1 D7-CR FY 9(A) PID ODOT proposes to replace or modify four existing culvert systems located in Champaign, Darke, and Mercer Counties. The project is necessary to address the deteriorated conditions of the culverts. With the exception of the CHP-68- location (where traffic will be maintained), the proposed construction will require the detour of traffic for up to days at each location. Signed detours will be provided. With the exception of the MER-9-79 location, all work is expected to occur within the existing public rights-of-way. The project is funded with federal and state System Preservation funds. Environmental clearance is scheduled for //7. The project is expected to award in January 9. CHP-68-, CF 89 Under the proposed project, the existing x concrete box culvert will be rehabilitated, with the pipe extended at the inlet and the headwall replaced. The roadside ditch will be reshaped at the inlet. The existing culvert was installed in c.99 and is in poor condition. Within the census blockgroups that include the project culvert, minorities represent to % of the population; individuals in poverty represent % to % of the population. The surrounding area is agricultural. The area was survey in 997, during investigations for the proposed Urbana Bypass. Scattered open site non-aboriginal finds have been documented in the area. earby farmsteads for which Ohio Historic Inventory Forms have been completed. In the vicinity of this culvert, there are no ational Historic Landmarks or sites listed or known eligible for the ational Register of Historic Places. There are no waterways, wetlands, or trees within the project construction limits at this location. This location is not within a designated special flood hazard area. DAR--, CF 877 Under the project, this existing 6 x concrete box will be replaced. Rock channel protection will be provided at the outlet. Roadside slopes at the inlet and outlet will be regraded. The existing culvert was installed prior to 98 and extended in 98. The culvert is in poor condition. The project is located in an area where minority represent % of the population and individuals in poverty represent % of the population. The surrounding area is agricultural. In the vicinity of this culvert, there are no ational Historic Landmarks, sites listed or known

2 eligible for the ational Register of Historic Places, or sites for which Ohio Historic/Archaeological Inventory forms have been completed. This culvert carries an unnamed tributary of Kraut Creek. This intermittent stream has a drainage area of approximately.9 square miles at the culvert location. Small instream/bank wetlands are present at the inlet and outlet. o suitable wooded habitat is present at this location. The culvert is not located within a designated special flood hazard area. DAR--89, CF 877 Under the proposed project, the existing x concrete box culvert will be rehabilitated. The headwalls and wingwalls will be replaced. Rock channel protection and other erosion control will be provided at the inlet and outlet. The existing culvert was installed in c.9 and is in poor condition. The project is located in an area where minority represent % of the population and individuals in poverty represent 8% of the population. The surrounding area is agricultural. In the vicinity of this culvert, there are no ational Historic Landmarks, sites listed or known eligible for the ational Register of Historic Places, or sites for which Ohio Historic/Archaeological Inventory forms have been completed. This culvert carries an unnamed tributary of Greenville Creek. This intermittent stream has a drainage area of approximately. square miles at the culvert location. Small instream/bank wetlands are present at the inlet and outlet. o suitable wooded habitat is present at this location. The culvert is not located within a designated special flood hazard area. MER-9-79, CF 8 Under the proposed project, the existing 7 -diameter corrugated metal pipe will be replaced with a similarly-sized conduit. The existing culvert was installed in c.99 and is in poor condition. At this location, the project is expected to require up to.-acre of temporary right-of-way and up to.-acre of permanent right-of-way. The project is located in an area where minority represent % of the population and individuals in poverty represent % of the population. The surrounding area is agricultural. In the vicinity of this culvert, there are no ational Historic Landmarks, sites listed or known eligible for the ational Register of Historic Places, or sites for which Ohio Historic/Archaeological Inventory forms have been completed. This culvert carries an unnamed tributary of the Wabash River. This intermittent stream has a drainage area of approximately. square miles at the culvert location. Small instream/bank wetlands are present at the inlet and outlet. o suitable wooded habitat is present at this location. The culvert is not located within a designated special flood hazard area.

3 MER-9-79 Detour Required CHP-68- Traffic Maintained DAR-- Detour Required DAR--89 Detour Required D7-CR FY8 PID,,,,, Feet

4 I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_GT.dgn Sheet //7 :: PM ikohli DESIG DESIGATIO VARIOUS LOCATIOS SEE SHEET LOCATIO MAP LATITUDE: 7'9" LOGITUDE: W8 9'" VARIOUS LOCATIOS SEE SHEET DESIG EXCEPTIOS OE UDERGROUD UTILITIES O S PLA PREPARED BY: OHIO DEPARTMET OF TRASPORTATIO DIRICT 7. MARYS AVE. SIDEY, OH EGIEERS SEAL: SIGED: DATE: ATE OF OHIO DEPARTMET OF TRASPORTATIO D7-CR-FY9(A) LIBERTY TOWSHIP GREEVILLE TOWSHIP DARKE COUTY LIBERTY TOWSHIP MERCER COUTY SALEM TOWSHIP CHAMPAIG COUTY IDEX OF SHEETS: TITLE SHEET LOCATIO MAPS AD DESIG DESIGATIOS TYPICAL SECTIOS GEERAL OTES MAITEACE OF TRAFFIC PLA & PROFILE (US ) PLA & PROFILE (SR 9) CROSS SECTIOS (US ) CROSS SECTIOS (SR 9) CULVERT DETAILS DAR--. DAR--.89 MER CHP SUPPLEMETAL ADA CORUCTIO AWIGS SPECIFICATIOS PROJECT DESCRIPTIO REPLACEMET OF CULVERTS (DAR-- AD MER-9-79), REPLACEMET OF CULVERT HEADWALLS AD WIGWALLS (DAR--89), AD THE EXTESIO OF A EXIIG CULVERT (CHP-68-), ICLUDIG ICIDETAL PAVEMET RECORUCTIO, GUARAIL REPLACEMET, AD ROADSIDE GRADIG. PROJECT LEGTH: PROJECT EARTH DIURBED AREA: /A EIMATED COTRACTOR EARTH DIURBED AREA: /A OTICE OF ITET EARTH DIURBED AREA: /A (ROUTIE MAITEACE PROJECT) 6 SPECIFICATIOS THE ADA SPECIFICATIOS OF THE ATE OF OHIO, DEPARTMET OF TRASPORTATIO, ICLUDIG SUPPLEMETAL SPECIFICATIOS LIED I THE PLAS AD CHAGES LIED I THE PROPOSAL SHALL GOVER THIS IMPROVEMET. I HEREBY APPROVE THESE PLAS AD DECLARE THAT THE MAKIG OF THIS IMPROVEMET WILL REQUIRE THE CLOSIG TO TRAFFIC OF THE HIGHWAY EXCEPT AS OTED O SHEET 6, AD THAT DETOURS WILL BE PROVIDED AS IDICATED O THE PLAS. SPECIAL PROVISIOS APPROVED DATE DIRICT DEPUTY DIRECTOR APPROVED DATE DIRECTOR, DEPARTMET OF TRASPORTATIO RAILROAD IVOLVEMET CORUCTIO PROJECT O. PID O. FEDERAL PROJECT O. D7-C R-FY9(A) O E E7(89)

5 6 7 6 ALLEY & DCROSS CHERRY MAI RICHMOD PALEIE 9 SUGAR LY LIBERT Y 8 TRACE L Branch 8 MCCLELLA DWYER AVE OTTIGHAM OXFO DOVER CAMBRI DGE RIVER TILLMA AVE VIRGIIA AVE SURREY L LUDY SEBRIG WARER AVE HICKORY EAWOOD REDWOOD GLEWOOD O AME E MAI LIWOOD IRWI SEBRIG WARER PALM CHILES HOME BRADFOR ORCHA O AME IFTWOOD TIMBERLAW CT DOGWOOD EDUCATIO GREGORY MICHELLE LIVIGO K AVE EAKOLL AOMI WOODBRIARL CAROL L JAYSVILLE SAIT JOHS AUBUR CLOVERLEAFL LAKE 9 AVE WOOD L FEITSHA AVE F DEER IELD AA L 7 BEECHWOOD 7 9 FAIRWAY CT CLUB RIVERSEDGE Ditch 7 ROUTZOG T-7 PERRY MAI C-6 6 LAYER T-6 SHORT ORTH PARK FACTORY CORWI MAI AULD SCLAY MARVI RUTH AVE HIGH BROW MARY AVE Branch TR 7 TR8 7 6 I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_GB.dgn Sheet //7 :: PM ikohli DESIG DESIGATIO CURRET ADT (8) DIRECTIOAL DIRIBUTIO TRUCKS ( HOUR B&C) DESIG SPEED LEGAL SPEED DESIG FUCTIOAL CLASSIFICATIO: HS PROJECT LOCATIO MAP (DAR--) LATITUDE: '6" DESIG YEAR ADT (8) DESIG HOURLY VOLUME (8) LOGITUDE: 8 '" LOCATIO MAP (DAR--.89) LOCATIO MAP (MER-9-79) LATITUDE: '6" LOGITUDE: W8 8'6" LATITUDE: 6'6" LOGITUDE: W8 '7" LATITUDE: '9" LOGITUDE: W8 7'" YEARIO T- LIPPICOTT T- C- OCKSDALE C-7 T-6 HITE C-79 C-7 ROSS T-6 HOUSE T- T-7 ACK T- River orth C- UPPER VALLEY PIKE T-6 C- Macochee W HERR T-8 Fork IGLEY WEAVERS FORT JEFFERSO River GREEVILLE ASHVILLE Glen T-7 Long C-6 CLAPP T-7 PALEIE C- T-6 SMITH PROJECT T-86 LOCATIO Mad Lippincott 9 Tampico Crane's Pond HILLGROVE SOUTHER RIDGE T- HOLLASBURG GODFREY River Indiana & Ohio Central Railroad Indiana RIDGE T- T- T- Kings C-7 Creek Kraut LOCATIO MAP (CHP-68-) T-6 LIBERTY T- SOADER 96 C- C- Creek E KAAGY C-7 SHORT T-9 MCCLAI MEOITE CHURCH T- T-6 FUK T- 68 E HERR T-8 PALEIE UIO CITY Sharpeye C- ashville C- T- Spring T- MEOITECHURCH T- C- KEA-KIGSCREEK Branch Greenville Creek GREEVI LLE ASHVILLE C-7 PALEIE 7 EA Kings T- GAME FARM D GAME FARM T- GAME GAME GAME FARM FARM T- FARM C-7 T- E C-7 Creek LUDLOW SIBLEY T-9 KIGSCREEK EW MADISO COLETOW IGLEY T-6 SALEM BYRKET T- Clark PROJECT LOCATIO Kingscreek MASO C-6 C-6 C-6 KAAGY T- C- Greenville MT TABOR C-8 C- T- West T-6 GREEVILLE PALEIE Baker CRUMRIE KEA C- T- T- T- T- LUDLOW C- GREEVILLE CELIA HILLTOP HIAWATHA CIRCLE C- SEBRIG WARER C- R.J. Corman C-9 CHILES HOME BRADFOR T- C-9 C-7 C-88 FOLKERTH T-9 T- JAYSVILLE SAIT JOHS T- KRUCKEBERG REQUARTH SEBRIG LARIMER T- WEFALL WARER T-88 ATE CULBERTSO T T-6 CAIAL GREEVILLE PROJECT GREEVILLE T-98 Branch WILLIS T-6 T-98 Concord DAR-- DAR--89 MER-9-79 CHP % 8% 6 MIOR ARTERIAL (RURAL) % 8% 6 MIOR ARTERIAL (URBA) O O O YES % 7 Railroad 7 OLDT8 9% 9% 6 MAJOR COLLECTOR (RURAL) MARTIDALE % 6 LOCATIO HARTZELL COUTRY T-8 Poplar AHL T- T- OTHER PRICIPAL Stelvideo Bolton ARTERIAL (RURAL) WILLOWLAKE C-9 ARCAUM BEARS MILL T-6 C- C- SPIDEL T-6 Ditch MILLER LEHMA McQuay UGER T-97 T-7 ERISMA T-6 Poplar Ridge Horatio Run Bears Mill 7 HORATIO EW HARRISO ROUTZOG MCCOOL T-6 T-7 T-69 ew OLTZ T-9 PAULI Harrison T-99 HAH MARTI C-87 T-69 Greenville T-8 AULD OLTZ T-9 C-66 C-9 Little EFF T- Landis BRIDGE DORWI CLAY S BRIDGE JOH ID OHIO ATE LIE T- T- T- OREGO C-8 FRAHM PIKE T-7 KABLE T-6 SKEELS C- MICH T- SCHROEDER T- KOCH T-88 9 TAMA C-96 SCHAADT T-9 FRAHM PIKE C-7 LIBERTY Skeels Crossroads CARMEL CHURCH T- Wabash DOER T- 9 SCHROEDER SCALE I MILES PORTIO TO BE IMPROVED ITERATE HIGHWAY FEDERAL ROUTES ATE ROUTES COUTY & TOWSHIP ROADS OTHER ROADS LI LI T-D T-D T-76 River Wabash TR W ABASH 6 WABASH PROJECT LOCATIO C-A T-6 C-A Black C-8 C-96 SCHAADT C-9 Scudder SCHROEDER OREGO C-7 MUD PIKE T- BURRVILLE T- C- T- Prairie Creek Beaver TAMA Bursville ERAUS DURBI ERAUS DURBI C-A C-A FRAHM PIKE HOE WEIR T-6A CARMEL CHURCH C- Creek Hinton MUD PIKE C- Brush TWP LIE C-8 SCHLEUCHER T-66 CARMEL CHURCH T- Durbin BUKER HILL T-A TWP LIE T-6 CARMEL T-6 HAWK T-9A C- D7-C R-FY9(A) LO C A TIO M A PS A D DESIG DESIG A TIO S

6 UAMED TRIBUTARY OF KRAUT CREEK I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_GP.dgn Sheet //7 :: PM ikohli OTES: * TRASITIO TO MATCH EXIIG BEGI PROJECT SUSPED PROJECT A. +7 A. + SLM. SLM. BEGI WORK E7(89) A. + E7(89).'* WOOD POS W/ METAL WIRES US US ROCK CHAEL PROTECTIO, TYPE B WITH FILTER (" THICK) BUTT ED JOIT MATCH EXIIG PAVEMET A. +7, ELEV. 6. PVC A. +. ELEV % -.6 % '.'.'.'.'* GRAVEL IVE " " " " " BUTT ED JOIT MATCH EXIIG PAVEMET A. +9, ELEV %-. % SUSPED WORK A. + CO. CO. 8"x9" CODUIT, TYPE A, SKEW "CMP 'x6' CULVERT WITH 7" CMP EXTESIOS () UAMED TRIBUTARY OF KRAUT CREEK ' VC P.V.I. A +. ELEV =,6.' SSD IS OT RERICTED -.8 % { = 6. { = 6. " CMP VERTICAL CURVE PROFILE EXTEDED 'x6' CULVERT WITH 7" CMP EXTESIOS () 8"x9" CODUIT, TYPE A, 76. (DD) PVT A +. ELEV 6. EXIIG PROFILE PLA A D PRO FILE US HORIZOTAL D7-C R-FY9(A) A. +. TO A +.

7 ROCK CHAEL PROTECTIO, TYPE B WITH FILTER (" THICK) 7" CMP CULVERT () RESUME WORK A LAW APPROX. LIMITS OF CULTIVATED FIELD +7..'* APPROX. LIMITS OF CULTIVATED FIELD SKEW 899 S.R TYPE E ACHOR ASSEMBLY, TYP. GUARAIL W/ TYPE A ACHOR ASSEMBLY (), TYP. 66" OR 7" CODUIT, TYPE A CO. RESUME PROJECT A. 9+ SLM 7. E7(89).'.'.' SUSPED PROJECT.'* A. 9+6 SLM 7.6 E7(89) +7. PROVIDE OFFSET DESIG AS PER MGS-. LAW SUSPED WORK CO. A. 9+ HORIZOTAL I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_GP.dgn Sheet //7 ::7 PM ikohli OTES: *TRASITIO TO MATCH EXIIG APPROX. LIMITS OF CULTIVATED FIELD APPROX. LIMITS OF CULTIVATED FIELD OMIT OE () PO OVER CULVERT " CPP FARM TILE (TO BE RELOCATED AS PER FARM AIS OTE) " CPP FARM TILE (APPLIES EACH SIDE) (DD) UAMED TRIBUTARY +.8 % OF WABASH RIVER BUTT ED JOIT MATCH EXIIG PAVEMET 868. A. 9+, ELEV " CMP CULVERT () % +.68 % APPROX. LIMITS OF CULTIVATED FIELD HW-. A 9+7.,.9' RT CB--B, GRATE ELEV 867. " () 86.7 " (S) 86.6 "CPP MASORY COLLAR AS PER DM-. '-" TYPE C, 76. '-" TYPE C, ' +79. BUTT ED JOIT MATCH EXIIG PAVEMET A. 9+7, ELEV A. 9+.7,.7' RT { " = " OR 7" CODUIT, TYPE A " " LAW CB--B " CPP Y FRAME RES #88 RESIDETIAL IVE (OE) PLA A D PRO FILE SR 9 D7-C R-FY9(A) A TO A. 9+

8 I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_DC.dgn Sheet /6/7 : PM ikohli SLOPE TO AI (TYP.) A. +.9,.9' LT UAMED TRIBUTARY OF KRAUT CREEK TOE OF SLOPE 6 6 OHWM = 7.6 { =.7 6.' 6: `6' 9.'..' MI. 6: A ' ILET WETLAD : : ' AGG. SHOULDER.' E/P 6..' ' AGG. SHOULDER 8 PGL 6..' MAX. COVER E/P 6.9.' MI. COVER.' MI. SKEW CORUCTIO U.S. CO..' TYP. 6: 6: 7:.8: 6:.: 9.' 8' { =. ' OF 8"x9" CODUIT, TYPE A, 76. AT.8% PROFILE ALOG CETERLIE OF CULVERT. OUTLET WETLAD " UAMED TRIBUTARY OF KRAUT CREEK ROCK CHAEL PROTECTIO, 8.' TYPE B WITH FILTER (" THICK), TOE OF SLOPE AREA = SF A. +6.,.9' RT REAM IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS. CY RCP/RIP RAP. 7 CY TEMPORARY CORUCTIO ACCESS 7. CY ILET WETLAD IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS /A <. <7 CY RCP/RIP RAP /A <. <7 CY TEMPORARY CORUCTIO ACCESS /A <. <7 CY OUTLET WETLAD IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS /A <. <7 CY RCP/RIP RAP /A <. <7 CY TEMPORARY CORUCTIO ACCESS /A <. <7 CY EXIIG CULVERT DATA TYPE: C.I.P. COCRETE BOX W/ CIRCULAR CMP EXTESIOS SIZE: 6' SPAx' RISEx' LEGTH BOX W/ 7" DIA.x' LEGTH EXTESIOS SKEW: 8 RF ALIGMET: TAGET DATE BUILT: PRE-98 WITH EXT. 98 CODITIO: POOR CF: 877 HYAULIC DESIG DATA AIAGE AREA = 6 ACRES Q() = 7 CFS HW() = 6. V() = FPS Q() = CFS 6 HW() V() = 6.6 = FPS OIARY HIGH WATER MARK = DESIG SERVICE LIFE = YEAR PH = 7. ABRASIVE CODITIOS = YES CROSS REFERECES SHEET O. DESCRIPTIO C ULVERT DETAIL HORIZOTAL D7-C R-FY9(A) D A R--.

9 8" AGG. SHOULDER REAM IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS 7. CY 9 S.R. 9 RCP/RIP RAP. CY TEMPORARY CORUCTIO ACCESS 6. CY ILET WETLAD IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS /A <. <7 CY RCP/RIP RAP /A /A /A TEMPORARY CORUCTIO ACCESS /A <. <7 CY OUTLET WETLAD IMPACTS LIEAR FEET ACREAGE VOLUME HORIZOTAL EW CULVERT/HEADWALLS /A <. <7 CY RCP/RIP RAP /A <. <7 CY TEMPORARY CORUCTIO ACCESS /A <. <7 CY A. 9+.7,.96' LT ROCK CHAEL PROTECTIO, TYPE B WITH FILTER (" THICK), AREA = SF TOE OF SLOPE.' 8.' TO FACE OF RAIL.' 8.' 8" AGG. SHOULDER TO FACE OF RAIL SLOPE TO AI (TYP.) MAX. SLOPE. ' A. 9+. I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_DC.dgn Sheet /6/7 : PM ikohli TOE OF SLOPE OUTLET WETLAD OHWM = ' " 7' 9' TYP. 8' { = 88..' TYP. SKEW E/P PGL ' " E CO. CO..6' MAX. COVER E/P ' MI. COVER { = HW-. OR HW-. HW-. OR HW-. 66' OF 66" CODUIT, TYPE A, 76. AT.% (SEE EIMATED QUATITIES FOR ALTERATE TYPES) PROFILE ALOG CETERLIE OF CULVERT `' ILET WETLAD A ,.96' RT UAMED TRIBUTARY OF WABASH RIVER TOE OF SLOPE TOE OF SLOPE AIAGE AREA Q() HW() V() Q() HW() V() DESIG SERVICE LIFE PH EXIIG CULVERT DATA TYPE: CIRCULAR CMP SIZE: 7" DIA. x 6' LEGTH SKEW: LF ALIGMET: TAGET DATE BUILT: CIRCA 99 CODITIO: POOR CF: 8 HYAULIC DESIG DATA OIARY HIGH WATER MARK ABRASIVE CODITIOS = 9 ACRES = 8 CFS = 86.6 = FPS = 8 CFS = = FPS = 86. = YEAR = 7.8 = O C ULVERT DETAIL D7-C R-FY9(A) M ER-9-7.9

10 CURVE C P.I. Sta RESUME PROJECT A. + SLM. E7(89) ROCK CHAEL PROTECTIO, TYPE B WITH FILTER (" THICK) AREA = SF REMOVE ' OF EXIIG " CPP AD IALL HEADWALL (HW-.) AT EW OUTLET ED. IALL HEADWALL (HW-.) AT WETLAD C OUTLET ED OF EXIIG " CPP. ROCK CHAEL PROTECTIO, TYPE B WITH FILTER (" THICK) AREA = SF SUSPED PROJECT A. + SLM. E7(89) UAMED TRIBUTARY OF GREEVILLE CREEK EXIIG PIPES (DD) TIED COCRETE BLOCK MAT, TYPE O GEOTEXTILE FABRIC AREA = SF SUSPED WORK A. + HORIZOTAL R =,96.' T =.98' L = 79.8' E = 7.' REMOVE AD REBUILD OUTLET ED "CPP (DD) " CPP(DD) C = 78.77' RESUME WORK A. + A. +8.,.' RT OMIT OE () PO OVER CULVERT REMOVE AD REPLACE 7.' OF GUARAIL I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_DC.dgn Sheet /6/7 : PM ikohli LEGED WETLAD B CO. ITEM - PAVEMET PLAIG, ASPHALT COCRETE (DEPTH = /") AD OE LIFT ( /" THICKESS) ITEM, ASPHALT COCRETE SURFACE COURSE, TYPE, (8), PG6- US 8" CMP (UDERAI OUTLET) (DD) UAMED TRIBUTARY OF GREEVILLE CREEK SHEET FOR DETAILS.) C REMOVE AD REBUILD ILET ED USE ' OF ITEM 9 - DITCH CLEA OUT TO FILL I THE EXIIG SCOUR HOLE AT THE OUTLET BEFORE IALLIG PROPOSED RCP. ROCK CHAEL PROTECTIO TYPE B WITH FILTER (" THICK), AS PER PLA WETLAD B LIMITS OF PAVEMET REORATIO (SEE OTE O AREA = 7 SF FWD TAGET (CURVE C) CULVERT A CO. 6. SKEW `.' `7.' 7 8'9" E CETERLIE SCHEMATIC OT TO SCALE ' AGG. SHOULDER WETLAD A 'x' CULVERT (TO BE REPAIRED) WETLAD A A. +6.,.' RT A ' AGG. SHOULDER OMIT OE () PO OVER CULVERT REMOVE AD REPLACE 7.' OF GUARAIL A. +9.9, 6.' LT EXIIG PAVED GUTTER(DD) 8" CMP (UDERAI OUTLET)(DD) `.' `7.' PT Sta. +.9 REAM IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS. CY RCP/RIP RAP. CY TEMPORARY CORUCTIO ACCESS. 9 CY WETLAD A IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS /A /A /A RCP/RIP RAP /A <. <7 CY TEMPORARY CORUCTIO ACCESS /A <. <7 CY WETLAD B IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS /A /A /A RCP/RIP RAP /A. 7 CY TEMPORARY CORUCTIO ACCESS /A. CY WETLAD C IMPACTS LIEAR FEET ACREAGE VOLUME EW CULVERT/HEADWALLS /A <. < CY RCP/RIP RAP /A <. < CY TEMPORARY CORUCTIO ACCESS /A <. < CY 7 8'9" E CO. US EXIIG CULVERT DATA TYPE: C.I.P. COCRETE BOX (D. WG. SBC- WITH SPECIAL WIGS) SIZE: ' SPAx' RISEx7'-7" LEGTH BOX SKEW: 6. LF FROM FORWA TAGET ALIGMET: TAGET DATE BUILT: CIRCA 9 CODITIO: POOR CF: 877 OIARY HIGH WATER MARK = 7. CROSS REFERECES SHEET O. DESCRIPTIO ILET / OUTLET SECTIO DETAILS C ULVERT DETAIL D7-C R-FY9(A) D A R--.89

11 ' ` SKEW HORIZOTAL RESUME WORK A. 6+ RESUME PROJECT A. 6+6 SLM.7 E7(89) ED PROJECT A. 7+ SLM.8 E7(89) ED WORK A I:\ProjectData\D7\_CR_FY8\Design\Roadway\Sheets\_DC.dgn Sheet //7 ::PM ikohli GROOVED OR BELL ED MODIFIED HW-. US 68 EXIIG TOE OF SLOPE `8' OF EXIIG RUCTURE (TO BE REMOVED) DITCH `8' EXIIG TOP OF BAK SLOPE TO AI (TYP.) RESHAPE `' OF DITCH FLUSH ED `.% SLOPE PROFILE ALOG CETERLIE OF CULVERT A ' MI. SLOPE TO AI EXIIG ASPHALT ' OF 'x' CODUIT, TYPE A, 76. AT `.% EXIIG OE IVE ' FROM ED OF EXIIG BARREL PAVEMET (DD) MODIFIED HW-. PROPOSED GRADE EXIIG GRADE ITEM, PORTIOS OF RUCTURE REMOVED, AS PER PLA A MASORY COLLAR PER DM-. WITH QC FS COCRETE 'x' CULVERT EXIIG CULVERT (TO BE REPAIRED) +. OE COMMERCIAL IVE CULVERT EXTESIO. OF THE EGIEER. US 68 ITEM 6 - CODUIT, MISC: 'X' CODUIT, TYPE A, 76., FT DESIG EARTH COVER ALL PORTIOS OF C&MS 6 AD 76. APPLY, EXCEPT THE BOX SIZE, SPA BY RISE, SHALL BE 'X' PER AM C77. THE PRECA REIFORCED COCRETE BOX SECTIO SHALL BE CORUCTED FLUSH AGAI THE EXIIG BOX CULVERT. TO MIIMIZE OP-OFFS WITHI THE WORK ZOE AD MAITAI ACCESS TO THE COMMERCIAL IVE COMPLETE THE FOLLOWIG WITHI THE DAYTIME HOURS OF A CALEDAR DAY: ) REMOVE PORTIOS OF EXIIG RUCTURE TO LIMITS SHOW. ) IALL PRECA REIFORCED COCRETE BOX SECTIO PER CMS 6. ) CORUCT MASORY COLLAR (DM-. WITH QC FS COCRETE). ) AFTER A FOUR () HOUR CURE TIME FOR THE MASORY COLLAR, BACKFILL AROUD THE APPLY THE EPOXY-URETHAE SEALER TO THE SIDES AD TOP OF THE PRECA SECTIOS BEFORE IALLIG. THE COTRACTOR SHALL BE CAREFUL TO PREVET DAMAGIG THE SEALER DURIG HADLIG AD IALLATIO. REPAIR AY DAMAGE TO THE SATISFACTIO PAYMET FOR THE ABOVE WORK OT BEIG PERFORMED UDER AOTHER ITEM, ICLUDIG ALL MATERIALS, EQUIPMET, AD LABOR, SHALL BE ICLUDED I THE COTRACT PRICE PER FOOT FOR ITEM 6 - CODUIT, MISC.: 'X' CODUIT, TYPE A, 76., FT DESIG C ULVERT DETAIL D7-C R-FY9(A) C HP-68-. EARTH COVER. LIMITS OF PAVEMET REORATIO (SEE OTE O SHEET FOR DETAILS.) EXIIG CULVERT DATA TYPE: C.I.P. COCRETE BOX (D. WG. SBC-) SIZE: ' SPAx' RISEx9'-" LEGTH BOX SKEW: LF ALIGMET: TAGET DATE BUILT: CIRCA 99 CODITIO: POOR CF: 89

Greenman-Pedersen, Inc. C-2. Engineering and Construction Services

Greenman-Pedersen, Inc. C-2. Engineering and Construction Services ITEM O DESCRIPTIO UIT ESTIMATED QUATITY 201.06 CLEARIG AD GRUBBIG LS EC 203.02 UCLASSIFIED EXCAVATIO AD DISPOSAL CY 710 203.03 EMBAKMET I-PLACE CY 1695 203.07 SELECT GRAULAR FILL CY 400 C205.01 YSERDA

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: DUROLAW MAT WITH STAKES & ZIPTIES: x 4 PRE-MITRED LOG BORDER: x 14.6 lin.m [48 lin.ft] 254mm [10"] S.D.W.S. FASTEER: x 5 DRILL BIT FOR FASTEERS: x 1 STRUCTURAL FILL, SOOTUBES, COCRETE,

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

MARION STREET MULTIFAMILY

MARION STREET MULTIFAMILY MARIO STREET MULTI-FAMILY BUILDIG, BLOCK 49, EVASTO BROADWAY ADDITIO. SITUATED THE SOUTHWEST QUARTER, SECTIO 35, TOWSHIP 4 SOUTH, RAGE 68 WEST OF THE SIXTH PRICIPAL MERIDIA, CITY OF EGLEWOOD, COUTY OF

More information

City of Valdez REQUEST FOR QUOTES. Project Name: Lowe River Levee Certification Groin 1 Freeboard Repairs PO Number: Cost Code:

City of Valdez REQUEST FOR QUOTES. Project Name: Lowe River Levee Certification Groin 1 Freeboard Repairs PO Number: Cost Code: ---July 19, 2017--- Dear Contractor: City of Valdez REQUEST FOR QUOTES Project ame: Lowe River Levee Certification Groin 1 Freeboard Repairs PO umber: 74818 Cost Code: 30-070-000 This project includes,

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: ATURE'S ISTRUMETS I-PG-1002-01 TRIPLE RAIL HILL SLIDE. I PACKAGE ICLUDES:- HT. SLIDE FRAME: x 1 WITH PRE-ATTACHED SLIDE AD COLLAR WIG WALL POST: x 2 PRE-ASSEMBLED WIG WALL RAILIGS: x 2

More information

D07-RW-VAR(A) PID 99863

D07-RW-VAR(A) PID 99863 D07-RW-VAR(A) PID 6 ODOT proposes to acquire right-of-way at five existing culvert systems located in Champaign, Darke, Logan and Mercer Counties. The project is necessary to bring the existing culvert

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

WATER VALVES REPLACEMENT PROJECT

WATER VALVES REPLACEMENT PROJECT WATER VALVES REPLACEMET PROJECT BROWSVILLE, TEXAS BID o B026-17 PUBLIC B R O W S V I L L E UTILITIES B OARD Brownsville - Board of Directors RAFAEL VELA...CHAIR RAFAEL S. CHACO...VICE-CHAIR MARTI C. ARAMBULA...SECRETARY/TREASURER

More information

CE 535, Spring 2002 Preliminary Design Example 1 / 6

CE 535, Spring 2002 Preliminary Design Example 1 / 6 CE 535, Spring 2002 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012 Bridge Design Preliminary Bridge Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over BUTLER CREEK. Date of Inspection: Equipment Used: 06/21/2016. County Highway Agency 2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # 25534 CSAH 14 over BUTLER CREEK DISTRICT: District 6 COUTY: Goodhue CITY/TOWSHIP: LEO STATE: Minnesota Date of Inspection: Equipment Used: 06/21/2016 Owner:

More information

Downtown Connector Trail

Downtown Connector Trail December 27, 2010 Updated January 10, 2012 1 ew Broadway / 9th Street Downtown Connection I-77 East 34th RTA Station I-490 Job Ready Development Parcel Morgana Run Steel Warehouse Washington Reservation

More information

Information for File # MVP LSP

Information for File # MVP LSP Information for File # MVP- 218-2671-LSP Applicant: Pennington County Highway Department Corps Contact: Lawrence Puchalski Address: 4111 Technology Drive W, Suite 295, Bemidji, Minnesota 5661 E-Mail: Lawrence.S.Puchalski@usace.army.mil

More information

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development

More information

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

WATER OBSTRUCTION AND ENCROACHMENT PERMIT ," /.@ Permit No. E36-813 Commonwealth of Pennsylvania Department of Environmental Protection Southcentral Regional Office Watershed Management Program Permitting and Technical Services Section WATER OBSTRUCTION

More information

Bridge Failures in Alberta

Bridge Failures in Alberta Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

PHASE II W. SAN CARLOS AVENUE - N. OF EXISTING PHASE III W. SAN CARLOS AVENUE SAN MARCO AVENUE MAY STREET

PHASE II W. SAN CARLOS AVENUE - N. OF EXISTING PHASE III W. SAN CARLOS AVENUE SAN MARCO AVENUE MAY STREET TRAFFIC COTROL GEERAL OTES ======================== TRAFFIC COTROL PHASIG OTES (COT'D.) ============================== 1. WORK ZOE TRAFFIC COTROL WILL BE I ACCORDACE WITH THE MAUAL O UIFORM TRAFFIC COTROL

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG

PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG ARCTIC OCEAN BARROW KOTZEBUE SOUND KOTZEBUE ALASKA CANADA BERING SEA YUKON RIVER FAIRBANKS BETHEL ANCHORAGE KENAI HAINES PROJECT LOCATION JUNEAU PACIFIC OCEAN KODIAK GULF OF ALASKA McHugh Creek SEWARD

More information

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP

More information

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA These regional conditions are in addition to but do not supersede the requirements in the Federal Register (Volume 82 No. 4 of January 6, 2017).

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal.

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal. CR166916b02 20 Jue 2017 Melida Dodso Melida Dodso Architects PO Box 5635 Hughes ACT 2605 Email: mdodso@melidadodsoarchitects.com.au Dear Melida, Project: Dickso Apartmets Lowrie St Re: Statemet o Parkig

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022 US Army Corps of Engineers Detroit District Public Notice Corps File No. LRE-2016-00006-100 Date: March 19, 2017 Expires: March 18, 2022 PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATIONS

More information

SERIES FP4000 FLOW RATES TABLE B** RANGE MODEL RANGE MODEL SERIES FP2000 FLOW RATES TABLE A** RANGE MODEL RANGE MODEL

SERIES FP4000 FLOW RATES TABLE B** RANGE MODEL RANGE MODEL SERIES FP2000 FLOW RATES TABLE A** RANGE MODEL RANGE MODEL Data Sheet Field IT Variable Area Flowmeters Acrylic VA Flowmeter Series FP Easy to read Eglish or Metric Scales Water rages from 4CCM to 20GPM Air rages from 50 CCM to 4000 LPM Threaded brass iserts for

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Fish Friendly Crossings- Examples from Nash Stream

Fish Friendly Crossings- Examples from Nash Stream Fish Friendly Crossings- Examples from Nash Stream Maggie Machinist- North Regional Forester, Division of Forests and Lands. Nash Stream Nash Stream Forest is 40,000 acres, owned and managed by NH Division

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Storm Damage Floating Culverts & Other Inlet Issues

Storm Damage Floating Culverts & Other Inlet Issues Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation

More information

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS March 2, 2011 FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS STANLEY STORM DRAINAGE IMPROVEMENTS, 151sT TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS DESCRIPTION: This report relates

More information

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION Field Operations Director 003513 Sr. Community Educator 003542 Asst. Field Operations Director 001046 Stormwater Operations Analyst 003833 Special Projects

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017 Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

Tahquamenon River Assessment

Tahquamenon River Assessment State owned land USFS land Superior Lower Falls USGS Gauging Station Superior Tahquamenon s Belle s Slater s Bass Betty B Dollarville Flooding Eckerman McMillan Mud East Kaks Twin McPhee s Hulbert Hulbert

More information

PED (OLD TWNS RD) over OTTER TAIL RIVER

PED (OLD TWNS RD) over OTTER TAIL RIVER 2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # L0885 PED (OLD TWS RD) over OTTER TAIL RIVER DISTRICT: District 4 COUTY: Otter Tail CITY/TOWSHIP: MAIE STATE: Minnesota Date of Inspection: Equipment Used:

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION)

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION) RAMOA FOOTHILL MEIECKE MILL 1" = 350' TRAFFIC DIVERTER MEIECKE BETO MURRAY SATA ROSA SERRAO MISSIO CETER WEST VEABLE MISSIO MISSIO ALMOD MOUTAI VIEW CETER LICOL CETER LICOL COCEPT ALTERATIVE 1 ( O WITH

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO. CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23

More information

Product Features Product Benefits Application

Product Features Product Benefits Application lamps are compact UVC (germicidal) lamps used i residetial water ad air disifectio uits. The compact size of the lamp allows for a small system desig ad desig flexibility. lamps offer costat UV output

More information

Great Lakes Stream Crossing Inventory Instructions

Great Lakes Stream Crossing Inventory Instructions Great Lakes Stream Crossing Inventory Instructions This document is a guide to completing the Stream Crossing Data Sheet (2/28/11 version). Careful attention to this guidance will ensure consistent crossing

More information

Northside School Class I Bike Path, Cool, CA Application Attachments

Northside School Class I Bike Path, Cool, CA Application Attachments PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area

More information

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan

RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan Community Board 7 July 5, 2016 Parks Capital Design W Architecture & Landscape Architecture California Skateparks HERY

More information

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

Estimating Highway Maintenance Work 2008

Estimating Highway Maintenance Work 2008 Purdue University Purdue e-pubs Indiana Local Technical Assistance Program (LTAP) Publications Indiana Local Technical Assistance Program (LTAP) 5-2008 Estimating Highway Maintenance Work 2008 Ohio Department

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

7.0 Nonmotorized Facilities

7.0 Nonmotorized Facilities 7.0 Nomotorized Facilities 7.1 Sectio Overview This sectio describes the existig coditios ad ay idetified future impacts with the project o omotorized facilities withi the study area. Data were collected

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The