King Dive. The sidepath, unde constuction at the time of this epot, will ultimatly connect to the existing sidepath nea the Univesity of Cincinnati. The follwoing map illustates how the connections ae made and the patnes included. CINCINNATI CONNECTS MILL CREEK TO UPTOWN - RECOMMENDED ALIGNMENT MAP LEGEND ELMORE COLERAIN LUDLOW AVENUE 1 Mt. Stom Pak Existing Uban Tails I-74 WB Poposed Uban Tails (2010 Cincinnati Bike Plan) Bike Lanes Recommended Alignment (12 Wide Sidepath on MLK; Cuently Unde Constuction) Recommended Alignment (Existing Uban Tail on Cental Pakway and Ludlow) MILLCREEK Bike Lanes I-74 EB Shaow 2 Cincinnati State MIDDLETON MCALPIN Climbing Lane WOOLPER 1 Old Ludlow Connection (Mill Ceek Geenway Tailhead) 2 3 On-Road Bike Facilities (2010 Cincinnati Bike Plan) Sidepath Connection (3-4) (CDOTE Plan; Being Constucted) ARLINGTON Bike Lanes VINE FOREST 4 Sidepath Connection (3-4) (CDOTE Plan; Being Constucted) Miles SPRING GROVE MONMOUTH 3 LUDLOW WENTWORTH Cincinnati Zoo & Botanical Gadens Poject Patnes: Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way CARLL BEEKMAN BALTIMORE LIDDELL HOPPLE GARRARD BURLINGTON COLERAIN JESSAMINE I-75 NB This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek. Cental Pakway Cycletack STIER MCMICKEN DIXMYTH PROBASCO Climbing Lane CLIFTON Bunet Woods BROOKLINE 4 JEFFERSON MARTIN LUTHER KING JR JEFFERSON Bike Lanes Univesity of Cincinnati EUCLID GOODMAN EDEN ERKENBRECHER PIEDMONT 82
18 C I N C I N N AT I CO N N E C TS MILL CREEK CORRIDOR CONNECTION MOO M MILLCREEK MAP LEGEND Altenative A LUDLOW Altenative C HOPPLE Constaint G JR KIN ER UTH NL RTI MA (Existing) I-75 NB I-75 SB Mill Ceek Geenway Tail CLIFTON AN BEEKM Altenative B Segment Points OVE SPRING GR QUEE N CIT Y WESTWOOD WESTERN HI LLS Miles Poject Patnes: 5 GLENWAY A10 4 A7 C3 C2 A5 3 2 A4 WARSAW EVANS DEPOT 9 SUMMER A9 STATE Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way Futue Pice Landing Pak A3 8TTHH A2 1 A1 GEST Evan s Receation Aea I-75 NB 6TH This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek.
19 C I N C I N N AT I CO N N E C TS MILL CREEK CORRIDOR - MSD CONNECTION MAP LEGEND LANE RAD CLIF F LIONEL Altenative A Altenative B Altenative C Constaint STA TE Segment Points LIBERTY SAR STERRETT 0.25 Miles KINGSTON A9 A8 A7 A6 4 C3 HOPKINS 9 SUMMIT VIEW 3 EVANS 2 A4 GEST SOUTH WHATLEY MARYLAND GLEN C1 DUTTON OSWALD 8TH MT HOPE CHATEAU PRICE A5 DEPOT NEVA DA PEERLESS SUMMER WIL DER RRO W WOODROW MO Poject Patnes: BENGALS PARDEE A3 HATMAKER 8TH STORRS BODLEY ZECH ENGLISH ST MICHAEL BURNS STAEBLER NEAVE Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way A10 C2 MATSON UNDERWOOD PARKSON NEFF G BOWM AN RIN 0 5 FITZP ATRI CK CLAYPOLE WING GRAND GLENWAY ATO GA A2 A1 1 Evan s Receation Aea 6TH WB This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek.
20 QUEEN CITY CINCINNATI CONNECTS MAP LEGEND MO MILL CREEK CORRIDOR - RECOMMENDED ALIGNMENT 3 MILLCREEK Recommended Alignment LUDLOW Futue Connection (Lick Run Geenway) BEEKMAN Mill Ceek Geenway Tail (Existing) I-75 SB I-75 NB MARTIN LUTHER KING JR CLIFTON HOPPLE 1 2 Mill Ceek Coido (Altenative A) Futue Tail Connections (Lick Run Geenway) 3 Existing Tail Connection (Mill Ceek Geenway Tail) SPRING GROVE WESTWOOD 2 WESTERN HILLS Miles Poject Patnes: Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way GLENWAY WARSAW STATE Futue Pice Landing Pak DEPOT SUMMER EVANS 1 8TH GEST Evan s Receation Aea I-75 NB 6TH This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek.
21 C I N C I N N AT I CO N N E C TS MILL CREEK TO UPTOWN -EXISTING AND PROPOSED URBAN TRAILS MAP LEGEND R COLE I-7 Cyc B ENUE AIN 4W Mt. Stom Pak LUDLOW AV Bike Lanes Existing Uban Tails ck a let Poposed Uban Tails Bik el s MIDDLETON LCR E s MIL ane B I-74 E Bike Lane EK (2010 Cincinnati Bike Plan) Shaow ELMORE Shaow Bike Lanes Climbing Lane MCALPIN WOOLPER FOREST VINE Cincinnati State SPRING GROVE nes MONMOUTH Cincinnati Zoo & Botanical Gadens Shaow 0.25 Miles WENTWORTH w Shao I-75 NB E LIN OK GOODMAN CLIFTON O BR Bike Lanes Climbing Lane RSON MARTIN LUTHER KIN G JR Univesity of Cincinnati s Lane This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek. EDEN PROBASCO EUCLID Shaow JEFFERSON Bike ELL LIDD Cental Pakway Cycletack et BALTIMORE INE Connecting Ste JEFFE STIER Cycletack JESSAM CARLL RUPP IN COLERA HOPPLE Bunet Woods Bike Lanes TH DIXMY AN BEEKM Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way MCMICKEN Poject Patnes: ERKENBRECHER BURLINGTON LUDLOW GARRARD 0 e La Bik ARLINGTON Climbing Lane Clim bing Lane PIEDMONT
22 C I N C I N N AT I CO N N E C TS MILL CREEK TO UPTOWN - RECOMMENDED ALIGNMENT 1 MAP LEGEND ELMORE LUDLOW AV R COLE I-7 B ENUE AIN 4W Existing Uban Tails Mt. Stom Pak Poposed Uban Tails Bik el (2010 Cincinnati Bike Plan) Shaow Old Ludlow Connection 2 On-Road Bike Facilities 2 B (Existing Uban Tail on Cental Pakway and Ludlow) 1 s MIDDLETON MIL ane I-74 E Recommended Alignment s LCR E EK (12 Wide Sidepath on MLK; Cuently Unde Constuction) Bike Lane Recommended Alignment Climbing Lane MCALPIN WOOLPER Cincinnati State (Mill Ceek Geenway Tailhead) 4 Sidepath Connection (3-4) ARLINGTON SPRING GROVE (CDOTE Plan; Being Constucted) (CDOTE Plan; Being Constucted) nes Sidepath Connection (3-4) e La Bik 3 FOREST VINE (2010 Cincinnati Bike Plan) Cincinnati Zoo & Botanical Gadens LUDLOW MONMOUTH 0.25 Miles 3 WENTWORTH ERKENBRECHER Poject Patnes: I-75 NB GOODMAN Climbing Lane CLIFTON 4 PIEDMONT MARTIN LUTHER KIN G JR Univesity of Cincinnati This poject made possible by the geneous suppot of Inteact fo Health. Poject Management and Leadeship povided by Goundwok Cincinnati-Mill Ceek. EDEN PROBASCO EUCLID MCMICKEN BURLINGTON NE KLI OO BR JEFFERSON ELL LIDD Cental Pakway Cycletack GARRARD RSON STIER INE JESSAM BALTIMORE JEFFE RUPP IN COLERA Bunet Woods HOPPLE CARLL TH Bike Lanes DIXMY AN BEEKM Goundwok Cincinnati-Mill Ceek AECOM City of Cincinnati Human Natue, Inc Inteact fo Health Kola Design Little Duck Ceek Tail Ohio Rive Tail - Oasis Line Ohio Rive Tail (Rivefont Paks) Ohio Rive Tail West Queen City Bike Ti-State Tails Wasson Way
College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. CUF Walnut Hills.
3.2 QUEENSGATE CONNECTIONS Hatwell College Hill Cathage Roselawn Winton Hills Kennedy Heights Mount Aiy Mill Ceek Bond Hill Pleasant Ridge Nothside Sping Gove Village Paddock Hills Roll Hill South Cumminsville
More informationMOT-Jefferson Street Reconstruction PID
MOT-Jeffeon Steet Recontuction PID 1317 The City of Dayton popoe to impove Jeffeon Steet fom Eat Second Steet to Eat Fouth Steet conitent with it Livable Steet Policy Thi egment of Jeffeon Steet i one-way
More informationMorrison Drive tel. Ottawa, ON, Canada K2H 8S fax. com
acomaecom 302 1150 Moison Dive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom. com To Pat Seguin, P. Eng. Manage of Engineeing Page 1 CC Subject Valeie McGi, Ted Achuticz Pine Steet
More informationJCRD-521: URBAN COUNTY ROADWAY SPECIFICATIONS
UBAN COUNTY STEET STANDADS AND SPECIFICATIONS Local Street Industrial Local Industrial Collector Minor Collector Major Collector Minor Arterial Major Arterial Typical ADT (Average Daily Traffic) 0-2,000
More informationAIRPLANE PAVEMENT MARKINGS
AIPLANE PAVEMENT MAKINGS 2 LANE OADWAY TAFFIC LANE GAVEL SHOULDES 4' SHLD 10-1 2 LANE OADWAY PAVED SHOULDES DESIGNE'S NOTE: SUVEYED PAY FO AIPLANE MAKE AS 2 LINE. SUVEYED 4 LANE OADWAY (UNDIVIDED) GAVEL
More informationBicycle and Pedestrian Master Plan
Falmouth, Maine Bicycle and Pedestian Maste Plan Januay, 2003 Pepaed by The Falmouth Tails Advisoy Committee Tom Williams, Chai Daeby Amble Elizabeth Ehenfeld John Locke William Lund William Robinson Robet
More informationA. Existing Conditions
A. Existing Conditions A 2002 conditions assessment was conducted fo the City fo use as a basis of compaison fo futue tanspotation system plan development. This chapte summaizes existing taffic and tanspotation
More informationREADING AREA TRANSPORTATION STUDY BICYCLE AND PEDESTRIAN TRANSPORTATION PLAN ADOPTED NOVEMBER 18, 2010
READING AREA TRANSPORTATION STUDY BICYCLE AND PEDESTRIAN TRANSPORTATION PLAN ADOPTED NOVEMBER 18, 2010 READING AREA TRANSPORTATION STUDY C/o Beks County Planning Commission 633 Cout St. FL 14 Reading,
More informationPlacesForBikes City Ratings Methodology. Overall City Rating
1 PlacesFoBikes City Ratings Methodology Oveall City Rating The PlacesFoBikes City Rating Scoe is based on five factos: Rideship, Safety, Netwok, Acceleation, and Reach. Each facto is scoed on a one to
More informationPennsylvania Congestion Management System: PA 100 Corridor. June 2002
Pennsylvania Congestion Management System: PA 100 Coido June 2002 Pennsylvania Congestion Management System PA 100 Coido June 2002 DELAWARE VALLEY REGIONAL PLANNING COMMISSION Ceated in 1965, the Delawae
More informationMOT-Stillwater Bikeway Bridge PID 99981
MOT-Stillwate Bikeway Bidge The City of Englewood in coodination with Five Rive MetoPak popoe to povide a multi-ue tail connection between the eat and wet ide of Englewood MetoPak which i divided by the
More informationCITY OF ANN ARBOR ENGINEERING RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT. ITB No. 4555, FILE No WARREN STEIN BARTON
APLE - - CAPENTE DWS FOUNDED 1824 NOTES Know what's below. ABO ENGINEEING I CH INCOPOATED 1851 I GAN IVEVIEW DIVE SANITAY SEWE AND WATE AIN EXTENSION POJECT Sheet List Table Sheet Number 1 COVE Sheet Title
More informationRAILROAD CROSSING AT TWO LANE ROADWAY
24" WHITE STOP LINE PEPENDICULA TO OADWAY CENTELINE AND APPOXIMATELY 15 FEET FOM NEAEST AIL MEASUED ALONG OADWAY CENTELINE O EDGE OF PAVEMENT WHICHEVE IS THE SHOTE DISTANCE AILOAD GADE COSSING DEVICE 15
More informationAGENDA REPORT. side of Walden Woods Dr., south of E. Park Rd. and north of E. Alexander St., in
F PLgNT AGENDA REPORT FLORID' DATE: Mach 28, 2016 TO: FROM: SUBJECT: City Commission Michael He, City Manage A public heaing egading the eplat of the Walden Woods Subdivision ceating a 116- lot single-
More informationTHORNCREEK COMMONS CONCEPTUAL SITE PLAN
THONCEEK COMMONS CONCEPTUAL SITE PLAN CITY OF WESTMINSTE CITY OF THONTON E 136TH AVE. POJECT LOCATION NOTH BIG DY CEEK THONCEEK GOLF COUSE WASHINGTON ST VICINITY MAP LAND USE TABLE LOT/TACT AEA (S.F.)
More informationUNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I
UNCUBED INTESECTIONS MINIMUM PAVED APON Paved shoulder Paved as per plans APPOACH TEATMENT DETAIL I EX adius Gravel oad Hinge Line EX adius Hinge Line 25' Taper (7.5m) 2' (0.6m) MIN Width 25' Taper (7.5m)
More informationEcoMobility World Festival 2013 Suwon: an analysis of changes in citizens awareness and satisfaction
IOSR Jounal Engineeing (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 07, Issue 03(Mach 2017), V1 PP 40-48 www.iosjen.og EcoMobility Wold Festival 2013 Suwon: an analysis changes in citizens awaeness
More information1111 Madison - Winton - Mt Airy 1111 AM. LV. SPRING GROVE & HAMILTON Via Spring Grove, L on Blue Rock, thru on Colerain, R to remain on Colerain,
1111 Madison - Winton - Mt Airy 1111 AM LV. SPRING GROVE & HAMILTON Via Spring Grove, L on Blue Rock, thru on Colerain, R to remain on Colerain, LV. COLERAIN & NORTH BEND Via Colerain, R on Kipling, L
More informationData Sheet. Linear bearings
Data Pack G Issued Septembe 1999 1502325042 Data Sheet Linea beaings Instument ball beaings and shafts The RS ange of instument quality ball bushing beaings ae fo 1 8in, 3 16in and 1 4in shafts. Each beaing
More informationthe Susquehanna River. Today, PFBC protects and conserves aquatic species throughout Pennsylvania.
Winte 2019 Wate Flows Though Pennsylvania Wate is all aound you. It is in the gound unde you feet. It flows by you in ceeks. Wate is in the sky, inside of tees and coming out of a gaden hose. When it ains,
More informationSR-714 (Monterey Road) Martin County, Florida
S-714 (Monterey oad) Martin County, Florida Financial Project ID:228861-1-21-01 Work Program Item No. (Old):4116331 Federal Project ID:FL62-033 Grade Separation Feasibility at Dixie Highway and FEC ailroad
More informationOverview. ALDER STREET CORRIDOR REVIEW Open House March 12, City of Campbell River BACKGROUND STUDY AREA
City of Campbell Rive Oveview 1 ACKGROUND The City of Campbell Rive is eviewing oppotunities to impove Ale Steet to bette balance vehicles, paking, peestians, cyclists, an public tansit. The oveall objective
More informationf i r e - p a r t s. c o m
A M E R I C A N F L A M E A F AF-1000 Seies Manual Gas Contol Valve APPLICATION The AF-1000 Manual Gas Contol Valve is designed fo use in gas in heath poducts, wall mount funaces, and space heating appliances.
More informationLesson 33: Horizontal & Vertical Circular Problems
Lesson 33: Hoizontal & Vetical Cicula Poblems Thee ae a wide vaiety of questions that you do if you apply you knowledge of cicula motion coectly. The tough pat is figuing out how to set them up. You need
More informationSAND DRAW CREEK REHABILITATION - SD 14 BROWN COUNTY, NEBRASKA
8.7.8567 JEO POJECT # 14838. INDEX OF SHEETS: \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:52
More informationD07-RW-VAR(B) PID
D7-RW-VAR(B) PID 43 ODOT popoe to acquie ight-of-way at two exiting culvet ytem located in Auglaize and Mece Countie. The poject i neceay to bing the exiting culvet ytem fully into the public ight-of-way
More information2111 Westwood Northern - Winton Terrace 2111 AM
2111 Westwood Northern - Winton Terrace 2111 AM LV. SPRING GROVE & STATION 8:02AM Via Spring Grove, L on Mitchell, thru on Este, L on Kings Run, R on Winneste, L on Dutch Colony, LV. DUTCH COLONY & WINTON
More informationThe Study About Stopping Distance of Vehicles
Intenational Jounal of Infomation Engineeing and Applications 018; 1(1): 18- http://www.aascit.og/jounal/infomation The Study About Stopping Distance of Vehicles Zhao Chun-xue School of Mathematics and
More informationWatford Half Marathon. Watford Half Marathon. Sunday February 5th Starting at 10.30am. Enjoy Your Run!!! Notice to all Entrants.
atfod Half Maathon 2017 Sunday Febuay 5th Stating at 1030am REF No 527 HELD UNDER UKA RULES ORGANISED BY atfod Half Maathon Notice to all Entants elcome to the atfod Half Maathon, oganised by atfod Haies
More informationMulti-Robot Forest Coverage
Multi-Robot Foest Coveage Xiaoming Zheng Sonal Jain Sven Koenig David Kempe Depatment of Compute Science Univesity of Southen Califonia Los Angeles, CA 90089-0781, USA {xiaominz, sonaljai, skoenig, dkempe}@usc.edu
More informationFALL PROTECTION PROGRAM
FALL PROTECTION PROGRAM 13255 South St. Ceitos, CA 90703 Telephone 562-924-3364 Fax 562-924-0521 Table of Contents Fall Potection... 3 Fall Potection Is Requied... 3 Fall Potection Types... 3 Standad Guadails,
More informationCORESTA RECOMMENDED METHOD N 68
COESTA ECOMMENDED METHOD N 68 DETEMINATION OF CABON MONOXIDE IN THE MAINSTEAM SMOKE OF CIGAS BY NON-DISPESIVE INFAED ANALYSIS (Januay 2010) 1. FIELD OF APPLICATION The method is applicable to the gas phase
More informationNoncrossing Trees and Noncrossing Graphs
Noncossing Tees and Noncossing Gaphs William Y. C. Chen and Shey H. F. Yan Cente fo Combinatoics, LPMC, Nanai Univesity, 300071 Tianjin, P.R. China chen@nanai.edu.cn, huifangyan@eyou.com Submitted: Sep
More informationRoute 47 (North Main Street) Reconstruction
TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related
More information10 Torque. Lab. What You Need To Know: Physics 211 Lab
b Lab 10 Toque What You Need To Know: F (a) F F Angula Systems Evey lab up to this point has dealt with objects moving in the linea system. In othe wods, objects moving in a staight line. Now we ae going
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More information3311 AM. LV. HAMILTON & ELKTON Via Hamilton, R on Spring Grove, R on Elmore, L on Beekman,
3311 Ferguson - College Hill - Daly 3311 AM LV. NORTH BEND & WINTON Via Winton, L on North Bend, R on Daly, L on Galbraith, L on Bobolink, thru on Edwood, R on North Bend, L on Hamilton, LV. HAMILTON &
More informationDETAIL "A" (INSIDE OF ENCLOSURE)
ENCOSUE SEE DETAI "A" AUTOMATIC BOW-OFF VAVE WITH COSS CONNECTION CONTO ASSEMBY (DUA CHECK) #57 BEDDING OCK 4" DEEP (UP TO GADE) 6" WIDE AOUND ENCOSUE 2" TAPPING SADDE W/ 2" COP STOP AND VAVE BOX METE
More informationOPTIMAL SCHEDULING MODELS FOR FERRY COMPANIES UNDER ALLIANCES
Jounal of Maine Science and Technology, Vol. 15, No. 1, pp. 53-66 (2007) 53 OPTIMAL SCHEDULING MODELS FOR FERRY COMPANIES UNDER ALLIANCES Shangyao Yan*, Chia-Hung Chen**, Hsin-Yen Chen*** and Tze-Chiang
More informationRESOLUTION No A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF
li RESOLUTION No. 2749 A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF SALISBURY, MARYLAND AND WICOMICO COUNTY, MARYLAND FOR THE DELIVERY
More informationPotential Bicycle Facility on Bayou Street Mobile, Alabama
Potential Bicycle Facility on Bayou Street Mobile, Alabama By Richard A. Hall, P.E. Prepared For Mobile Downtown Alliance Hall Planning & Engineering, Inc. March 28, 2018 Introduction Review of the February
More informationWatford Half Marathon. Watford Half Marathon. Sunday February 4th Starting at 10.30am. Enjoy Your Run!!! Notice to all Entrants.
atfod Half Maathon 2018 Sunday Febuay 4th Stating at 1030am REF No 527 HEld UNdERUka RUlEs ORGANISED BY atfod Half Maathon Notice to all Entants elcome to the atfod Half Maathon, oganised by atfod Haies
More informationFollow this and additional works at:
Lehigh Univesity Lehigh Peseve Fitz Laboatoy Repots Civil and Envionmental Engineeing 1987 Weigh-in-motion and esponse study of fou insevice bidges, U.S. Depatment of Tanspotation, Fedeal Highway Administation
More informationTHE IMPACTS OF CONGESTION ON COMMERCIAL VEHICLE TOUR CHARACTERISTICS AND COSTS
Figliozzi 1 THE IMPACTS OF CONGESTION ON COMMERCIAL VEHICLE TOUR CHARACTERISTICS AND COSTS Miguel Andes Figliozzi Depatment of Civil and Envionmental Engineeing Maseeh College of Engineeing and Compute
More informationOUTDOOR FOOTBALL FIELD
www integalspo com USING AREAS: Mini football fields, pivate buildings, pivate schools and pivate entepeunes. SYSTEM DESCRIPTION: Composite steel constuction with synthetic tuf floo, oof and sides coveed
More information"A Home for Gracious Living" (real estate brochure for Batten House)
Byn Maw College Scholaship, Reseach, and Ceative Wok at Byn Maw College Achitectue, Gounds, and Histoy Facilities 1959 "A Home fo Gacious Living" (eal estate bochue fo Batten House) Let us know how access
More informationCITY OF STURGIS ST. JOSEPH COUNTY, MICHIGAN WEST SOUTH STREET IMPROVEMENTS FEBRUARY 2017 VICINITY MAP WEST SOUTH STREET IMPROVEMENTS CITY OF STUGIS
ST. JOSEPH COUNTY, MICHIGAN ST. JOSEPH COUNTY VICINITY MAP Know what's below. Callbefore you dig. CITY OF STUGIS INDEX OF DAWINGS DESCIPTION COVE SHEET TYPICA COSS SECTIONS, NOTES, & DETAIS PAN & POFIES
More informationLight Rail Transit heads to French Hill and Mount Scopus
Jeusalem Tanspotation Netwok The Geen Line is on the way Light Rail Tansit heads to Fench H and Mount Scopus Infastuctue woks in the oad-woks section of the steets Ahaon Katzi, Lehi, Etzel, Lohamei HaGeta'ot,
More information0ur Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011
0u Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011 SUBJECT: PROCUREMENT OF CALIBRATION SERVICES FOR THE EQUIPMENTS IN Cental Laboatoy (Mechanical) Dea Sis, Technical & Commecial s ae invited fo the
More informationA Force Platform Free Gait Analysis
Poceedings A Foce Platfom Fee Gait Analysis Tokio Maeda 1,2, *, Tatsuo Ishizuka 3, Sakua Yamaji 4 and Yuji Ohgi 3 1 Keio Reseach Institute at SFC, 5322 Endo, Fujisawa, Kanagawa 252-0882, Japan 2 Koseki
More informationCyclostrophic Balance in Surface Gravity Waves: Essay on Coriolis Effects
Jounal of Oceanogaphy, Vol. 53, pp. 311 to 315. 1997 Shot Contibution Cyclostophic Balance in Suface Gavity Waves: Essay on Coiolis Effects KERN E. KENYON 4632 Noth Lane Del Ma, CA 92014-4134, U.S.A. (Received
More informationProject Proposal: Characterization of Tree Crown Attributes with High Resolution Fixed-Base Aerial Photography. by Rich Grotefendt and Rob Harrison
Poject Poposal: Chaacteization of Tee Cown Attibutes with High Resolution Fixed-Base Aeial Photogaphy by Rich Gotefendt and Rob Haison Funding Acknowledgments of Past Wok Pesented Alaska Depatment of Natual
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More informationFire-Safety Analysis Timber. FRILO Software GmbH As of 29/06/2016
Fie-Safety nalysis Timbe FRILO Softwae GmbH www.filo.com info@filo.com s of 29/06/2016 Fie-Safety nalysis Timbe Fie-Safety nalysis Timbe This documentation efes to the fie safety veifications used in
More informationThe Dockline AUGUST Board of Directors. Greetings from the Commodore. Jim Manlick
The Dockline 2018 Boad of Diectos COMMODORE - Jim Manlick jmanlick@new..com 655-1460 VICE COMMODORE - Gay Kuschel gaene@hotmail.com 619-0906 REAR COMMODORE - Jim Thompson jimtsmu@icloud.com 621-2946 FLEET
More informationMontgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015
Montgomery County Life Sciences Center LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015 Trail Alternatives GENERAL ASSUMPTIONS Where separated bicycle and pedestrian facilities
More informationBritish Prime Minister Benjamin Disraeli once remarked that
GABREL COSTA, MCHAEL HUBER, & OHN SACCOMAN Cumulative Home Run Fequency and the Recent Home Run Explosion Bitish Pime Ministe Benjamin Disaeli once emaked that thee ae thee kinds of falsehoods: lies, damned
More informationFORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION
FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationIncorporating Location, Routing and Inventory Decisions in Dual Sales Channel - A Hybrid Genetic Approach
Incopoating Location, Routing and Inventoy Decisions in Dual Sales Channel - A Hybid Genetic Appoach Chia-lin Hsieh 1, Shu-hsien Liao 2, Wei-chung Ho 2 1 Depatment of Statistics and Actuaial Science, Aletheia
More informationA CONCEPTUAL WHEELED ROBOT FOR IN-PIPE INSPECTION Ioan Doroftei, Mihaita Horodinca, Emmanuel Mignon
A CONCEPTUAL WHEELED ROBOT FOR IN-PIPE INSPECTION Ioan Dooftei, Mihaita Hoodinca, Emmanuel Mignon Univesité Libe de Buxelles Active Stuctues Laboatoy 50, Av. F.D.Roosevelt, B-1050, Bussels, Belgium. Email:
More informationA tale of San Diego County s water. If you had to describe San Diego's weather, you probably would use
keep San Diego beautiful Dought-toleant plants envionmentally-sensitve Bay-Delta The 1895 viewing Sweetwate Dam, Two women A tale of San Diego County s wate If you had to descibe San Diego's weathe, you
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationNorth Tahoe Division Projects & Assessments AUGUST 2015
1 Noth Tahoe Division Pojects & Assessments C A L I F O R N I A AUGUST 215 Noth tahoe DivisioN Pojects & assessments Page 2 Fie Adapted Community Assessment WhAT Is The FIRe ADAPTeD COmmuNITy Assessme
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationThe Properties of. Model Rocket Body Tube Transitions
The Popeties of Moel ocket Boy Tube Tansitions Date: Septembe 6, 000 Pepae By: J.. Bohm NA 7808 CA S680 ev: (June, 005) .0 Intouction When esigning moel ockets, esignes often choose to incopoate iffeent
More informationInformation on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps
Public information meeting #4 4 to 7 p.m., September 30, 2009 Hales Corners Welcome Thank you for attending this public information meeting for the WIS 100 Corridor Study. Your interest and comments are
More informationEPHESUS CHURCH ROAD-FORDHAM BOULEVARD AREA PLANNING DISTRICT
EPHESUS CHURCH ROAD-FORDHAM BOULEVARD AREA PLAIG DISTRICT TRASPORTATIO IMPACT AALYSIS EXECUTIVE SUMMARY Pepae fo: The Town of Chapel Hill Public Woks Depatment Taffic Engineeing Pepae by: HTB oth Caolina,
More informationPublic Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018
Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road
More informationfor several years, during which time the Committee printed two papers (Manning, 1979, 1981) regarding the
" Chapte 5 THE HISTORY OF BERKELEY BEACH Magaet Tanne Intoduction Most of the people who live in Bekeley today do not know that thee once existed a sandy beach stetching fom Univesity Avenue to Fleming's
More informationColumbia Pike Implementation Team (CPIT) Meeting
Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal
More information1 of 6 5/12/2015 8:02 PM
1 of 6 5/12/2015 8:02 PM TUESDAY MAY 12, 2015 10:01 PM oebea ate~12-5 Delmava Shoebids v. Augusta @ Athu W. Pedue Stadium /delmava-shoebidsv-augusta /?instance_id=994255) 11:00 pm Pub Paty Tivia @ The
More informationExperiment #10 Bio-Physics Pre-lab Questions
Expeient #10 Bio-Physics Pe-lab Questions ** Disclaie: This pe-lab is not to be copied, in whole o in pat, unless a pope efeence is ade as to the souce. (It is stongly ecoended that you use this docuent
More informationCheat-Proof Playout for Centralized and Distributed Online Games
Cheat-Poof Playout fo Centalized and Distibuted Online Games Nathaniel E. Baughman Bian Neil Levine baughman@cs.umass.edu bian@cs.umass.edu Depatment of Compute Science Univesity of Massachusetts Amhest,
More informationDonahue Drive Corridor Traffic Operational Evaluation
Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationTrends in Cycling, Walking & Injury Rates in New Zealand
Tends in Cycling, Walking & Injuy Rates in New Zealand Walking and cycling, minutes/week SUMMAR Estimates of walking and cycling fom 9 Household Tavel suveys in New Zealand, conducted etween 1989 and 2012,
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationExperiment #10 Bio-Physics Pre-lab Comments, Thoughts and Suggestions
Expeient #10 Bio-Physics Pe-lab Coents, Thoughts and Suggestions The pupose of this pape is to povide you with soe infoation which ay be useful fo solving the pe-lab questions and pefoing the lab. I will
More informationAppendix O. Assessment of Bicycle Facility Alternatives
Appendix O Assessment of Bicycle Facility Alternatives FINAL ASSESSMENT OF CROSS-SECTION ELEMENTS Lakeshore Road, from Mississaga Street to Dorval Drive Town of Oakville Submitted to: Town of Oakville
More informationDUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS
DUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS Fo desciption of zone boundaies see: 68C-22.027 F.A.C fo State Manatee Potection Zones last amended 1/30/2007 68D-24.016
More informationPublic Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017
Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned
More informationInterior Rule of the Quebec Open 2017
Inteio Rule of the Quebec Open 2017 Aticle 1. The Oganize The Oganize is the club d'échecs de Sainte-Foy which will be epesented by M Chales Tenblay, chaiman of the oganizing committee Le tounoi se déoulea
More informationSession 6. Global Imbalances. Growth. Macroeconomics in the Global Economy. Saving and Investment: The World Economy
Session 6. Global Imbalances. Gowth. v, and the Real Inteest Rate v Global Imbalances v Gowth v Intoduction to exchange ates and : The Wold Economy The eal inteest ate is the pice that equilibates saving
More informationComments EXECUTIVE SUMMARY
Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal
More informationMODELLING THE INTERACTION EFFECTS OF THE HIGH-SPEED TRAIN TRACK BRIDGE SYSTEM USING ADINA
MODELLING THE INTERACTION EFFECTS OF THE HIGH-SPEED TRAIN TRACK BRIDGE SYSTEM USING ADINA ABSTRACT Constança Rigueio Depatment of Civil Engineeing, Polytechnic Institute of Castelo Banco Potugal Calos
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationCS3350B Computer Architecture. Lecture 6.2: Instructional Level Parallelism: Hazards and Resolutions
CS3350B Compute Achitectue Winte 2015 Lectue 6.2: Instuctional Level Paallelism: Hazads and Resolutions Mac Moeno Maza www.csd.uwo.ca/couses/cs3350b [Adapted fom lectues on Compute Oganization and Design,
More informationAn Auction Based Mechanism for On-Demand Transport Services
An Auction Based Mechanism fo On-Demand Tanspot Sevices Malcolm Egan, Ni Oen and Michal Jakob Abstact Recently, a new class of tanspot sevices, exemplified by Ube and Lyft has emeged. Such sevices use
More informationApplication to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.
September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed
More informationMultimodal Design Guidance. October 23, 2018 ITE Fall Meeting
Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT
More informationTOWN OF CHAPEL HILL Town Council Special Meeting 405 Martin Luther King Jr Blvd, Chapel Hill, NC :00 P.M., OCTOBER 30, 2014
1 TOWN OF CHAPEL HILL Town Council Special Meeting 405 Martin Luther King Jr Blvd, Chapel Hill, NC 27514 7:00 P.M., OCTOBER 30, 2014 Participate! Transform your ideas into action and make Chapel Hill even
More informationADVISORY BICYCLE LANES REALITY VERSUS DESIGN GUIDANCE
Michael Williams 0 ADVISORY BICYCLE LANES REALITY VERSUS DESIGN GUIDANCE Michael Williams (Corresponding author) Alta Planning + Design SE Grand Avenue Portland, OR Email: michaelwilliams@altaplanning.com
More informationTHE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhart County
THE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhat County WHEN: Fiday August 26 2016 WHERE: LaSalle Bistol Pond Elkhat INTRODUCTION The Geat Cadboad Boat Race is
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationNorth Avenue Corridor Study
North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:
More informationWho is Toole Design Group?
2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationCapital Region Council of Governments
March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry
More information