1 ROCKAWAY BOARDWALK RECONSTRUCTION Phase 4 (B86th B60th) Access Update October 28,

2 Construction Schedule Phase: Phase 1 (B86-B97) Phase 2 (B98-B108): Phase 3 (B108-B126): Phase 4a (B73-B86): Phase 4b (B60-B73) Phase 5a (B39-B60): Phase 5b (B19-B39) : *Piping Plover Moratorium (Apr Sept) Target Start: Spring 2014 Summer 2014 Fall 2014 Spring 2015 Late 2014* Fall 2015* Fall 2016* Target End: Memorial Day 2015 July 4 th 2015 Memorial Day 2016 Memorial Day 2016 Memorial Day 2016* Memorial Day 2016* Memorial Day 2017* 2

3 Boardwalk Finish Planks 3

4 Boardwalk Materials 4

5 Bike Lane Markings 5

6 World s Fair Bench 6

7 Custom Seating 7

8 Landside Planter 8

9 Lighting 9

10 Fountains and Showers 10

11 Signage 11

12 Dune Planting 12

13 Baffle Wall 13

14 Dune Planting 14

15 Typical Planting Plan 15

16 Planting Pallet 16

17 Typical Landside Access 17

18 Typical Landside Access 18

19 Typical Beachside Access 19

20 SANDY DUNE WAY B 68TH ST BEACH FRONT ROAD B 69TH ST B 67TH ST EXISTING ISLAND BEACHFRONT PRESERVEBEACHFRONT PRESERVE Vehicular ramp FEET FEET Proposed stairs to be changed to small ramp L5 - Combined access. Stairs and accessible path B-BP1 - Stairs 8 wide Proposed stairs to be Proposed stairs to be L1 - Stairs 10 wide B-BP2 - Combined L-BP1 access. - Stairs 10 wide B1 - Stairs 8 wide changed to ramp & changed stairs to small ramp L2 - Stairs 20 wide Stairs and L-BP2 accessible - ADA dune Ramp crossing B2 - Combined access. L3 - ADA Ramp L-BP3 - Combined access. Stairs and accessible L4 - Accessible dune crossing path with step seating V1 - Landside vehicular ramp Stairs and accessible path V1 - Landside vehicular L5 - Combined ramp access. Stairs and accessible V2- Beachside path vehicular B-BP1 ramp - Stairs 8 wide Beach side vehicular Proposed stairs V2- to be Beachside vehicular B1 - Stairs ramp8 wide ramp added changed to ramp & stairs B2 - Combined access. Stairs and accessible dune crossing Beach side vehicular ramp added L1 - Stairs 10 wide L2 - Stairs 20 wide L3 - ADA Ramp L4 - Accessible path with step seating V1 - Landside vehicular ramp V2- Beachside vehicular ramp L-BP1 - Stairs 10 wide L-BP2 - ADA Ramp L-BP3 - Combined access. Stairs and accessible path B-BP2 - Combined access. Stairs and accessible dune crossing V1 - Landside vehicular ramp V2- Beachside vehicular ramp P4b - B 73rd St Island to B 65th St - Proposed R O C K AWAY B OA R DWA LK R EC O N STRUCTION NYC PARKS NYC EDC CH2MHILL WXY RBA PENTAGRAM

21 BEACH WAY BEACHFRONT PRESERVE B 62ND ST B 61ST ST B 60TH ST FEET Proposed stairs to be changed to small ramp Proposed stairs to be changed to ramp & stairs Beach side vehicular ramp added L1 - Stairs 10 wide L2 - Stairs 20 wide L3 - ADA Ramp L4 - Accessible path with step seating L5 - Combined access. Stairs and accessible path B1 - Stairs 8 wide B2 - Combined access. Stairs and accessible dune crossing V1 - Landside vehicular ramp V2- Beachside vehicular ramp L-BP1 - Stairs 10 wide L-BP2 - ADA Ramp L-BP3 - Combined access. Stairs and accessible path B-BP1 - Stairs 8 wide B-BP2 - Combined access. Stairs and accessible dune crossing V1 - Landside vehicular ramp V2- Beachside vehicular ramp P4b - B65th St to B60th St - Proposed R O C K AWAY B OA R DWA LK R EC O N STRUCTION NYC PARKS NYC EDC CH2MHILL WXY RBA PENTAGRAM

22 Questions?

23 SHOR E FRO BASKETBALL COURT HANDBALL COURT HANDBALL COURT EET D STR EET H 73R H STR BEAC NT PA RKWA Y PAVED AREA PLAYGROUND BEAC BEAC Y A W K R A P T N O R F H 74T H STR H 77T BEACH 81S SHORE EXISTING ACCESSIBLE RAMP EXISTING STAIRS EET T STREET REET H ST H 84T BEAC R.O.W. R.O.W. R.O.W. EXISTING PLANTER PLAYGROUND SHOR E FRO EXISTING ISLAND NT PA RKWA Y HANDBALL COURT BASKETBALL COURT HANDBALL COURT CREST OF U.S.A.C.E. DUNE TOE OF U.S.A.C.E. DUNE EXISTING PLAYGROUND EXISTING ACCESSIBLE RAMP & STAIRS BEACH FRONT ROAD EXISTING MODULAR BUILDINGS LEGEND CREST OF U.S.A.C.E. DUNE TOE OF U.S.A.C.E. DUNE EXISTING CONDITIONS RIGHT OF WAY TAX LOT LINE PRE-SANDY ACCESS STAIR SITE ANALYSIS A TO MTA STATION EXISTING ACCESSIBLE RAMP PARK NON-ACCESSIBLE RAMP CONNECTION TO THROUGH STREET EXISTING ISLAND PROPOSED ACCESS EXISTING ISLAND ACCESSIBLE RAMP & STAIRS VEHICULAR RAMP PROPERTY OWNERSHIP IN QUESTION 0 Pre-Sandy Access & Proposed Access Phase 4a FEET SCALE: 1 =50-0

24 BEACH 73RD STREET MERIDIAN BLVD SANDY DUNE WAY BEACH 69TH STREET BEACH 68TH STREET A TO BEACH 67TH ST STATION BEACH 67TH STREET OCEAN AVENUE S. BEACH 62ND STREET BEACH 61ST STREET BEACH 60TH STREET EXISTING ACCESSIBLE RAMP EXISTING ISLAND BEACH FRONT ROAD BEACH 59TH STREET PLAYGROUND BEACH 59TH STREET EXISTING RAMP & STAIRS CREST OF U.S.A.C.E. DUNE TOE OF U.S.A.C.E. DUNE PHASE 5 CREST OF U.S.A.C.E. DUNE TOE OF U.S.A.C.E. DUNE LEGEND EXISTING CONDITIONS CREST OF U.S.A.C.E. DUNE TOE OF U.S.A.C.E. DUNE RIGHT OF WAY TAX LOT LINE PRE-SANDY ACCESS SITE ANALYSIS APPROXIMATE PRE-SANDY SHORELINE PARK EXISTING ISLAND PROPOSED ACCESS STAIR NON-ACCESSIBLE RAMP A TO MTA STATION CONNECTION TO THROUGH STREET APPROXIMATE PRE-SANDY SHORELINE ACCESS BY OTHER (PER PDC PRESENTATIN PROPERTY OWNERSHIP IN QUESTION VEHICULAR RAMP ATLANTIC OCEAN EXISTING JETTY FEET SCALE: 1 =50-0 Pre-Sandy Access & Proposed Access Phase 4b

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

A. INTRODUCTION For the Environmental Assessment, the term dune is used to describe the 14 to 16 foot elevation sand

A. INTRODUCTION For the Environmental Assessment, the term dune is used to describe the 14 to 16 foot elevation sand Chapter 1: Project Description A. INTRODUCTION The City of New York (the City) is proposing to enter into a grant agreement with the United States Department of Housing and Urban Development (HUD) to disburse

More information

Regional Beach Access

Regional Beach Access Beach and Bay Access Finding your perfect beach is easy when you have so many choices. South Walton has over 50 beach and bay access points along its 26 miles of shoreline. Types of access vary, so be

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update June 2016 US Army Corps of Engineers Project Purpose Three specific damage mechanisms of coastal

More information

Q1 Which of the following best describes your relationship to Atlantic Beach?

Q1 Which of the following best describes your relationship to Atlantic Beach? Q1 Which of the following best describes your relationship to Atlantic Beach? Answered: 1,183 Skipped: 0 Full-Time Resident of... Seasonal Resident of... Visitor Business Owner in Atlantic... Full-Time

More information

Appendix F: Public Access Plan

Appendix F: Public Access Plan Atlantic Coast of Long Island Jones Inlet to East Rockaway Inlet Long Beach Island, New York Coastal Storm Risk Management Project Hurricane Sandy Limited Reevaluation Report Appendix F: Public Access

More information

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019 Astoria Boulevard ADA and Station Renewal Track Improvements February 19, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install

More information

STAGE #3 TRANSITION 1 at Camp Keystone

STAGE #3 TRANSITION 1 at Camp Keystone STAGE #3 SWIM STAGE #3 TRANSITION 1 at Camp Keystone Mount bike AFTER bump T1 Changing Tent STAGE #3 Camp Keystone to Marineland 68 MILE BIKE STAGE #3 68 MILE BIKE Mile 0-10 SAG 0.0 Turn RIGHT out of T1.

More information

BIKETOBERFEST October 13-16, 2016 Updated :15PM

BIKETOBERFEST October 13-16, 2016 Updated :15PM America s Best Value Inn 1305 South Ridgewood Avenue Daytona Beach 386-252-1142 Atlantic Ocean Palm Inn 3247 South Atlantic Avenue Daytona Beach Shores 386-761-8450 Bahama House 2001 South Atlantic Avenue

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

BIKETOBERFEST October 13-16, 2016 Updated :15AM

BIKETOBERFEST October 13-16, 2016 Updated :15AM ***This is a list of properties that we have been able to contact who currently have availabilities for Biketoberfest (). This list changes daily. America s Best Value Inn 1305 South Ridgewood Avenue Daytona

More information

Derby Street. Project Updates. Salem, Massachusetts

Derby Street. Project Updates. Salem, Massachusetts Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets

More information

Southeast Volusia Coastal Projects Update

Southeast Volusia Coastal Projects Update Southeast Volusia Coastal Projects Update Public Works Department Coastal Division August 15, 2016 2016 Dune Walkover Re-Decking Program Completed Dune Walkovers South End 8 th Ave. New Smyrna Beach* 12

More information

Visit for more information, including the full 2017 program route.

Visit  for more information, including the full 2017 program route. Philly Free Streets is a family-friendly, people-powered initiative of the City of Philadelphia that temporarily closes a street route to vehicular traffic, inviting people to bike, walk, and play. Philly

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

BIKETOBERFEST October 13-16, 2016 Updated :25PM

BIKETOBERFEST October 13-16, 2016 Updated :25PM ***This is a list of properties that we have been able to contact who currently have availabilities for Biketoberfest (). This list changes daily. America s Best Value Inn 1305 South Ridgewood Avenue Daytona

More information

Beach Renourishment in Jacksonville

Beach Renourishment in Jacksonville Beach Renourishment in Jacksonville Kevin Bodge, PhD, P.E. - Olsen Associates, Inc. 1978 Oct 2004 2000 2016 2011 Oct 2016 Coastal Duval County, FL Nassau Sound Blount Island Ft. George Inlet St. Johns

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

The Sand Beaches of New Hampshire and Maine

The Sand Beaches of New Hampshire and Maine The Sand Beaches of New Hampshire and Maine Beach Preservation and Erosion Control Photographs provided by Joe Kelly and Steve Adams Cover photo: Reid State Park, ME Introduction The sand beaches of New

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

PROJECT KEY TYPICAL SECTION 1 =60

PROJECT KEY TYPICAL SECTION 1 =60 6 WASHINGTON BLVD - BETWEEN NE 1ST ST AND NE 3RD ST Washington Boulevard is a low volume, low speed one-way road, signed for no street between NE 1st Street and NE 2nd Street, and closed to traffic between

More information

Walton County Beach Access Selection Chart

Walton County Beach Access Selection Chart Walton County Beach Selection Chart Beach Lupine #1 No No 242 Walton Magnolia Ln., Inlet, FL 32413 Phillip's Inlet Beach #1a (3 Spaces) N/A 202 S Walton Lakeshore Dr., Inlet, FL 32413 Inlet RBA (East)

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Public Access Quarterly Report

Public Access Quarterly Report 7/7/2017 Public Access Quarterly Report Clean Ocean Access update of 50 CRMC rights-of-way on Aquidneck Island. Contributing Authors: Eva Touhey, Program Manager, Clean Ocean Access Megan Carvalho, Communications

More information

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 Traffic Improvements Project Goals Widen roadway to construction two-way left turn lanes-greatly decreases congestion Ease access to & from

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

See Figure 38, Existing Nonmotorized Connections.

See Figure 38, Existing Nonmotorized Connections. Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Sloat Blvd. Pedestrian Safety Improvement Project

Sloat Blvd. Pedestrian Safety Improvement Project Sloat Blvd. Pedestrian Safety Improvement Project Department of Public Works Project team and background Budget Schedule Scope of work Sloat Blvd - Everglade Drive Sloat Blvd - Forest View Drive Sloat

More information

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area.

Proposed Mural. Ninth St. Proposed Sitting Area. Proposed Bump-out. Bike Lane and Buffer Zone. Proposed Trees and Sitting Area. Proposed Mural Proposed Sitting Area Ninth St Proposed Bump-out Bike Lane and Buffer Zone Proposed Trees and Sitting Area Tenth St Bike Sign to Lake 47 Proposed Trees and Sitting Area Eighth St Bike Lane

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

GLYNN COUNTY MANAGER S OFFICE 1725 Reynolds Street, Third Floor, Brunswick, GA Phone: (912) Fax: (912)

GLYNN COUNTY MANAGER S OFFICE 1725 Reynolds Street, Third Floor, Brunswick, GA Phone: (912) Fax: (912) GLYNN COUNTY MANAGER S OFFICE 1725 Reynolds Street, Third Floor, Brunswick, GA 31520 Phone: (912) 554-7401 Fax: (912) 554-7596 www.glynncounty.org MEMO TO: FROM: The Honorable Commissioners Alan Ours,

More information

Emerson Circle Entrance

Emerson Circle Entrance Emerson Circle Entrance It is not clear that there is a park in this location without a sign. Access from Emerson Circle: The present sloped granite curb does not provide access immediately at the park

More information

TRANSPORTATION IMPROVEMENT STRATEGY

TRANSPORTATION IMPROVEMENT STRATEGY TRANSPORTATION IMPROVEMENT STRATEGY A Vision for Staten Island North Shore November 2016 1 EXISTING CONDITIONS Transit Conditions MTA Bus Staten Island Railroad Peak Directional Traffic Volume (per hour)**:

More information

STREETSCAPE CONCEPTS

STREETSCAPE CONCEPTS STREETSCAPE S CARGO WAY CARGO WAY CYCLE TRACK Streetscape Concepts JENNINGS ST Illustrative Plan EVANS AVE PG&E BAY TRAIL HERON S HEAD PARK The recommended improvements build off the planned improvements

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS 14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS 141 Symbols Recommendations - Southern End of 14th Street Study Area Streetscape Each icon

More information

PUBLIC REALM MASTER PLAN

PUBLIC REALM MASTER PLAN WESTSHORE BUSINESS DISTRICT PUBLIC REALM MASTER PLAN MASTER PLAN COMMITTEE MEETING MARCH 20, 2013 WESTSHORE BUSINESS DISTRCT PUBLIC REALM MASTER PLAN MACRO-SCALE CONCEPT: A PUBLIC REALM FRAMEWORK DEFINED

More information

Waterfront Trail; Lynde Creek to Pickering

Waterfront Trail; Lynde Creek to Pickering Waterfront Trail; Lynde Creek to Pickering Ride starts at Lynde Creek C.A., Whitby 0.0 0.0 Victoria St. (caution - busy road!) 0.6 0.6 Halls Rd. 1.8 2.4 gravel path 0.2 2.6 gravel path (towards Lk. Ontario)

More information

OTTAWA AVENUE NEIGHBORHOOD

OTTAWA AVENUE NEIGHBORHOOD OTTAWA AVENUE NEIGHBORHOOD 4.17.2018 RECAP September 19, 2016 Meeting Identify concerns * needs * wants of neighborhood residents Safety Improvements Ottawa Avenue, Ayersville Avenue, Cleveland Avenue,

More information

ATLANTIC COUNTY 2006 to 2008

ATLANTIC COUNTY 2006 to 2008 ATLANTIC COUNTY 2006 to 2008 The Atlantic County oceanfront shoreline consists of three barrier islands where the northern one, Little Beach Island and a third of the second, Brigantine Island, are undeveloped

More information

Functional, Preliminary Design and Detailed Design

Functional, Preliminary Design and Detailed Design Functional, Preliminary Design and Detailed Design Main Street (Echo Drive to the Rideau River), Lees Avenue (Main Street to Chestnut Street), and Rideau River Drive (Main Street to 130m south of Main

More information

Figure 106. Locations of the 28 NJBPN profile stations in Ocean County, NJ.

Figure 106. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 130 Figure 106. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 131 2016-2017 Beach Fills in Ocean County: The federal/state/local storm damage reduction project (beachfill) between Manasquan

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

Ormond Beach s Andy Romano Beachfront Park. Imagine. City Commission Meeting June 1 st, Presented by

Ormond Beach s Andy Romano Beachfront Park. Imagine. City Commission Meeting June 1 st, Presented by Ormond Beach s Andy Romano Beachfront Park Imagine City Commission Meeting June 1 st, 2011 Presented by Who are we? Daytona Regional CHAMBER OF COMMERCE 2010 Small Business Of the Year Presented To Zev

More information

Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ.

Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 55 Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 56 Individual Site Descriptions: Northern Ocean County recovered its beaches approaching pre-hurricane Sandy elevation or width,

More information

Plainfield Gateway. Plainfield Context

Plainfield Gateway. Plainfield Context Plainfield Gateway The western arm of The Campus, much like the Thomas Street Placita eastern arm, must connect residents and workers from the western side of the neighborhood to The Campus and the activity

More information

February 11, 2016 TPO Board Presentation

February 11, 2016 TPO Board Presentation February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)

More information

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and

More information

Marina Bay Trail Community Meeting #1

Marina Bay Trail Community Meeting #1 Marina Bay Trail Community Meeting #1 AGENDA 1. Introductions: Meghan Tiernan, DPW Cristina Olea, DPW Jerry Robbins, SFMTA 2. Meeting Purpose:. 4. 5. 6. To introduce the project to the community and gather

More information

New Jersey Saltwater Fishing Beach Access compliments of New Jersey Beach Buggy Association

New Jersey Saltwater Fishing Beach Access compliments of New Jersey Beach Buggy Association New Jersey Saltwater Fishing Beach Access compliments of New Jersey Beach Buggy Association GATEWAY SANDY HOOK: Dates of operation: The season runs from Memorial Day to Labor Day, and the times are from

More information

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY DELAWARE S VULNERABLE COASTAL AREAS and the DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY Kimberly K. McKenna, PG Delaware Dept. of Natural Resources & Environmental Control Division of Watershed

More information

Falls Lake Trail (A part of the NC Mountains-to-Sea Trail) East to West

Falls Lake Trail (A part of the NC Mountains-to-Sea Trail) East to West Falls Lake Trail (A part of the NC Mountains-to-Sea Trail) East to West Section 1 (Falls of the Neuse Rd to Raven Ridge Rd) 0.0 mi Parking area of the Tailrace Fishing Area, just below the dam, off Falls

More information

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA DATE: MONDAY, 5/22/2017 TIME: 6:00 8:00 P.M. LOCATION: CITY HALL, CONFERENCE ROOM #107 Call to Order/Approval of

More information

11TH & VERMONT SPRC MEETING 4 1/25/ th & North Vermont. Ballston, VA R2L:ARCHITECTS 1 PROJECT TEAM

11TH & VERMONT SPRC MEETING 4 1/25/ th & North Vermont. Ballston, VA R2L:ARCHITECTS 1 PROJECT TEAM PROJECT TEAM DEVELOPER/OWNER NVR Inc. 11700 Plaza America Drive Suite 500 Reston, VA. 20190 T: 703-956-4775 Contact: John Halak Jay Johnson ATTORNEY Mcguire Woods, LLP 1750 Tysons Boulevard 18th Floor

More information

Shoalwater Bay Shorline Erosion Dredging

Shoalwater Bay Shorline Erosion Dredging Shoalwater Bay Shorline Erosion Dredging ROSS ISLAND SAND & GRAVEL CO. Saving the Tokeland Penninsula Willapa Bay & Tokeland Penninsula Southwestern Washington Coast Shoalwater Bay Historic View Settlements

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

Pine Point Study Committee. Report and Recommendations to Scarborough Town Council. December 10, 2009

Pine Point Study Committee. Report and Recommendations to Scarborough Town Council. December 10, 2009 The Delphi Group, Inc Results through Alignment: Linking Direction, Capability & Commitment Pine Point Study Committee Report and Recommendations to Scarborough Town Council December 10, 2009 Committee

More information

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY

TO: FROM: SUBJECT: RECOMMENDATION REPORT SUMMARY BOARD AUTHORITY February 8, 2018 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Douglas Park Playground Replacement - Construction Contract RECOMMENDATION

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

MEMORANDUM. Existing Operations. City of Clearwater. Michael Herrman. Date: January 26, Seminole Boat Launch Overview. M&N Job No.

MEMORANDUM. Existing Operations. City of Clearwater. Michael Herrman. Date: January 26, Seminole Boat Launch Overview. M&N Job No. 1509 W. Swann Avenue, Suite 225 Tampa, FL 33606 (813) 258-8818 Fax (813) 258-8525 www.moffattnichol.com MEMORANDUM To: From: City of Clearwater Michael Herrman Date: Subject: Seminole Boat Launch Overview

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

AUTHORIZE BID ADVERTISEMENT

AUTHORIZE BID ADVERTISEMENT STAFF REPORT MEETING DATE: May 17, 2016 TO: City Council FROM: Petr Skala, Assistant Engineer PRESENTER: Russell Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

Community Redevelopment Agency Regular Meeting July 12, 2016

Community Redevelopment Agency Regular Meeting July 12, 2016 Community Redevelopment Agency Regular Meeting July 12, 2016 The Community Redevelopment Agency (CRA) of the City of Titusville, Florida met in regular session in the Council Chamber of City Hall, 555

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

STREETSCAPE CONCEPT PLAN

STREETSCAPE CONCEPT PLAN 03 STREETSCAPE CONCEPT PLAN Zone 1 This zone includes the gateway into both the downtown and the Village at Harlem. The gateway features are shown closer to the Harlem intersection to make them more prominent.

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017

Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017 to be updated to reflect base bid condition Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017 Previous Site Plan POTENTIAL PARK CONNECTION & MID-BLOCK CROSSING BOAT STREET

More information

Assateague Island National Seashore North End Restoration Project Timeline

Assateague Island National Seashore North End Restoration Project Timeline Assateague Island National Seashore North End Restoration Project Timeline Date Event Some information provided in the Project Introduction document. Detailed events are available in a timeline compiled

More information

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010 CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE

More information

San Francisco Bay Area Water Trail Site Description for. Cuttings Wharf

San Francisco Bay Area Water Trail Site Description for. Cuttings Wharf 1 San Francisco Bay Area Water Trail Site Description for Cuttings Wharf Location, Ownership, and Management: Cuttings Wharf is a public boat launch on the Napa River, located at 1230 Cuttings Wharf Road

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but

More information

Active Transportation Rail to River Corridor. Community Meeting - Segment A

Active Transportation Rail to River Corridor. Community Meeting - Segment A Active Transportation Rail to River Corridor Community Meeting - Segment A June 29, 2017 Tonight s Agenda > Open House (30 min) > Welcome / Project Overview > Presentation of 30% Design Refinements > Next

More information

I-290 Phase I Study Village of Forest Park November 9, of 25

I-290 Phase I Study Village of Forest Park November 9, of 25 I-290 Phase I Study Village of Forest Park November 9, 2015 1 of 25 I-290 Study Area Reconstruction Section (9 miles) Re-striping Section (4 miles) 13 miles West of Mannheim Road to Racine Avenue Connects

More information

Modeling Beach Erosion

Modeling Beach Erosion Ocean Lecture & Educator s Night May 16, 2012 Modeling Beach Erosion Below is an overview of the activity Modeling Beach Erosion (New Jersey Sea Grant Consortium, Education Program) to incorporate information

More information

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY Tarpey Elementary School, Clovis, CA October 15, 2014 6:30pm-8:30pm OVERVIEW On Wednesday, October 15, 2014, staff from the City of Clovis

More information

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access The replacement of the George Washington Bridge suspender ropes is part of the

More information

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. Parking On street parking Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. At-grade parking lot Parking garages SITE Parking 90 degree (20 x 9 stalls)

More information

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero. RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements Date: October 1, 2013 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements RECOMMENDATION A. THAT the Board approve the new bike paths

More information

Community Advisory Committee (CAC) Workshop #6

Community Advisory Committee (CAC) Workshop #6 Community Advisory Committee (CAC) Workshop #6 MEETING SUMMARY HELD Tuesday, September 9, 2014 6:30 8:30 PM Nokomis Community Center 2401 E. Minnehaha Pkwy Minneapolis, MN 55417 Meeting Purpose: Discuss

More information

APRIL 1, 2015 APWA CONFERENCE. TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer

APRIL 1, 2015 APWA CONFERENCE. TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer DIANE WIATR Active Transportation Coordinator/Senior Planner City of Tacoma APRIL 1, 2015 APWA CONFERENCE TIM HANSEN, PE Chief Operating Officer AHBL, Inc. Project Designer MATT PAVOLKA Project Manager

More information

Point Defiance Park. Master Plan

Point Defiance Park. Master Plan Point Defiance Park Master Plan Public Participation 1/29, 2/26, 3/26 & 4/23 Owen Beach Ferry Zoo Fort Nisqually Mildred Street Pearl Street Triangle Hare & Hare Master Plan - 1911 2008 Concept Plan Comments

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. Community Plan Skiatook Community Overview Skiatook Skiatook is a growing city located approximately 14 miles north of downtown Tulsa with its main street, W.C. Rogers

More information

STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE

STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/ SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE January 12, 2016 Welcome and Introductions Meeting Goals I 80/SR

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING TRANSPORTATION FOR ALL AGES, ABILITIES & MEANS CHANGING PATTERNS: TRENDING TO WALKING, BIKING, TRANSIT San Francisco s Change in Number of Commuters by Mode

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Existing Transportation System

Existing Transportation System < Open for Additional Text Transportation System Existing Transportation System This section describes vehicular transportation associated with Children s. transportation are described in a separate section

More information

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 154 Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 ATLANTIC COUNTY SPRING 2009 to FALL 2010 The Atlantic County coastline consists of three barrier islands. Between Little

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Site 1180_042 Kekaulike Mall. Bikeshare Hawaii. Location: ewa side of Kekaulike Mall makai of Hotel Street. Power Source: solar

Site 1180_042 Kekaulike Mall. Bikeshare Hawaii. Location: ewa side of Kekaulike Mall makai of Hotel Street. Power Source: solar Station located on the ewa side of Kekaulike Mall makai of Hotel Street 24 18 wide clear space remains for pedestrians and maintenance/emergency vehicles 40 Location: ewa side of Kekaulike Mall makai of

More information