Project/PrANAMBRA STATE EDUCATION PROGRAMME INVESTMENT PROJECT. Estimated Amount in US $'000. Procure ment Method

Size: px
Start display at page:

Download "Project/PrANAMBRA STATE EDUCATION PROGRAMME INVESTMENT PROJECT. Estimated Amount in US $'000. Procure ment Method"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project/PrANAMBRA STATE EDUCATION PROGRAMME INVESTMENT PROJECT Loan #: Procurement Description Norm Duration st of Contracts 1.Procureme nt of 1 No spiral binding 2.Procure ment of 5,000 copies of test instrumen t g of 5,000 Package Number Lot Number Estimated Amount in US $'000 Procure ment Method Pre-or Post Qualific ation Prior or Post Review If Prequalification add 7-13 wks Plan vs. Plan ANSEPIP/GD/NS /002/2015 LOT NS Post Post Plan ANSEPIP/GD/NS /003/2015 LOT NS Post Post Plan ANSEPIP/NS/GD /004/2015 LOT NS Post Post Plan 4.Product ion and publicati on of 2000 copies of SBMCs activities ANSEPIP/NCB/G D/007/2015 LOT NS Post Post Plan

2 5.Produ ction of 5,000 copies of SEPIP hand book for Anambr a State ANSEPIP/NS/GD /011/2015 Lot NS Post Post Plan 44922

3 Draft Bid Documents, including specs and quantities, draft SPN If Post-Review, No-objection Dates are not needed Spec Proc Notice Advert Bidding Period d Evaluation Contract Fi Prep & Submissi on by Ex Agency Noobjectio n Date On-line UNDB Gateway Nat Press Bid Invitatio n Date Bid Closing- Opening Submissi on Bid Eval Rpt Plan vs. Contract Amount in US$'000 Date Contract Award 4-7 wks wks1.5-2 wks 6 to 12 wks wks Plan 1 wk N/A N/A N/A 22/3/15 29/3/15 6/4/15 Plan /4/15 N/A N/A N/A 22/3/15 29/3/15 6/4/15 Plan /4/15 N/A N/A N/A 22/3/15 29/3/15 6/4/15 Plan /4/15 N/A N/A N/A 22/4/15 29/4/15 6/5/15 Plan /5/15

4 N/A N/A 20/6/15 27/6/15 4/7/15 11/7/15 Plan /7/

5 inalization Contract Implementation Date Contract Advert Date Contract Signatur e Opening of Let of Credit Arrival of Goods Inspectio n Final Accepta nce wks 20/4/15 27/4/15 N/A 4/5/15 11/5/15 20/4/15 27/4/15 N/A 11/10/15 18/10/15 20/4/15 27/4/15 N/A 11/10/15 18/10/15 20/5/15 27/5/15 N/A 4/6/15 11/6/15

6 24/7/15 31/7/15 N/A 7/8/ /8/15

7 Country/OrganisatiFor Contracts under projects approved before the May 2002 Project/ProgrammeIf Post-Review, No-objection Dates are not needed Preparation Contract Loan #: Request for Type Proposals Description Selection Method Lumpsu m or Time- Based Estimate d Amount in US$ '000 Prior/Po st Review Plan vs. Prep & Submissi on by Ex Ag Noobjectio n Date S/NO Norm Plan 3-6 wks 1-2 wks Duration List of Contracts 1 Upgrade EMIS unit for State SOME,SUB EB and PPSSC CQ Lumpsu m Prior Plan 21/4/15 27/4/15 2 Conduct of survey in 46 representat ive schools in the state to etermine the STR CQ firm Lumpsu m Post Plan N/A N/A 3 Develop capacity of 2100 Lumpsu m teachers for CQ firm Post Plan N/A N/A 4 Renewal of Pilot

8 of Pilot testing in English language and SS Accredita tion of relevant 5 courses IC in the Design,d evelop and deploy a 6 website IC in Decompo sition analysis of past 7 external CQ firm examinati Tracer study of past students of the 8 state IC Diagnosti technical c core competen ce test 9 graduatin IC g Provide for Public Expendit 10 ure IC Tracking Productio n of pamphlet s,posters 11,wall CQ firm paintings, Lumpsu m Time- Based Prior Plan N/A N/A Lumpsu m Lumpsu m Lumpsu m Lumpsu m Post Plan N/A N/A Post Plan N/A N/A Post Plan N/A N/A Time- Based Post Plan N/A N/A Lumpsu m Lumpsu m Lumpsu m 2105 Post Plan N/A N/A Post Plan N/A N/A Time- Based Post Plan N/A N/A

9 NOTE Pilot testing was satisfactorily conducted in 2014 and its being renewed in 2015

10 2 Guidelines Request for EOI (where required) On-line UNDB Gateway Nat Press Leadtime before shortlist Submissi on Date Short List Noobjectio n Date Plan vs. Consultant Proposals Invitatio n Date Submissi on/ Opening Date Proposal Evalua Project Technical (T) & Fin Noobjectio Submissi on n Evaluati Evaluati on on Report Report (T) (T) wks2 wks 1-2 wks Plan 4 to 12 wks 2-3 wks wks 4/5/15 28/5/15 16/6/2015 5//615 Plan 26/6/15 26/7/15 10/8/15 24/8/15 4/4/15 28/4/15 N/A N/A Plan 26/4/15 3/5/15 N/A N/A 4/4/15 28/4/15 N/A N/A Plan 26/4/15 3/5/15 N/A N/A

11 N/A N/A N/A N/A Plan N/A N/A N/A N/A N/A N/A N/A N/A Plan 3/4/2015 3/5/15 N/A N/A N/A N/A N/A N/A Plan 3/4/2015 3/5/15 N/A N/A 4/4/15 28/4/15 N/A N/A Plan 26/4/15 3/5/15 N/A N/A N/A N/A N/A N/A Plan 3/4/2015 3/5/15 N/A N/A 4/4/15 28/4/15 N/A N/A Plan 26/4/15 3/5/15 N/A N/A 4/3/15 28/3/15 N/A N/A Plan 26/4/15 3/5/15 N/A N/A 4/4/15 28/4/15 N/A N/A Plan 26/4/15 3/5/15 N/A N/A

12

13 ation and Negotiation for ts after May 2002 nancial (F) and Negotions (N) Draft Contract Contract Finalization Opening Financia l Proposal s Preparat ion Eval Report (T) (F) Negotiati ons (N) Plan vs. Submissi on Date Noobjectio n Date Contract Amount in US$ '000 Contract Award Date Contract Advert 2 wks 1-2 wks 2 wks Plan 1-2 wks 1-2 wks 1 wk 17/5/15 24/5/15 28/5/15 Plan 5/6/15 12/6/ /6/15 26/6/15 17/5/15 24/5/15 28/5/15 Plan N/A N/A /6/15 26/6/15 17/5/15 24/5/15 28/5/15 Plan 5/6/15 12/6/ /6/15 26/6/15

14 N/A N/A N/A Plan 5/6/15 12/6/ N/A N/A N/A N/A 20/6/15 Plan N/A 12/6/ N/A N/A N/A N/A 20/6/15 Plan N/A 12/6/ N/A N/A 17/5/15 24/5/15 28/5/15 Plan N/A N/A /6/15 26/6/15 N/A N/A 20/6/15 Plan N/A 12/6/ N/A N/A N/A N/A 28/5/15 Plan 5/6/15 12/6/ /6/15 26/6/15 N/A N/A 31/5/15 Plan 5/6/15 12/6/ /7/15 26/7/15 17/5/15 24/5/15 28/5/15 Plan N/A N/A /6/15 26/6/

15

16 n Contract Implementation Contract Signatur e Plan vs. Mobiliza tion Advance Payment Draft Report Final Report Final Cost 1-3 wks Plan 3/7/15 Plan 10/7/15 17/7/15 24/7/ /7/15 Plan 10/7/15 17/7/15 24/7/ /7/15 Plan 10/7/15 17/7/15 24/7/

17 N/A Plan N/A N/A N/A /6/15 Plan N/A 30/7/15 7/8/ /6/15 Plan N/A 30/7/15 7/8/ /7/15 Plan 10/7/15 17/7/15 24/7/ /6/15 Plan N/A 30/7/15 7/8/ /7/15 Plan 10/7/15 17/7/15 24/7/ /8/15 Plan 20/8/15 27/8/15 24/9/ /7/15 Plan 10/7/15 17/7/15 24/7/

18 ANAMBRA SEPIP TRAINING PLAN Departm Objectives ent of the S/N Descripti on of Training training Particip ants Désignat ion Instituti on/venue Period Tuition fee 1 SMOE,S SUBEB, PPSSC Local training on EMIS indicators for 40 participant s selected from SMoE,PPSS C, SMoE,PPSS C, ASUBEB& STPSU A 5-day training of 40 selected participants conducted 40 Teachers Anambra MAR- APR 2 Cascading Participants trained on Principals, Vice Principals Anambra MAR- APR

19 of local training of Principals, Vice Principals (Admin), School managers/ Chaplains, ZEOs, ZDEs, AEOs, LGEOs, Head masters/he admistress es, Chairmen of SBMCs, Education officers and other Stakeholde rs on their roles/respo nsibilities, SIP preparatio n and proactive strategies in SBMC operations in phases. trained on their roles and responsibili ty in SBMC matters. (21800 persons). Three hundred already trained in Vice Principals (Admin), School managers/ Chaplains, ZEOs, ZDEs, AEOs, LGEOs, Head masters/he admistresse s, Chairmen of SBMCs, Education officers and other Stakeholde rs Vice Principals (Admin), School managers/ Chaplains, ZEOs, ZDEs, AEOs, LGEOs, Head masters/he admistresse s, Chairmen of SBMCs, Education officers and other Stakeholde rs APR 3 Steering Short-term Capacity of committe local and project Internation officers on e, al training best in batches practices for Steering built technical Committee, committe Technical e Committee and STPSU members and for STPSU adoption of best practices 42 Steering London, committe Dubai e,singapor e,abuja,i badan technical and committe Anambra e and State STPSU JUL- DEC

20 4 STPSU Capacity building ofproject officers on project related issues Capacity of key project officers strengthene d on project related issues 12 STPSU Ibadan,lagos JUL- DEC 5 PFMU Staff 6 Stakehol ders 7 Emis officers Capacity building on Fiduciary matters on PFMU Stakeholde rs engagemen t on the operations of SEPIP Capacity building on review of payroll, updating of chart of accounts and EMIS data Number of capacity building on Flexible Accounting, etc. (12 officers) Teachers, traditional leaders, community leaders, faith-based organizatio ns Officers capacities on payroll, chart of account and EMIS strengthene d 12 PFMU staff 1,300 Teachers, Anambra JUL- DEC traditiona l leaders,commun ity leaders /faith based organizat ion 50 EMIS officers Kaduna JUL- DEC Anambra JUL- DEC

21 Transpo rt fare DSA Total cost Remarks 5,, ,,

22 5,

23 5, , , ,

24 SUMMMARY GOODS CONSULTANCY TOTAL

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency Public Disclosure Authorized Procurement Plan-Goods Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Project/Programme: MONTHS) Loan #: CR Description*

More information

Request for Proposals. Prep & Submissio n by Ex Ag. Noobjection. Plan vs. Actual. Date

Request for Proposals. Prep & Submissio n by Ex Ag. Noobjection. Plan vs. Actual. Date losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Nigeria: Lagos Metropolitan Area Transport Authority (LAMATA) Project/Programme:

More information

Procurement Plan-Goods. Prior or Post Review. Procurement Method. Estimated Amount in US $ Pre-or Post Qualification

Procurement Plan-Goods. Prior or Post Review. Procurement Method. Estimated Amount in US $ Pre-or Post Qualification losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan-Goods SNO Country/Organisation: Ministry of Works and Urban Development COMPONENT

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Ethiopia /UDCBO CBDSD RELG Component 2 : 3698-ET Package Number Lot Number

More information

ZAMBIA ENVIRONMENTAL MANAGEMENT AGENCY

ZAMBIA ENVIRONMENTAL MANAGEMENT AGENCY ZAMBIA ENVIRONMENTAL MANAGEMENT AGENCY PROCUREMENT PLAN FOR GOODS, SERVICES, WORKS AND CONSULTANCY- 201 (A) GOODS DATE FOR No. Description Unit Qty Procur e-ment metho d 1. Procurement of motor vehicles

More information

Procurement Plan for Consultancy Services (As of April 30, 2010)

Procurement Plan for Consultancy Services (As of April 30, 2010) losure Authorized Serial no. Procurement Plan for Consultancy Services (As of April 30, 2010) LKR USD Date Currency Value 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1 1/2008 RERED

More information

General. Procurement Plan

General. Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General 1. Project Information Project Name: Country: General Plan Public Finance

More information

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN)

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN) THE UNITED REPUBLIC TANZANIA MINISTRY FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN) Procurement Plan for Goods, Works, Non- Consultancy Services and Consultancy Services

More information

Total planned cost under the Grant USD 19,8 mln.

Total planned cost under the Grant USD 19,8 mln. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized No 1 Costs Category PBF Payments ( Including of the first verification by SHASS, which

More information

19/HQ/G/02 MC RFQ L.P.O N/A N/A N/A N/A N/A N/A 28/08/2018 Plan 174,218,051

19/HQ/G/02 MC RFQ L.P.O N/A N/A N/A N/A N/A N/A 28/08/2018 Plan 174,218,051 MID-YEAR REVIEW Supply of Consumable Stationery Supply of Fuel for Motorvehicles and Generator Supply,Installation and Commissioning of ICT Facilities and Office Equipments Supply of Medicines and Lab

More information

THE UNITED REPUBLIC OF TANZANIA

THE UNITED REPUBLIC OF TANZANIA THE UNITED REPUBLIC OF TANZANIA MINISTRY OF AGRICULTURE, LIVESTOCK AND FISHERIES TANZANIA VETERINARY LABORATORY AGENCY General Procurement Notice (GPN) Procurement plan for Goods, Non-Consultancy Consultancy

More information

Planned Procurement Opportunities Report. June 2018

Planned Procurement Opportunities Report. June 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

GENERAL PROCUREMENT NOTICE NO.1/2016/2017. PPF Pensions Fund. Morogoro Road/Samora Avenue. Dar es Salaam, Tanzania. Telephone: /21

GENERAL PROCUREMENT NOTICE NO.1/2016/2017. PPF Pensions Fund. Morogoro Road/Samora Avenue. Dar es Salaam, Tanzania. Telephone: /21 ISO 9001:2008 Certified GENERAL PROCUREMENT NOTICE NO.1/2016/2017 PPF Pensions Fund 11 th Floor PPF House Morogoro Road/Samora Avenue Dar es Salaam, Tanzania Telephone: +255 22 2113919/21 Fax: +255 22

More information

REVISED PROCUREMENT PLAN 30-Dec-12

REVISED PROCUREMENT PLAN 30-Dec-12 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of the People s Republic of Bangladesh SKILLS AND TRAINING ENHANCEMENT PROJECT (STEP)

More information

Scrum Master (CM-SMC)

Scrum Master (CM-SMC) Our goal in CertMind is to certify the skills of professionals who work in the context of Technology. To achieve this, we look for to ensure that professionals demonstrate their skills and knowledge through

More information

2018 HR & PAYROLL Deadlines

2018 HR & PAYROLL Deadlines th (by payment date) EPAF 3rd PARTY FEEDS WTE Approval 2018 HR & PAYROLL s Normal Payroll day s 2017 B1-26 3 * 13-Dec-17 15-Dec-17 n/a n/a n/a 28-Dec-17 29-Dec-17 11:00 AM 16-Dec-2017 29-Dec-2017 JAN 2018

More information

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI WAVE HUB A Future for Wave Energy in Cornwall Dr Mike Patching BEng, PhD, CEng, MEI 1 Pelamis - Wave Energy in Action!! 2 Wave Hub - What is it? Simple idea! An area of sea with an electrical cable and

More information

Olympic Agenda th IOC Session. 5-6 February 2014

Olympic Agenda th IOC Session. 5-6 February 2014 Olympic Agenda 2020 126 th IOC Session 5-6 February 2014 Five clusters of ideas The uniqueness of the Olympic Games Athletes: at the heart of the Olympic Movement Olympism in action: keep Olympism alive

More information

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1. County of Orange Resources and Development Management Department Harbors, Beaches and Parks Strategic Plan HBP Strategic Plan Workshop 1 v18 PRESENTATION OUTLINE Harbors, Beaches & Parks (HBP) History

More information

Caltrain Bicycle Parking Management Plan

Caltrain Bicycle Parking Management Plan Caltrain Bicycle Parking Management Plan Board of Directors October 5, 2017 Agenda Item 11 Context for Plan Capacity and Access Issues Modernization program with Electrification Complimenting limited on-board

More information

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Expenditure Category Goods Works Consultant Services (including training) Value Threshold (US$)

More information

Charlottesville Regional Chamber of Commerce. October 28, 2014

Charlottesville Regional Chamber of Commerce. October 28, 2014 Charlottesville Regional Chamber of Commerce October 28, 2014 1 A. Rt. 29 Project Delivery Advisory Panel B. Contract Procurement Schedule Status C. Panel Recommendations D. Right of Way and Easements

More information

Prior Review Threshold

Prior Review Threshold Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date of General Procurement Notice: 1 Prior Review Threshold Procurement Method ICB Goods

More information

Contracts Subjects to Prior Review (US$)

Contracts Subjects to Prior Review (US$) re Authorized Expenditure Category Goods Works Services (including training) Value Threshold (US$) Procurement ICB NCB s Subjects Prior Review (US$) All ICB contracts First 2 NCB contracts

More information

PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE

PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE Wednesday, March 16, 2016, 12:00 p.m. Committee Room E, Ground Floor, City Hall Members Ms. S. Marchildon, Chair Ms. V. Charles Inspector R. Friesen Mr.

More information

Mini Tennis Coaching

Mini Tennis Coaching COMHAIRLE NÁISIÚNTA NA gcáilíochtaí GAIRMOIDEACHAIS NATIONAL COUNCIL FOR VOCATIONAL AWARDS Draft Module Descriptor Mini Tennis Coaching Level 5 N22970 www.fetac.ie 1 Title Mini Tennis Coaching 2 Code N22970

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Expenditure Category Notes: Goods Works Consultant Services THE KYRGYZ REPUBLIC PROCUREMENT PLAN - for

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) Issue Number STTM IIR 15-003 Proponent AEMO Date of submission Affected gas markets STTM (wholesale) Consultation process

More information

BOXING FEDERATION OF INDIA

BOXING FEDERATION OF INDIA BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR PROCUREMENT SPORTS EQUIPMENTS - 1 HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, DELHI, 2018 DATE OF ISSUE: September 18, 2018 LAST DATE & TIME

More information

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1.

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1. Public Disclosure Authorized Project name: Skills and Training Enhancement Project Loan: 4764-BD Procurement Plan Version: 2015-1 Status: Approved Date of Last Change of Status: 30/04/2015 Public Disclosure

More information

DEPARTMENT OF TRANSPORT

DEPARTMENT OF TRANSPORT DEPARTMENT OF TRANSPORT UPDATE ON THE IMPLEMENTATION OF SHOVA KALULA BICYCLE PROJECT SELECT COMMITTEE ON PUBLIC SERVICES 14 SEPTEMBER 2010 Outline of the presentation Objectives of the project Legislative

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

Ridership Growth Strategy. Presentation to the board & beyond 1

Ridership Growth Strategy. Presentation to the board & beyond 1 Ridership Growth Strategy Presentation to the board 2018 2022 & beyond 1 Objectives of the Ridership Growth Strategy 1 Retain 2 Increase 3 Attract current customers transit rides per current customer new

More information

Outline 2017/3/9. Presented at JTRI Symposium, Tokyo, 20 February 2017

Outline 2017/3/9. Presented at JTRI Symposium, Tokyo, 20 February 2017 PRIMITIVO C. CAL, PH.D. Executive Director, PLANADES Former Undersecretary for Transportation Former Dean, UP-SURP & Former Director of TTC/NCTS Presented at JTRI Symposium, Tokyo, 20 February 2017 Outline

More information

ID: V i e w A l l F i r s t 1 of 1 L a s t

ID: V i e w A l l F i r s t 1 of 1 L a s t ID: Academ ic Adv isem ent University of New Orleans Undergraduate This report last generated on 07/21/2014 10:45AM collapse all expand all view report as pdf Taken In Progress Planned Dis claim e r [RG:

More information

Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project

Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project re uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized Item GOODS/ 1 2 3 WORKS ost Table odes omponent Reference as per PD D ontract Ref. ontract Description BO-HO-1-G-NS-2-3/4

More information

NF Conference, Plovdiv 17 Sept 18

NF Conference, Plovdiv 17 Sept 18 NF Conference, Plovdiv 17 Sept 18 2. Towards 2020 and beyond A) B) 2018 15-16 Oct 2020, London GBR 2024 Olympic Programme A) FISA 2020 Extraordinary Congress STATUTES RULES OF RACING Lucy Trochet Governance

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

CESA Sustainability Guideline Document and Reporting Process Checklist

CESA Sustainability Guideline Document and Reporting Process Checklist CESA Sustainability Guideline Document and Reporting Process Checklist Lee Scott, Wal-Mart CEO: Sustainability is the single biggest business opportunity of the 21 st century.it will be the next source

More information

Wellington Public Transport Spine Study

Wellington Public Transport Spine Study Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

2018 FISA NF Meeting. Poznan, 28 July 2018

2018 FISA NF Meeting. Poznan, 28 July 2018 2018 FISA NF Meeting Poznan, 28 July 2018 Agenda Agenda 1. Introduction 2. Towards 2020 and beyond FISA Governance and Rules Working Groups FISA Olympic Strategy 3. 2017 FISA Review Projects 4. FISA Updates

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Below this line not for printing

Below this line not for printing MAHAGENCO INVITATION FOR EXPRESSION OF INTEREST (EOI) MAHARASHTRA STATE POWER GENERATION CO. LTD CIN:U40100MH2005SGC153648 Name of work:- Sale of fly ash on cost and as is where is on long term basis from

More information

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$) re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Expenditure Category Goods Works Consultant Services (including training) Value Threshold (US$) Procurement

More information

To, All concerned. Subject: - Notice Inviting Tender (NIT) for Printing of all books and booklets of NMPB regd. Sir,

To, All concerned. Subject: - Notice Inviting Tender (NIT) for Printing of all books and booklets of NMPB regd. Sir, To, F. No. A 11019/47 (B)/2015 NMPB National Medicinal Plants Board Ministry of AYUSH Government of India Room No. 309, 3 rd Floor, AYUSH Bhawan, B-Block, G.P.O. Complex, INA, New Delhi 110023 Tel:- 011

More information

Category Works: Activities ShowHide

Category Works: Activities ShowHide Public Disclosure Authorized Project name: Project for Agriculture Commercialization and Trade Loan: CR. 5180, H813 Procurement Plan Version: 2018-1 Status: Approved Date of Last Change of Status: 16/09/2016

More information

ROSEE Road safety in Sout East European regions: Safe Road Infrastructure

ROSEE Road safety in Sout East European regions: Safe Road Infrastructure ROSEE Road safety in Sout East European regions: Safe Road Infrastructure Kostanjsek, Jure; Lipar, Peter; Milotti, Alberto 2014 European Workshop: Road Safety Design InternationalActivities Brussels, November

More information

ANNUAL PROCUREMENT PLAN FOR ERB DATE FOR. No.

ANNUAL PROCUREMENT PLAN FOR ERB DATE FOR. No. ANNUAL PROCUREMENT PLAN FOR ERB - 2018 No. 1 2 3 4 5 6 7 8 Description Radio Program Series - ERB Publicity Lusaka Newspaper Adverts- Lusaka Radio Adverts- Lusaka Television Program - Lusaka Television

More information

Douglas Park Playground Replacement

Douglas Park Playground Replacement Douglas Park Playground Replacement Construction Contract Park Board Committee Meeting Monday, February 19, 2018 Purpose of this Presentation To seek approval from the Board to enter into a contract with

More information

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013 M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Régis Gosselin, B ès Arts, MBA, CGA, Chair Larry Soldier, Member Marilyn Kapitany, B.Sc. (Hon), M.Sc., Member CENTRA GAS MANITOBA

More information

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011 The role of the Authority in promoting sustainable transport Gerry Murphy South East Regional Assembly 27 th May 2011 Who we are National Transport Authority established on 1 st December 2009 Dublin Transport

More information

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR. L E S 1 Government of Karnataka BELGAUM INSTITUTE OF MEDICAL SCIENCES, BELGAUM AUTONOMOUS INSTITUTE (Registered Under Societies Registration Act) Dr. B. R. Ambedkar Road, Belgaum 590 001. Phone No: 0831-2420320,

More information

Juni 2013 DI Bernhard Engleder,

Juni 2013 DI Bernhard Engleder, Juni 2013 DI Bernhard Engleder, Head of department Vienna City Administration - Road Construction and Maintenance ESTABLISHMENT OF A MOBILITY AGENCY FOR VIENNA Introduction The current coalition agreement

More information

Overview of the IAEA Activities on Occupational Radiation Protection

Overview of the IAEA Activities on Occupational Radiation Protection International Conference on ORP December 1-5, 2014, Vienna, Austria Overview of the Activities on Occupational Radiation Protection Pil-Soo Hahn Director Division of Radiation, Transport & Waste Safety

More information

Bicycle and Pedestrian Connectivity Study Phase 2

Bicycle and Pedestrian Connectivity Study Phase 2 Connectivity Study Phase 2 Process PROCESS OUTCOMES Phase Prepared By STEP I Public Participation and Outreach 1. RTP Outreach activities, and development of the Bike and Ped Task Force Phase 1 2011 OCPC

More information

1. Expression of interest Dec July Preliminary allocation and reassignment of events 1 Aug Oct 2018

1. Expression of interest Dec July Preliminary allocation and reassignment of events 1 Aug Oct 2018 WORLD ROWING EVENT ATTRIBUTION PROCESS: 2021 2024 INFORMATION SHEET A. Introduction A large number of regatta venues have benefited from significant investment from local, regional and national governments

More information

MEMORANDUM OF UNDERSTANDING

MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING Memorandum of Understanding 1 st October 13 30 th September 17 Memorandum of Understanding between the Lancashire Cricket Board () and the Northern Premier Cricket League (NPL)

More information

Olympic Tourism: Understanding Flows & Developing Strategies

Olympic Tourism: Understanding Flows & Developing Strategies Olympic Tourism: Understanding Flows & Developing Strategies Mike Weed Department of Sport Science, Tourism & Leisure Olympic Tourism Tourism behaviour motivated or generated by Olympic-related activities

More information

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion

More information

January 2019 FY Key Performance Report

January 2019 FY Key Performance Report January 2019 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

EBA s REVIEW OF THE IRB APPROACH

EBA s REVIEW OF THE IRB APPROACH EBA s REVIEW OF THE IRB APPROACH EIFR seminar on internal models Paris, 15 December 2016 Dorota Siwek Why does the IRB Approach have to be reviewed? Lack of trust regarding the use of internal models:

More information

Objects and images from the collections: Top: Cord Zoned Maritime Beaker from West Kennet Avenue; approximately 4400 / 4300 years old. Below: W.E.V.

Objects and images from the collections: Top: Cord Zoned Maritime Beaker from West Kennet Avenue; approximately 4400 / 4300 years old. Below: W.E.V. This is largely the report as seen by the Board at the January meeting; additions - and substantially re-written sections are in mauve. This is intended as the formal report for the partners. 2 A report

More information

FIL World Lacrosse Championship 2010

FIL World Lacrosse Championship 2010 FIL World Lacrosse Championship 2010 FIL Board Minutes Appendix E Introduction The overall event will comprise of two distinct parts, the FIL World Championship, referred to within the local English Lacrosse

More information

CPS Attachment 1. Calgary Combative Sports Commission Year in Review 2015 ISC: UNRESTRICTED

CPS Attachment 1. Calgary Combative Sports Commission Year in Review 2015 ISC: UNRESTRICTED CPS2016-0326 Attachment 1 Calgary Combative Sports Commission Year in Review 2015 CALGARY COMBATIVE SPORTS COMMISSION YEAR IN REVIEW 2015 TABLE OF CONTENTS Page Introduction and Background.... 2 Calgary

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

architectural practice empowering first nations

architectural practice empowering first nations architectural engineering practice empowering first nations mission statement Ayshkum Engineering Inc. is dedicated to working primarily with Aboriginal Communities, to improve quality of life and standard

More information

Wilshire Boulevard Bus Rapid Transit Project

Wilshire Boulevard Bus Rapid Transit Project Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies

More information

The British Dressage Apprenticeship Scheme aims to formalise the traditional working pupil scheme.

The British Dressage Apprenticeship Scheme aims to formalise the traditional working pupil scheme. BRITISH DRESSAGE APPRENTICESHIP SCHEME Please note that details shown in the document are correct at the time of writing but it is the responsibility of Apprentice/guardian to verify with the department

More information

Joint External Evaluation (JEE)

Joint External Evaluation (JEE) Joint External Evaluation (JEE) Zoonotic Diseases Action Package Conference Da Nang, Viet Nam 29-30 August 2017 Background & rationale The IHR Review Committee on Second Extensions for Establishing National

More information

SERVICE PROVIDERS FOR GAMES PROMOTION

SERVICE PROVIDERS FOR GAMES PROMOTION BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR GAMES PROMOTION HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, DELHI, 2018 DATE OF ISSUE: October 15, 2018 LAST

More information

KITIGAN ZIBI ANISHINABEG P.O. Box 309, Maniwaki, QC J9E 3C9 Tel: (819) 449-5170 Fax: (819) 449-5673 KITIGAN ZIBI ANISHINABEG Request for Proposal (RFP) RFP PROJECT: Feasibility Study on First Nations Tourism

More information

Strategic Plan

Strategic Plan Strategic Plan 2016-2020 President s Message On behalf of the Board and staff I am very pleased to present the Ballarat Golf Club Strategic Plan 2016-2020 (the Plan) to the members. The Plan has been

More information

Members & Firms

Members & Firms Members & Firms 2016-2017 PAGE l 43 Members & Firms 2016-2017 PAGE l 44 Members & Firms 2016-2017 PAGE l 45 Members & Firms 2016-2017 PAGE l 46 Members & Firms 2016-2017 PAGE l 47 Members & Firms 2016-2017

More information

Carroll Consolidated School Corporation MINUTES

Carroll Consolidated School Corporation MINUTES Carroll Consolidated School Corporation MINUTES Regular Meeting August 1, 2006 The Carroll Consolidated School Corporation met in regular session Tuesday, August 1, 2006, 7:30 p.m. at the Administration

More information

IRB Authorization Agreement Implementation Checklist and Documentation Tool

IRB Authorization Agreement Implementation Checklist and Documentation Tool IRB Authorization Agreement Implementation Checklist and Documentation Tool This is the preferred selections version. If more flexible terms are needed, download the blank version from the IRB website.

More information

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association,

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association, 1 Hawaiiana Management Company, Ltd. Kukui Grove Executive Center 4370 Kukui Grove Street, Suite #208 Lihue, Hawaii 96766 Tel: (808) 240-3218 Fax: (808) 245-6583 Internet: www.hmcmgt.com May 2017 Re: Fiscal

More information

OTUMOETAI COLLEGE NCEA MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018

OTUMOETAI COLLEGE NCEA MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018 OTUMOETAI COLLEGE MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018 MARINE STUDIES L2MAST Course Relationship to the National Vocational Pathways Construction & Infrastructure Course Entry Course Overview

More information

ROYAL MELBOURNE YACHT SQUADRON. Strategic Plan

ROYAL MELBOURNE YACHT SQUADRON. Strategic Plan ROYAL MELBOURNE YACHT SQUADRON Strategic Plan 2014-18 VISION AND MISSION VISION A St Kilda icon and Melbourne s best sailing experience MISSION The Royal Melbourne Yacht Squadron: Promotes participation

More information

Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition

Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition Brian Caufield, P.E., CFM Principal Engineer CDM Smith Kerry Bogdan, CFM Senior Engineer FEMA Region I

More information

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, 2018 BEFORE: Larry Ring, Q.C., Panel Chair Marilyn Kapitany, B.Sc.(Hon), M.Sc., Vice Chair Carol Hainsworth, C.B.A., Member Susan

More information

Guildford Borough (Draft)

Guildford Borough (Draft) ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November

More information

2 May 2018 Human Rights in Sport Slide 1

2 May 2018 Human Rights in Sport Slide 1 2 May 2018 Human Rights in Sport Slide 1 2 May 2018 Human Rights in Sport Slide 2 2 May 2018 Human Rights in Sport Slide 3 180 Growth in player associations, 1900s 2010s 160 140 120 100 80 60 40 20 0 1900s

More information

2026 Olympic and Paralympic Winter Games Bid Book Overview

2026 Olympic and Paralympic Winter Games Bid Book Overview 2026 Olympic and Paralympic Winter Games Assessment OPC2018-0738 Committee 2017 June 12 Page 1 of 5 EXECUTIVE SUMMARY This report provides an overview of the Bid Book that is being prepared by The City

More information

G E M D A L E. Chief Commercial Officer. Candidate Brief

G E M D A L E. Chief Commercial Officer. Candidate Brief G E M D A L E Chief Commercial Officer Candidate Brief W T A F I N A L S 2 0 1 9-2 0 2 8 Founded in 1973 by Billie Jean King, the Women s Tennis Association (WTA) is the principal organising body of women

More information

ECB WOMEN S CRICKET SUPER LEAGUE ( WCSL ) HOST MINIMUM QUALITY STANDARDS

ECB WOMEN S CRICKET SUPER LEAGUE ( WCSL ) HOST MINIMUM QUALITY STANDARDS ECB WOMEN S CRICKET SUPER LEAGUE ( WCSL ) HOST MINIMUM QUALITY STANDARDS Thank you for taking the time to read this document outlining the Minimum Quality Standards ( MQS ) for organisations wishing to

More information

CEU's Course Number, Name and Hours

CEU's Course Number, Name and Hours CE-00001 Integrated Pest Management Training (Credit for attending once in 3 year period) Multiple 4.0 CE-00002 Indoor Air Quality (Credit for attending once in 3 year period) Multiple 4.0 CE-00003 Emergency

More information

Next Steps Staff report to Council on October 2, 2018 to present the Whistler 2018 Transportation Action Plan Final Draft

Next Steps Staff report to Council on October 2, 2018 to present the Whistler 2018 Transportation Action Plan Final Draft Whistler 2028 Transportation Action Plan Information Session September 18, 2018 Agenda 4:00 4:45 Transportation Information Session Gallery walk 4:45 5:00 Presentation of transportation outcomes and long-term

More information

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685 CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,

More information

IRB APPLICATION CHECKLIST

IRB APPLICATION CHECKLIST The application for IRB approval may appear daunting at first, but most questions are straightforward. For those that may require some interpretation or specialized knowledge, this guide (which is essentially

More information

ITU WORLD TRIATHLON MULTISPORT CHAMPIONSHIPS

ITU WORLD TRIATHLON MULTISPORT CHAMPIONSHIPS ITU WORLD TRIATHLON MULTISPORT CHAMPIONSHIPS BID DOCUMENT 2020-2021 1 ITU WORLD TRIATHLON MULTISPORT CHAMPIONSHIPS 2020-2021 CRITERIA PACKAGE INTERNATIONAL TRIATHLON UNION MULTISPORT BID DOCUMENT 2 ITU

More information

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services MOTION NO. M2017-74 Contract Amendment for Systems Construction Management Consultant Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee PROPOSED ACTION 5/11/2017 5/25/2017 Recommend

More information

Kyrgyzstan Agricultural Productivity Assistance Project

Kyrgyzstan Agricultural Productivity Assistance Project re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Item Ref. Description Пункта GOODS/ТОВАРЫ Plan vs Actual Контракта Описание контракта План и Факт 1

More information

Basketball Agent 101 Syllabus

Basketball Agent 101 Syllabus Basketball Agent 101 Syllabus Course Description Examines the skills, tools and techniques needed to become a NBA sports agent; as well as an overview of the interconnected positions associated with the

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

NOVEMBER [Date]

NOVEMBER [Date] NOVEMBER [Date] TABLE OF CONTENTS SELECTED ECONOMIC INDICATORS 1 STOCK MARKET DEVELOPMENTS 2 MONETARY DEVELOPMENTS 3 INFLATION OUTTURN 4 Annual Inflation 4 Monthly Inflation 4 NATIONAL PAYMENTS SYSTEM

More information

VACANCY NOTICE. and competitive examination. English translator (self-revising) CATEGORY AND GRADE: Administrative category, Grade 9 Step 1

VACANCY NOTICE. and competitive examination. English translator (self-revising) CATEGORY AND GRADE: Administrative category, Grade 9 Step 1 VACANCY NOTICE VACANCY ANNOUNCEMENT: COI/AV-5/2018 TYPE OF RECRUITMENT COMPETITION: TITLE OF POST: External, based on merits and competitive examination English translator (self-revising) CATEGORY AND

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer STAFF REPORT MEETING DATE: October 1, 217 TO: City Council FROM: Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-89 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher J.

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB)

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) Aryabhata Block, C.R. Rao Advanced Institute of Mathematics, Statistics and Computer Science (AIMSCS), UoH Campus, Gachibowli, Hyderabad-500 046 TENDER

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 18-072 Subject: Authorizing the City Manager to Negotiate and Enter into a Contract with Bering Marine Corporation for the Purchase and Delivery of 100 Tons of Road