Ohio Department of Transportation STIP Project Listing as of 7/27/2017 Query: "Current STIP Detail 4"
|
|
- Ira Parker
- 5 years ago
- Views:
Transcription
1 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA LACRPC ALL ALL Lima RR Grade Separation Description: Improvements include a railroad grade separation of the Indiana & Ohio railway crossing at Elm St. Additional improvements include 0.70 miles of pavement reconstruction at the intersection of Elm St. and Bellefontaine Ave. and the addition of a storm sewe Work Type: Railroad Grade Separation Termini: Bellefontaine Ave. to North St. along the Indiana & Ohio Railway LIMA BD7 Funds () $480,000 $2,900,000 $19,610,360 AM06ID0138FD 4BK7 Un-Assigned $1,920,000 $2,900,000 $19,610,360 AM06ID0138FD 4BD7 Funds () $2,900,000 $19,610,360 AM06ID0138FD 4BK7 Un-Assigned $400,000 $2,900,000 $19,610,360 AM06ID0138FD Ph subtotal: $2,900,000 $2,900,000 $19,610,360 Description: Study potential Grade separation of Indiana & Ohio Railroad between Bellefontaine Avenue and North Street. Then construct a grade separation at the chosen location. Work Type: Railroad Grade Separation Termini: Bellefontaine Ave. to North St. along the Indiana & Ohio Railway LIMA 0.23 Labor - Match $39,435 $1,909,955 $2,172,853 $20,667,541 stipid0fd Labor - Match $223,463 $1,909,955 $2,172,853 $20,667,541 stipid0fd Ph subtotal: $262,898 $1,909,955 $2,172,853 $20,667, LACRPC ALL ALL SR Description: Grind and resurface with asphalt concrete from Grand Avenue to SR115. Install curb & gutter, sidewalks and new storm sewer from Northern Avenue to Jacobs Avenue. PID used to conduct. Work Type: Resurfacing, Undivided System Termini: FROM GRAND AVENUE IN LIMA TO JCT SR CO 4BG7 $200,925 $2,989,860 $4,552,686 stipid0003fdco $1,597,839 $2,989,860 $4,552,686 stipid0003fdco Funds () $246,390 $2,989,860 $4,552,686 stipid0003fdco $800,000 $2,989,860 $4,552,686 stipid0003fdco $47,935 $2,989,860 $4,552,686 stipid0003fdco Labor - $89,378 $2,989,860 $4,552,686 stipid0003fdco Labor - Match $7,392 $2,989,860 $4,552,686 stipid0003fdco Ph subtotal: $2,989,860 $2,989,860 $4,552,686 Labor - Match $107,193 $18,203 $732,826 $4,552,686 stipid0003fd Labor - Match $607,430 $18,203 $732,826 $4,552,686 stipid0003fd Ph subtotal: $714,623 $18,203 $732,826 $4,552,686 4BG7 2 $52,000 $830,000 $4,552,686 MODID0325FD $118,400 $830,000 $4,552,686 MODID0325FD Funds () $29,600 $830,000 $4,552,686 MODID0325FD $260,000 $830,000 $4,552,686 MODID0325FD Funds () $65,000 $830,000 $4,552,686 MODID0325FD $204,000 $830,000 $4,552,686 MODID0325FD Labor - Match $51,000 $830,000 $4,552,686 MODID0325FD Utl Remb $830,000 $4,552,686 MODID0325FD Utl Remb Funds () $10,000 $830,000 $4,552,686 MODID0325FD Ph subtotal: $830,000 $830,000 $4,552, LACRPC ALL ALL IR Description: Major Rehab From Interstate Plan. IR 75 Reconstruction From Auglaize Co Line Thru Mm Geometrics To Be Corrected. Capacity Needs Analyzed. Interchanges & s Will Be Reconstructed. Work Type: Major Rehabilitation Termini: FROM AUGLAIZE CO LINE TO MM 5.53 CO Air Quality Nonex RA7 Funds () $90,000 $3,413,687 $6,925,851 $70,224,989 MODID0004FD 4RC L01E Interstate Maintenance $810,000 $3,413,687 $6,925,851 $70,224,989 MODID0004FD Utl Remb 4RA7 Funds () $2,612,164 $3,413,687 $6,925,851 $70,224,989 MODID0004FD Ph subtotal: $3,512,164 $3,413,687 $6,925,851 $70,224, LACRPC ALL ALL SR Description: Resurface the roadway with asphalt concrete. Replace the existing curb and gutter in the Village of Elida. From Pioneer Road to 0.2 miles west of Eastown Road - widen the roadway to meet design standards (5-12' lanes), install new curb and gutter and Work Type: Mill and Fill Termini: On SR309 from US30 to 0.2 miles west of Eastown Road 8.48 CO 4BG7 $163,780 $6,279,519 $9,596,701 stipid0004fdco L20E $84,944 $6,279,519 $9,596,701 stipid0004fdco L25E $934,382 $6,279,519 $9,596,701 stipid0004fdco $2,943,512 $6,279,519 $9,596,701 stipid0004fdco M232 $154,870 $6,279,519 $9,596,701 stipid0004fdco Funds () $1,029,427 $6,279,519 $9,596,701 stipid0004fdco L20E $400,000 $6,279,519 $9,596,701 stipid0004fdco $200,000 $6,279,519 $9,596,701 stipid0004fdco Page 1 of 233 L20E $2,548 $6,279,519 $9,596,701 stipid0004fdco
2 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA LACRPC ALL ALL SR Description: Resurface the roadway with asphalt 8.48 CO L25E M232 Labor - Labor - Match $28,031 $206,046 $15,485 $53,465 $63,028 $6,279,519 $6,279,519 $6,279,519 $6,279,519 $6,279,519 $9,596,701 $9,596,701 $9,596,701 $9,596,701 $9,596,701 stipid0004fdco stipid0004fdco stipid0004fdco stipid0004fdco stipid0004fdco Ph subtotal: $6,279,519 $6,279,519 $9,596,701 Utl Remb Funds () $300,000 $950,000 $1,250,000 $9,596,701 stipid0004fd Ph subtotal: $300,000 $950,000 $1,250,000 $9,596, LACRPC ALL ALL Lima Wayne/High Streets Description: Modify High Street to a one-way, one lane operation between Metcalf Street and Central Avenue. Implement "complete streets" features. Convert Wayne Street to a two-way operation between Jameson Avenue and Central Avenue. (AKA - 3 of the ALL-Traff Work Type: Section Improvement Termini: High Street from Metcalf Street to Central Avenue AND Wayne Street from Jameson Avenue to Central Avenue. LIMA 1.76 CO $2,200,000 $2,420,000 $2,621,245 stipid0005fdco $220,000 $2,420,000 $2,621,245 stipid0005fdco Ph subtotal: $2,420,000 $2,420,000 $2,621,245 Description: Modify High Street to a one-way, two lane operation between Metcalf Street and Central Avenue. Convert Wayne Street to a two-way operation between Cole Street and Central Avenue. Includes resurfacing, curb & gutter, replacing sidewalk as needed, new sign Work Type: Section Improvement Termini: High Street from Metcalf Street to Central Avenue AND Wayne Street from Cole Street to Central Avenue. Lima, City of BD7 Funds () $5,815 $130,924 $201,095 $3,519,408 AM07ID0178FD 4BK7 L20E Labor - Match Labor - Match $23,261 $6,096 $457 $34,542 $130,924 $130,924 $130,924 $130,924 $201,095 $201,095 $201,095 $201,095 $3,519,408 $3,519,408 $3,519,408 $3,519,408 AM07ID0178FD AM07ID0178FD AM07ID0178FD AM07ID0178FD Ph subtotal: $70,171 $130,924 $201,095 $3,519, LACRPC ALL ALL SR Description: Replace the existing culvert that lies Spencerville, Village of 0.09 CO on the south side of 4th Street (SR 117) from Elizabeth Street to Pearl Street. The existing culvert for petitioned ditch #1138 is deteriorating and is undersized, causing the roadway to flood. The project also ent Work Type: Culvert Construction/Reconstr/Repair Termini: On 4th Street (SR117) between Elizabeth St. and Pearl St. in the Village of Spencerville. 4BG7 $275,006 $1,380,476 $2,130,476 stipid0006fdco M232 Labor - $979,972 $125,498 $1,380,476 $1,380,476 $2,130,476 $2,130,476 stipid0006fdco stipid0006fdco Ph subtotal: $1,380,476 $1,380,476 $2,130,476 Labor - Match Labor - Match $112,500 $637,500 $750,000 $750,000 $2,130,476 $2,130,476 stipid0006fd stipid0006fd Ph subtotal: $750,000 $750,000 $2,130, LACRPC ALL ALL Augsburger Rd Bikepath Description: Construct a 10' wide walk-bike pathway from the existing pedestrian facilities in the village to the senior citizen and subdivision housing. Work Type: Bikeways Termini: On Augsburger Rd. from Bentley Rd. (east) connection to sidewalks along Elm St. to Maplecrest driveway (assisted living facility) BLUFFTON; VILLAGE OF 0.40 CO 4BG7 $26,947 $315,642 $444,883 stipid0007fdco Labor - $260,000 $28,695 $315,642 $315,642 $444,883 $444,883 stipid0007fdco stipid0007fdco Ph subtotal: $315,642 $315,642 $444,883 Labor - Match Labor - Match $8,886 $50,355 $59,241 $59,241 $444,883 $444,883 stipid0007fd stipid0007fd Ph subtotal: $59,241 $59,241 $444,883 Labor - Match $70,000 $70,000 $444,883 stipid0007fd Ph subtotal: $70,000 $70,000 $444,883 Page 2 of 233
3 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA LACRPC ALL ALL Cairo Main St. Improvements Description: The project will be the complete reconstruction Main Street (Lincoln Highway) from the village s east corporation line to the west corporation line. The existing concret roadway, curbing and sidewalk will be removed and replaced with a new asphalt roadw Work Type: Major Rehabilitation Termini: Main Street (Lincoln Highway) from the WCL to the ECL of Cairo. Cairo, Village of 0.83 CO 4BG7 $702,643 $2,050,388 $2,096,652 stipid0008fdco M240 Labor - $1,100,000 $114,000 $133,745 $2,050,388 $2,050,388 $2,050,388 $2,096,652 $2,096,652 $2,096,652 stipid0008fdco stipid0008fdco stipid0008fdco Ph subtotal: $2,050,388 $2,050,388 $2,096, LACRPC ALL ALL LACRPC FY 16 Reg Trans Plng Description: ACRPC SFY Regional Transportation Supplemental funds Work Type: & Research Termini: 0 LIMA (TCC) SPR 4TD7 M240 $150,000 $150,000 $150,000 stipid0009fdspr Ph subtotal: $150,000 $150,000 $150, LACRPC ALL ALL LACRPC FY 17 Reg Trans Plng Description: LACRPC SFY Regional Transportation Program Supplemental funds Work Type: & Research Termini: 0 LIMA (TCC) SPR 4TD7 M240 $150,000 $150,000 $150,000 stipid0010fdspr Ph subtotal: $150,000 $150,000 $150, LACRPC ALL ALL Cable Road Sidewalks Description: Construct sidewalks on both sides of Cable Road. Work Type: Add Sidewalks Termini: Along Cable Road from Shawnee / Spencerville Road to Elm Street in the City of Lima. LIMA 0.82 CO $214,000 $235,400 $249,367 stipid0011fdco $21,400 $235,400 $249,367 stipid0011fdco Ph subtotal: $235,400 $235,400 $249,367 Labor - Match Labor - Match $595 $3,372 $3,967 $3,967 $249,367 $249,367 stipid0011fd stipid0011fd Ph subtotal: $3,967 $3,967 $249,367 Labor - Match $10,000 $10,000 $249,367 stipid0011fd Ph subtotal: $10,000 $10,000 $249, LACRPC ALL ALL Elida Road Description: Plane and pave with 1.5" of asphalt concrete, including concrete joint repairs. Work Type: Resurfacing, Undivided System Termini: On Elida Road, from the East corporation limit of Delphos to Jct. Baugh Road. ALLEN COUNTY ENGINEER 2.17 CO M231 $184,380 $913,120 $929,398 stipid0012fdco M232 $517,866 $175,754 $35,120 $913,120 $913,120 $913,120 $929,398 $929,398 $929,398 stipid0012fdco stipid0012fdco stipid0012fdco Ph subtotal: $913,120 $913,120 $929,398 Labor - Match Labor - Match $2,442 $13,836 $16,278 $16,278 $929,398 $929,398 stipid0012fd stipid0012fd Ph subtotal: $16,278 $16,278 $929, LACRPC ALL ALL/HAN SR 103 Corridor Study Description: SR103 Corridor Study from NS RR in Bluffton to the IR75 Interchange. Work Type: Corridor Study Termini: From the NS Railroad to IR75. BLUFFTON; VILLAGE OF 0.86 Pln Stdy M231 $50,000 $50,000 $50,000 stipid0013fd Ph subtotal: $50,000 $50,000 $50, LACRPC ALL ALL Beaverdam Main Street Description: Resurfacing with asphalt concrete on Main Street in the Village of Beaverdam. Includes joint repair. Work Type: Minor Rehabilitation - Pavement Gnrl Sys Termini: On Main Street from the west corportation limit of Beaverdam to the Norfolk Southern RR. Beaverdam, Village of 0.44 CO 4BG7 $35,000 $182,000 $187,251 stipid0014fdco M232 Labor - $140,000 $7,000 $182,000 $182,000 $187,251 $187,251 stipid0014fdco stipid0014fdco Ph subtotal: $182,000 $182,000 $187,251 Labor - Match Labor - Match $788 $4,463 $5,251 $5,251 $187,251 $187,251 stipid0014fd stipid0014fd Ph subtotal: $5,251 $5,251 $187, LACRPC ALL ALL LACRPC SFY18 RTP Description: LACRPC SFY Regional Transportation Program Supplemental Funds. Work Type: & Research Termini: 0 LIMA (TCC) SPR 4TD7 M240 $150,000 $150,000 $150,000 stipid0015fdspr Ph subtotal: $150,000 $150,000 $150,000 Page 3 of 233
4 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA LACRPC ALL ALL LACRPC SFY19 RTP Description: LACRPC SFY Regional Transportation Program Supplemental Funds Work Type: & Research Termini: 0 LIMA (TCC) SPR 4TD7 M240 $150,000 $150,000 $150,000 stipid0016fdspr Ph subtotal: $150,000 $150,000 $150, LACRPC ALL ALL/VAN Delphos Fifth Street Description: Prepare a study of Fifth Street in the City of Delphos for possible improvements such as a road diet. Work Type: Traffic Studies Termini: Fifth Street from the west to the east corporation limits of the City of Delphos Delphos, City of 1.38 Pln Stdy Z231 $75,000 $75,000 $75,000 AM10ID0262FD Ph subtotal: $75,000 $75,000 $75, D01 D01 GES FY14 Description: HIRE A CONSULTANT BY WAY OF TASK ORDER AGREEMENT TO RFORM MISCELLANEOUS GENERAL ENGINEERING TASKS DUE TO LIMITED STAFFING OR EXRTISE. 24 MONTH AGREEMENT Work Type: General Engineering Services Termini: VARIOUS LOCATIONS THROUGHOUT DISTRICT ONE Engr Funds () $200,000 $200,000 $200,000 MODID0003FD Ph subtotal: $200,000 $200,000 $200, DEF DEF SR Description: Perfrom to determine if scope will include a full replacement or a dec replacement. PID also includes the design and construction phases of the project. Structure carries Clinton Street over the Maumee River in downtown defiance. Work Type: Replacement Termini: SR15/18/66 bridge over the Maumee River in the City of Defiance CO $7,280,000 $9,742,000 $14,248,808 stipid0019fdco Funds () Labor - Match Funds () $1,820,000 $509,600 $127,400 $4,000 $1,000 $9,742,000 $9,742,000 $9,742,000 $9,742,000 $9,742,000 $14,248,808 $14,248,808 $14,248,808 $14,248,808 $14,248,808 stipid0019fdco stipid0019fdco stipid0019fdco stipid0019fdco stipid0019fdco Ph subtotal: $9,742,000 $9,742,000 $14,248,808 Funds () Labor - Match Labor - Match $364,771 $2,067,037 $611,794 $611,794 $611,794 $611,794 $3,168,602 $3,168,602 $3,168,602 $3,168,602 $14,248,808 $14,248,808 $14,248,808 $14,248,808 stipid0019fd stipid0019fd stipid0019fd stipid0019fd Ph subtotal: $2,556,808 $611,794 $3,168,602 $14,248,808 Labor - Match $50,000 $50,000 $14,248,808 stipid0019fd Ph subtotal: $50,000 $50,000 $14,248, Findlay HAN HAN IR Description: Major-New reconstruction and widening of IR75 through the City of Findlay Reconstruct the IR75/US 68 system interchange and replace all mainline structures. See companion project PID Work Type: Major Widening Termini: From approximately 0.8 miles south of US68/IR75 interchange to just south of the CR 99 interchange CO 7PM Bonds 045 Garvee Bond-Fund 045-Long $129,594,604 $65,000 $138,826,227 $160,141,765 MODID0361FDCO RR Remb RR Remb 4RA7 4RA7 4RC L01E L05E L05E Interstate Maintenance National Highway System Labor - Match Funds () Funds () National Highway System $2,173,202 $5,325,563 $1,572,858 $10,000 $30,000 $120,000 $65,000 $65,000 $65,000 $65,000 $65,000 $65,000 $138,826,227 $138,826,227 $138,826,227 $138,826,227 $138,826,227 $138,826,227 $160,141,765 $160,141,765 $160,141,765 $160,141,765 $160,141,765 $160,141,765 MODID0361FDCO MODID0361FDCO MODID0361FDCO MODID0361FDCO MODID0361FDCO MODID0361FDCO Ph subtotal: $138,826,227 $65,000 $138,826,227 $160,141,765 Utl Remb Utl Remb 4RA7 4RC Funds () $115,732 $462,929 $11,037,446 $11,037,446 $11,616,107 $11,616,107 $160,141,765 $160,141,765 stipid0001fd stipid0001fd Ph subtotal: $578,661 $11,037,446 $11,616,107 $160,141, PUT PUT M Description: Disassemble, clean, galvanize and reassemble historic bridge. also includes abutment repairs, approach repairs and guardrail upgrades. Work Type: Repair Termini: TR M-6 over Riley Creek PUTNAM COUNTY ENGINEER CO 4B37 M303 $308,800 $424,600 $441,756 stipid0fdco $77,200 $38,600 $424,600 $424,600 $441,756 $441,756 stipid0fdco stipid0fdco Ph subtotal: $424,600 $424,600 $441,756 Labor - Match Labor - Match $1,073 $6,083 $7,156 $7,156 $441,756 $441,756 stipid0fd stipid0fd Ph subtotal: $7,156 $7,156 $441,756 Labor - Match $10,000 $10,000 $441,756 stipid0fd Page 4 of 233
5 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) Ph subtotal: $10,000 $10,000 $441,756 FHWA LACRPC VAN VAN Delphos Canal Bikeway 1 Description: Construct a bike/hike path on the towpath of the Miami & Erie Canal. This is 1 of a two phase project. 2 is PID Work Type: Bikeways Termini: From Fifth Street to the north corporation limit of the City of Delphos. DELPHOS CO stipid0017xxco stipid0017xxco stipid0017xxco Ph subtotal: Labor - Match Labor - Match $790 $4,477 $5,267 $5,267 $367,767 $367,767 stipid0017fd stipid0017fd Ph subtotal: $5,267 $5,267 $367,767 Labor - Match $50,000 $50,000 $367,767 stipid0017fd Ph subtotal: $50,000 $50,000 $367, LACRPC VAN VAN Delphos Canal Bikeway 2 Description: Construct a bike/hike path on the towpath of the Miami & Erie Canal. This is 2 of a two phase project. 1 is PID Work Type: Bikeways Termini: From the south corportation limit of Delphos to Fifth Street DELPHOS CO M231 stipid0018xxco stipid0018xxco stipid0018xxco stipid0018xxco Ph subtotal: Labor - Match Labor - Match $743 $4,213 $4,956 $4,956 $299,033 $299,033 stipid0018fd stipid0018fd Ph subtotal: $4,956 $4,956 $299, VAN VAN Washington St. 3 Description: Complete reconstruction and widening of Washington Street Work Type Major Rehabilitation Termini: From Fox Road to Ervin Road Van Wert, City of 0.57 CO 4B97 M231 $2,653,600 $5,069,425 $5,113,054 stipid1fdco 4BG7 M231 M231 Funds () Labor - Labor - Match $1,959,181 $7,000 $322,894 $1,750 $5,069,425 $5,069,425 $5,069,425 $5,069,425 $5,069,425 $5,069,425 $5,113,054 $5,113,054 $5,113,054 $5,113,054 $5,113,054 $5,113,054 stipid1fdco stipid1fdco stipid1fdco stipid1fdco stipid1fdco stipid1fdco Ph subtotal: $5,069,425 $5,069,425 $5,113, D02 D02 Land Preserv Along New US-24 Description: A project to protect land as open space along the new US-24 corridor by acquiring a conservation easment from various properties (13 properties in FUL/HEN/LUC); perform necessary related work. Work Type: Acquire Easements Termini: Various parcels in Fulton, Henry and Lucas Counties DISTRICT 2 PRODUCTION CO Air Quality Exem 4BG7 $4,441,383 $7,876,001 $8,000,001 MODID3FD 4D57 National Corridor Boarder $3,434,618 $7,876,001 $8,000,001 MODID3FD Ph subtotal: $7,876,001 $7,876,001 $8,000, D02 D02 Maj s Deck Seal Description: Seal decks of major bridges in D-2; perform necessary related work. Work Type: Maintenance Termini: Various major bridges in D-2 DISTRICT 2 PRODUCTION 1.46 CO 7BTB Bonds 042 Bonds $2,062,200 $2,262,200 $2,437,200 AM07ID0179FDCO Labor - Match $200,000 $2,262,200 $2,437,200 AM07ID0179FDCO Ph subtotal: $2,262,200 $2,262,200 $2,437, FUL FUL TR22 Turnpike Mitigation Description: A turnpike mitigation funded project to address embankement failures of TR-22 bridge over the Ohio Turnpike in Fulton County; perform necessary related work. Work Type: Slide Repair Termini: TR22 over Ohio Turnpike FULTON COUNTY ENGINEER 0.01 CO 4TN7 Funds () $500,000 $540,000 $600,000 stipid0077fdco 4TN7 Funds () $540,000 $600,000 stipid0077fdco Ph subtotal: $540,000 $540,000 $600, TMACOG LUC LUC IR widening study Description: A study for the widening and reconstruction of LUC-75 from Lagrange St to I-280; perform necessary related work. Original agreement is thru step 4 of the major PDP process. Work Type: Major Widening Termini: From Lagrange St to I-280 in the city of Toledo DISTRICT 2 PRODUCTION BD7 Funds () $400,000 $2,477,225 $3,477,225 $48,477,225 MODID0007FD Engr Engr 4BK7 4BD7 4BK7 L05E L050 National Highway System Funds () National Highway System $1,600,000 $200,000 $800,000 $2,477,225 $2,477,225 $2,477,225 $3,477,225 $3,477,225 $3,477,225 $48,477,225 $48,477,225 $48,477,225 MODID0007FD MODID0007FD MODID0007FD Ph subtotal: $3,000,000 $2,477,225 $3,477,225 $48,477,225 Page 5 of 233
6 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA TMACOG LUC LUC TMACOG SIB loan repayment Description: II rehabilitation of the MLK bridge Work Type: SIB Termini: SIB loan repayment for PID OT Dbt Serv $456,195 $1,909,190 stipid2fdoth Dbt Serv Dbt Serv Dbt Serv $469,983 $484,189 $498,823 $1,909,190 $1,909,190 $1,909,190 stipid2fdoth stipid2fdoth stipid2fdoth Ph subtotal: $1,909,190 $1,909, TMACOG LUC LUC IR Indiana Av Brdg Description: A ML funded project to construct a new Indiana Ave bridge deck over I-75 in downtown Toledo; perform necessary related work. should be coordinated with the th addition of a third lane to I-75. (Design plan complete, split out from PID 23163). UP Work Type: Deck Replacement Termini: Indiana bridge over I-75 in Lucas County DISTRICT 2 PRODUCTION 0.01 CO 4RA7 Funds () $1,135,534 $6,075,060 $6,077,235 MODID0391FDCO 4RC L1C0 Un-Assigned Labor - Match $4,542,136 $357,651 $39,739 $6,075,060 $6,075,060 $6,075,060 $6,077,235 $6,077,235 $6,077,235 MODID0391FDCO MODID0391FDCO MODID0391FDCO Ph subtotal: $6,075,060 $6,075,060 $6,077, TMACOG LUC LUC TMACOG FY 16 Air Quality Description: TMACOG FY 16 Air Quality Program TMACOG SPR 4TE7 L400 $85,000 $85,000 $85,000 stipid3fdspr Work Type: Air Quality Termini: 0 Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC TMACOG FY 16 Rideshare Description: TMACOG FY 16 Rideshare Program Work Type: Rideshare Termini: 0 TMACOG SPR 4TE7 L40E $95,800 $95,800 $95,800 stipid4fdspr Ph subtotal: $95,800 $95,800 $95, TMACOG LUC LUC South Ave Reconstruct Description: A TMACOG funded project to reconstruct South Ave from Reynolds Rd to Byrne Rd; perform necessary related work; FIELD REVIEW Required. Work Type: Major Reconstruction Termini: City of Toledo, Reynolds Rd to Byrne Rd TOLEDO 2.23 CO L23E $3,717,700 $5,240,000 $5,240,000 stipid5fdco $1,045,937 $476,363 $5,240,000 $5,240,000 $5,240,000 $5,240,000 stipid5fdco stipid5fdco Ph subtotal: $5,240,000 $5,240,000 $5,240, TMACOG LUC LUC AWT/S. River Rd Widening Description: A TMACOG funded project to widen to 3 lanes old US-24 (S. River Rd/Anthony Wayne Trail) from South St to Waterville-Monclova Rd in the Village of Waterville; perform necessary related work; FIELD REVIEW Required. May need to coordinate with PID May Work Type: Minor Widening Termini: City of Waterville, South St to Waterville-Monclova Rd Waterville, Village of (Lucas County) Air Quality Non-Exe 1.13 CO L23E $1,816,000 $2,495,000 $2,495,000 stipid6fdco L23E $454,000 $180,000 $45,000 $2,495,000 $2,495,000 $2,495,000 $2,495,000 $2,495,000 $2,495,000 stipid6fdco stipid6fdco stipid6fdco Ph subtotal: $2,495,000 $2,495,000 $2,495, TMACOG LUC LUC SR Paint Description: A major bridge funded project to paint the structural steel of the high level bridge over the Maumee River in Toledo, perform necessary related work. See PID for bridge rehab. Work Type: Repair Termini: High level (AWT) bridge over Maumee River in Toledo DISTRICT 2 PRODUCTION 0.01 CO 7BTB Bonds 042 Bonds $15,000,000 $16,505,000 $16,670,994 stipid7fdco Labor - Match $1,204,000 $301,000 $16,505,000 $16,505,000 $16,670,994 $16,670,994 stipid7fdco stipid7fdco Ph subtotal: $16,505,000 $16,505,000 $16,670,994 Labor - Match Labor - Match $1,389 $7,873 $156,732 $156,732 $165,994 $165,994 $16,670,994 $16,670,994 stipid7fd stipid7fd Ph subtotal: $9,262 $156,732 $165,994 $16,670, TMACOG LUC LUC IR Description: A multi-lane & Major funded project (project # 2) to reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges; perform necessary related work. See PID for project # 1 and PID for project # 3. UPDATE ( Work Type: Major Rehabilitation Termini: From South Ave to north of Dorr St DISTRICT 2 PRODUCTION Air Quality Non-Exe 1.65 CO 4BT7 Funds () $2,500,000 $162,915,946 $179,449,356 MODID0391FDCO 4RA7 4RC 7BTB Bonds 7MB Bonds 7PM Bonds Z Funds () Bonds Garvee Bond-Fund 045-Long Garvee Bond-Fund 045-Long $6,800,000 $27,200,000 $34,712,740 $16,000,000 $60,000,000 $162,915,946 $162,915,946 $162,915,946 $162,915,946 $162,915,946 $179,449,356 MODID0391FDCO $179,449,356 MODID0391FDCO $179,449,356 MODID0391FDCO $179,449,356 MODID0391FDCO $179,449,356 MODID0391FDCO Page 6 of 233
7 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA TMACOG LUC LUC IR Description: A multi-lane & Major funded DISTRICT 2 PRODUCTION Air Quality Non-Exe 1.65 CO 7RA Bonds 4RA7 042 Bonds Funds () Labor - Match $6,000,000 $13,206 $9,670,000 $162,915,946 $162,915,946 $162,915,946 $179,449,356 $179,449,356 $179,449,356 MODID0391FDCO MODID0391FDCO MODID0391FDCO Ph subtotal: $162,895,946 $162,915,946 $179,449,356 Description: A multi-lane & Major funded project (project # 2) to reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges; perform necessary related work. See PID for project # 1 and PID for project # 3. UPDATE ( Work Type: Major Rehabilitation Termini: Fron South Ave to north of Dorr St DISTRICT 2 PRODUCTION Air Quality Non-Exe BT7 Funds () $35,000 $10,592,107 $10,797,107 $211,647,281 stipid8fd Env S 4RA7 Funds () $170,000 $10,592,107 $10,797,107 $211,647,281 stipid8fd Ph subtotal: $205,000 $10,592,107 $10,797,107 $211,647,281 CO Air Quality Nonex RA7 Funds () $119,880,000 MODID0FD Ph subtotal: $119,880, TMACOG LUC LUC Toledo Lighthouse Ph 1 Description: A TMACOG funded phase 1 project to address exterior cleaning and stabilization of the masonry walls and structure of the the Toledo Harbor lighthouse; Also, new replacement windows and shutters will be included in 1; perform necessary related work. Work Type: Facility Renovation Termini: Offshore at the western end of Lake Erie at the entrance to the Toledo Harbor channel in Maumee Bay LUCAS COUNTY ENGINEER 0.01 CO M301 $464,400 $638,500 $638,500 stipid9fdco M301 $116,100 $46,400 $11,600 $638,500 $638,500 $638,500 $638,500 $638,500 $638,500 stipid9fdco stipid9fdco stipid9fdco Ph subtotal: $638,500 $638,500 $638, TMACOG LUC LUC-Chessie Circle Trail Description: Construct a bike/hike trail on abandoned RR track, owned by Toledo Metroparks; perform necessary related work. See PID for. See PID for former CSX RR bridge removal. Work Type: Bikeways Termini: Bike/hike trail from River Rd to Glanzman Rd Toledo Area Metropark District CO M301 $720,000 $998,500 $1,686,770 AM02ID0031FDCO Un-Assigned $180,000 $78,800 $19,700 $998,500 $998,500 $998,500 $1,686,770 $1,686,770 $1,686,770 AM02ID0031FDCO AM02ID0031FDCO AM02ID0031FDCO Ph subtotal: $998,500 $998,500 $1,686,770 WOO/LUC-Chessie Circle Trail Description: Remove the former CSX RR bridge over the Maumee River and construct a bike/hike trail on abandoned RR track, owned by Toledo Metroparks; perform necessary related work. See PID for. Work Type: Bikeways Termini: Former CSX RR over Maumee River near the Turnpike and Bike/hike trail from River Rd to Glanzman Rd Wood County Airport Labor - Match $50,400 $217,365 $552,165 $3,343,121 stipid0030fd Labor - Match $284,400 $217,365 $552,165 $3,343,121 stipid0030fd Ph subtotal: $334,800 $217,365 $552,165 $3,343,121 Labor - Match $25,200 $25,200 $3,343,121 stipid0030fd Ph subtotal: $25,200 $25,200 $3,343, TMACOG LUC LUC Sylvania-Metamora Bike Path Description: A TMACOG funded project to construct a bike path along Sylvania-Metamora; perform necessary related work. FIELD REVIEW REQUIRED completed 10/3/13. Work Type: Bike path Relocation Termini: Sylvania-Metamora Bike Path LUCAS COUNTY ENGINEER 0.56 CO M301 $252,800 $348,000 $348,000 stipid0031fdco M301 $63,200 $25,600 $6,400 $348,000 $348,000 $348,000 $348,000 $348,000 $348,000 stipid0031fdco stipid0031fdco stipid0031fdco Ph subtotal: $348,000 $348,000 $348,000 Un-Assigned $159,680 $39,920 $199,600 $199,600 $643,600 $643,600 AM03ID0083FD AM03ID0083FD Ph subtotal: $199,600 $199,600 $643,600 Page 7 of 233
8 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA TMACOG LUC LUC Douglas/Dorr Intersection Description: Improve the intersection of Douglas & Dorr St in the City of Toledo by providing 2 EB left turn lanes, lengthen SB right turn lane, realign lanes & striping, upgrade traffic signal & signage; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Intersection Improvement Termini: City of Toledo, intersection of Douglas and Dorr St TOLEDO Air Quality Non-Exe 0.05 CO $1,006,400 $1,384,000 $1,384,000 stipid0032fdco $251,600 $100,800 $25,200 $1,384,000 $1,384,000 $1,384,000 $1,384,000 $1,384,000 $1,384,000 stipid0032fdco stipid0032fdco stipid0032fdco Ph subtotal: $1,384,000 $1,384,000 $1,384, TMACOG LUC LUC Douglas Rd Reconst/Widen Description: A TMACOG funded project to widen TOLEDO 1.00 & reconstruct Douglas Rd from Sylvania Ave to Laskey Rd in the City of Toledo; perform necessary related work. UPDATE ( ): Safety fundng provided to improve intersection of Douglas/Laskey/Tremainsville. Work Type: Major Rehabilitation Termini: City of Toledo, from Sylvania Ave to Laskey Rd Labor - Match $94,500 $627,750 $4,629,756 stipid0033fd Labor - Match $533,250 $627,750 $4,629,756 stipid0033fd Ph subtotal: $627,750 $627,750 $4,629,756 Labor - Match $47,250 $47,250 $4,629,756 stipid0033fd Ph subtotal: $47,250 $47,250 $4,629, CO 4HJ7 MS30 $1,453,400 $2,246,166 $2,330,523 $212,000 $6,242,089 $6,242,089 $6,242,089 $6,242,089 $6,917,089 $6,917,089 $6,917,089 $6,917,089 AM04ID0135FDCO AM04ID0135FDCO AM04ID0135FDCO AM04ID0135FDCO Ph subtotal: $6,242,089 $6,242,089 $6,917, TMACOG LUC LUC SR (AWT) Reconst Description: A TMACOG funded project to perform full depth reconstruction of existing roadway and intersection imptovements at Erie St; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: City of Toledo, I-75 to Erie TOLEDO 0.63 $940,000 $1,175,000 $4,190,100 MODID4FD $235,000 $1,175,000 $4,190,100 MODID4FD Ph subtotal: $1,175,000 $1,175,000 $4,190,100 Description: A TMACOG funded project to reconstruct existing roadway and intersection imptovements at Erie St in the City of Toledo; perform necessary related work. (The AWT Gateway project). Work Type: Major Rehabilitation Termini: City of Toledo, I-75 to Erie TOLEDO 0.63 CO $3,760,000 $5,170,000 $6,892,000 AM03ID0084FDCO Un-Assigned $940,000 $84,400 $385,600 $5,170,000 $5,170,000 $5,170,000 $6,892,000 $6,892,000 $6,892,000 AM03ID0084FDCO AM03ID0084FDCO AM03ID0084FDCO Ph subtotal: $5,170,000 $5,170,000 $6,892, TMACOG LUC LUC Indiana Ave Resurf Description: A TMACOG funded "small project" to reconstruct Indiana Ave from I-75 to Washington St; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Mill and Fill Termini: City of Toledo, I-75 to Washington TOLEDO 0.18 CO $400,000 $1,060,000 $1,086,028 stipid0035fdco $564,000 $96,000 $1,060,000 $1,060,000 $1,086,028 $1,086,028 stipid0035fdco stipid0035fdco Ph subtotal: $1,060,000 $1,060,000 $1,086,028 Labor - Match Labor - Match $3,644 $20,562 $24,206 $24,206 $1,086,028 $1,086,028 stipid0035fd stipid0035fd Ph subtotal: $24,206 $24,206 $1,086,028 Labor - Match $1,822 $1,822 $1,086,028 stipid0035fd Ph subtotal: $1,822 $1,822 $1,086, TMACOG LUC LUC Sylvania RiverTrail Ph 2 Description: A TMACOG funded proejct to build a multi-use path in the City of Sylvania; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Bike path Relocation Termini: City of Sylvania, from Harroun Rd across Flower Hospital Campus, under the expressway entrance ramp to Monroe St SYLVANIA; CITY OF CO M301 stipid0036xxco M301 stipid0036xxco stipid0036xxco stipid0036xxco Page 8 of 233
9 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) Ph subtotal: FHWA TMACOG LUC LUC Bancroft St Reconst Description: A TMACOG funded project to rehabilitate the pavementon Bancroft St from Secor Rd to Parkside Blvd and reconstruct University Hill Blvd; Perform necessary related work. FIELD REVIEW conducted on 6/2/15. Work Type: Mill and Fill Termini: City of Toledo, from Secor to Parkside Toledo, City of 1.40 CO $8,280,800 $10,938,500 $11,172,500 MODID0394FDCO $2,070,200 $587,500 $10,938,500 $10,938,500 $11,172,500 $11,172,500 MODID0394FDCO MODID0394FDCO Ph subtotal: $10,938,500 $10,938,500 $11,172, TMACOG LUC LUC IR Widening Description: A project to replace/rehab existing pavement and widen I-475 by adding one additional lane for a total of 3 lanes in each direction from US-24 to US-20; perform necessary related work. See PIDs 80694, 88084, and for mainline bridges. See PID 9 Work Type: Major Widening Termini: From US-24 (AWT) to SR-20 (Central Ave) DISTRICT 2 PRODUCTION Air Quality Non-Exe BD7 Funds () $107,388 $4,700,000 $61,200,000 MODID5FD 4BK7 4BD7 4BK7 Funds () $400,000 $818,522 $3,274,090 $107,388 $107,388 $107,388 $4,700,000 $4,700,000 $4,700,000 $61,200,000 $61,200,000 $61,200,000 MODID5FD MODID5FD MODID5FD Ph subtotal: $4,592,612 $107,388 $4,700,000 $61,200, TMACOG LUC LUC IR over Monclova Rd Description: Redeck and widen the I-475 bridge over Monclova Road and NS RR; Perform other necessary work. "Limited Review". Work Type: Minor Widening Termini: I-475 bridge over Monclova Road and NS RR. DISTRICT 2 PRODUCTION BD7 Funds () $7,000 $300,000 $6,215,000 MODID8FD 4BK7 4BD7 4BK7 Un-Assigned Funds () $28,000 $53,000 $212,000 $300,000 $300,000 $300,000 $6,215,000 $6,215,000 $6,215,000 MODID8FD MODID8FD MODID8FD Ph subtotal: $300,000 $300,000 $6,215, TMACOG LUC LUC Bennett Rd Pav Reconst Description: Reconstruction of Bennett Rd in Toledo; perform necessary related work; FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: Laskey to Alexis TOLEDO 1.02 CO M23E $1,821,040 $2,476,300 $2,476,300 stipid0038fdco $455,260 $200,000 $2,476,300 $2,476,300 $2,476,300 $2,476,300 stipid0038fdco stipid0038fdco Ph subtotal: $2,476,300 $2,476,300 $2,476, TMACOG LUC LUC Douglas Rd Reconst Description: Reconstruct Douglas Rd from Laskey to Alexis in the City of Toledo; perform necessary related work; FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: Laskey to Alexis TOLEDO 1.12 CO M23E $1,997,896 $2,697,370 $2,697,370 stipid0039fdco $499,474 $200,000 $2,697,370 $2,697,370 $2,697,370 $2,697,370 stipid0039fdco stipid0039fdco Ph subtotal: $2,697,370 $2,697,370 $2,697, TMACOG LUC LUC Sylvania Ave Rehab in County Description: Rehabilitate the pavement of Sylvania Ave; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: Centennial Rd to McCord Rd LUCAS COUNTY ENGINEER 1.87 CO M23E $2,041,600 $2,627,000 $2,627,000 stipid0040fdco $510,400 $75,000 $2,627,000 $2,627,000 $2,627,000 $2,627,000 stipid0040fdco stipid0040fdco Ph subtotal: $2,627,000 $2,627,000 $2,627, TMACOG LUC LUC Glendale Resurf Description: Mill and resurface existing asphalt pavement including full depth pavement repairs; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Mill and Fill Termini: AWT to Broadway St TOLEDO 0.36 CO M23E $296,640 $643,280 $643,280 stipid0041fdco $296,640 $50,000 $643,280 $643,280 $643,280 $643,280 stipid0041fdco stipid0041fdco Ph subtotal: $643,280 $643,280 $643, TMACOG LUC LUC TMACOG FY 17 Rideshare Description: TMACOG FY 17 Rideshare Program` Work Type: Rideshare Termini: 0 TMACOG SPR 4TE7 $95,800 $95,800 $95,800 stipid0042fdspr Ph subtotal: $95,800 $95,800 $95, TMACOG LUC LUC TMACOG FY 17 AQ Program Description: TMACOG FY 17 Air Quality Program TMACOG SPR 4TE7 $85,000 $85,000 $85,000 stipid0043fdspr Work Type: Air Quality Termini: 0 Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC TMACOG FY 18 Rideshare Description: TMACOG FY 18 Rideshare Program Work Type: Rideshare Termini: 0 TMACOG SPR 4TE7 $95,800 $95,800 $95,800 stipid0044fdspr Page 9 of 233
10 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) Ph subtotal: $95,800 $95,800 $95,800 FHWA TMACOG LUC LUC TMACOG FY 18 AQ Program Description: TMACOG FY 18 AQ Program Work Type: Air Quality Termini: 0 TMACOG SPR 4TE7 $85,000 $85,000 $85,000 stipid0045fdspr Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC TMACOG FY 19 Rideshare Description: TMACOG FY 19 Rideshare Program Work Type: Rideshare Termini: 0 TMACOG SPR 4TE7 $95,800 $95,800 $95,800 stipid0046fdspr Ph subtotal: $95,800 $95,800 $95, TMACOG LUC LUC TMACOG FY 19 AQ Program Description: TMACOG FY 19 AQ Program Work Type: Air Quality Termini: 0 TMACOG SPR 4TE7 $85,000 $85,000 $85,000 stipid0047fdspr Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC Woodruff Ave Resurf Description: Mill and resurface existing asphalt pavement including full depth pavement repairss, minor walk upgrades, minor drainage improvements, and curb repairs as needed; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Resurfacing, Undivided System Termini: Collingwood Blvd to Cherry St TOLEDO 1.23 CO $400,000 $1,240,000 $1,240,000 stipid0048fdco $800,000 $1,240,000 $1,240,000 $1,240,000 $1,240,000 stipid0048fdco stipid0048fdco Ph subtotal: $1,240,000 $1,240,000 $1,240, TMACOG LUC LUC McCord Resurf Description: Mill existing pavement, perform spot full depth repairs; reconstruct failed catch basins; place 2 course asphalt overlay; sidewalk repair/addition; perform necessary related work. FIELD REVIEW REQUIRED Work Type: Mill and Fill Termini: Angola Rd to Hancock Ave LUCAS COUNTY ENGINEER 0.99 CO $400,000 $880,000 $880,000 stipid0049fdco $400,000 $80,000 $880,000 $880,000 $880,000 $880,000 stipid0049fdco stipid0049fdco Ph subtotal: $880,000 $880,000 $880, TMACOG LUC LUC Wheeling St Resurf Description: A small MACOG funded project to resurface Wheeling St in the City of Oregon; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Mill and Fill Termini: Fram Randall Dr to Hollydale Ave Oregon, City of 0.61 CO $306,000 $637,000 $637,000 stipid0050fdco $306,000 $12,500 $12,500 $637,000 $637,000 $637,000 $637,000 $637,000 $637,000 stipid0050fdco stipid0050fdco stipid0050fdco Ph subtotal: $637,000 $637,000 $637, TMACOG LUC LUC Ottawa River Rd Resurf Description: Resurface Ottawa River Rd in the City of Toledo; perform necessary related work; swmall project designated by TMACOG. FIELD REVIEW REQUIRED. Work Type: Mill and Fill Termini: Suder to 290th TOLEDO 1.13 CO $325,000 $676,000 $676,000 stipid0051fdco $325,000 $13,000 $13,000 $676,000 $676,000 $676,000 $676,000 $676,000 $676,000 stipid0051fdco stipid0051fdco stipid0051fdco Ph subtotal: $676,000 $676,000 $676, TMACOG LUC LUC Kilburn Rd Bike Lanes Description: A TMACOG funded project to add bike lanesalong Kilburn Rd; Perform necessary related work; FIELD REVIEW REQUIRED; Spnosor Twp/County? Work Type: Bikeways Termini: Sylvania-Metamora to Central LUCAS COUNTY ENGINEER 2.96 CO M301 $1,308,800 $1,799,000 $1,799,000 stipid0052fdco $327,200 $163,000 $1,799,000 $1,799,000 $1,799,000 $1,799,000 stipid0052fdco stipid0052fdco Ph subtotal: $1,799,000 $1,799,000 $1,799, TMACOG LUC LUC Summit St Enh Description: Summit St enhancement; perform necessary related work; FIELD REVIEW REQUIRED. Work Type: Design Aesthetics Termini: Lagrange to Chestnut TOLEDO 1.59 CO M301 $608,000 $790,000 $790,000 stipid0053fdco M301 $152,000 $24,000 $6,000 $790,000 $790,000 $790,000 $790,000 $790,000 $790,000 stipid0053fdco stipid0053fdco stipid0053fdco Ph subtotal: $790,000 $790,000 $790, TMACOG LUC LUC IR 475 Interchnge Description: Build a new interchange in Lucas County at I-475 and US-20A; perform necessary related work. See PID for AER. Work Type: Interchange, New Termini: I-475 & 20A new interchange DISTRICT 2 PRODUCTION Air Quality Non-Exe BD7 Funds () $180,000 $1,900,000 $26,300,000 stipid0054fd 4BG7 4BK7 $900,000 $720,000 $1,900,000 $1,900,000 $26,300,000 stipid0054fd $26,300,000 stipid0054fd Page 10 of 233
11 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) Ph subtotal: $1,800,000 $1,900,000 $26,300,000 FHWA TMACOG LUC LUC IR 475/Dorr St Interchange Description: Buid a new inetrchnage in Lucas County on i-475 at Dorr St; perform necessary related work. See PID for AER. phase will be undertaken by local. Work Type Interchange, New Termini: I-475/Dorr St Interchange DISTRICT 2 PRODUCTION Air Quality Non-Exe BD7 Funds () $80,000 $950,000 $12,450,000 stipid0055fd 4BK7 $320,000 $400,000 $950,000 $950,000 $12,450,000 $12,450,000 stipid0055fd stipid0055fd Ph subtotal: $800,000 $950,000 $12,450, TMACOG LUC TMACOG SFY16 TIP Management Description: SFY16 TMACOG TIP Management Work Type: & Research Termini: 0 TMACOG SPR 4TD7 M240 $80,000 stipid0056fdspr stipid0056fdspr Ph subtotal: TMACOG LUC TMACOG SFY17 TIP Management Description: TMACOG SFY17 TIP Management Work Type: & Research Termini: 0 TMACOG SPR 4TD7 M240 $80,000 stipid0057fdspr stipid0057fdspr Ph subtotal: TMACOG LUC TMACOG SFY18 TIP Management Description: SFY18 TMACOG TIP Management Work Type: & Research Termini: 0 TMACOG SPR 4TD7 M240 $80,000 stipid0058fdspr stipid0058fdspr Ph subtotal: TMACOG LUC TMACOG SFY19 TIP Management Description: TMACOG SFY19 TIP Management Work Type: & Research Termini: 0 TMACOG SPR 4TD7 M240 $80,000 stipid0059fdspr stipid0059fdspr Ph subtotal: TMACOG LUC LUC SR Central/Talmdg Description: A funded project to imnprove the intersection by adding turn lanes; perform necessary related work; May need to coordinate with PID Urban Pav; FIELD REVIEW REQUIRED. Work Type: Turn Lane Addition Termini: Intersection of Central Ave and Talmadge ST in Toledo TOLEDO Air Quality Non-Exe 0.42 CO $1,048,000 $1,440,000 $1,440,000 stipid0060fdco $262,000 $130,000 $1,440,000 $1,440,000 $1,440,000 $1,440,000 stipid0060fdco stipid0060fdco Ph subtotal: $1,440,000 $1,440,000 $1,440, TMACOG LUC LUC US Narrow Description: Narrow Detroit Ave from an existing 4/5 lanes to 3 lanes with street parking; Signalized intersections changed to single lane roundabouts; perform neceesary related work; FIELD REVIEW REQUIRED. Work Type: Intersection Improvement Termini: AWT to Copland in Toledo TOLEDO 0.67 CO $2,507,200 $3,447,400 $3,447,400 stipid0061fdco $626,800 $313,400 $3,447,400 $3,447,400 $3,447,400 $3,447,400 stipid0061fdco stipid0061fdco Ph subtotal: $3,447,400 $3,447,400 $3,447, TMACOG LUC LUC SR Dehumidify Description: Install a dehumidification system for the existing cable with new round wire wrap at sections previously opened, new elastomeric wrap over the entire length of the cables an acoustic monitoring system; perform necessary related work. See PID for re Work Type: Repair Termini: High Level (AWT) over Maumee River DISTRICT 2 PRODUCTION 4BT7 Funds () $163,312 $816,559 $9,269,559 AM03ID0085FD 4BU7 $653,247 $816,559 $9,269,559 AM03ID0085FD Ph subtotal: $816,559 $816,559 $9,269, TMACOG LUC LUC SR Reconstruct Description: Reconstruction of SR-25 (AWT) in Toledo; perform necessary related work. Work Type: Major Rehabilitation Termini: From near City Park to I-75 DISTRICT 2 PRODUCTION 0.36 CO 4BG7 $1,200,000 $1,320,000 $1,919,210 AM10ID0264FDCO 4BG7 $120,000 $1,320,000 $1,919,210 AM10ID0264FDCO Ph subtotal: $1,320,000 $1,320,000 $1,919, TMACOG LUC WOO/LUC Miami St Connector Description: Construct Miami St new connector ahead of the larger project PID 93592; perform necessary related work. Work Type: New Construction Termini: New Miami St connector DISTRICT 2 PRODUCTION 0.49 CO 4RA7 Funds () $700,000 $770,000 $984,401 AM06ID0139FDCO Labor - Match $70,000 $770,000 $984,401 AM06ID0139FDCO Ph subtotal: $770,000 $770,000 $984,401 Labor - Match Labor - Match $16,000 $75,000 $27,401 $27,401 $118,401 $118,401 $984,401 AM06ID0139FD $984,401 AM06ID0139FD Page 11 of 233
12 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) Ph subtotal: $91,000 $27,401 $118,401 $984,401 FHWA TMACOG LUC WOO/LUC Miami St Description: Construct Miami St new connector DISTRICT 2 PRODUCTION 0.49 Labor - Match $16,000 $80,000 $96,000 $984,401 AM06ID0139FD Ph subtotal: $16,000 $80,000 $96,000 $984, TMACOG LUC LUC VGCS lighting Description: Evaluate options for replacement or rehab of the existing VGCS lighting system; Construct selected option and perform all necessary related work. Work Type: Lighting Maintenance Termini: VGCS DISTRICT 2 PRODUCTION 0.01 CO 4BT7 Funds () $570,000 $736,500 AM08ID0230FDCO 4BU7 Z001 Z001 Labor - Match $400,000 $56,000 $14,000 $570,000 $570,000 $570,000 $736,500 $736,500 $736,500 AM08ID0230FDCO AM08ID0230FDCO AM08ID0230FDCO Ph subtotal: $570,000 $570,000 $736,500 Z001 Z001 Z001 Z001 Funds () Labor - Match Funds () Labor - Match $5,000 $2,400 $600 $9,600 $2,400 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $736,500 $736,500 $736,500 $736,500 $736,500 $736,500 $736,500 $736,500 AM08ID0230FD AM08ID0230FD AM08ID0230FD AM08ID0230FD AM08ID0230FD AM08ID0230FD AM08ID0230FD AM08ID0230FD Ph subtotal: $165,000 $165,000 $736, TMACOG LUC LUC-Oregon Bike Preserve Description: Place Asphalt Rejuvenating Agent and 1 Fine Graded Polymer Asphalt Concrete Overlay on bikeways within the City of Oregon. Work Type: Pavement/Shoulder Sealing and/or Repair Termini: Various Biketrail/Paths Oregon, City of CO Z301 $182,592 $254,500 $269,500 AM10ID0265FDCO $51,908 $254,500 $254,500 $269,500 $269,500 AM10ID0265FDCO AM10ID0265FDCO Ph subtotal: $254,500 $254,500 $269, TMACOG LUC LUC Oak Openings Trail Description: Construct 1.8 miles of new trail from Secor Road to Wiregrass Lake Metro park. Work Type: Bikeways Termini: Secor Road to Wiregrass Lake Metropark Toledo Area Metropark District CO Z301 $158,252 $870,389 $900,389 AM10ID0266FDCO $633,012 $79,125 $870,389 $870,389 $900,389 $900,389 AM10ID0266FDCO AM10ID0266FDCO Ph subtotal: $870,389 $870,389 $900, TMACOG LUC LUC CR Main St Description: Full-depth reconstruction of Main Street including storm sewer replacement. Remove and replacesidewalks on both sides including widening on the east side to be a 10 wide multi-path to better connect the Sylvani River Trail with Downtown Sylvania. Vehi Work Type: Major Reconstruction Termini: from Monroe St to Over Ten Mile Creek Sylvania, City of 0.09 CO Z230 $347,650 $749,500 $794,500 AM10ID0267FDCO Z230 $347,650 $27,100 $27,100 $749,500 $749,500 $749,500 $794,500 $794,500 $794,500 AM10ID0267FDCO AM10ID0267FDCO AM10ID0267FDCO Ph subtotal: $749,500 $749,500 $794, TMACOG LUC LUC Toledo Bike Share Description: Provide 17 Bike share stations and purchase 100 bikes to establish a Bike Share program Work Type: Other Modes Related Termini: Downtown Toledo Toledo Area Metropark District CO Z301 $262,760 $361,295 $390,579 AM10ID0268FDCO $65,690 $32,845 $361,295 $361,295 $390,579 $390,579 AM10ID0268FDCO AM10ID0268FDCO Ph subtotal: $361,295 $361,295 $390, OTT OTT Billman Rd Turnpike Mitig Description: A transportation mitigation funded project to resurface pavement on both ends of Billman Road bridge over the Ohio Turnpike in Ottawa County and to tile a ditch in the southwest corner of the overpass; perform necessary related work. Work Type: Mill and Fill Termini: over Ohio Turnpike OTTAWA COUNTY ENGINEER 0.01 CO 4TN7 Funds () $90,000 $99,000 $111,959 stipid0078fdco $9,000 $99,000 $111,959 stipid0078fdco Ph subtotal: $99,000 $99,000 $111,959 Labor - Match Labor - Match $1,814 $10,238 $12,052 $12,052 $111,959 $111,959 stipid0078fd stipid0078fd Ph subtotal: $12,052 $12,052 $111,959 Labor - Match $907 $907 $111,959 stipid0078fd Ph subtotal: $907 $907 $111,959 Page 12 of 233
13 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA OTT OTT Portage Rvr S. Rd Trnpk Miti Description: A transportation mitigation funded OTTAWA COUNTY project to repair and stabilize approach ENGINEER enbankements associated with the overpass structure on Portage River South Road spanning the Ohio Turnpike; perform necessary related work. Work Type: Slide Repair Termini: Ove the Ohio Turnpike 0.01 CO 4TN7 Funds () $310,000 $481,000 $582,251 stipid0079fdco $140,000 $31,000 $481,000 $481,000 $582,251 $582,251 stipid0079fdco stipid0079fdco Ph subtotal: $481,000 $481,000 $582,251 Labor - Match Labor - Match $14,175 $79,988 $94,163 $94,163 $582,251 $582,251 stipid0079fd stipid0079fd Ph subtotal: $94,163 $94,163 $582,251 Labor - Match $7,088 $7,088 $582,251 stipid0079fd Ph subtotal: $7,088 $7,088 $582, OTT OTT Const Insp Description: OTT Constrution Inspection of the Rehabilitation, PID Work Type: Maintenance/Repair (NEW) Termini: OTT CO 4BT7 Funds () $1,500,000 $1,500,000 $1,500,000 stipid0080fdco Ph subtotal: $1,500,000 $1,500,000 $1,500, OTT OTT Madison St Reconst Description: Reconstruct Madison St in the City of Port Clinton; Perform necessary related work; incudes replacement of curb & sidewalks, upgrade & enhace pedestrian safety with traffic calming features. LED street ligh eligible as cost was included in the es Work Type: Major Rehabilitation Termini: Third ST to Perry St (SR-163) in Port Clinton Port Clinton, City of 0.20 CO 4B97 Un-Assigned $2,640,000 $3,880,000 $4,590,000 AM07ID0180FDCO $910,000 $330,000 $3,880,000 $3,880,000 $4,590,000 $4,590,000 AM07ID0180FDCO AM07ID0180FDCO Ph subtotal: $3,880,000 $3,880,000 $4,590, SAN SAN US College Entrance Description: A TID funded project to construct a roundabout and a new entrance to Terra Communiity College off US6/SR-53, perform necessary related work. UPDATE (9/25/14) added bridge over Muskellunge Creek. Work Type: Intersection Termini: US-6 and Napoleon Rd in City of Fremont DISTRICT 2 PRODUCTION Air Quality Non-Exe 0.02 Labor - Match $45,011 $247,490 $547,563 $3,351,711 stipid0081fd Labor - Match $255,062 $247,490 $547,563 $3,351,711 stipid0081fd Ph subtotal: $300,073 $247,490 $547,563 $3,351,711 Funds () Labor - Match $60,000 $15,000 $15,648 $90,648 $90,648 $90,648 $3,351,711 $3,351,711 $3,351,711 stipid0081fd stipid0081fd stipid0081fd Ph subtotal: $90,648 $90,648 $3,351, SAN SAN West St in Fremont Description: Resurface and reconstruct West Rd in the City of Fremont; perform necessary related work. NEED NHS Waiver. Work Type: Major Rehabilitation Termini: Christy Rd to Oak Harbor Rd (SR-19) Fremont, City of 0.86 CO 4B97 $1,008,900 $1,137,000 $1,297,000 AM08ID0228FDCO 4B97 $53,100 $71,250 $3,750 $1,137,000 $1,137,000 $1,137,000 $1,297,000 $1,297,000 $1,297,000 AM08ID0228FDCO AM08ID0228FDCO AM08ID0228FDCO Ph subtotal: $1,137,000 $1,137,000 $1,297, SEN SEN SR Intersection Description: Intersection improvement and culvert extension; perform necessary related work. Work Type: Intersection Improvement Termini: CR592 Intersection improvement and culvert extension DISTRICT 2-ORATIONS 0.10 CO M232 $280,000 $385,000 $390,000 stipid0082fdco M232 Funds () Labor - Match $70,000 $28,000 $7,000 $385,000 $385,000 $385,000 $390,000 $390,000 $390,000 stipid0082fdco stipid0082fdco stipid0082fdco Ph subtotal: $385,000 $385,000 $390,000 Funds () $5,000 $5,000 $390,000 stipid0082fd Ph subtotal: $5,000 $5,000 $390, WIL WIL SR Turn Lanes Description: Add turn lanes on SR-49 at Turnpike interchange; perform necessary related work. Work Type: Turn Lane Addition Termini: Turnpike interchange DISTRICT 2 PRODUCTION 0.43 CO Un-Assigned $673,844 $471,095 $1,404,400 $1,702,785 AM01ID0001FDCO Funds () Un-Assigned Labor Labor - Match $168,461 $72,800 $18,200 $471,095 $471,095 $471,095 $1,404,400 $1,404,400 $1,404,400 $1,702,785 AM01ID0001FDCO $1,702,785 AM01ID0001FDCO $1,702,785 AM01ID0001FDCO Page 13 of 233
Ohio Department of Transportation STIP Project Listing (Appendix 6) as of 7/25/2018 Query: "Current STIP Detail 4"
Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationCOMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514
TMACOG TIP PROGRAM FY2010 AND FY2011 PLUS PIPELINE PROJECTION FY2012 THROUGH 2017 revised 02/03/2010 FISCAL PROJECT R/W PS&E FEDERAL PROJECT CONSTRUCT CONSTRUCT YEAR PID SPONSOR PROJECT NAME PROJECT LIMITS
More informationODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND
ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND TMACOG TRANSPORTATION SUMMIT MARCH 16, 2018 Mike Gramza, District Two, Capital Programs Administrator John R. Kasich, Governor Jerry Wray, ODOT
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationHighway Construction
Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More informationMIAMI & ERIE CANAL SHARED USE TRAIL
New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14
More informationDistrict Construction Projects
District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationCY2017 Summary of STP applications
CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationProposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017
Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders
More informationT W P L A I A A V O L H S Bike Network Plan Sylvania, Ohio. July 20, 2009
Y 2009 E T W O R K N P L A E N K I B N I A A V O L H S O I 2009 Bike Network Plan Sylvania, Ohio I-75 Lenawee County US 23 Monroe County I-75 Michigan Ohio SYLVANIA Alexis Rd I-475 Monroe 24 I-75 20/120
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationS/TIP LIST OF PROJECTS
LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationReplace Bridge 51 on Blackiston Mill Dr. over Silver Creek,
INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north
More informationSFY Transportation Improvement Program Highway and Bikeway Element Amendments
PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker
More informationNew Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007
New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationSIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS
TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor
More informationNew Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid
New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.
1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationExisting conditions of each bridge and repair plan are presented in Table
2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationNorth Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary
Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare
More informationPREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036
HAM-32F-0.00 PID 86461 PREFERRED ALTERNATIVE IMPLEMENTATION PLAN Prepared for Ohio Department of Transportation, District 8 505 South SR 741 Lebanon, Ohio 45036 Prepared by URS Corporation 564 White Pond
More information2012 Capital Budget Capital Improvement Program
2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationBuilding Great Neighbourhoods BONNIE DOON
Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationCOMMUNITY DEVELOPMENT COMMITTEE. May 18, 2017
COMMUNITY DEVELOPMENT COMMITTEE May 18, 2017 There was a meeting of the Community Development Committee of the Lima-Allen County Regional Planning Commission held on Thursday, May 18, 2017, at 3:30 p.m.
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, June 20 th, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More informationRED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,
RED BANK CORRIDOR Community Partners Committee Meeting Madisonville Recreation Center May 21, 2013 RED BANK CORRIDOR PROJECT Create a balance of mobility and access to better serve local communities, businesses
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationRoadway Project Recommendations:
Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationCity of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate
City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or
More informationCITY OF SOUTH DAYTONA
CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage
More informationMulti-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period
2011 CITY CENTER MASTER PLAN UPDATE ADOPTED TRANSPORTATION ELEMENT PROJECT LIST FOR THE CBD, WATERFRONT, AND YORK, SEHOME, AND LETTERED STREETS NEIGHBORHOODS IMMEDIATELY ADJACENT TO CITY CENTER TRANSPORTATION
More informationCITY OF OREGON BIKEWAYS
Location Oregon, Ohio Services Provided Transportation Engineering Right-of-Way Acquisition Construction Administration Cost Engineers Estimate: $549,400 Project Cost: $479,075.86 (Stadium Road Bikeway,
More informationI-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.
RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS
RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationBuilding Great Neighbourhoods QUEEN ALEXANDRA
Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.
More informationFY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015
FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL
More information2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.
More informationODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT
More information2017 (FY 21,22,23) Ohio CMAQ Project Selection
2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationPlanned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationOldham County Major Thoroughfare Plan
Prepared for: Oldham County Planning & Zoning Commission Prepared by: December 2003 Table of Contents I. INTRODUCTION...1 A. Contents of Report...1 B. Purpose of Study...2 C. Related Project Documents...2
More information