1 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA LACRPC ALL ALL Lima RR Grade Separation Description: Improvements include a railroad grade separation of the Indiana & Ohio railway crossing at Elm St. Additional improvements include 0.70 miles of pavement reconstruction at the intersection of Elm St. and Bellefontaine Ave. and the addition of a storm sewe Work Type: Railroad Grade Separation Termini: Bellefontaine Ave. to North St. along the Indiana & Ohio Railway Lima, City of 0.23 CO 4B37 Z302 $599,180 $11,937,539 $17,354,104 AM02ID0035FDCO RR Remb 4BD7 4BK7 4HJ7 4R47 4B37 LY10 Z231 Z400 Z302 Funds () Earmarks / High Priority $800,000 $3,200,000 $2,500,000 $370,832 $1,014,000 $1,414,800 $1,170,485 $41,943 $732,909 $9,391 $84,000 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO AM02ID0035FDCO Ph subtotal: $11,937,539 $11,937,539 $17,354,104 RW Utl Remb Utl Remb 4BD7 4BK7 Funds () $80,000 $1,304,364 $1,304,364 $1,404,364 $1,404,364 $14,300,275 $14,300,275 stipid0fdrw stipid0fdrw Ph subtotal: $1,304,364 $1,404,364 $14,300, LACRPC ALL ALL SR 65/818.02/11.34 Description: SR 65: Grind and resurface with asphalt concrete from Grand Avenue to SR115. Install curb & gutter, sidewalks and new storm sewer from Northern Avenue to Jacobs Avenue. PID used to conduct PE. SR81: Grind and resurface with asphalt concrete. Work Type: Resurfacing, Undivided System Termini: SR65:From Grand Ave. in Lima to SR115. SR81: From Wapak Rd. to Eastown Rd CO 4BG7 $78,491 $3,745,913 $4,852,145 stipid0003fdco Z231 Z400 Z231 Z400 Funds () Labor - Labor - Match $1,862,129 $7,670 $343,469 $474,826 $589,367 $247,967 $97,120 $10,304 $16,495 $2,355 $15,721 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco stipid0003fdco Ph subtotal: $3,745,913 $3,745,913 $4,852,145 RW Utl Remb Utl Remb Funds () $10,000 $564,618 $564,618 $614,618 $614,618 $4,852,145 $4,852,145 stipid0003fdrw stipid0003fdrw Ph subtotal: $564,618 $614,618 $4,852, LACRPC ALL ALL SR Description: Part 1 of 2. Resurface the roadway with asphalt concrete. Replace the existing cur and gutter in the Village of Elida. From Pioneer Road to 0.2 miles west of Eastown Road - widen the roadway to meet design standards (5-12' lanes), install new curb a Work Type: Mill and Fill Termini: On SR309 from US30 to 0.2 miles west of Eastown Road 8.96 RW Utl Remb Funds () $1,179,076 $1,279,076 $12,022,680 stipid0004fdrw Ph subtotal: $1,179,076 $1,279,076 $12,022, LACRPC ALL ALL Lima Wayne/High Streets Description: Modify High Street to a one-way, two lane operation between Metcalf Street and Central Avenue. Convert Wayne Street to a two-way operation between Cole Street and Central Avenue. Includes resurfacing, curb & gutter, replacing sidewalk as needed, new sign Work Type: Section Improvement Termini: High Street from Metcalf Street to Central Avenue AND Wayne Street from Cole Street to Central Avenue. Lima, City of 1.87 CO $3,091,730 $3,313,015 $3,512,117 stipid0005fdco $216,421 $4,864 $3,313,015 $3,313,015 $3,512,117 $3,512,117 stipid0005fdco stipid0005fdco Ph subtotal: $3,313,015 $3,313,015 $3,512, LACRPC ALL ALL Elida Road Description: Plane and pave with 1.5" of asphalt concrete, including concrete joint repairs. Work Type: Resurfacing, Undivided System Termini: On Elida Road, from the East corporation limit of Delphos to Jct. Baugh Road. ALLEN COUNTY ENGINEER 2.17 CO 4BG7 $175,754 $913,120 $923,557 stipid0006fdco Page 1 of 218

2 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA LACRPC ALL ALL Elida Road Description: Plane and pave with 1.5" of asphalt ALLEN COUNTY ENGINEER 2.17 CO M231 M232 Labor - $184,380 $517,866 $35,120 $913,120 $913,120 $913,120 $923,557 $923,557 $923,557 stipid0006fdco stipid0006fdco stipid0006fdco Ph subtotal: $913,120 $913,120 $923, LACRPC ALL ALL LACRPC SFY18 RTP Description: LACRPC SFY Regional Transportation Program Supplemental Funds. Work Type: & Research Termini: 0 LIMA (TCC) SP 4TD7 M240 $150,000 $150,000 $150,000 stipid0007fdspr Ph subtotal: $150,000 $150,000 $150, LACRPC ALL ALL LACRPC SFY19 RTP Description: LACRPC SFY Regional Transportation Program Supplemental Funds Work Type: & Research Termini: 0 LIMA (TCC) SP 4TD7 M240 $150,000 $150,000 $150,000 stipid0008fdspr Ph subtotal: $150,000 $150,000 $150, LACRPC ALL ALL LACRPC FY 20 Reg Trans Plng Description: LACRPC SFY Regional Transportation Program Supplemental funds Work Type: & Research Termini: 0 LIMA (TCC) SP 4TD7 Un-Assigned stipid0009fdspr Ph subtotal: LACRPC ALL ALL LACRPC FY 21 Reg Trans Plng Description: LACRPC SFY Regional Transportation Program Supplemental funds Work Type: & Research Termini: 0 LIMA (TCC) SP 4TD7 Un-Assigned stipid0010fdspr Ph subtotal: LACRPC ALL ALL Pavement Condition Index Description: Acquire the PCI data for County and Township roads in Allen County through acquisition of capital system management software, PAVER Pavement Maintenance Management System V Colorado University PAVER Center. Work Type: Pavement Condition Investigation Termini: Various locations in Allen County ALLEN COUNTY ENGINEER SP Un-Assigned AM04ID0126FDSPR Ph subtotal: DEF DEF SR Description: Perfrom PE to determine if scope will include a full replacement or a dec replacement. PID also includes the design and construction phases of the project. Structure carries Clinton Street over the Maumee River in downtown defiance. Work Type: Bridge Replacement Termini: SR15/18/66 bridge over the Maumee River in the City of Defiance RW Labor - Match $14,248,808 MODID0006FDRW Ph subtotal: $14,248,808 MVPO DEF DEF SR Description: Preliminary engineering determined this to be a full structure replacement. PID also includes the design and construction phases of the project. Structure carries Clinton Street over the Maumee River in downtown Defiance. Work Type: Bridge Replacement Termini: SR15/18/66 bridge over the Maumee River in the City of Defiance CO 4B37 Z302 $447,450 $10,558,468 $12,956,620 stipid0011fdco 4BG7 Z302 Funds () Labor - Labor - Match Funds () $403,840 $7,191,370 $1,797,843 $503,396 $44,745 $28,975 $125,849 $12,000 $3,000 $10,558,468 $10,558,468 $10,558,468 $10,558,468 $10,558,468 $10,558,468 $10,558,468 $10,558,468 $10,558,468 $12,956,620 $12,956,620 $12,956,620 $12,956,620 $12,956,620 $12,956,620 $12,956,620 $12,956,620 $12,956,620 stipid0011fdco stipid0011fdco stipid0011fdco stipid0011fdco stipid0011fdco stipid0011fdco stipid0011fdco stipid0011fdco stipid0011fdco Ph subtotal: $10,558,468 $10,558,468 $12,956,620 PE Funds () Labor - Match $123,491 $30,873 $45,866 $11,467 $2,129,475 $2,129,475 $2,129,475 $2,129,475 $2,341,172 $2,341,172 $2,341,172 $2,341,172 $12,956,620 $12,956,620 $12,956,620 $12,956,620 stipid0011fdpe stipid0011fdpe stipid0011fdpe stipid0011fdpe Ph subtotal: $211,697 $2,129,475 $2,341,172 $12,956, Findlay HAN HAN IR Description: Major-New reconstruction and widening of IR75 through the City of Findlay. Reconstruct the IR75/US 68 system interchange and replace all mainline structures. See companion project PID Work Type: Major Widening Termini: From approximately 0.8 miles south of US68/IR75 interchange to just south of the CR 99 interchange RW Utl Remb 4RA7 Funds () $115,732 $11,037,446 $11,616,107 $160,141,765 MODID0FDRW Page 2 of 218

3 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA Findlay HAN HAN IR Description: Major-New reconstruction and 7.10 RW Utl Remb 4RC $462,929 $11,037,446 $11,616,107 $160,141,765 MODID0FDRW Ph subtotal: $578,661 $11,037,446 $11,616,107 $160,141, Findlay HAN HAN Findlay FY Resurfacing Description: Resurface with asphalt concrete. also includes widening, drainage and bike path work. Work Type: Resurfacing, Undivided System Termini: On CR 236 from SR 568 to US 224 Findlay, City of 1.27 CO Z231 $940,000 $1,210,250 $1,232,035 stipid0001fdco Z231 $235,000 $28,200 $7,050 $1,210,250 $1,210,250 $1,210,250 $1,232,035 $1,232,035 $1,232,035 stipid0001fdco stipid0001fdco stipid0001fdco Ph subtotal: $1,210,250 $1,210,250 $1,232, HAN HAN US Arlington 1 Description: 1 of 3 to reconstruct Main Street (US 68) in the Village of Arlington, including curb, gutter, drainage and storm sewer. Construction limits for 1 is from the northern intersection with SR 103 to the bridge over Buck Run.This PID includes the Work Type: Major Rehabilitation Termini: From the south corp to Wardwell Street in the Village of Arlington. Arlington, Village of 0.36 CO 4BG6 $801,000 $1,335,470 $1,411,130 stipid0012fdco Z232 Z232 Funds () Labor - Labor - Match $368,000 $92,000 $14,720 $56,070 $3,680 $1,335,470 $1,335,470 $1,335,470 $1,335,470 $1,335,470 $1,411,130 $1,411,130 $1,411,130 $1,411,130 $1,411,130 stipid0012fdco stipid0012fdco stipid0012fdco stipid0012fdco stipid0012fdco Ph subtotal: $1,335,470 $1,335,470 $1,411, HAN HAN US Arlington 2 Description: 2 of 3 to reconstruct Main Street (US 68) in the Village of Arlington, including curb, gutter, drainage and storm sewer. Construction limits for 2 is from the south corp limit of Arlington to the northern intersection with SR 103.Preliminary Work Type: Major Rehabilitation Termini: From the south corp to the northern intersection with SR 103. Arlington, Village of 0.31 CO 4BG7 $793,000 $1,358,110 $1,435,090 stipid0013fdco Z232 Z232 Funds () Labor - Labor - Match $392,000 $98,000 $15,680 $55,510 $3,920 $1,358,110 $1,358,110 $1,358,110 $1,358,110 $1,358,110 $1,435,090 $1,435,090 $1,435,090 $1,435,090 $1,435,090 stipid0013fdco stipid0013fdco stipid0013fdco stipid0013fdco stipid0013fdco Ph subtotal: $1,358,110 $1,358,110 $1,435, D02 D02 Land Preserv Along New US-24 Description: A project to protect land as open space along the new US-24 corridor by acquiring a conservation easment from various properties (13 properties in FUL/HEN/LUC); perform necessary related work. Work Type: Acquire Easements Termini: Various parcels in Fulton, Henry and Lucas Counties DISTRICT 2 PRODUCTION CO Air Quality Exem RW BG7 $4,441,383 $7,876,001 $8,000,001 MODID0015FDRW D57 National Corridor Boarder $3,434,618 $7,876,001 $8,000,001 MODID0015FDRW Ph subtotal: $7,876,001 $7,876,001 $8,000, MVPO FUL FUL SR66 Relocation on CR24 Description: Relocate SR-66 west of Archbold on CR-24; perform necessary related work Work Type: Relocation Termini: From US-20A in Fulton County to US-6 in Henry County Archbold, Village of 5.97 PE 4BD7 Funds () $90,000 $971,730 $1,469,817 $1,469,817 stipid0014fdpe 4BK7 Z232 $398,470 $9,617 $971,730 $971,730 $1,469,817 $1,469,817 $1,469,817 $1,469,817 stipid0014fdpe stipid0014fdpe Ph subtotal: $498,087 $971,730 $1,469,817 $1,469, MVPO FUL FUL CR Bridge Re-deck X Description: exchange project to re-deck and widen bridge on Fulton CR 20,.5 north of CR N Work Type: Bridge Deck Replacement Termini: CR SLM 12.5 FULTON COUNTY ENGINEER 0.20 CO 4C87 Funds () $646,000 $714,000 $717,916 stipid0015fdco 4C87 Funds () $34,000 $32,300 $1,700 $714,000 $714,000 $714,000 $717,916 $717,916 $717,916 stipid0015fdco stipid0015fdco stipid0015fdco Ph subtotal: $714,000 $714,000 $717,916 PE Labor - Match Labor - Match $500 $2,916 $3,416 $3,416 $717,916 $717,916 stipid0015fdpe stipid0015fdpe Ph subtotal: $3,416 $3,416 $717,916 RW Labor - Match $500 $500 $717,916 stipid0015fdrw Ph subtotal: $500 $500 $717,916 Page 3 of 218

4 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA MVPO FUL FUL Wilson St Bridge Replacement Description: Full replacement of Wilson Street bridge over Bad Creek in Delta Ohio Work Type: Bridge Replacement Termini: Wilson St Bridge over Bad Creek Delta, Village of CO 4R87 Z233 $482,220 $507,600 $567,600 stipid0016fdco $25,380 $507,600 $567,600 stipid0016fdco Ph subtotal: $507,600 $507,600 $567, MVPO HEN HEN New Bridge Description: A project to implement the preferred alternative for a new bridge over the Maumee River located somewhere between SR-108 and US-6 in Henry County; perform necessary related work. UPDATE ( ): Jobs & Commerce provided $250k towards the construction of Work Type: New Bridge Termini: New Maumee River crossing in Henry County somewhere between SR-108 and US-6 HENRY COUNTY ENGINEER 0.20 CO 4BD7 Funds () $1,200,000 $12,051,000 $12,933,223 AM06ID0173FDCO 4BG7 4BK7 4TM Un-Assigned Funds () Un-Assigned Labor Labor - Labor - Match $5,458,000 $4,800,000 $144,000 $155,500 $43,500 $12,051,000 $12,051,000 $12,051,000 $12,051,000 $12,051,000 $12,051,000 $12,933,223 $12,933,223 $12,933,223 $12,933,223 $12,933,223 $12,933,223 AM06ID0173FDCO AM06ID0173FDCO AM06ID0173FDCO AM06ID0173FDCO AM06ID0173FDCO AM06ID0173FDCO Ph subtotal: $12,051,000 $12,051,000 $12,933, TMACOG LUC LUC Ph 2 Description: Detail Design (Stage 2 on), R/W and Construction of the I-75 stretch between Detroit Ave and Lagrange. Widen and upgrade existing facility and modify existing (including system intechange by old Jeep plant) and/or add new interchanges to provide better an Work Type: Interchange, Reconstruction Termini: Toledo. From Detroit Ave (US-24) to Lagrange Air Quality Non-Exe 3.11 CO 4BD7 Funds () $398,000 $148,268,140 $150,058,140 $161,207,907 stipid0019fdco 4BK7 $1,392,000 $148,268,140 $150,058,140 $161,207,907 stipid0019fdco Ph subtotal: $1,790,000 $148,268,140 $150,058,140 $161,207, TMACOG LUC LUC TMACOG SIB loan repayment Description: II rehabilitation of the MLK bridge Work Type: SIB Termini: SIB loan repayment for PID Not Yet Assigned OT Dbt Serv $484,189 $983,012 stipid0fdoth Dbt Serv $498,823 $983,012 stipid0fdoth Ph subtotal: $983,012 $983, TMACOG LUC LUC South Ave Reconstruct Description: A TMACOG funded project to reconstruct South Ave from Reynolds Rd to Byrne Rd; perform necessary related work; FIELD REVIEW Required. Work Type: Major Reconstruction Termini: City of Toledo, Reynolds Rd to Byrne Rd Toledo, City of 2.23 CO L23E $3,717,700 $5,240,000 $5,554,000 stipid1fdco $1,045,937 $476,363 $5,240,000 $5,240,000 $5,554,000 $5,554,000 stipid1fdco stipid1fdco Ph subtotal: $5,240,000 $5,240,000 $5,554,000 PE Labor - Match Labor - Match $47,000 $220,000 $267,000 $267,000 $5,554,000 $5,554,000 stipid1fdpe stipid1fdpe Ph subtotal: $267,000 $267,000 $5,554,000 RW Labor - Match $47,000 $47,000 $5,554,000 stipid1fdrw Ph subtotal: $47,000 $47,000 $5,554, TMACOG LUC LUC IR Description: A multi-lane & Major Bridge funded project (project# 2) to reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges; perform necessary related work. See PID for project # 1 and PID for project # 3. UPDATE ( Work Type: Major Rehabilitation Termini: From South Ave to north of Dorr St DISTRICT 2 PRODUCTION 1.60 CO 4BT7 Funds () $2,500,000 $170,903,206 $187,595,728 stipid2fdco RR Remb 4RA7 4RC 7BTB Bonds 7MB Bonds 7PM Bonds 7RA Bonds 4RA7 4RA Funds () Bonds Garvee Bond-Fund 045-Long Garvee Bond-Fund 045-Long Bonds Funds () Funds () Labor - Match Funds () Funds () Funds () $6,800,000 $27,200,000 $37,000,000 $16,000,000,000 $6,000,000 $2,400,000 $600,000 $13,206 $3,336,000 $6,334,000 $1,200,000 $300,000 $400,000 $140,000 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $170,903,206 $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco $187,595,728 stipid2fdco Page 4 of 218

5 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC IR Description: A multi-lane & Major Bridge funded DISTRICT 2 PRODUCTION 1.60 CO RR Remb 4RC $560,000 $170,903,206 $187,595,728 stipid2fdco Ph subtotal: $170,883,206 $170,903,206 $187,595,728 Description: A multi-lane & Major Bridge funded project (project# 2) to reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges; perform necessary related work. See PID for project # 1 and PID for project # 3. UPDATE ( Work Type: Major Rehabilitation Termini: Fron South Ave to north of Dorr St DISTRICT 2 PRODUCTION Air Quality Non-Exe 1.65 PE 4BT7 Funds () $35,000 $10,592,107 $10,797,107 $119,880,000 MODID0012FDPE Env RW S 4RA7 Funds () $170,000 $10,592,107 $10,797,107 $119,880,000 MODID0012FDPE Ph subtotal: $205,000 $10,592,107 $10,797,107 $119,880,000 CO Air Quality Nonex 1.65 RW RA7 Funds () $119,880,000 MODID0013FDRW Ph subtotal: $119,880, TMACOG LUC LUC US 20A 3.55/4.55 Rndbt/Conct Description: A project to construct 2 roundabouts at US-20A/SR-295 and at US-20A/Whitehouse-Spence Rd and a connector road from the new SR-295 to the South Airfield Rd Industrial Park; perform necessary related work. Work Type: Intersection Improvement Termini: at US-20A/SR-295 and US-20A/Whitehouse-Spencer Rd intersections DISTRICT 2 PRODUCTION 1.43 CO 4BG7 $2,450,000 $3,928,000 $4,771,473 AM03ID0094FDCO 4JM7 4BG7 Funds () Funds () Labor - Match $800,000 $75,000 $122,400 $30,600 $3,928,000 $3,928,000 $3,928,000 $3,928,000 $3,928,000 $3,928,000 $4,771,473 $4,771,473 $4,771,473 $4,771,473 $4,771,473 $4,771,473 AM03ID0094FDCO AM03ID0094FDCO AM03ID0094FDCO AM03ID0094FDCO AM03ID0094FDCO AM03ID0094FDCO Ph subtotal: $3,928,000 $3,928,000 $4,771, TMACOG LUC LUC Toledo Lighthouse Ph 1 Description: A TMACOG funded phase 1 project to address exterior cleaning and stabilization of the masonry walls and structure of the the Toledo Harbor lighthouse; Also, new replacement windows and shutters will be included in 1; perform necessary related work. Work Type: Facility Renovation Termini: Offshore at the western end of Lake Erie at the entrance to the Toledo Harbor channel in Maumee Bay LUCAS COUNTY ENGINEER 0.01 CO M301 $464,400 $638,500 $642,784 stipid3fdco M301 $116,100 $46,400 $11,600 $638,500 $638,500 $638,500 $642,784 $642,784 $642,784 stipid3fdco stipid3fdco stipid3fdco Ph subtotal: $638,500 $638,500 $642,784 PE Labor - Match Labor - Match $643 $3,641 $4,284 $4,284 $642,784 $642,784 stipid3fdpe stipid3fdpe Ph subtotal: $4,284 $4,284 $642, TMACOG LUC WOO/LUC-Chessie Circle Trail Description: Remove the former CSX RR bridge Wood County Airport over the Maumee River and construct a bike/hike trail on abandoned RR track, owned by Toledo Metroparks; perform necessary related work. See PID for RW. Work Type: Bikeways Termini: Former CSX RR Bridge over Maumee River near the Turnpike Bridge and Bike/hike trail from River Rd to Glanzman Rd PE Labor - Match Labor - Match $50,400 $284,400 $217,365 $217,365 $552,165 $552,165 $3,343,121 $3,343,121 MODID0014FDPE MODID0014FDPE Ph subtotal: $334,800 $217,365 $552,165 $3,343, TMACOG LUC LUC Bancroft St Reconst Description: A TMACOG funded project to rehabilitate the pavementon Bancroft St from Secor Rd to Parkside Blvd; Perform necessary related work. FIELD REVIEW conducted on 6/2/15. Work Type: Mill and Fill Termini: City of Toledo, from Secor to Parkside Toledo, City of 1.40 CO $8,280,800 $10,938,500 $11,172,500 stipid4fdco $2,070,200 $587,500 $10,938,500 $10,938,500 $11,172,500 $11,172,500 stipid4fdco stipid4fdco Ph subtotal: $10,938,500 $10,938,500 $11,172, TMACOG LUC LUC IR Widening Description: A project to replace/rehab existing pavement and widen I-475 by adding one additional lane for a total of 3 lanes in each direction from US-24 to US-20; perform necessary related work. See PIDs 80694, 88084, and for mainline bridges. See PID 9 Work Type: Major Widening Termini: From US-24 (AWT) to SR-20 (Central Ave) DISTRICT 2 PRODUCTION Air Quality Non-Exe 8.39 PE BD7 Funds () $107,388 $4,700,000 $61,200,000 MODID1FDPE Page 5 of 218

6 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC IR Widening Description: A project to replace/rehab existing DISTRICT 2 PRODUCTION Air Quality Non-Exe 8.39 PE BK7 4BD7 4BK7 Funds () $400,000 $818,522 $3,274,090 $107,388 $107,388 $107,388 $4,700,000 $4,700,000 $4,700,000 $61,200,000 $61,200,000 $61,200,000 MODID1FDPE MODID1FDPE MODID1FDPE Ph subtotal: $4,592,612 $107,388 $4,700,000 $61,200, TMACOG LUC LUC IR over Monclova Rd Description: Redeck and widen the I-475 bridge over Monclova Road and NS RR; Perform other necessary work. "Limited Review". Work Type: Minor Widening Termini: I-475 bridge over Monclova Road and NS RR. DISTRICT 2 PRODUCTION 0.39 PE BD7 Funds () $7,000 $300,000 $6,215,000 MODID3FDPE BK7 4BD7 4BK7 Un-Assigned Funds () $28,000 $53,000 $212,000 $300,000 $300,000 $300,000 $6,215,000 $6,215,000 $6,215,000 MODID3FDPE MODID3FDPE MODID3FDPE Ph subtotal: $300,000 $300,000 $6,215, TMACOG LUC LUC Bennett Rd Pav Reconst Description: Reconstruction of Bennett Rd in Toledo; perform necessary related work; FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: Laskey to Alexis Toledo, City of 1.02 CO M23E stipid5xxco stipid5xxco stipid5xxco Ph subtotal: PE Labor - Match Labor - Match $1,725 $9,750 $11,475 $11,475 $2,487,775 $2,487,775 stipid5fdpe stipid5fdpe Ph subtotal: $11,475 $11,475 $2,487, TMACOG LUC LUC Douglas Rd Reconst Description: Reconstruct Douglas Rd from Laskey to Alexis in the City of Toledo; perform necessary related work; FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: Laskey to Alexis Toledo, City of 1.12 CO M23E $1,997,896 $2,697,370 $2,709,970 stipid6fdco $499,474 $2,697,370 $2,697,370 $2,709,970 $2,709,970 stipid6fdco stipid6fdco Ph subtotal: $2,697,370 $2,697,370 $2,709,970 PE Labor - Match Labor - Match $1,900 $10,700 $12,600 $12,600 $2,709,970 $2,709,970 stipid6fdpe stipid6fdpe Ph subtotal: $12,600 $12,600 $2,709, TMACOG LUC LUC Sylvania Ave Rehab in County Description: Rehabilitate the pavement of Sylvania Ave; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Major Rehabilitation Termini: Centennial Rd to McCord Rd LUCAS COUNTY ENGINEER 1.87 CO M23E $2,041,600 $2,627,000 $2,640,000 stipid7fdco $510,400 $75,000 $2,627,000 $2,627,000 $2,640,000 $2,640,000 stipid7fdco stipid7fdco Ph subtotal: $2,627,000 $2,627,000 $2,640,000 PE Labor - Match Labor - Match $2,000 $11,000 $13,000 $13,000 $2,640,000 $2,640,000 stipid7fdpe stipid7fdpe Ph subtotal: $13,000 $13,000 $2,640, TMACOG LUC LUC Glendale Resurf Description: Mill and resurface existing asphalt pavement including full depth pavement repairs; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Mill and Fill Termini: AWT to Broadway St Toledo, City of 0.36 PE Labor - Match $500 $3,000 $400,716 stipid8fdpe Labor - Match $2,500 $3,000 $400,716 stipid8fdpe Ph subtotal: $3,000 $3,000 $400,716 RW Labor - Match $300 $300 $400,716 stipid8fdrw Ph subtotal: $300 $300 $400, TMACOG LUC LUC TMACOG FY 18 Rideshare Description: TMACOG FY 18 Rideshare Program Work Type: Rideshare Termini: 0 TMACOG SP 4TE7 $95,800 $95,800 $95,800 stipid9fdspr Ph subtotal: $95,800 $95,800 $95, TMACOG LUC LUC TMACOG FY 18 AQ Program Description: TMACOG FY 18 AQ Program Work Type: Air Quality Termini: 0 TMACOG SP 4TE7 $85,000 $85,000 $85,000 stipid0030fdspr Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC TMACOG FY 19 Rideshare Description: TMACOG FY 19 Rideshare Program Work Type: Rideshare Termini: 0 TMACOG SP 4TE7 $95,800 $95,800 $95,800 stipid0031fdspr Ph subtotal: $95,800 $95,800 $95, TMACOG LUC LUC TMACOG FY 19 AQ Program Description: TMACOG FY 19 AQ Program Work Type: Air Quality Termini: 0 TMACOG SP 4TE7 $85,000 $85,000 $85,000 stipid0032fdspr Ph subtotal: $85,000 $85,000 $85,000 Page 6 of 218

7 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC TMACOG FY 20 Rideshare Description: TMACOG FY 20 Rideshare Program Work Type: Rideshare Termini: 0 TMACOG SP 4TE7 $112,800 $112,800 $112,800 stipid0033fdspr Ph subtotal: $112,800 $112,800 $112, TMACOG LUC LUC TMACOG FY 20 AQ Program Description: TMACOG FY 20 AQ Program Work Type: Air Quality Termini: 0 TMACOG SP 4TE7 $68,000 $85,000 $85,000 stipid0034fdspr $17,000 $85,000 $85,000 stipid0034fdspr Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC Woodruff Ave Resurf Description: Mill and resurface existing asphalt pavement including full depth pavement repairss, minor walk upgrades, minor drainage improvements, and curb repairs as needed; perform necessary related work. FIELD REVIEW REQUIRED. Work Type: Resurfacing, Undivided System Termini: Collingwood Blvd to Cherry St Toledo, City of 1.23 CO $400,000 $1,240,000 $1,240,000 stipid0035fdco $800,000 $1,240,000 $1,240,000 $1,240,000 $1,240,000 stipid0035fdco stipid0035fdco Ph subtotal: $1,240,000 $1,240,000 $1,240, TMACOG LUC LUC McCord Resurf Description: Mill existing pavement, perform spot LUCAS COUNTY ENGINEER full depth repairs; reconstruct failed catch basins; place 2 course asphalt overlay; sidewalk repair/addition; perform necessary related work. FIELD REVIEW REQUIRED Work Type: Mill and Fill Termini: Angola Rd to Hancock Ave 0.99 CO $400,000 $887,000 $913,200 stipid0036fdco $407,000 $80,000 $887,000 $887,000 $913,200 $913,200 stipid0036fdco stipid0036fdco Ph subtotal: $887,000 $887,000 $913,200 PE Labor - Match Labor - Match $3,900 $18,400 $22,300 $22,300 $913,200 $913,200 stipid0036fdpe stipid0036fdpe Ph subtotal: $22,300 $22,300 $913,200 RW Labor - Match $3,900 $3,900 $913,200 stipid0036fdrw Ph subtotal: $3,900 $3,900 $913, TMACOG LUC LUC Ottawa River Rd Resurf Description: Resurface Ottawa River Rd in the City of Toledo; perform necessary related work; swmall project designated by TMACOG. FIELD REVIEW REQUIRED. Work Type: Mill and Fill Termini: Suder to 290th Toledo, City of 1.13 CO $325,000 $676,000 $696,100 stipid0037fdco $325,000 $13,000 $13,000 $676,000 $676,000 $676,000 $696,100 $696,100 $696,100 stipid0037fdco stipid0037fdco stipid0037fdco Ph subtotal: $676,000 $676,000 $696,100 PE Labor - Match Labor - Match $3,000 $14,100 $17,100 $17,100 $696,100 $696,100 stipid0037fdpe stipid0037fdpe Ph subtotal: $17,100 $17,100 $696,100 RW Labor - Match $3,000 $3,000 $696,100 stipid0037fdrw Ph subtotal: $3,000 $3,000 $696, TMACOG LUC LUC Kilburn Rd Bike Lanes Description: A TMACOG funded project to add bike lanesalong Kilburn Rd; Perform necessary related work; FIELD REVIEW REQUIRED; Spnosor Twp/County? Work Type: Bikeways Termini: Sylvania-Metamora to Central LUCAS COUNTY ENGINEER 2.96 PE 044 $7,200 $102,000 $2,431,000 AM04ID0127FDPE Env RW S Env RW S 044 Z301 Labor - Match Labor - Match $1,800 $39,200 $9,800 $35,200 $8,800 $102,000 $102,000 $102,000 $102,000 $102,000 $2,431,000 $2,431,000 $2,431,000 $2,431,000 $2,431,000 AM04ID0127FDPE AM04ID0127FDPE AM04ID0127FDPE AM04ID0127FDPE AM04ID0127FDPE Ph subtotal: $102,000 $102,000 $2,431,000 RW M Labor - Match $67,200 $16,800 $12,000 $3,000 $99,000 $99,000 $99,000 $99,000 $2,431,000 $2,431,000 $2,431,000 $2,431,000 AM06ID0174FDRW AM06ID0174FDRW AM06ID0174FDRW AM06ID0174FDRW Ph subtotal: $99,000 $99,000 $2,431, TMACOG LUC LUC Summit St Enh Description: Summit St enhancement; perform necessary related work; FIELD REVIEW REQUIRED. Work Type: Design Aesthetics Termini: Lagrange to Chestnut Toledo, City of 1.59 CO M301 $776,944 $1,001,180 $1,001,180 AM03ID0095FDCO $194,236 $30,000 $1,001,180 $1,001,180 $1,001,180 $1,001,180 AM03ID0095FDCO AM03ID0095FDCO Ph subtotal: $1,001,180 $1,001,180 $1,001,180 Page 7 of 218

8 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC IR Interchnge Description: Build a new interchange in Lucas County at I-475 and US-20A; perform necessary related work. See PID for AER. Work Type: Interchange, New Termini: I-475 & 20A new interchange DISTRICT 2 PRODUCTION Air Quality Non-Exe 0.05 PE 4BD7 Funds () $180,000 $1,900,000 $26,300,000 MODID7FDPE 4BG7 4BK7 $900,000 $720,000 $1,900,000 $1,900,000 $26,300,000 $26,300,000 MODID7FDPE MODID7FDPE Ph subtotal: $1,800,000 $1,900,000 $26,300, RW 4BD7 4BG7 4BK7 Funds () $2,800,000 $800,000 $3,900,000 $3,900,000 $3,900,000 $27,291,791 $27,291,791 $27,291,791 stipid0040fdrw stipid0040fdrw stipid0040fdrw Ph subtotal: $3,800,000 $3,900,000 $27,291, TMACOG LUC LUC IR 475/Dorr St Interchange Description: Buid a new inetrchnage in Lucas County on i-475 at Dorr St; perform necessary related work. See PID for AER. PE phase will be undertaken by local. Work Type Interchange, New Termini: I-475/Dorr St Interchange DISTRICT 2 PRODUCTION Air Quality Non-Exe 0.02 PE 4BD7 Funds () $80,000 $950,000 $12,450,000 MODID8FDPE 4BK7 $320,000 $400,000 $950,000 $950,000 $12,450,000 $12,450,000 MODID8FDPE MODID8FDPE Ph subtotal: $800,000 $950,000 $12,450,000 LUC IR /Dorr St Intrchng Description: Build a new interchange in Lucas County on IR-475 at Dorr St. See PID for AER. PE phase will be undertaken by local Includes federal funded early acquisition of RW, independent of construction phase. Work Type: Interchange, New Termini: I-475/Dorr St Interchange DISTRICT 2 PRODUCTION Air Quality Non-Exe 1.04 RW 4BD7 Funds () $279,142 $600,000 $5,700,798 $24,176,641 AM03ID0096FDRW 4BK7 4BK7 4BD7 4BK7 Un-Assigned Funds () Un-Assigned $800,000 $316,566 $2,836,470 $173,724 $694,896 $600,000 $600,000 $600,000 $600,000 $600,000 $5,700,798 $5,700,798 $5,700,798 $5,700,798 $5,700,798 $24,176,641 $24,176,641 $24,176,641 $24,176,641 $24,176,641 AM03ID0096FDRW AM03ID0096FDRW AM03ID0096FDRW AM03ID0096FDRW AM03ID0096FDRW Ph subtotal: $5,100,798 $600,000 $5,700,798 $24,176, TMACOG LUC TMACOG SFY18 TIP Management Description: SFY18 TMACOG TIP Management Work Type: & Research Termini: 0 TMACOG SP 4TD7 M240 $80,000 stipid0042fdspr stipid0042fdspr Ph subtotal: TMACOG LUC TMACOG SFY19 TIP Management Description: TMACOG SFY19 TIP Management Work Type: & Research Termini: 0 TMACOG SP 4TD7 M240 $80,000 stipid0043fdspr stipid0043fdspr Ph subtotal: TMACOG LUC LUC SR Central/Talmdg Description: A funded project to imnprove the intersection by adding turn lanes; perform necessary related work. Work Type: Turn Lane Addition Termini: Intersection of Central Ave and Talmadge St in Toledo Toledo, City of Air Quality Non-Exe 0.15 CO $1,048,000 $1,440,000 $2,131,000 stipid0044fdco $262,000 $130,000 $1,440,000 $1,440,000 $2,131,000 $2,131,000 stipid0044fdco stipid0044fdco Ph subtotal: $1,440,000 $1,440,000 $2,131,000 PE Labor - Match Labor - Match $103,600 $483,800 $587,400 $587,400 $2,131,000 $2,131,000 stipid0044fdpe stipid0044fdpe Ph subtotal: $587,400 $587,400 $2,131,000 RW Labor - Match $103,600 $103,600 $2,131,000 stipid0044fdrw Ph subtotal: $103,600 $103,600 $2,131, TMACOG LUC LUC US Narrow Description: Narrow Detroit Ave from an existing 4/5 lanes to 3 lanes with street parking; Signalized intersections changed to single lane roundabouts; perform neceesary related work; FIELD REVIEW REQUIRED. Work Type: Intersection Improvement Termini: AWT to Copland in Toledo Toledo, City of 0.67 CO $2,507,200 $3,447,400 $3,561,400 stipid0045fdco $626,800 $313,400 $3,447,400 $3,447,400 $3,561,400 $3,561,400 stipid0045fdco stipid0045fdco Ph subtotal: $3,447,400 $3,447,400 $3,561,400 PE Labor - Match Labor - Match $8,000 $98,000 $106,000 $106,000 $3,561,400 $3,561,400 stipid0045fdpe stipid0045fdpe Ph subtotal: $106,000 $106,000 $3,561,400 RW Labor - Match $8,000 $8,000 $3,561,400 stipid0045fdrw Ph subtotal: $8,000 $8,000 $3,561,400 Page 8 of 218

9 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC SR Signals Description: Purchase and install a Central Traffic System for 507 signalized intersections in the City of Toledo and an Adaptive Traffic System for 13 signals to improve travel time and reduce congestion; perform necessary related work. Work Type: Signals Termini: Monroe St corridor-cheltenham to Nantucket Toledo, City of 2.64 CO Z400 $640,000 $880,000 $880,000 MODID0350FDCO $160,000 $80,000 $880,000 $880,000 $880,000 $880,000 MODID0350FDCO MODID0350FDCO Ph subtotal: $880,000 $880,000 $880, TMACOG LUC LUC US Urban Pav Description: An urban paving project on US24 in Toledo to perform reconstruction of the pavement. UPDATE ( ): deleted piece from City limit (18.59) to Copland (19.23) which is funded by TMACOG, PID Work Type: Major Rehabilitation Termini: Sherwood to Glendale Toledo, City of 0.54 CO Z240 $320,000 $550,000 $550,000 stipid0047fdco $180,000 $550,000 $550,000 $550,000 $550,000 stipid0047fdco stipid0047fdco Ph subtotal: $550,000 $550,000 $550, TMACOG LUC LUC Old Millard Ave Bridge Description: Replace the deteriorated concrete beam bridge on Old Millard Ave over Otter Creek in the City of Oregon; perform necessary related work. Work Type: Bridge Replacement Termini: Old Millard Ave bridge over Otter Creek Oregon, City of CO 4R87 Z233 $504,000 $700,000 $930,900 stipid0048fdco 4R87 Z232 $126,000 $56,000 $14,000 $700,000 $700,000 $700,000 $930,900 $930,900 $930,900 stipid0048fdco stipid0048fdco stipid0048fdco Ph subtotal: $700,000 $700,000 $930,900 PE Labor - Match Labor - Match $34,600 $161,700 $196,300 $196,300 $930,900 $930,900 stipid0048fdpe stipid0048fdpe Ph subtotal: $196,300 $196,300 $930,900 RW Labor - Match $34,600 $34,600 $930,900 stipid0048fdrw Ph subtotal: $34,600 $34,600 $930, TMACOG LUC LUC SR Dehumidify Description: Install a dehumidification system, a dynamic lighting system, and repair cable hold-downs of the AWT bridge over the Maumee River in Toledo; Perform necessary related work.wrap the existing cable with new round wire wrap at sections previously opened, new Work Type: Bridge Repair Termini: High Level Bridge (AWT) over Maumee River DISTRICT 2 PRODUCTION CO 4BG7 $300,000 $12,253,000 $14,147,312 AM02ID0037FDCO 4BT7 4BU7 L1CE L1CE Funds () Bridge Bridge Labor - Match $2,280,000 $9,120,000 $442,400 $110,600 $12,253,000 $12,253,000 $12,253,000 $12,253,000 $14,147,312 $14,147,312 $14,147,312 $14,147,312 AM02ID0037FDCO AM02ID0037FDCO AM02ID0037FDCO AM02ID0037FDCO Ph subtotal: $12,253,000 $12,253,000 $14,147, TMACOG LUC LUC TMACOG FY 21 AQ Program Description: TMACOG FY 21 Air Quality Program TMACOG Air Quality Non-Exe SP Work Type: Air Quality Termini: 0 4TE7 $68,000 $85,000 $85,000 stipid0050fdspr $17,000 $85,000 $85,000 stipid0050fdspr Ph subtotal: $85,000 $85,000 $85, TMACOG LUC LUC TMACOG FY 21 Rideshare Description: TMACOG FY 21 Rideshare Program Work Type: Air Quality TMACOG SP 4TE7 $112,800 $112,800 $112,800 stipid0051fdspr Ph subtotal: $112,800 $112,800 $112, TMACOG LUC LUC SR Reconstruct Description: Reconstruction of SR-25 (AWT) in Toledo; perform necessary related work. Work Type: Major Rehabilitation Termini: From near City Park to I-75 DISTRICT 2 PRODUCTION 0.36 CO 4BG7 $1,200,000 $1,320,000 $1,919,210 stipid0052fdco 4BG7 $120,000 $1,320,000 $1,919,210 stipid0052fdco Ph subtotal: $1,320,000 $1,320,000 $1,919, TMACOG LUC LUC Chessie Circle Connector Description: Construct a bike path along the northeast side of University Hills Blvd; perform necessary related work. This project will connect the Chessie Circle TYrail from Douglas Rd to Bancroft-Promenade Trail. Work Type: Bike path Relocation Termini: From Douglas to Bancroft Toledo, City of 0.02 CO Z301 $388,400 $534,000 $614,000 stipid0053fdco Z301 $97,100 $38,800 $9,700 $534,000 $534,000 $534,000 $614,000 $614,000 $614,000 stipid0053fdco stipid0053fdco stipid0053fdco Ph subtotal: $534,000 $534,000 $614,000 Page 9 of 218

10 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC WOO/LUC Miami St Connector Description: Construct Miami St new connector ahead of the larger project PID 93592; perform necessary related work. Work Type: New Construction Termini: New Miami St connector DISTRICT 2 PRODUCTION 0.49 CO 4RA7 Funds () $700,000 $770,000 $984,401 MODID0030FDCO Labor - Match $70,000 $770,000 $984,401 MODID0030FDCO Ph subtotal: $770,000 $770,000 $984, TMACOG LUC LUC VGCS lighting Description: Evaluate options for replacement or rehab of the existing VGCS lighting system; Construct selected option and perform all necessary related work. Work Type: Lighting Maintenance Termini: VGCS Bridge DISTRICT 2 PRODUCTION 0.01 CO 4BT7 Funds () $720,000 $1,105,893 stipid0054fdco 4BU7 4BT7 4BU7 Funds () Labor - Match $400,000 $30,000 $120,000 $56,000 $14,000 $720,000 $720,000 $720,000 $720,000 $720,000 $1,105,893 $1,105,893 $1,105,893 $1,105,893 $1,105,893 stipid0054fdco stipid0054fdco stipid0054fdco stipid0054fdco stipid0054fdco Ph subtotal: $720,000 $720,000 $1,105, TMACOG LUC LUC Chessie Circle Trail Paving Description: This 3.0 mile project will provide a 16' paved surface on the existing Chessie Circle Trail from Bowman park to University Hills. Work Type: Bikeways Termini: Bowman Park to University Hills Toledo, City of CO Z400 $1,418,400 $1,773,000 $1,782,350 stipid0055fdco $354,600 $1,773,000 $1,782,350 stipid0055fdco Ph subtotal: $1,773,000 $1,773,000 $1,782,350 PE Labor - Match Labor - Match $1,350 $7,500 $8,850 $8,850 $1,782,350 $1,782,350 stipid0055fdpe stipid0055fdpe Ph subtotal: $8,850 $8,850 $1,782,350 RW Labor - Match $500 $500 $1,782,350 stipid0055fdrw Ph subtotal: $500 $500 $1,782, TMACOG LUC LUC Secor Rd Wdn (Ban-Cen) Description: This project will widen Secor Rd between Bancroft St and Central Ave and install 2 roundabouts.; NHS Waiver Required Work Type: Major Widening Termini: Bancroft St or Central Ave Toledo, City of 1.01 PE Labor - Match $25,000 $125,000 $10,722,000 stipid0056fdpe Labor - Match $125,000 $10,722,000 stipid0056fdpe Ph subtotal: $125,000 $125,000 $10,722,000 RW Z400 Labor - Match $2,600,000 $650,000 $3,300,000 $3,300,000 $3,300,000 $10,722,000 $10,722,000 $10,722,000 stipid0056fdrw stipid0056fdrw stipid0056fdrw Ph subtotal: $3,300,000 $3,300,000 $10,722, TMACOG LUC LUC SR Sfty Improv Description: Upgrade pedestrian markings, install back plates and upgrade signing at the intersection of Erie ST and Monroe St in Downtown Toledo; PERFORM NECESSARY RELTD WORK UPDATE; Work moved to PID Work Type: Intersection Improvement Termini: TOLEDO. SR 25 ( Erie St ) at SR 51 ( Monroe St) Toledo, City of PE Labor - Match $2,000 $7,000 $7,500 stipid0057fdpe Labor - Match $5,000 $7,000 $7,500 stipid0057fdpe Ph subtotal: $7,000 $7,000 $7,500 RW Labor - Match $500 $500 $7,500 stipid0057fdrw Ph subtotal: $500 $500 $7, TMACOG LUC LUC Overland Trail Description: This.9 mile project would replacement the pavement on the old Ottawa Park trail. The project begins at Bancroft St and runs to Monroe St along Ottawa Pky & Southcove Blvd. Work Type: Bikeways Termini: from Bancroft St to Monroe St along Ottawa Pky & Southcove Blvd. Toledo, City of 0.54 CO Z301 $450,800 $619,850 $649,850 stipid0058fdco $112,700 $56,350 $619,850 $619,850 $649,850 $649,850 stipid0058fdco stipid0058fdco Ph subtotal: $619,850 $619,850 $649,850 PE Labor - Match Labor - Match $2,500 $25,000 $27,500 $27,500 $649,850 $649,850 stipid0058fdpe stipid0058fdpe Ph subtotal: $27,500 $27,500 $649,850 RW Labor - Match $2,500 $2,500 $649,850 stipid0058fdrw Ph subtotal: $2,500 $2,500 $649,850 Page 10 of 218

11 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC Oak Openings Trail Description: Construct 1.8 miles of new trail from Secor Road to Wiregrass Lake Metro park. Work Type: Bikeways Termini: Secor Road to Wiregrass Lake Metropark Toledo Area Metropark District CO Z301 $158,252 $870,389 $900,389 MODID0374FDCO $633,012 $79,125 $870,389 $870,389 $900,389 $900,389 MODID0374FDCO MODID0374FDCO Ph subtotal: $870,389 $870,389 $900,389 PE Labor - Match Labor - Match $2,500 $25,000 $27,500 $27,500 $900,389 $900,389 stipid0059fdpe stipid0059fdpe Ph subtotal: $27,500 $27,500 $900,389 RW Labor - Match $2,500 $2,500 $900,389 stipid0059fdrw Ph subtotal: $2,500 $2,500 $900, TMACOG LUC LUC CR Lagrance St Resf Description: Milling and resurfacing of the existing asphalt pavement, including full depth pavement repairs, walk improvements, minor drainage improvements and curb repairs as needed. Work Type: Minor Rehabilitation - Pavement Gnrl Sys Termini: From Utica St. to Oakland St. Toledo, City of 1.27 CO $1,744,000 $2,245,400 $2,296,400 stipid0060fdco $436,000 $52,320 $13,080 $2,245,400 $2,245,400 $2,245,400 $2,296,400 $2,296,400 $2,296,400 stipid0060fdco stipid0060fdco stipid0060fdco Ph subtotal: $2,245,400 $2,245,400 $2,296,400 PE Labor - Match Labor - Match $4,500 $45,000 $49,500 $49,500 $2,296,400 $2,296,400 stipid0060fdpe stipid0060fdpe Ph subtotal: $49,500 $49,500 $2,296,400 RW Labor - Match $1,500 $1,500 $2,296,400 stipid0060fdrw Ph subtotal: $1,500 $1,500 $2,296, TMACOG LUC LUC CR York St Recon Description: Full Depth Reconstruction of the 0.86 mile of the existing roadway including curb replacement, walk improvements, and drainage improvements as needed. Work Type: Major Reconstruction Termini: From Front St. to City Limit Toledo, City of 0.90 CO $1,368,000 $1,761,300 $1,761,300 stipid0061fdco $342,000 $41,040 $10,260 $1,761,300 $1,761,300 $1,761,300 $1,761,300 $1,761,300 $1,761,300 stipid0061fdco stipid0061fdco stipid0061fdco Ph subtotal: $1,761,300 $1,761,300 $1,761, TMACOG LUC LUC CR Central Recon Description: Full Depth Reconstruction of the existing roadway and ramps to Buckeye including curb replacement, walk improvements, and drainage improvements as needed. (SMALL PROJECT) Work Type: Major Reconstruction Termini: Brigham St. to Buckeye St. Toledo, City of 0.28 CO $400,000 $33,000 $1,287,300 $1,480,300 stipid0062fdco $854,300 $33,000 $1,287,300 $1,480,300 stipid0062fdco Ph subtotal: $1,254,300 $33,000 $1,287,300 $1,480,300 PE Labor - Match Labor - Match $5,000 $1,480,300 $1,480,300 stipid0062fdpe stipid0062fdpe Ph subtotal: $1,480,300 RW Labor - Match $3,000 $3,000 $1,480,300 stipid0062fdrw Ph subtotal: $3,000 $3,000 $1,480, TMACOG LUC LUC CR McCord Mill & Fill Description: Mill and Fill the existing pavement, performing spot full depth repairs, placing a two course asphalt concrete overlay (SMALL PROJECT) Work Type: Mill and Fill Termini: Hancock Avenue to Dorr Street LUCAS COUNTY ENGINEER 0.91 CO $400,000 $634,000 $657,000 stipid0063fdco $210,000 $24,000 $634,000 $634,000 $657,000 $657,000 stipid0063fdco stipid0063fdco Ph subtotal: $634,000 $634,000 $657,000 PE Labor - Match Labor - Match $5,000 $657,000 $657,000 stipid0063fdpe stipid0063fdpe Ph subtotal: $657,000 RW Labor - Match $3,000 $3,000 $657,000 stipid0063fdrw Ph subtotal: $3,000 $3,000 $657,000 Page 11 of 218

12 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) FHWA TMACOG LUC LUC CR Wenz Rd FDR Description: Full Depth Reclamation of the existing roadway including widening for asphalt shoulders, new walk, new bike facilities, and water quality drainage improvements. Work Type: Minor Rehabilitation - Pavement Gnrl Sys Termini: from Angola Rd to Hill Ave Toledo, City of 1.04 CO $1,776,000 $2,286,600 $2,319,600 stipid0064fdco $444,000 $53,280 $13,320 $2,286,600 $2,286,600 $2,286,600 $2,319,600 $2,319,600 $2,319,600 stipid0064fdco stipid0064fdco stipid0064fdco Ph subtotal: $2,286,600 $2,286,600 $2,319,600 PE Labor - Match Labor - Match $5,000 $25,000 $30,000 $30,000 $2,319,600 $2,319,600 stipid0064fdpe stipid0064fdpe Ph subtotal: $30,000 $30,000 $2,319,600 RW Labor - Match $3,000 $3,000 $2,319,600 stipid0064fdrw Ph subtotal: $3,000 $3,000 $2,319, TMACOG LUC LUC CR Front St Description: Milling and resurfacing of the existing asphalt pavement, including full depth pavement repairs, walk improvements, minor drainage improvements and curb repairs as needed. Work Type: Mill and Fill Termini: from I-280 to Millard Ave Toledo, City of 1.79 PE Labor - Match $10,000 $3,505,200 stipid0065fdpe Labor - Match $3,505,200 stipid0065fdpe Ph subtotal: $3,505,200 RW Labor - Match $5,000 $5,000 $3,505,200 stipid0065fdrw Ph subtotal: $5,000 $5,000 $3,505,200 LUC Front-Millard St Resurf&Rnbt Description: On Front St from I-280 to Millard Ave resurface existing pavement, including full depth pavement repairs, walk improvements, minor drainage improvements and curb repairs as needed. On Millard Ave construct two roundabouts at Millard and Front St and Mill Work Type: Intersection Termini: On Front from I-280 to Millard Ave; On Millard from Front St to Tiffin Ave Toledo-Lucas County Port 2.60 CO $4,219,500 $5,437,500 $5,502,500 AM03ID0097FDCO $1,054,875 $130,500 $32,625 $5,437,500 $5,437,500 $5,437,500 $5,502,500 $5,502,500 $5,502,500 AM03ID0097FDCO AM03ID0097FDCO AM03ID0097FDCO Ph subtotal: $5,437,500 $5,437,500 $5,502, TMACOG LUC LUC CR Main St Description: Full-depth reconstruction of Main Street including storm sewer replacement. Remove and replacesidewalks on both sides including widening on the east side to be a 10 wide multi-path to better connect the Sylvani River Trail with Downtown Sylvania. Vehi Work Type: Major Reconstruction Termini: from Monroe St to Bridge Over Ten Mile Creek Sylvania, City of 0.09 CO $347,650 $749,500 $794,500 stipid0066fdco $347,650 $27,100 $27,100 $749,500 $749,500 $749,500 $794,500 $794,500 $794,500 stipid0066fdco stipid0066fdco stipid0066fdco Ph subtotal: $749,500 $749,500 $794, TMACOG LUC LUC Toledo Bike Share Description: Provide 17 Bike share stations and purchase 100 bikes to establish a Bike Share program Work Type: Other Modes Related Termini: Downtown Toledo Toledo Area Metropark District CO Z301 $262,760 $361,295 $390,579 MODID0033FDCO $65,690 $32,845 $361,295 $361,295 $390,579 $390,579 MODID0033FDCO MODID0033FDCO Ph subtotal: $361,295 $361,295 $390, TMACOG LUC TMACOG SFY20 TIP Management Description: TMACOG SFY20 TIP Management Work Type: & Research Termini: 0 TMACOG SP 4TD7 $80,000 stipid0067fdspr stipid0067fdspr Ph subtotal: TMACOG LUC TMACOG SFY21 TIP Management Description: TMACOG SFY21 TIP Management Work Type: & Research Termini: 0 TMACOG SP 4TD7 $80,000 stipid0068fdspr stipid0068fdspr Ph subtotal: TMACOG LUC LUC CR Holand-Syl M&F Description: This project will resurface Holland-Sylvania Road, from Bancroft to Elmer and also install sidewalk south of Bancroft. Work Type: Mill and Fill Termini: Bancroft to Elmer Toledo, City of Air Quality Non-Exe 0.55 CO $400,000 $1,060,240 $1,067,240 stipid0069fdco $632,820 $27,420 $1,060,240 $1,060,240 $1,067,240 stipid0069fdco $1,067,240 stipid0069fdco Page 12 of 218

13 Ohio Department of Transportation - Listing (Appendix 6) as of 7/25/ Query: "Current Detail 4" Agency Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length Reference (New) Ph subtotal: $1,060,240 $1,060,240 $1,067,240 FHWA TMACOG LUC LUC CR Description: This project will resurface Toledo, City of Air Quality Non-Exe 0.55 PE Labor - Match Labor - Match $1,000 $5,000 $6,000 $6,000 $1,067,240 $1,067,240 stipid0069fdpe stipid0069fdpe Ph subtotal: $6,000 $6,000 $1,067,240 RW Labor - Match $1,000 $1,000 $1,067,240 stipid0069fdrw Ph subtotal: $1,000 $1,000 $1,067, TMACOG LUC LUC CR Bancroft M&F Description: This project will resurface the length Toledo, City of Air Quality Non-Exe 0.60 CO of Bancroft, from the Western City Limits to Holland-Sylvania Road and install sidewalk along the North side of the street where there are currently gaps. Work Type: Mill and Fill Termini: City Limit to Holland-Sylvania Rd $400,000 $1,093,880 $1,100,080 stipid0070fdco $665,590 $28,290 $1,093,880 $1,093,880 $1,100,080 $1,100,080 stipid0070fdco stipid0070fdco Ph subtotal: $1,093,880 $1,093,880 $1,100, TMACOG LUC LUC CR Bancft & Mcrd M&F Description: The scope of work includes milling LUCAS COUNTY ENGINEER the existing pavement, performing spot full depth repairs, placing a two course asphalt concrete overlay, adjusting manholes and valves, tying down the shoulders, bringing drives to grade, repairing catch basins, placing Work Type: Mill and Fill Termini: Bancroft- St. James Blvd to Wilford Dr; McCord m. south Bancroft to Regents Park Blvd CO $307,500 $637,000 $641,750 stipid0071fdco $307,500 $22,000 $637,000 $637,000 $641,750 $641,750 stipid0071fdco stipid0071fdco Ph subtotal: $637,000 $637,000 $641,750 PE Labor - Match Labor - Match $1,500 $2,500 $4,000 $4,000 $641,750 $641,750 stipid0071fdpe stipid0071fdpe Ph subtotal: $4,000 $4,000 $641,750 RW Labor - Match $750 $750 $641,750 stipid0071fdrw Ph subtotal: $750 $750 $641, TMACOG LUC LUC CR Safety Description: A safety funded project to install medians to prohibit left turns into and out of Manley Road, Knightshill Lane and Pine Trace Drive; widen Perrysburg-Holland to allow an additional through lane in each direction; and improve signal visibility at the inte Work Type: Intersection Improvement Termini: From I80/90 to Heatherdowns Blvd Toledo, City of 0.66 CO 4HJ7 $2,604,150 $2,893,500 $2,943,500 stipid0072fdco $289,350 $2,893,500 $2,943,500 stipid0072fdco Ph subtotal: $2,893,500 $2,893,500 $2,943, TMACOG LUC LUC IR Vandal Fence Description: Parapet sealing and vendal fence placement project for those bridges on which these activities were not completed or non-performed under PIDs and Work Type: Bridge Maintenance Termini: On I-75 from Oakwood Ave to I-280 DISTRICT 2 PRODUCTION 5.16 CO 4BD7 Funds () $98,500 $1,055,000 $1,093,900 AM06ID0175FDCO RR Remb RR Remb 4BK7 4BD7 4BK7 Un-Assigned Labor Labor - Match Funds () Un-Assigned $886,500 $32,000 $8,000 $3,000 $27,000 $1,055,000 $1,055,000 $1,055,000 $1,055,000 $1,055,000 $1,093,900 $1,093,900 $1,093,900 $1,093,900 $1,093,900 AM06ID0175FDCO AM06ID0175FDCO AM06ID0175FDCO AM06ID0175FDCO AM06ID0175FDCO Ph subtotal: $1,055,000 $1,055,000 $1,093, TMACOG LUC LUC VGCS conc. overlay Description: Major Bridge funded project to orovide new wearing surface ( concrete overlay ) for the Veterans Glass City Skyway and replace the existing railing. Work Type: Bridge Repair Termini: Entire VGCS bridge DISTRICT 2 PRODUCTION 1.52 CO 4BT7 Funds () $4,000,000 $21,400,000 $21,495,000 AM02ID0038FDCO 4BU7 Un-Assigned Un-Assigned Labor Labor - Match $16,000,000 $1,120,000 $280,000 $21,400,000 $21,400,000 $21,400,000 $21,495,000 $21,495,000 $21,495,000 AM02ID0038FDCO AM02ID0038FDCO AM02ID0038FDCO Ph subtotal: $21,400,000 $21,400,000 $21,495, TMACOG LUC LUC US WB Left turn add Description: A safety funded project to convert the signal phasing for the westbound Central Avenue left-turn movement from protected/permissive to protected-only. Install a second left-turn lane on the westbound Central Avenue approach (Toledo). Make sure to square Work Type: Intersection Improvement Termini: Reynolds and Central intersection DISTRICT 2 PRODUCTION 0.01 CO 4BC7 Funds () $59,209 $642,090 $931,508 AM02ID0039FDCO 4HJ7 $532,881 $642,090 $931,508 AM02ID0039FDCO Page 13 of 218

Ohio Department of Transportation STIP Project Listing as of 7/27/2017 Query: "Current STIP Detail 4"

Ohio Department of Transportation STIP Project Listing as of 7/27/2017 Query: Current STIP Detail 4 Ohio Department of Transportation - Listing as of 7/27/ Query: "Current Detail 4" Dist PID MPO Cnty Name (ie CRS) Descript / Category / Termini Sponsoring Air Quality Status Reference (New) FHWA 1 80441

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514 TMACOG TIP PROGRAM FY2010 AND FY2011 PLUS PIPELINE PROJECTION FY2012 THROUGH 2017 revised 02/03/2010 FISCAL PROJECT R/W PS&E FEDERAL PROJECT CONSTRUCT CONSTRUCT YEAR PID SPONSOR PROJECT NAME PROJECT LIMITS

More information

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND TMACOG TRANSPORTATION SUMMIT MARCH 16, 2018 Mike Gramza, District Two, Capital Programs Administrator John R. Kasich, Governor Jerry Wray, ODOT

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017 Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

T W P L A I A A V O L H S Bike Network Plan Sylvania, Ohio. July 20, 2009

T W P L A I A A V O L H S Bike Network Plan Sylvania, Ohio. July 20, 2009 Y 2009 E T W O R K N P L A E N K I B N I A A V O L H S O I 2009 Bike Network Plan Sylvania, Ohio I-75 Lenawee County US 23 Monroe County I-75 Michigan Ohio SYLVANIA Alexis Rd I-475 Monroe 24 I-75 20/120

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

2017 (FY 21,22,23) Ohio CMAQ Project Selection

2017 (FY 21,22,23) Ohio CMAQ Project Selection 2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2017 (FY 21,22,23) Ohio CMAQ Prioritization 2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018 ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

OTTAWA AVENUE NEIGHBORHOOD

OTTAWA AVENUE NEIGHBORHOOD OTTAWA AVENUE NEIGHBORHOOD 4.17.2018 RECAP September 19, 2016 Meeting Identify concerns * needs * wants of neighborhood residents Safety Improvements Ottawa Avenue, Ayersville Avenue, Cleveland Avenue,

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

NJTPA DRAFT Transportation Improvement Program Fiscal Years

NJTPA DRAFT Transportation Improvement Program Fiscal Years County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

S/TIP LIST OF PROJECTS

S/TIP LIST OF PROJECTS LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U

More information

2012 Capital Budget Capital Improvement Program

2012 Capital Budget Capital Improvement Program 2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

Enhancing Downtown

Enhancing Downtown Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses

More information

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018 SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John

More information

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661

National Network Safety Analysis (6/4/2015 Revision) FRA and FRA PID 86661 Existing Roadway National Network Safety Analysis (6/4/2015 Revision) FRA-23-10.83 and FRA-23-12.24 PID 86661 This 8.82 miles project is on United States Route 23 (US-23) and United States Route 23 Directional

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL MONROE COUNTY VILLAGE SQUARE FINAL CONCEPT-LEVEL STRATEGY REPORT I. Introduction The purpose of this report is to recommend

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

CSAH 101 Preliminary Design

CSAH 101 Preliminary Design CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid

New Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Key Findings & Corridor Highlights

Key Findings & Corridor Highlights The PA 358 Corridor Greenville to I-79 The PA 358 Corridor connects the Borough of Greenville in northwest Mercer County with I-79 to the east. For much of the way it follows the Shenango and Little Shenango

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016 RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,

More information