5:30 1 Introductions, appointment of note taker (5 minutes) Ad
|
|
- Percival Burke
- 5 years ago
- Views:
Transcription
1 CY OF OKD DZ BUDG. 250 FRK. OGW PZ. SU OKD. CFOR Public Works gency : (510) nfrastructure Plans and Programming Division FX: (510) Bicycle and Pedestrian dvisory Committee, Monthly Meeting hursday, ovember 17, 2011; 5:30-7:30 pm Oakland City all, Sgt Daniel Sakai earing Room (aka earing Room 4), Second Floor GD ime tem # opic opic ype * 5:30 1 ntroductions, appointment of note taker (5 minutes) d 5:35 2 pproval of meeting minutes (5 minutes) Seek motion to adopt the October meeting minutes or postpone adoption until December. 5:40 3 6:05 4 6:25 5 6:40 6 Update on lameda-oakland stuary Crossing Shuttle Service ink (25 minutes) Bikelameda members will explain the importance of this gap closure project, describe the status of the current service, and request feedback on the project s effectiveness. Resurfacing update ttachment (20 minutes) Staff will provide an overview of streets pending or scheduled for resurfacing and how the streets overlap with the existing/proposed bikeway network. Bikeway striping update (15 minutes) Staff will give an update on bikeway striping in progress or scheduled. BPC calendar / agenda for 2012 (40 minutes) n 2011, staff prepared a framework for BPC agenda setting to encourage fruitful and interesting meetings. Staff will review that framework and take comments on how to improve the agenda-setting process for :20 7 nnouncements, suggestions for next meeting topics (10 minutes) d * opic ypes: =informational; =action item; d=administrative genda online at: his meeting will follow Robert's Rules of Order (see For more information, please call (510) or bikeped@oaklandnet.com.
2 City of Oakland Bikeways/Resurfacing Coordination Department of ngineering and Construction [JWP, 1 ov 20011] Project C (Proposition 1B funding) Status: PCC in progress; base repair pending; overlay and striping anticipated in 2012 xisting Proposed Bike Plan ncluded 105 RUSS RO 3 2 X X Bikeway included as proposed 106 FOO B PR OKS DR 0 0 o proposed bikeway MD FRU X Restriping project with minor improvements RDY 31 WY 580 BRDG 0 3 X Bikeway being developed as separate project CRMO CY M RDO RD Project would require roadway widening COSUM WY 66 CRK BRDG 0 0 o proposed bikeway 33 BUMO X X Bikeway included as proposed XCSOR KGSY MCRUR B 0 3B X X Bikeway included as proposed GOF KS RD BURGOS MOU B Project would require roadway widening RRSO WB MO P X X Bikeway being developed as separate project RO o proposed bikeway K X X Bikeway included as proposed MCRUR (SB) PRK B BUMO 0 2 X X Bikeway included as proposed MCRUR B GRCR RD G 0 2 X X Bikeway included as proposed S COSUM WY CRK BRDG GBRGR RD 0 0 o proposed bikeway FORD S MRK CY M 0 0 o proposed bikeway SUYMR SMRY MOURK 3 3B Paving project only 535 feet of roadway W GRD CMPB MD PKWY 0 2 Paving project only 416 feet of roadway W MCRUR B DWY M 0 2 X X Bikeway being developed as separate project KY xisting Bikeway/Proposed Bikeway: 2.1 = bicycle lane in one direction only 0 = no bikeway 3 = bicycle route 1 = bicycle path 3 = arterial bicycle route 2 = bicycle lane 3B = bicycle boulevard Bike Plan Priority = Priority project as per the Bicycle Master Plan (2007) ncluded Project = Bikeway project proposed for inclusion with resurfacing. 1 of 4
3 Project C (Federal Stimulus funding) Status: Paving completed, striping completed, striping punch list in progress xisting Proposed Bike Plan ncluded 98 Y RM 0 0 o proposed bikeway D W GRD ow priority: close to Market St, Mandela Pkwy BUMO o proposed bikeway CRMO UDSO CY M 0 2 ow priority, would require study for road diet FOO B 14 KSOR 0 2 X rterial bike route instead of bike lanes (39' ROW) KR MOU B R WY 0 3 o proposed bikeway striping MCRUR B MSW OS 0 2 X ncluded for nos ve to Buell St only S DRO 53 SMRY 0 1 Pending ast Bay Greenway CR GRD RRSO 2 2 X Restriping project with geometric improvements FORD S S PO MRK 0 0 o proposed bikeway W GRD MRK S PO 2 2 X Restriping project with geometric improvements Project C (Federal Stimulus funding) Status: Base repair and crack seal completed; micro surfacing in ovember; striping in ovember December xisting Proposed Bike Plan ncluded DWY (B) MBRCDRO WY /3 X Bikeway included as proposed (above Grand ve) FOO B 23 SMRY 0 3 X Bikeway included as proposed M KG WY MBRCDRO W GRD 3 2 ow priority, would require study for road diet S PO X Bikeway included as proposed (16th to 32nd) Project C (Federal Stimulus funding) Status: Completed summer 2011 xisting Proposed Bike Plan ncluded deline St. 19th St. West Grand ve. 0 2 wo blocks of paving; requires study for road diet Pleasant alley ve. Broadway City imit 0 3 ow priority sharrow project Santa Clara ve. (WB) Grand ve. Santa Clara ve. 0 2 X Bikeway included as proposed Stanford ve. (B) San Pablo ve. Market St. 0 0 o proposed bikeway West Macrthur Blvd. MK Jr Way 580 Freeway 0 2 X Feasibility study results require R Project G (Federal block grant funds) Status: Completing environmental, beginning design; construction planned for 2013 xisting Proposed Bike Plan ncluded lcatraz ve College ve City imit 0 2 X Bikeway included as proposed Broadway 38th St Broadway er 0 2 X X Pending final design and City Council approval 12th St 12th ve 40th ve 0 2 X X Pending final design and City Council approval akeshore ve ake Park ve Mandana Blvd 0 3 X X ncluded as proposed, plus bike lanes under 580 Skyline Blvd Parkridge Dr Joaquin Miller Rd 3 3 o proposed bikeway striping 2 of 4
4 Project C (Proposition 1B funding) Status: Priority streets to be completed in 2011; other streets completed in 2012 xisting Proposed Bike Plan ncluded 12th St Broadway Franklin St 0 0 o proposed bikeway; priority street 12th St Webster arrison 0 0 o proposed bikeway; priority street 14th St Mandela Pkwy Brush St 0 2 X X Bikeway included as proposed 26th St Mandela Pkwy Campbell St 0 0 o proposed bikeway 33rd St Market St M.. King Way 0 0 o proposed bikeway 42nd ve Foothill Blvd nternational Blvd (600' w 0 0 o proposed bikeway Brookdale ve igh St Monticello ve 0 0 o proposed bikeway.33rd Street lliot St 13th ve 0 0 o proposed bikeway Greenwood Rd orwood ve Park Blvd 0 0 o proposed bikeway Jackson Street 7th Street 9th Street 0 0 o proposed bikeway Joaquin Miller Rd WY 13 Overcrossing Monterey Blvd ' paving project akeshore ve Macrthur Blvd ake Park ve 0 3 X X Bike lanes instead of sharrows; priority street incoln ve Palmetto St Monterey Blvd 0 0 o proposed bikeway Moraga ve Mountain Blvd hornhill Dr 0 0 o proposed bikeway Mountain Blvd Moraga ve Snake Rd 3 3 X Bikeway corridor pending development; priority street Mountain Blvd Snake Rd Off Ramp 3 3 X Bikeway corridor pending development; priority street Mountain Blvd Off Ramp scot Dr 0 0 o proposed bikeway; priority street Park Blvd Monterey Blvd Mountain Blvd 0 1 Pending Park Blvd path development; priority street School St Fruitvale ve orth nd 0 0 o proposed bikeway elegraph ve 51st St ileen St 0 2 X X Sharrows included for 55th to ileen; priority street iffin Rd incoln ve Whittle 0 3B One block paving project ernon St Bay Place ernon errace 0 0 o proposed bikeway 3 of 4
5 Project C (Proposition 1B funding) Status: Design completed; pending advertising for contract; construction planned for 2012 xisting Proposed Bike Plan ncluded 66th ve Oakport ve San eandro St 0 1/2 Requires study for road diet; path development Campus Dr 580' of Skypoint Ct Campus Dr 0 0 o proposed bikeway 12th St 40th ve 46th ve 0 3 X Requires study of one way to two way conversion lmwood ve Derby St ancaster St 0 0 o proposed bikeway Foothill Blvd avenscourt Blvd Macrthur Blvd 0 0 o proposed bikeway Grizzly Peak Blvd Skyline Blvd Marlborough errace 3 3 o proposed bikeway striping Grizzly Peak Blvd Marlborough errace Fish Ranch Rd 3 3 o proposed bikeway striping Grizzly Peak Blvd Fish Ranch Rd Centennial Dr 3 3 W B DDD PDG UY CRCS elen St 32nd St Peralta St 0 0 o proposed bikeway illmont Dr 73rd ve Parker 0 0 o proposed bikeway Macrthur Blvd Millsview ve Camden St 0 2 X Pending final design and City Council approval Macrthur Blvd Seminary ve 73rd ve 0 3 ow priority sharrow project Piedmont ve West Mac rthur Pleasant alley 0 2 X Bikeway included as proposed Shattuck ve 59th St Woolsey St 0 2 X X W B DDD PDG UY CRCS St Cloud Ct iewcrest Dr West nd 0 0 o proposed bikeway win Oaks Way Fairway ve 580 Crossing 0 0 o proposed bikeway iewcrest Ct iewcrest Dr ast nd 0 0 o proposed bikeway 108th ve Foothill Blvd Macrthur Blvd 0 0 o proposed bikeway 4 of 4
6 CY OF OKD PM MGM PROGRM 5 YR PG P US 2011 June 2011 GRZZY PK C R CO S MO GRZZY PK SKY DR MRM K S DRO 0 2,000 4,000 Feet S DRO M C R U R RD 106 KS GOF K S RD 73RD F GO BCR OF WY 580 SCOUR O FO D 98 R Y S M G G U FR MCRUR SMRY OKPO R M D 12 G 42D D ORC FOO OKD RO D C R O R RD D SO K S OR 8 S B M P RK 2D FOO MO DR 105 C O PRK MOR G PDMO PDM O 12 S 8 MCRUR Z C R FOR D MCRUR O R D K C X S UR MO CO PK OM RG P GOF KS RD KR Y KSO JC Y KW P D M 80 O 14 W D GR KSOR S MD D S PR B CMP S D W GR M C R UR K M RK M S O CR O RRS Y O DW RS R R WB Y P DW RUS D B GR R WG RO G D Y CS R W RR O JR S BO BRU R D MD RK M P 27 C X R S O R S O D R S R U R C M D GR UR R C M 13 MR P U FR Y DW D 40 SQUOY RD CRSO MO CR P Y 51S W Y DW 24 MOR G PRK 13 COSUM WY OKP OR S DG W R DR 880 RPOR CCSS RD egend 5 Yr Paving Plan Paved Or Planned 5 Yr Paving Plan Remaining ocations Oakland City imit Map: J. Mach
5:30 1 Introductions, appointment of note taker (5 minutes) Ad
CITY OF OAKLAND DALZIEL BUILDING. 250 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Agency TEL: (510) 238-3466 Infrastructure Plans and Programming Division FAX: (510) 238-7415
More informationPROJECT SPONSOR: The City of Oakland
Grand Ave, MacArthur Blvd, Market St, and Telegraph Ave. The City s bicycle facilities include those within the jurisdiction of the Port of Oakland. The City s facilities also link to bicycle facilities
More information5:30 1 Introductions, appointment of note taker (5 minutes) Ad
CITY OF OKLND DLZIEL BUILDING. 250 FRNK H. OGW PLZ. SUITE 4344. OKLND. CLIFORNI. 94612 Public Works gency TEL: (510) 238-3466 Transportation & Infrastructure Planning & Programming FX: (510) 238-7415 Bicycle
More informationCity of Oakland, Bicycle and Pedestrian Advisory Committee, Monthly Meeting
City of Oakland, Bicycle and Pedestrian Advisory Committee, Monthly Meeting Thursday October 17, 2013 meeting Attendees: Jennifer Anderson Jenna Burton Dave Campbell, East Bay Bicycle Coalition Jeffrey
More informationApproval of Meeting Minutes: The September minutes were approved.
Bicycle and Pedestrian Advisory Committee, Monthly Meeting Thursday, October 18, 2012; 5:30 7:30 pm Oakland City Hall, Sgt Daniel Sakai Hearing Room (aka Hearing Room 4), Second Floor Attendees: Ann Killebrew,
More informationCommunity & Economic Development Agency TEL: (510) Transportation Services Division FAX: (510)
CITY OF OKLND DLZIEL BUILDING. 250 FRNK H. OGW PLZ. SUITE 4344. OKLND. CLIFORNI. 94612 Community & Economic Development gency TEL: (510) 238-3466 Transportation Services Division FX: (510) 238-6412 Bicycle
More informationTOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN
TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.
More informationChapter 6 Implementation Plan
Chapter 6 Implementation Plan Walking is the oldest and most basic form of human transportation. It requires no fare, no fuel, no license, and no registration. With the exception of devices to enhance
More informationBICYCLE PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE MEMORANDUM
BICYCLE EDESTRIN ND SFE ROUTES TO TRNSIT LN DVISORY COMMITTEE MEMORNDUM December 19, 2016 TO: FROM: Bicycle, edestrian, and Safe Routes to Transit lan dvisory Committee (C) Robert Ovadia, E, City Engineer
More informationAGENDA. 6:00 1 Roll Call/Determination of Quorum/Introductions (5 minutes)
CITY OF OAKLAND DALZIEL BUILDING. 250 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Department TEL: (510) 238-3466 Transportation Planning & Funding Division FAX: (510) 238-7415
More informationFINAL PLAN APPENDIX H CITY OF BERKELEY BIKE PLAN H-1
CITY OF BERKELEY BIKE PLAN H-1 . Complete Street Corridor Studies Planning Maps The maps in this appendix provide critical planning context for the Complete Streets Corridor Studies identified in the Berkeley
More information5:30 1 Introductions, appointment of note taker (5 minutes) Ad
CITY OF OAKLAND DALZIEL BUILDING. 250 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Agency TEL: (510) 238-3466 Transportation Planning & Funding Division FAX: (510) 238-7415
More informationMinutes: A motion was made to approve minutes from both the July and August BPAC meetings. That motion was approved.
Oakland BPAC 9/20/12 Attendees: Ann Killebrew, Carol Levine, Chris Hwang, Chris Kidd, Dave Campbell, Jason Patton, Jennifer Stanley, Liza Pratt, Midori Tabata, Robert Prinz, Ryan Chan, Tom Willging, Ade
More informationCity of Oakland Bicycle and Pedestrian Advisory Committee MINUTES Thursday, April, 19, :30 7:30 pm
City of Oakland Bicycle and Pedestrian Advisory Committee MINUTES Thursday, April, 19, 2012 5:30 7:30 pm Attendees: Brian Toy, Carol Levine, Chris Hwang, Jason Patton, Jennifer Stanley, Kendahsi Haley,
More informationCity of Charlottesville Bicycle and Pedestrian Master Plan Update
City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationBike, and Pedestrian This section discusses background studies and plans, the roadway network, transit network, and bicycle and pedestrian
7 Circulation, Streets, Bus, Bike, and Pedestrian This section discusses background studies and plans, the roadway network, transit network, and bicycle and pedestrian conditions, and discusses key transportation
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationCITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017
CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway Open House - February 2017 2/27/2017 1 Purpose of Meeting Inform: Provide an overview of the project Opportunity to gather feedback/input/observations
More informationCity of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from the May 19, 2016 meeting City Hall, Hearing Room 3
City of Oakland, Bicyclist & Pedestrian Advisory Commission Minutes from the May 19, 2016 meeting City Hall, Hearing Room 3 Meeting agenda at http://www2.oaklandnet.com/oak056327 Meeting called to order
More informationLynchburg District Update
Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active
More informationApril 10, Lathrup Village. Non-Motorized Transportation Improvement Program
April 10, 2012 Lathrup Village Non-Motorized Transportation Improvement Program 2012 2017 www.birchlerarroyo.com OVERVIEW Complete Streets is a national movement to ensure that roadways are designed and
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationMEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA
MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE Monday, April 25, 2016 5:30 p.m., Regular Meeting PERMIT CENTER CONFERENCE ROOM 1950 Parkside Drive,
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationBicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013
Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city
More informationCITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.
CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More information1. Introduction and Executive Summary
1. Introduction and Executive Summary Vision Statement: Oakland will be a city where bicycling is fully integrated into daily life, providing transportation and recreation that are both safe and convenient.
More informationA copy of the draft plan is available at:
To: From: Re: Mayor and City Council Patricia Nilsson, AICP, Comprehensive Planning Manager Boise Central Bench Neighborhood Pedestrian and Bicycle Plan Date: August 24, 2012 Requested Action Provide comments
More informationCastro Valley Municipal Advisory Council March 19, 2018
Castro Valley Municipal Advisory Council March 19, 2018 1 Background 2 Draft Bicycle Vision and Pedestrian Networks 3 Next Steps 4 Updates Agenda 2 PROJECT AREA: Unincorporated Areas of Alameda County
More informationPublic Works and Infrastructure Committee. General Manager, Transportation Services
STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre
More informationEXPO II BIKE PATH - NORTHVALE GAP CLOSURE
Project Overview and Context Beverly Hills UCLA Los Angeles Project Area Santa Monica USC Culver City Source: StreetsblogLA Expo Bike Path (outside of Project Area) Vicinity Map stub of Expo Bike Path
More informationSUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO
STAFF REPORT MEETING DATE: May 3, 2016 TO: FROM: City Council Russell Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213
More informationRail Station Fact Sheet CityLine/Bush Station
Rail Station Fact Sheet CityLine/Bush Station Station Overview CityLine/Bush Station is located just south of the President George Bush Turnpike and east of US 75 in Richardson. The station opened in 00
More information5:30 1 Introductions, appointment of note taker (5 minutes) Ad
DALZIEL BUILDING. 250 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Agency TEL: (510) 238-3466 Transportation Planning & Funding Division FAX: (510) 238-7415 Bicycle and Pedestrian
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationWest End Connectivity Master Plan
West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity
More informationshared-use paths dedicated places for people on foot and on bicycles, separated from vehicles
G BLB G shared-use paths dedicated places for people on foot and on bicycles, separated from vehicles Figure 1003.1 SHRD-US PTHS are designed for many types of users- recreational cyclists moving at 10+
More informationNotes from BPAC Meeting January 20, 2011
tes from BPAC Meeting January 20, 2011 Attendees: Brian Toy, Chris Hwang, Dave Campbell, Jason Patton, Jennifer Stanley, Jonathan Bair, Kassie Rohrbach, Rebecca Saltzman, Rick Rickard, Robert Raburn, Ron
More informationSanta Ana Creating Community Together
City of Santa Ana Creating Community Together Circulation & Housing Element Update Open House Thursday, May 9, 2013 1 General Plan Circulation Element Update Open House #3 2 What is a Circulation Element?
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationSanta Clara I-280 CORRIDOR STUDY
Santa Clara I-280 CORRIDOR STUDY OCTOBER 2017 PREPARED BY: 1.1 Background The I-280 Corridor Study within Santa Clara County is a high-level highway planning study led by the Santa Clara VTA, in partnership
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationRail Station Fact Sheet Downtown Carrollton Station
Rail Station Fact Sheet Downtown Carrollton Station Station Overview Downtown Carrollton Station is located at East Belt Line Road and Broadway Street near the historic Downtown Carrollton Square. The
More informationPrince George s County plans, policies, and projects
Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail
More informationRail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 2018)
Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 018) Station Overview North Side Station will be located near the intersection of North
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationStakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads
1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule
More informationTransportation and General Civil Engineering Projects
Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM
More information1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT
1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline
More informationConnecting cyclists to work. Syracuse Metropolitan Transportation Council
Connecting cyclists to work Syracuse Metropolitan Transportation Council Overview Prepared at request: NYS Department of Transportation (NYSDOT) Project Achievements Target group Purpose Process Recommendations
More informationTxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017
AGENDA ITEM 6 TxDOT Bicycle Tourism Trails Study Update April 2017 BAC Meeting April 10, 2017 Agenda Approval of interim products o Present study vision statement, goals, and study objectives o Present
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More information5:30 1 Introductions, appointment of note taker (5 minutes) Ad
CITY OF OAKLAND DALZIEL BUILDING. 25 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Agency TEL: (51) 238-3466 Transportation Planning & Funding Division FAX: (51) 238-7415 Bicycle
More informationCity of Oakland - Department of Transportation
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 206-207 AGENCY CONTACT INFORMATION Agency Name: City of Oakland - Department of Transportation Date: 2/22/207 Primary Point
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationMEETING NOTICE BICYCLE PEDESTRIAN ADVISORY COMMITTEE (BPAC) Mark McHenry, MO Co-Chair & Michael McDonald, KS Co-Chair
MEETING NOTICE BICYCLE PEDESTRIAN ADVISORY COMMITTEE (BPAC) Mark McHenry, MO Co-Chair & Michael McDonald, KS Co-Chair 1. Introductions (McHenry, 2 min) 2. January Summary* (Bartlett, 3 min) 3. Presentation:
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5883 FOR PUBLIC HEARING
The Sustainable Streets Division of the San Francisco Municipal Transportation Agency will hold a public hearing on Friday, March 2, 2018, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton
More informationFOURTH PLAIN BOULEVARD RE-STRIPING PROJECT. Post Implementation Report 1.2. Transportation Services. October 2004 DEMONSTRATION
FOURTH PLAIN BOULEVARD DEMONSTRATION RE-STRIPING PROJECT Post Implementation Report 1.2 October 2004 Transportation Services Table of Contents GENERAL INTRODUCTION 1 PROJECT BACKGROUND 1 PURPOSE OF 3-LANE
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationBicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011
Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011 In collaboration with: Alta Planning + Design Fuss & O Neill Darrohn Engineering DNA Creative Bicycle Master Plan Advisory
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationCommunity & Economic Development Agency TEL: (510) Transportation Services Division FAX: (510)
ITY OF OAKLAND DALZIEL BUILDING. 250 FRANK H. OGAWA LAZA. SUITE 3. OAKLAND. ALIFORNIA. 9612 ommunity & Economic Development Agency TEL: (5) 238-366 Transportation Services Division FAX: (5) 238-612 Bicycle
More informationMINUTES FOR ADOPTION Bicycle Advisory Committee Teleconference Meeting 200 E. Riverside Drive, Austin TX, Classroom E May 1, 2015
AGENDA ITEM 3 MINUTES FOR ADOPTION Bicycle Advisory Committee Teleconference Meeting 200 E. Riverside Drive, Austin TX, Classroom E May 1, 2015 BAC Committee Members Present and Participating: Billy Hibbs,
More informationThe Big Picture. FY Bicycling Highlights
FY 2007 2009 Bicycling Highlights Bikeway Improvements are identified as a Major City Goal in the 2007-2009 Financial Plan. Objectives of the goal are to continue to work towards the completion of the
More informationDevelopment Review Program Annual Report 2016
Development Review Program Annual Report 2016 Web version Spring 2017 http://museumplacesanjose.com/ http://www.elcaminohospital.org City of Campbell Council Agenda Packet 9/13/16 Gunter Lofts Development
More informationODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.
1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationBicycle Pedestrian Commission
City of Gilroy Bicycle Pedestrian Commission Strategic Plan 2017 Table of Contents Invitation to the Public Goals Action Plan Grants Bicycle/Pedestrian Projects 2 3-4 5-6 7 8-9 1 The Bicycle Pedestrian
More informationRolling Out New Bike Facilities Within the North Bethesda & White Flint Area
Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Agenda Designing for all Cyclists Background on
More informationMEMORANDUM - CITY OF PASADENA Department Of Transportation DATE: OCTOBER 21, 2008 TO: ENVIRONMENTAL ADVISORY COMMISSION FROM: ~ FRED C. DOCK, DIRECTOR OF TRANSPORTATION SUBJECT: UPDATE ON DEPT. OF TRANSPORTATION
More informationAre We There Yet? IPv6 as Related to GDP per Capita. By Alain Durand November 28 th,` 2016
Are We There Yet? as Related to By Alain Durand November 28 th,` 2016 Quesons for this Study: I. Where are we across the globe with adoption? a. Is deployed uniformly? b. Is there a rich country/poor country
More informationBikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop
Bikeable/Walkable Community Plan Oct. 11, 2012 City Council Workshop Background 2006 - O Fallon s population was 72,477. Citizen Survey showed a strong interest in additional bike & pedestrian opportunities.
More informationBICYCLE STRATEGY UPDATE
SFMTA Municipal Transportation Agency Image: Bike locks in front of San Francisco main library BICYCLE STRATEGY UPDATE 2015 SAN FRANCISCO, CALIFORNIA Bicycle Strategy Overview Four Goals: 1. Improve safety
More informationMulti-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period
2011 CITY CENTER MASTER PLAN UPDATE ADOPTED TRANSPORTATION ELEMENT PROJECT LIST FOR THE CBD, WATERFRONT, AND YORK, SEHOME, AND LETTERED STREETS NEIGHBORHOODS IMMEDIATELY ADJACENT TO CITY CENTER TRANSPORTATION
More informationFigure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements
INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending
More informationCity of San Bernardino
City of San Bernardino Population 204,800 City Overview The City of San Bernardino is the largest City and the county seat of San Bernardino County, California. The City encompasses approximately 81 square
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationActive Transportation Access to Transit
Active Transportation Access to Transit Introduction COMO Connect customers access transit service in many ways, including walking, bicycling, riding in a car and being dropped off, and directly boarding
More informationSouthcote Road Improvements Class Environmental Assessment Study
1 Southcote Road Improvements Class Environmental Assessment Study Public Information Centre #1 May 24, 2018 Study Area 2 3 Welcome The Ancaster Transportation Master Plan (2011) outlined a long range
More information3.0 Future Conditions
3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 SUBJECT: FINANCE COMMITTEE RECOMMENDATION TO ADOPT TRANSPORTATION STRATEGIC
More information/ ARLINGTON COUNTY, VIRGINIA
/ ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 24, 2016 DATE: August 11, 2016 SUBJECT: Amendment of the Master Transportation Plan (MTP) Streets Element to include new local
More informationDISTRICT BICYCLE PROGRAM
DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationOuter Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015
Outer Cape Bicycle & Pedestrian Master Plan PUBLIC WORKSHOP #2 March 26, 2015 Introductions TODAY S DISCUSSION PRESENTATION: Project Background : Where have we been? Where are we now? Steering Committee
More informationDistrict 6 & Citywide Non-Transit Project Delivery Status Report
District 6 & Citywide Non-Transit Project Delivery Status Report Prop K and Non-Prop K Active Projects October 23, 2012 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO COUNTY TRANSPORTATION
More informationOLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD
STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 7, 2016 SUBJECT: Adoption of amendments to the Master Transportation Plan (MTP) to create a new Pedestrian
More informationRail Station Fact Sheet Buckner Station
Rail Station Fact Sheet Buckner Station Station Overview Buckner Station is located at the intersection of Buckner Boulevard and Elam Road in Dallas. The station opened in 2010 and currently serves as
More informationKnox Street Complete Streets Project
Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences
More information42nd Ave N Reconstruction
CITY OF MINNEAPOLIS 42nd Ave N Reconstruction Community Meeting #2 May 2016 6:00 7:30 p.m. 5/16/2016 1 Purpose of Meeting Inform: Provide an overview of project, identify anticipated scope of work, and
More informationHarbord Street and Hoskin Avenue Bicycle Lane Upgrades
STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and
More information