1 IN THE MATTER OF the Resource Management Act 1991 AND IN THE MATTER OF an application by the Church of Jesus Christ of Latter-day Saints Trust Board for the Temple View Project CDP1 and removal of DOM Building and privacy wall. STATEMENT OF EVIDENCE OF CAMERON BESWICK INDER ON BEHALF OF THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS TRUST BOARD INTRODUCTION 1. My full name is Cameron Beswick Inder and I hold the position of Transportation Engineer at Bloxam Burnett & Olliver, a firm of consulting engineers, planners and surveyors based in Hamilton. I have held this position since I hold the Qualifications of Bachelor of Engineering (Civil) degree with Honours from the University of Auckland (1999). 3. I have seventeen years experience in transportation/traffic engineering gained through employment in New Zealand and the UK. 4. I have been working on the Temple View project with the Church of Jesus Christ of Latter-day Saints (LDS) project team for approximately four years. My early work on 1

2 the project involved the assessment of transportation effects of the Mendenhall Library upgrade, the new Stake Centre building, the housing developments on the west side of Tuhikaramea Road and the Tuhikaramea Road upgrade. I have subsequently been the project manager for the civil engineering construction works of these projects, while continuing to be involved in the transportation assessment of the proposed CDP2, CDP1 and Waipa Bolt-on developments. I was responsible for preparing the transportation assessment that accompanied this Application. 5. I have been asked by the Church of Jesus Christ of Latter-day Saints Trust Board (Trust Board) to prepare this brief statement of evidence to summarise the key matters of the Application relevant to my expertise. 6. This evidence is intended to supplement the information contained in the Application and the assessment of environmental effects (AEE). 7. I confirm that I have read the Code of Conduct for Expert Witnesses contained in the Environment Court Practice Note and that I agree to comply with it. I confirm that I have considered all the material facts that I am aware of that might alter or detract from the opinions that I express, and that this evidence is within my area of expertise. SCOPE OF EVIDENCE 8. In my evidence, I will: (a) Provide an overview of the traffic assessment for the proposed CDP1 development; (b) Address the transportation effects of the proposed CDP1 development and any mitigation proposed; (c) Address submitter comments and concerns in relation to traffic; (d) Address any traffic related issues from the Officer's Report; (e) Provide comments on the draft conditions; and (f) Provide my conclusions. 2

3 EXECUTIVE SUMMARY 9. In my opinion the transportation effects of the proposed Temple View CDP1 development have been appropriately assessed. The local road network including the upgraded Tuhikaramea Road in Temple View has been designed to accommodate the full development traffic, along with appropriate walking and cycling and public transport provisions such that the transportation effects will be less than minor. 10. A Private Developer Agreement (PDA) between the Church and Hamilton City Council (HCC) is an appropriate mechanism to ensure the wider network effects of CDP1 traffic are mitigated in future, since the timing and final form of intersection improvements cannot be confirmed at this time. The PDA will ensure that any improvements and the apportionment of costs are identified at a time closer to when the CDP1 development traffic effects occur and the road controlling authorities have more certainty about intersection upgrades. 11. Accordingly, I am satisfied that the wider network traffic effects will be appropriately mitigated by the proposed condition requiring a PDA between HCC and the Church, along with the monitoring condition, subject to my suggested amendments in paragraphs 45 and 46 of my evidence. PROPOSED CDP1 DEVELOPMENT OVERVIEW Background 12. Temple View is located on Tuhikaramea Road to the south of Hamilton City. Tuhikaramea Road has been upgraded over the past two years as part of the Stake Centre, Mendenhall Library and Legacy Park developments on the ex-church College of New Zealand (CCNZ) site. These works were consented in late The upgrade works involved a fundamental redesign of the road, including three new roundabouts, shared walking and cycling paths, new on-street parking bays, replacement of all storm water and communications services, and replacement of almost the entire road pavement. This work has been carried out by the Church at its own expense, even though analysis had shown that much of the existing Tuhikaramea Road pavement had no life left in it 1 at the time the upgrade began. 1 Remaining pavement life in years is an output of the Falling Weight Deflectometer (FWD) analysis of the existing pavement condition. This gives a prediction of the number of years before full rehabilitation of the pavement is due. 3

4 Proposal as assessed 13. The proposed CDP1 development is located at the northern end of the former CCNZ land on the eastern side of Tuhikaramea Road. The proposal is for a residential development consisting of approximately 106 lots (of which approximately 36 are senior housing). The development will also include approximately 517m 2 of retail development and a 200m 2 childcare centre. 14. The proposed CDP1 development will have access to Tuhikaramea Road via two existing roundabouts (completed as part of the Tuhikaramea Road upgrade): one located at Foster Road and the other located just north of Cowley Drive. An additional T-intersection will also be constructed just south of Cowley Drive. These will be constructed to the standards found in the Hamilton City Infrastructure Technical Specifications and to comply with the Hamilton City District Plan. Therefore, I support the design and location of the proposed access intersections. 15. The internal roads of the CDP1 development have been designed to be consistent with the already consented CDP2 development adjacent to CDP1 to the south. The CDP2 roads were designed with a strong focus on good urban design, and the design has been agreed on by HCC. Consequently, I support the design of the internal roads for the CDP1 development. 16. The proposed CDP1 development is predicted to generate approximately 1320 vehicle trips per day and approximately 205 vehicles trips in each of the morning and evening peak hours. 17. The CDP1 development is part of the wider Temple View project that also includes the CDP2 development (already consented) and development of an adjacent area of land previously within Waipa district (referred to as the Waipa bolt-on) that is expected to undergo a Plan Change process in late For completeness, my assessment of effects includes the traffic generated by the entire Temple View project development area (including Waipa bolt-on) with a total of approximately 3500 vehicle trips per day and 480 vehicle trips in each of the morning and evening peak hours. Method of assessment 18. I have used the total trip generation numbers mentioned in paragraph 17 above to assess the traffic effects on the local road network, including the access intersections 4

5 and internal roads. However, for the wider road network, I have assumed that trips generated by the retail and childcare facilities do not use the wider transportation network (i.e. they are internal trips within Temple View village). I believe this to be a reasonable assumption, as it is unlikely that people will travel large distances to use these local facilities. Furthermore, other community facilities such as the Kai Hall, Stake Centre and the Mendenhall History Centre are also likely to generate many internal trips. Therefore, in my opinion the number of trips assessed as using the wider traffic network is a conservative estimate. 19. To determine the distribution of these trips on the wider transport network, a number plate survey was carried out on Wednesday 30/11/2016 and Thursday 01/12/2016. The dates were agreed with HCC and the New Zealand Transport Agency and careful analysis was done to ensure that traffic volumes were not significantly affected by senior school students being on exam leave. 20. The number plate survey enabled the existing traffic distribution patterns to be determined. Ie the current directional split of traffic to and from Temple View. Temple View traffic is generated by approximately 225 existing residential lots accessing Tuhikaramea Road via Cowley Drive and Foster Road. The results show that approximately 67% and 76% of traffic in the AM peak and PM peak respectively, is coming from / heading to the north (Hamilton). The remaining traffic heads south towards the Collins Road intersection. Of the traffic to and from the north, approximately 65% travels through the Dinsdale roundabout, with most of the remainder using Kahikatea Drive Extension. This is shown in diagrammatic form in Figures 1 and Figure 2 on the following page. In my opinion, there is no reason that future traffic patterns for the CDP1 development will differ significantly from this existing traffic pattern in Temple View. 21. The results of the number plate survey also demonstrated that the Temple View residential area generates on average approximately 1.16 trips per lot in the AM peak hour (260 total trips) and 1.01 trips per lot in the PM peak hour (230 total). These rates are consistent with the trip generation rate used to assess the proposed CDP1 development. 22. I have used this survey information to assess the effects of the proposed development at three key intersections on the wider network near Temple View. These intersections are listed below and shown on Figure 1: Tuhikaramea Road / Collins Road / Koromatua Road 5

6 The Dinsdale Roundabout Tuhikaramea Road / Gibson Road / Kahikatea Drive 23. I have assessed the intersections mentioned in paragraph 22 with predicted traffic flows for the year 2041 to identify any transportation effects of the full Temple View project. To predict traffic volumes for 2041, I have assumed a background growth rate of 1% on all surrounding roads, in addition to the additional traffic generated by the Temple View project. The 1% growth rate is consistent with past growth rates on surrounding roads. 24. I have not used the Waikato Regional Transport Model (WRTM) as a predictor of local effects in 2041 as the model does not include any residential growth areas in Temple View. Also, the WRTM coding is very coarse (low accuracy) in this part of Hamilton. However, as a high-level model it is useful for showing the potential impact of the future Hamilton Bypass and Southern Links road corridors (two major new road projects in the next years) on traffic volumes through Temple View. The WRTM shows that both these projects have little impact on future 2041 traffic flows through Temple View. 6

7 Figure 1: Plan showing the three key intersections relative to Temple View Dinsdale Roundabout Hamilton Kahikatea Drive / Tuhikaramea Road / Gibson Road Intersections Temple View Temple View CDP1 Project Colins Road / Tuhikaramea Road Intersection 7

8 Figure 2 AM network percentage splits 8

9 Figure 3: PM network percentage splits 9

10 TRANSPORTATION EFFECTS OF THE PROPOSED CDP1 DEVELOPMENT Local network effects 25. The predicted peak hour flow on Tuhikaramea Road could rise to 1100 vehicles per hour in a worst-case scenario. Theoretical capacities of 2,400 to 2,800 passenger car units (pcu) per hour per lane can be calculated where there are uninterrupted flows, and pcu per hour per lane are practical capacities where there is other interaction with corridor constraints such as accesses and parking. Tuhikaramea Road between Temple View and Hamilton in my opinion has sufficient capacity to accommodate the total baseline traffic (including CDP2) plus that generated by CDP 1 and the Waipa Bolt-On. 26. The local road network that the development will use to access Tuhikaramea Road in Temple View has been designed to accommodate the CDP1 development traffic. This network includes the two new roundabouts recently constructed on Tuhikaramea Road. I have modelled these roundabouts using SIDRA intersection, and the results show that Tuhikaramea Road will operate at no worse than level of service A (the highest possible level of service) under the full development of the Temple View project. 27. Consequently, in my opinion the predicted transportation effects on the local road network within Temple View village are negligible. Wider network effects 28. As discussed above, there are three key intersections in the wider network that I expect will be affected by traffic generated by the Temple View project. These are identified in Figure 1. I will address each intersection in turn. 29. The Dinsdale roundabout is the intersection of five roads including two designated as State Highway 23. The roundabout presently performs poorly on some approaches during the weekday commuter peak periods. The PM peak experiences long queues on Tuhikaramea Road while Whatawhata Road and Dinsdale Road experience long queues in the AM peak period. In 2016 the NZ Transport Agency completed some safety improvement works that reduced the roundabout's capacity. However in the last month they reinstated a second approach lane to the Tuhikaramea Road approach which in my opinion, based on SIDRA modelling results and observations before the safety works were done, will help to improve the capacity of this approach. 10

11 30. It is my opinion that in 2041 the performance of the roundabout will be poor in the AM and PM peak periods, regardless of whether traffic generated by the Temple View project is included in the assessment. Without Temple View development traffic added, both the Killarney Street and Rifle Range Road approaches are predicted to operate at level of service F with 95th percentile queue lengths of 1008m on Rifle Range Road and 536m on Killarney Street. With the addition of Temple View CDP1 traffic (which is approximately 3% of the total traffic using the roundabout), these queues increase to 1438m and 596m respectively. The remaining three approaches operate at level of service A. The change in queue length is disproportionate to the small volume increase associated with Temple View CDP1 because average delays increase exponentially when an approach is at or near capacity. In my opinion, the 2041 Level of Service F and 500m+ queue lengths without CDP1 traffic means an upgrade to this roundabout will be required regardless of whether Temple View project traffic is included. 31. Crash prediction models predict that the addition of Temple View CDP1 traffic has the effect of increasing the number of injury crashes by 0.22 over a five-year period (ie. 1 additional injury crash per 23 years). Therefore in my opinion, the addition of Temple View CDP1 traffic will have a negligible effect on the safety of the Dinsdale Roundabout. Furthermore, the NZ Transport Agency has recently undertaken work at the Dinsdale Roundabout to improve safety, which is not accounted for in the crash prediction models. 32. The Tuhikaramea Road / Collins Road / Koromatua Road intersection has similar issues to the Dinsdale Roundabout, with the side roads (Collins Road and Koromatua Road) operating at a poor level of service in 2041 without Temple View CDP1 traffic. The addition of Temple View CDP1 traffic further reduces this performance, but again, by a disproportionate amount due to the already existing capacity issues. As with the Dinsdale Roundabout, the impact of the additional traffic from CDP1 on the safety of this intersection is expected to be negligible relative to the 2041 baseline situation. HCC is already aware of this intersection s potential safety issues (being a 4-leg cross roads intersection) however at this stage, I understand HCC has no current plans that identify what a suitable upgrade may be. 33. The Tuhikaramea Road / Gibson Road / Kahikatea Drive intersection is actually two T intersections approximately 30m apart. Due to this close spacing each needs to be considered in context with the other, so I have referred to them as one intersection. This intersection has a similar situation to the aforementioned intersections, with a poor level 11

12 of service on Kahikatea Drive and Gibson Road approaches in 2041 without the addition of Temple View CDP1 traffic. The addition of Temple View CDP1 traffic then further reduces the performance, but again, by a disproportionate amount to the traffic volume increase by CDP1 due to the existing approach capacities having already been exceeded. This highlights that there is a need for planned improvements to the intersection regardless of the addition of CDP1 traffic. However, similar to the aforementioned intersections, relative to the 2041 baseline situation the impact of the small increase in traffic associated with CDP1 on the safety of this intersection is expected to be negligible. 34. Overall, it is my opinion that with the background traffic growth through to 2041, the upgrade works to the three intersections mentioned above will need to be undertaken regardless of whether there is additional traffic from the Temple View CDP1 project. However, the addition of Temple View CDP1 traffic will expedite the necessity of these upgrades. Proposed mitigation 35. As part of the assessment, I have considered some potential upgrade solutions to the three intersections that will address the traffic effects of both the background growth through to 2041 and the addition of Temple View CDP1 traffic. I have consulted with HCC as to the form and purpose of these upgrades, as well as the NZ Transport Agency in regards to the Dinsdale Roundabout. 36. The Tuhikaramea Road / Gibson Road / Kahikatea Drive intersection has two potential upgrade solutions: a signalised intersection or two small closely spaced roundabouts. Both of these solutions have the potential to accommodate 2041 traffic volumes, including traffic generated by the Temple View project. However, both of these upgrade solutions require widening of the road and possibly significant land area purchases. 37. The Tuhikaramea Road / Collins Road / Koromatua Road intersection is a difficult situation due to the cross-roads layout and location perched on a sharp ridgeline. There is really just one potentially viable upgrade solution that will accommodate 2041 traffic volumes including traffic from Temple View, and that is a roundabout. However, the location of the intersection on the ridge will require significant earthworks and potential land acquisition to provide the geometry requirements for a roundabout. 12

13 38. The Dinsdale Roundabout has several significant constraints on potential upgrades, including that the centre island currently houses a significant sewer pump station for the Dinsdale and Temple View areas. As a consequence there is no obvious solution or planned long term improvement at this time. Discussions with the NZ Transport Agency and the HCC indicated that they are aware of the potential capacity issues in future but a suitable upgrade or replacement solution is not currently known. 39. Due to the uncertainty around the timing and form of upgrades for these three intersections, to mitigate effects the offer of financial contributions via a PDA has been made by the LDS project team to HCC. The scope of the PDA will cover the Church s contribution to the costs of upgrading the aforementioned affected intersections, based on a proportion of the traffic using the intersection that comes from the Temple View CDP1 project. Using the 1% background growth rate, the proportion of Temple View CDP1 traffic in 2041 at each intersection in the AM and PM peak hour will be approximately: (a) Tuhikaramea Road/Collins Road/Koromatua Road 7%; (b) The Dinsdale Roundabout 3%; and (c) Tuhikaramea Road/Gibson Road/Kahikatea Drive 11%. COMMENTS ON SUBMISSIONS 40. There have been two submissions that pertain to traffic. The first submission was from the NZ Transport Agency, who are neutral on the proposal. They noted that the proposal will result in additional traffic onto the State Highway network, however overall they did not have any significant concerns with the proposal and its effects on the State Highway network. As outlined above I consulted the NZ Transport Agency during the preparation of my traffic assessment that accompanied the Application. 41. The second submission was from the Temple View NZ Heritage Society, who oppose the proposal on the grounds that no traffic assessment has been undertaken to look at the effects of additional vehicles on the Dinsdale Roundabout and other roads around Temple View. 42. In response to the latter submission, it is my opinion that the effects of the proposed development on the surrounding road network have been careful analysed and assessed in the Integrated Transport Assessment. Paragraphs 25 through 34 above outline the results of this assessment. 13

14 RESPONSE TO OFFICER'S REPORT 43. I have read the officer's s42a report and the traffic review evidence by Mr Alastair Black dated 29 March Paragraph 140 in the officers report requests a plan confirming which roads and lanes in Temple View CDP1 the Church expects to vest in HCC. Attachment A to my evidence provides this plan. This shows that apart from the cul-desac laneways in Precinct 4, the Church anticipates that all of the roads in CDP1 will be vested in HCC. COMMENTS ON DRAFT CONDITIONS 44. I have read the draft conditions that relate to transportation matters, and offer the follows comments. 45. In regards to draft condition 33 (traffic monitoring); I support the inclusion of a monitoring condition although I believe it needs amendment to ensure that traffic surveys by the LDS Church are not required indefinitely. To that end I recommend that the condition include that the final monitoring survey is to be undertaken 3 years after the last code compliance issued for construction in CDP1. That final monitoring survey will capture all CDP1 development traffic flows necessary for the LDS Church and HCC to confirm the intersection upgrade contributions. At that time the purpose of the monitoring condition will be met and therefore no further surveys are necessary. 46. In addition, for the same condition #33 the intersection identified in b (iii) Kahikatea Drive / Greenwood Street intersection is not one that we previously surveyed or assessed in the ITA. This intersection was initially considered in consultation with HCC and the NZ Transport Agency but it was agreed to not be of interest due to the future changes that will occur with the Southern Links project. Instead it was agreed that we survey the traffic volumes at the Kahikatea Drive / Higgins Road intersection to understand the traffic splits at that point in the network. Therefore, I believe the following amendment should apply: Condition 33 b (iii) Kahikatea Drive / Greenwood Street intersection Higgins Road intersection. CONCLUSION 47. In my opinion the transportation effects of the proposed Temple View CDP1 development have been appropriately assessed. The local road network including the 14

15 upgraded Tuhikaramea Road in Temple View has been designed to accommodate the full development traffic, along with appropriate walking and cycling and public transport provisions such that the transportation effects will be less than minor. 48. A PDA between the Church and HCC is an appropriate mechanism to ensure the wider network effects of CDP1 traffic are mitigated in future, since the timing and final form of intersection improvements cannot be confirmed at this time. The PDA will ensure that any improvements and the apportionment of costs are identified at a time closer to when the CDP1 development traffic effects occur and the road controlling authorities have more certainty about intersection upgrades. 49. Accordingly, I am satisfied that the wider network traffic effects will be appropriately mitigated by the proposed condition requiring a PDA between HCC and the Church, along with the monitoring condition, subject to my suggested amendments in paragraphs 45 and 46 of my evidence. Cameron Beswick Inder 11 April

16 CDP1 PRECINCT 4 RETAIL PRECINCT PRECINCT 3 PRECINCT 1 PRECINCT 2 PRECINCT 3 CDP2 BOLT ON CDP2 Project: Temple View CDP1 Client: The Church of Jesus Christ of Latter Day Saints Project: Temple View CDP1, File Path: /Volumes/CONSTRUKT/ P R O J E C T S/TMPN/2.CONCEPT MASTERPLAN/ArchiCAD/PLN/TMPN Masterplan Campus V19 7.pln Drawing: PRECINCT PLAN Scale: 1:1250 N COPYRIGHT RESERVED BY CONSTRUKT ARCHITECTS LTD Sheet: CDP110 Date: 14/12/16 Rev:

Statement of Evidence of Judith Makinson

Statement of Evidence of Judith Makinson In the Matter of: The Resource Management Act 1991 and In the Matter of: Podium Sports Lodge, 18 20 Peake Road Application By: Brian Perry Charitable Trust Statement of Evidence of Judith Makinson TDG

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016 Ministry of Education Flat Bush School Notice of Requirement Integrated Transportation Assessment Report February 2016 TDG Ref: 12988-2 151105 ita flat bush.docx Ministry of Education Flat Bush School

More information

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT PREPARED FOR WOLFDENE PTY LTD TRAFFIC ENGINEERING ASSESSMENT PRECINCT STRUCTURE PLAN AT BROMPTON LODGE, CRANBOURNE Document

More information

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria August 2018 CONTENTS 1 Executive summary... 1 2 Summary of the amendment... 2 3 Submission...

More information

1 Introduction. COPY John Denney FROM Chris Morahan DATE 2 November 2015 FILE 6-XT177.62/305DC SUBJECT Stanley Street Network Traffic Modelling

1 Introduction. COPY John Denney FROM Chris Morahan DATE 2 November 2015 FILE 6-XT177.62/305DC SUBJECT Stanley Street Network Traffic Modelling Opus International Consultants Ltd Christchurch Office 20 Moorhouse Avenue PO Box 1482, Christchurch Mail Centre, Christchurch 8140 New Zealand TO Reece Gibson COPY John Denney FROM Chris Morahan DATE

More information

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010 Ministry of Education Notice of Requirement, North City High School Transportation Assessment July 2010 PO Box 1261, Level 1, 7 Hardley Street Hamilton 3240 P: +64 7 839 550 www.tdg.co.nz New Zealand 10574ta_v6.doc

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

PROPOSED RESIDENTIAL SUBDIVISION

PROPOSED RESIDENTIAL SUBDIVISION PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT ROAD & 1121 DOHERTYS ROAD, TARNEIT Prepared For: TCG (RM) Developments Pty Ltd MARCH 2014 OUR REF: 16740R#1 PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT

More information

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017 Traffic Impact Analysis (TIA) Process and Procedures Manual Post Office Box 664 101 Huntersville-Concord Road Huntersville, NC 28070 Phone 704-766-2220 Fax 704-992-5528 www.huntersville.org (c) 2017, Town

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Transport Assessment. Curtis Street Plan Change

Transport Assessment. Curtis Street Plan Change Transport Assessment Curtis Street Plan Change Transport Assessment for Curtis Street Plan Change i Contents 1. Introduction... 1 2. Existing Conditions... 2 2.1 Location... 2 2.2 Study Area... 3 2.3

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Kings College, Otahuhu Proposed Plan Change. Integrated Transportation Assessment Report

Kings College, Otahuhu Proposed Plan Change. Integrated Transportation Assessment Report Proposed Plan Change Integrated Transportation Assessment Report 23 October 2017 Project: Report title: Document reference: Kings College, Otahuhu Integrated Transportation Assessment Report J00700 Kings

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

MEMORANDUM. Our project study area included the following locations:

MEMORANDUM. Our project study area included the following locations: MEMORANDUM Date: To: From: Subject: Najib O. Habesch Nick M. Fomenko, PE, PTOE Bushnell Park North Traffic Assessment BETA Project #: 4461 As part of our contract to undertake the design of the Bushnell

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

Auranga B1 Proposed Plan Change, Bremner Road, Drury. Integrated Transportation Assessment Report

Auranga B1 Proposed Plan Change, Bremner Road, Drury. Integrated Transportation Assessment Report Auranga B1 Proposed Plan Change, Bremner Road, Drury Integrated Transportation Assessment Report 12 May 2017 Project: Report title: Document reference: Proposed Plan Change, Bremner Road, Drury Integrated

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

Pakenham East PSP 1210

Pakenham East PSP 1210 Pakenham East PSP 1210 Victorian Planning Authority Traffic and Transport: Expert Witness Statement Final C May 28, 2018 Pakenham East PSP 1210 Project No: Document Title: Document No.: Revision: IS245200

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

BEFORE THE ENVIRONMENT COURT

BEFORE THE ENVIRONMENT COURT 1991 BEFORE THE ENVIRONMENT COURT I MUA I TE KOOTI TAIAO O AOTEAROA ENV-2018-AKL-000078 Under the Resource Management Act 1991 ( the Act ) In the matter of a direct referral of an application for resource

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

gaf traffic 2015 capability statement

gaf traffic 2015 capability statement gaf traffic 2015 capability statement www.gaftraffic.com.au INTRODUCING GAF TRAFFIC GAF Traffic is a people-centred traffic engineering consultancy serving new and existing projects in Western Australia.

More information

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION

More information

Traffic and Transport Assessment

Traffic and Transport Assessment Traffic and Transport Assessment Section 96 Residential Subdivision, Davis Road Tarneit CG120370 Prepared for Stockland Pty Ltd 19 February 2013 Document Information Prepared for Stockland Pty Ltd Project

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

VicRoads. Drysdale Bypass Overview Traffic Modelling Report

VicRoads. Drysdale Bypass Overview Traffic Modelling Report Vics Drysdale Bypass Overview Traffic Modelling Report July 2017 Table of contents 1. Introduction... 1 1.1 Qualifications and Experience... 1 1.2 Instructions and Purpose of this Report... 1 1.3 Scope

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Walton Acres at Riverwood Athletic Club Clayton, North Carolina 9. CONCLUSIONS This Traffic Impact Analysis Update was conducted to determine the potential traffic impacts of the proposed Walton Acres at Riverwood Athletic Club residential development, located east

More information

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA 5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA The Transportation Services Committee recommends the adoption of the recommendations

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

SAMRAND DEVELOPMENT (PTY) LTD C2562/01TIA FEBRUARY 2019

SAMRAND DEVELOPMENT (PTY) LTD C2562/01TIA FEBRUARY 2019 SAMRAND DEVELOPMENT (PTY) LTD C2562/1TIA PROPOSED MIXED-USE DEVELOPMENT TO BE LOCATED ON ERVEN 1 AND 2, KOSMOSDAL EXTENSION 14 CENTURION, PRETORIA TRAFFIC IMPACT ASSESSMENT FEBRUARY 219 REPORT SHEET PROJECT

More information

Land at Chesterton, Cirencester

Land at Chesterton, Cirencester Land at Chesterton, Cirencester Transport Update 22 October 2014 By Mark Gimingham BA (Hons) BTP CMILT MCIHT, Partner, i-transport LLP Purpose To provide an update on progress with the development of the

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants IPWEA Conference: 7 June 11 June 2015 Abstract AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants The AMETI project is a package of multi-modal transport

More information

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street, Suite 100 Syracuse, NY 13202 Telephone (315) 422-5716; Fax

More information

Frome Street Bicycle Route

Frome Street Bicycle Route The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities

More information

SH3 Waitara to Bell Block

SH3 Waitara to Bell Block SH3 Waitara to Bell Block NZ Transport Agency August 2017 Community feedback report Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal

More information

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Acland Street, St Kilda

Acland Street, St Kilda Acland Street, St Kilda Traffic Redistribution Client: Yarra Trams Project No. 122531 Draft_4 Report 16/09/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic 3079 PO Box 417 Ivanhoe Vic 3079

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

The Value of Technical Peer Reviews

The Value of Technical Peer Reviews The Value of Technical Peer Reviews Axel Wilke ViaStrada Daniel Newcombe Auckland City Council Overview Background & Introduction Methodology 5 Peer Review Examples Original design Peer review changes

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

Mr. Randy Kowalchuk, President

Mr. Randy Kowalchuk, President October 20, 2017 #201, 8506-200th Street, Langley, BC V2Y 0M1 T: 604.371.0091 F: 604.371.0098 Our Reference: 31931 Naramata Benchland Properties 176 Fraser Court, Penticton, BC V2A 8B4 Attention: Mr. Randy

More information

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS Section Title Page 4.1 Introduction... 4-1 4.1.1 General... 4-1 4.1.2 Applicant Responsibility... 4-1 4.1.3 Capacity and Safety Issues... 4-1 A.

More information

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC Howes Technical Advantage Ltd. This report was prepared by Howes Technical Advantage Ltd. for the City of Port

More information

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge. Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public

More information

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010 Shotover Country Proposed Private Plan Change February 2010 PO Box 13 835, Armagh Christchurch 8141 P: +64 3 379 2404 www.tdg.co.nz New Zealand Shotover Country Proposed Private Plan Change Quality Assurance

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Prepared By Chris Morahan Transportation Engineer/Traffic Modeller

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),

More information

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning Memorandum To: Smart Growth From: Bruce Robinson, Transport Advisor, Infrastructure Planning Subject: Te Tumu Transportation Assessment: Stage 1 Sensitivity Analysis Date: 1 June 2016 INTRODUCTION This

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Isle of Capri Casinos, Inc. Waterloo, Iowa SEH No. A-CLAAS0501.00 November 16, 2004 Table of Contents (Continued) Table of Contents Certification Page Table of Contents Page 1.0

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Community engagement guide May 2018

Community engagement guide May 2018 Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements

More information

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission

More information

SH1 Western Belfast Bypass Transportation Assessment

SH1 Western Belfast Bypass Transportation Assessment SH1 Western Belfast Bypass Transportation Assessment WBB- Transportation Assessment i This report has been prepared on behalf of the NZ Transport Agency (NZTA). No liability is accepted by this company

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Middleton Beach Activity Centre

Middleton Beach Activity Centre Middleton Beach Activity Centre CW926600 Prepared for Landcorp 24 November 2015 24 November 2015 Cardno i Contact Information Cardno (WA) Pty Ltd Trading as Cardno ABN 77 009 119 000 11 Harvest Terrace,

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

Figure 7.6 Indicative site layout for Northcote Street tunnel site (C7), eastern ventilation facility site (C8) and Wattle Street and Walker Avenue

Figure 7.6 Indicative site layout for Northcote Street tunnel site (C7), eastern ventilation facility site (C8) and Wattle Street and Walker Avenue 7-18 Figure 7.6 Indicative site layout for Northcote Street tunnel site (C7), eastern ventilation facility site (C8) and Wattle Street and Walker Avenue civil site (C9) Eastern ventilation facility site

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

STATE OF VERMONT ENVIRONMENTAL COURT } } } } } Decision and Order

STATE OF VERMONT ENVIRONMENTAL COURT } } } } } Decision and Order STATE OF VERMONT ENVIRONMENTAL COURT In re: Appeal of Ted S. Gladstone and Kathleen Hoisington Docket No. 190-10-99 Vtec Decision and Order Appellants appealed from a decision of the Planning Commission

More information

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report.

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report. 1.0 Introduction 1.1 Part One of this study has assessed options to mitigate the impacts of existing issues on the road network in and around South Marston Village. Issues have been identified from site

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

RC25777 PROPOSED SERVICE CENTRE, 25 TE ARAHORI STREET, TURANGI REVIEW OF TRAFFIC ASSESSMENT FINAL

RC25777 PROPOSED SERVICE CENTRE, 25 TE ARAHORI STREET, TURANGI REVIEW OF TRAFFIC ASSESSMENT FINAL 19 April 2018 Louise Wood Senior Resource Consents Planner Taupō District Council Private Bag 2005 Taupō 3352 Gray Matter Ltd 2 Alfred Street PO Box 14178 Hamilton, 3252 Tel: 07 853 8997 170_02 Dear Louise

More information

Appendix 5 Traffic Assessment

Appendix 5 Traffic Assessment Appendix 5 Traffic Assessment 44 Harrison Transportation Best Start Educare Shelly Bay Road Beachlands Transportation Assessment Report September 2017 PO Box 11 557 Palm Beach Papamoa 3151 Reference: 187

More information

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018 March 2, 2018 Traffic Assessment for Woodhaven Redevelopment City of Rome Oneida County, New York Prepared for: City of Rome 198 N. Washington Street Rome, NY 13440 Prepared by: C.T. MALE ASSOCIATES 50

More information

Birmingham City Council

Birmingham City Council Birmingham City Council A summary of the recommendations for the calculation of Saturation Flows at Traffic Signals. Index to Recommended Method of Calculating Saturation Flows 1 Introduction 2 Summary

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

19 July 2016 OUR REF:

19 July 2016 OUR REF: 19 July 2016 OUR REF: 602263-01000 194168 Ontario Ltd. 320 McRae Street Ottawa, ON K1Z 5R8 Attention: Brian Casagrande Dear Brian: Re: 320 McRae/1976 Scott Redevelopment CTS Addendum #1 This Addendum has

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information