CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT
|
|
- Emery Gavin Lawrence
- 5 years ago
- Views:
Transcription
1 CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 10, 2018
2 CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Contractor Notice to Proceed Estimated Completion Current Contract Amount Earned to % Complete Status Countywide Traffic Signal Upgrade and Timing Project; PI Traffic signal upgrades at 37 intersections - GDOT funded GTG Traffic Signals, Inc. 1/17/2018 7/15/2018 $ 517, $ 500, % Project is complete. Contractor working on correction items. Countywide Traffic Signal Signing and Striping Upgrade Project Signing and Striping upgrades at 37 intersections - County funded $ 37% GTG Traffic Signals, Inc. 2/15/2018 5/15/2018 $ 239, , working on correction items and Project is complete. Contractor final billing. Bells Ferry Road at Ridge Road Intersection Improvement and Traffic Signal Installation Bartow Paving Company, Inc. 5/21/ /16/2018 $ 1,037, $ 901, % Project 95% complete. Signal in test period. Replacement Rectangular Rapid Flashing Beacon at Hopewell Baptist Church for pedestrian crosswalk ordered and waiting to be installed. Contractor working on correction items. Estimated completion end of December Batesville Road at Lower Birmingham Road Intersection Improvement Bartow Paving Company, Inc. 7/23/ /19/2018 $ 412, $ 80, % Utility relocation still underway. Storm pipe work completed. Due to the weather, the road widening has been delayed. Contractor to work on as weather allows. Sixes Road at Wellstar Way (Gresham Mill Parkway) Traffic Signal Installation GTG Traffic Signals, Inc. 8/6/ /3/2018 $ 154, $ 28, % Signal activated , currently in test period. Contractor to begin working on correction items and final billing. Page 2 of 8
3 CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Contractor Notice to Proceed Estimated Completion Current Contract Amount Earned to % Complete Status John Tate Road cul-desac Reconstruct Cul-de-sac Bobby Tucker Trucking, Inc. 6/11/2018 9/8/2018 $ 144, $ 111, % Change Order #2 install Trench Drain at beginning of cul-de-sac ordered and waiting to be installed. Contractor working on correction items and final billing Resurfacing Project Resurfacing 17.3 miles of roadways Bartow Paving Company, Inc. 5/29/ /24/2018 $ 3,535, $ 2,389, % Contractor has paved 65% of roads. Due to weather, projected completion of project by end of December East Cherokee Dr at Tripp Road Intersection Improvement and Traffic Signal Installation Bartow Paving Company, Inc. TBD TBD $ 689, $ - 0% Pre-Construction Meeting held on November 1, CCWSA relocation work in progress. SR 140 at Lower Burris Rd/Puckett Creek Rd Intersection Improvements & Traffic Signal Installation Bartow Paving Company, Inc. TBD TBD $ 2,714, $ - 0% Project includes installation of left-turn lanes and a traffic signal on SR 140 at Lower Burris Road and Puckett Creek Road. Bids received October 11, Brick Mill Road Reconstruction - SR 140 to Buford West Way In-house by Roads & Bridges 95% Waiting on 7 concrete driveway apron re-pours. Paving, shoulder building and striping complete. Permanent vegetation established. Recreation Lane Pave unpaved portion of a substandard County road In-house by Roads & Bridges 100% Project complete. Rosewood Circle Pave unpaved portion of a substandard County road In-house by Roads & Bridges 15% Utility conflicts resolved/relocated. Grading and reconstruction to take place in late winter/spring Garland Mountain Trail Pave unpaved portion of a substandard County road In-house by Roads & Bridges 90% Shoulder building in progress. Page 3 of 8
4 PRE-CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Consultant/Designer Earney Road Hames Road Roadway Reconstruction - Old Country Place to Capital City Club property Roadway Reconstruction - SR 92 to Jamerson Road; includes roundabout at S. Jett Road intersection Proposed Letting American Engineers, Inc. (AEI) Winter 2019 Atwell Group (LAI) TBD Design / Pre-Construction Status Updating utility plans, erosion control plans and quantities to prepare plans for bidding. Right-ofway acquisition is complete - verification of current owners still needed. Will need temporary construction easements from adjacent property owners; plans being updated with new right-of-way information. Consultant working on stipulation additions. Project design is approximately 90% complete and under review. Right-of-way and construction easements still to be acquired. Designer addressing latest comments from Engineering. R/W Parcels (closed/req'd) 29/43 0/52 Comments Project includes reconstruction of Earney Road from Old Country Place to Capital City Club Project includes reconstruction of Hames Road from SR 92 to Jamerson Road, including the installation of a roundabout at the intersection of Hames Road and S. Jett Road. Curb and gutter and sidewalk will be installed along the entire length of Hames Road. East Cherokee Dr at SR 140 (PI ) Intersection Improvements & Traffic Signal Modification AMEC, Inc. & Moreland-Altobelli Assoc, Inc. (MAAI) Fall 2019 Plans updated to meet current GDOT standards. GDOT approved ROW plans. Appraisal preparation and review in progress. Utility certification complete. All comments from GDOT FFPR have been addressed. Right-of-way acquisition is proceeding as appraisals are approved by GDOT. Designer and appraiser still working on some cost to cure issues for appraisals. 0/28 Project includes providing right-turn lanes on all quadrants of intersection. GDOT has committed to fund $1,000,000 of construction cost dependent upon approval of environmental document. NEPA document approved ; Utilities certified 4/2018. East Cherokee Drive at South Holly Springs Rd/Thornwood Dr. Intersection Improvements AECOM Winter 2019 Construction and right-of-way plans complete. Plans being updated to meet current GDOT and EPD ES&PC standards. Updated Traffic Signal Warrant Study completed - intersection still does not warrant a traffic signal installation. ACOE permit received on 10/16/2017. Right-of-way acquisition in progress. 3/16 Project includes providing left-turn lanes and deceleration lanes on East Cherokee Drive for both South Holly Springs Road and Thornwood Drive. SR 140 at Darnell Road Intersection Improvements BM&K Construction & Engineering, Inc. TBD Design is being reviewed by County. All utility companies have located their facilities that are in conflict. Plans submitted to GDOT for review. All comments have been addressed. GDOT permit is pending, the County needs to do a traffic count and submit to GDOT. 0/6 Project includes adding left-turn lane from westbound SR 140 to Darnell Road. Canton Road Sidewalk Project (PI ) Installation of sidewalk on west side of Canton Road from Cobb Co line to Stockwood Drive Moreland-Altobelli (MAAI) Spring 2019 Project revised to include 5 ft sidewalk vs 6 ft sidewalk to minimize utility relocations and right-ofway acquisitions. Revised concept report approved by GDOT on 12/21/2017. Parcel appraisals being updated to reflect recent plan changes. Appraisals approved by GDOT. Notice to proceed with right-of-way acquisition issued on 5/2/18. Anticipated bid date is 5/15/19. 6/14 Project is 80% federally funded, designed per GDOT PDP. Concept report has been approved. Page 4 of 8
5 PRE-CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Consultant/Designer Bells Ferry Road South of Steels Bridge Road Trickum Road at Wagon Trail/Trickum Hills Dr Bells Ferry Road - Southfork Way to Victoria Road (PI ) Proposed Letting Design / Pre-Construction Status R/W Parcels (closed/req'd) Comments Intersection Improvements - Improve sight distance on NB approach to Bells Ferry Rd/Steels Bridge Atwell Group (LAI) Construction and right-of-way plans complete. Project on hold. Plans will need updating. intersection Intersection Improvements Keck & Wood, Inc. Construction and right-of-way plans complete. Widening from 2 to 4 lanes VHB, Inc GDOT restarted design phase. Survey is complete. Logical termini approved by FHWA in May Public Information Open House held in April Consultant reviewing and responding to comments received at PIOH. 141 Project on hold. Plans will need updating. Project includes providing a center left turn lane for both side roads. GDOT design and construct. County to acquire right-of-way. Project limit revised to end at Victoria Road. GDOT is proposing to use HB 170 funds for construction. Bells Ferry Road over Little River/Lake Allatoona (PI ) Bridge Replacement Project VHB, Inc GDOT restarted design phase. Survey is complete. Updated concept report has been submitted to GDOT. Working with ACOE and marina owners regarding permitting needs and impacts to marina operations. Public Information Open House held in April Consultant reviewing and responding to comments received at PIOH. GDOT design and construct. County to acquire right-of-way. GDOT working to bid with Bells Ferry Road project. County will look at possibility of advanced acquisition of restaurant parcel. Bells Ferry Road at Kellogg Creek Road and Victory Drive Intersection Improvement - Design Southeastern Engineering, Inc. (SEI) 2019 Field surveys are complete. Public Information Open House held in April Plans update per new traffic count information and comments received at PIOH. Consultant is working on latest comments to last plan submittal Intersection improvement(s) to improve traffic flow at the Bells Ferry Road/Kellogg Creek Road/Victory Drive intersection(s). Project also includes improving horizontal alignment on Victory Drive in vicinity of Patriots Park. Current curve does not meet standards for posted speed limit. Towne Lake Area Multi-use Path Multi-use Trail - Design Moreland-Altobelli (MAAI) Spring 2019 Field surveys are complete. Designer working on concept layout. Designer completing Phase I - Towne Lake Hills South Dr to Towne Lake Hills East/West Dr. Consultant is working on comments provided in October, and starting utility coordination. Multi-use trail along Parkside Lane and Towne Lake Parkway, from Towne Lake Hills South Drive to Bells Ferry Road. Will be constructed in phases. Heard Road Extension Scoping Study VHB, Inc. Consultant has completed preliminary alignment and is working on details and cost estimate. Concept with new typical section and project phasing has been submitted to the County for review. Scoping study to determine project scope, schedule and budget. Determine path for potential roadway and right-of-way needs. Determine environmental permitting requirements and potential utility conflicts. Noonday Creek Trail Extension Scoping Study Heath & Lineback Engineers Cobb County has approved alignment to Noonday Park. Revised concept report submitted to GDOT on 12/15/2017. Federal funds have been awarded for design, right-of-way and construction phases. City of Woodstock to solicit RFP's for design services in Fall Scoping study to determine feasibility of extendin Noonday Creek Trail from SR 92 south to Shallowford Road/Noonday Park in Cobb County. County is the project manager - City of Woodstock is funding project. Little Road Widening and improvements - Hickory Road to Vaughn Road Moreland-Altobelli (MAAI) Spring 2019 Preliminary plan comments have been addressed. Plan revisions continue as a result of right-of-way negotiations. Right-of-way acquisition complete. Plans being revised to address right-of-way acquisitions. County to finish contract and bid documents for the culvert portion of project. Completed Plans originally designed in-house. An EPD stream buffer variance and an ACOE Nationwide permit for stream impacts have both been obtained in summer Page 5 of 8
6 PRE-CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Consultant/Designer Proposed Letting Design / Pre-Construction Status R/W Parcels (closed/req'd) Comments Union Hill Road - Bridge over Canton Creek Bridge replacement/upgrade project Heath & Lineback Engineers Spring % plans received in September Geotechnical work scheduled for October Consultant is working on comments to 30% plans submitted. Consultant is finalizing R/W plans. Project includes replacement of substandard bridge on Union Hill Road over Canton Creek. Union Hill Road - Bridge over Mill Creek Bridge replacement/upgrade project Heath & Lineback Engineers Fall 2019 Field surveying in progress. Geotechnical work scheduled for October Consultant investigating revision to the bridge location due to ROW issues. Consultant is developing detour plan for construction phasing. Project includes replacement of substandard bridge on Union Hill Road over Mill Creek. Lower Dowda Mill Road - Bridge over Sharp Mountain Creek Bridge replacement/upgrade project Heath & Lineback Engineers Spring 2019 Field surveying in progress. Geotechnical work scheduled for October Preliminary plans being developed for December 2018 Project includes replacement of substandard bridge (one lane - wood deck) on Lower Dowda Mill Road over Sharp Mountain Creek Wrights Mill Road Widen, improve and resurface a substandard width roadway BM&K Construction & Engineering, Inc. Designer is looking at improvements at both ends of the project - up to Wrights Mill Court from south and Wright Mill Way from north. Construction plans 95% complete. Designer working on completing right-ofway plans. Consultant is coordinating with utilities 0/12 Project includes improving vertical alignment and pavement widening of Wrights Mill Road to bring it up to current County standards. Hunter Trail/Hunter Road Widen, improve and resurface a substandard width roadway Southeastern Engineering, Inc. (SEI) Designer updating the final plans with utility comments and has submitted plans to County for review. Right-of-way acquisition authorized on 10/4/2018. Consultant investigating some R/W issues. 0/19 Project includes bringing Hunter Trail/Hunter Road up to current County standards. S. Cherokee Lane Improve a substandard County roadway BM&K Construction & Engineering, Inc. Construction plans have been submitted to the County for review. County has received new plans 11/30 with cost estimate. Project includes improving horizontal and vertical alignment on 3,000 feet of substandard roadway. Martin Lane Widen and pave a substandard width roadway In-house design In-house Right-of-way agent has visited all property owners. Approximately half support project and are willing to donate right-of-way. The other half are opposed to widening. Based upon results of right-of-way acquisitions, it is recommended that we pave this roadway as-is and achieve maximum pavement width within existing right-of-way. Kellogg Creek Road at Jacobs Road Toonigh Road Lower vertical curve at intersection with Jacobs Road Lower vertical curve at Deerfield Drive Southeastern Engineering, Inc. (SEI) In-house design In-house In-house Awaiting utility companies to locate and redesign their facilities on the latest construction plans. Rightof-way acquisition authorized on 10/1/2018. Plans are complete. Minimal right-of-way and easements required. 2/6 Project includes improving vertical geometry on Kellogg Creek Road to improve visibility at Jacobs Road intersection and approach to 90 degree curve. This improvement will improve sight distance at approach to Blalock Road. Page 6 of 8
7 PRE-CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Consultant/Designer Trickum Road - Sycamore Lane to Belles Lane Trickum Road - Gunnin Road to Barnes Road Univeter Road at Pinecrest Road Univeter Road at New Light Road Woodstock Road at Victory Drive Wiley Bridge Road at Cox Road Proposed Letting Design / Pre-Construction Status Installation of a center left-turn lane Arcadis Fall 2019 Project kick-off meeting held 10/31/18 Installation of left-turn lanes Arcadis Intersection Improvement Intersection Improvement and Traffic Signal Installation MaesAwyr, LLC Project kick-off meeting held 10/31/18. Project will be developed in phases. Project kick-off meeting held 11/1/18. Concept to be developed to determine project limits. Southeastern Engineering, Inc. (SEI) Project kick-off meeting held on 11/8/18. Roundabout Southeastern Engineering, Inc. (SEI) Project kick-off meeting held on 11/8/18. Roundabout Southeastern Engineering, Inc. (SEI) Project kick-off meeting held on 11/8/18. R/W Parcels (closed/req'd) Comments Roadway improvements include installation of a center left-turn lane for entire length and installation of sidewalk along the west side of the corridor. Consultant will evaluate the corridor and make a recommendation as to the best solutions and configurations for a proposed typical section - including left-turn lanes, operational improvements and sidewalk. Project includes intersection realignment and installation of a left-turn lane on Univeter Road at Pinecrest Road. Project includes intersection realignment and installation of a left-turn lane on Univeter Road at New Light Road and the installation of a traffic signal. Intersection improvements that include the installation of a roundabout. Intersection improvements that include the installation of a roundabout. Copper Creek Drive Sidewalk Installation of sidewalk on the east side of Copper Creek Drive Keck & Wood, Inc. Spring 2019 Project kick-off meeting held 10/30/18. Survey to begin late November This project includes the construction of sidewalk along the east side of Copper Creek Drive, between Sixes Road and Garnet Court. Trickum Road at SR 92 Intersection Improvement Project Southeastern Engineering, Inc. (SEI) Kickoff meeting scheduled for 12/19/2018. Working with the consultant and GDOT to establish schedule. Intersection improvements project to include dualleft-turn lanes and receiving lanes on northbound and southbound Trickum Road approaches to SR 92. Also includes reconfiguration of Trickum Road at Gunnin Road intersection. 575 at Towne Lake Parkway Interchange Operational Improvements (PI ) Scoping Study Moreland-Altobelli (MAAI) Kickoff meeting held 11/26/18. Working with the consultant and GDOT to establish schedule. Scoping study to determine project scope, schedule and budget to program possible State funds and future SPLOST funds. 575 at Ridgewalk Parkway Interchange Operational Improvements (PI ) Scoping Study Moreland-Altobelli (MAAI) Kickoff meeting held 11/26/18. Working with the consultant and GDOT to establish schedule. Scoping study to determine project scope, schedule and budget to program possible State funds and future SPLOST funds. Shoal Creek Road Culvert replacement TBD In-house RFP prepared and sent to consultants Gaddis Road Drainage improvements TBD In-house RFP prepared and sent to consultants Replacement of existing failing culverts. Roadway will be shifted and geometry improved. Project to be constructed in 2 phases Installation of curb & gutter and sidewalk to improve roadside drainage Page 7 of 8
8 PRE-CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Consultant/Designer Proposed Letting Design / Pre-Construction Status R/W Parcels (closed/req'd) Comments Rhine Road Right-of-way Research In-house Engineering. In-house Complete. Roper Road Right-of-way Research In-house Engineering. In-house Complete. McCurley Road Right-of-way Research In-house Engineering. In-house Complete. Collett Drive Right-of-way Research In-house Engineering. In-house Complete. Old Jones Road Right-of-way Research In-house Engineering. In-house In-progress. Brown Road Right-of-way Research In-house Engineering. In-house In-progress. Rampley Trail Right-of-way Research In-house Engineering. In-house Complete. Gannt Road Right-of-way Research In-house Engineering. In-house In-progress. Lula Payne Trail Right-of-way Research In-house Engineering. In-house Complete. Westbrook Road Right-of-way Research In-house Engineering. In-house Complete. Page 8 of 8
9 BELLS FERRY ROAD AT RIDGE ROAD INTERSECTION IMPROVEMENT
10 BATESVILLE ROAD AT LOWER BIRMINGHAM ROAD INTERSECTION
11 SIXES ROAD AT WELLSTAR WAY (GRESHAM MILL PKWY) SIGNAL PROJECT
12 BRICK MILL ROAD RECONSTRUCTION
13 GARLAND MOUNTAIN TRAIL RECONSTRUCTION
CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT
CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT October 1, 2018 CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Contractor East Cherokee Dr at Old Hwy 5 Notice to
More informationCHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT
CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 29, 2017 CONSTRUCTION STATUS MONTHLY REPORT 12/2017 Project Description Contractor Notice to Proceed Estimated Completion
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationRoute 47 (North Main Street) Reconstruction
TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationNorthwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationSC 41/Joe Rouse Intersection Improvements
SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost
More informationDRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners
DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationPROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT
PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationCrosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013
Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans Presentation to Sanibel City Council July 16, 2013 Outline Crosswalk Policy Revisions Minimum Standards Goals and Objectives Pedestrian
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationProject Update May 2018
Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202
More informationMandan Commission Meeting August 2, 2016 Mandan City Hall
Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationTable 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line
Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationFleur Drive Reconstruction
Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationPublic Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018
Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationAPPENDIX E GRADE CROSSING LOCATIONS
APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing
More informationMeeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County
Meeting Notes PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County Attendees: Date/Time: Location: See attached sign in sheet October 25, 2017; 6:00
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationKalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission
FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort
More informationAtwood Avenue Fair Oaks Avenue Cottage Grove Road
Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationTOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019
TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior
More informationMILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO
MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationDowntown Redevelopment Project Update
Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 8-1-18
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationJoshua Jester, E.I., Florida Department of Transportation, District One
MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington
More informationRoadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004
Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationPine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session
Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationGiles Run Connector Road
Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More information4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project
City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationRevisions to Larimer County Urban Area Street Standards (2016 Update)
1.9.2 B 1-18 Street Construction Policy 1.14 (new) 1-29 Complete Streets in Fort Collins 4.1.1 04-01 General 4.1.3 04-01 Capacity and Safety Issues 4.1.3 B 04-02 Pedestrian Traffic Considerations 4.1.4
More informationState Street and Pierce Park Lane Intersection Concept Report
State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September
More informationGWINNETT COUNTY DEPARTMENT OF TRANSPORTATION
GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION 1 of 7 June 20, 2007 GENERAL: The following guidelines shall be used in the determination of the requirement for left turn lanes for development projects and
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationBPP / SUB
Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationMark Malone, P.E. SD DOT
Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More information11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT
11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will
More informationWashington St. Corridor Study
FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project
More informationAPPENDIX L. Design Criteria
APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationDESIGN PUBLIC HEARING SEPTEMBER 26, 2017 PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED
DESIGN PUBLIC HEARING SEPTEMBER 26, 2017 AT PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED KING S HIGHWAY IMPROVEMENTS PROJECT Project No. 606709 Roadway/Bridge Project Management
More informationODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.
1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationRED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,
RED BANK CORRIDOR Community Partners Committee Meeting Madisonville Recreation Center May 21, 2013 RED BANK CORRIDOR PROJECT Create a balance of mobility and access to better serve local communities, businesses
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City
More informationHighway 56 Traffic Study Rymal Road to Cemetery Road
January 31, 2018 6:00 pm 8:00 pm Highway 56 Traffic Study Rymal Road to Cemetery Road City of Hamilton Public Meeting 2 2 Purpose of Public Meeting To review and obtain public input and comments on the
More information