Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008
|
|
- Johnathan Marshall
- 5 years ago
- Views:
Transcription
1 - Committee of the Whole January 30, 2008 Improving mobility Easing congestion Strengthening our communities
2 Today s Agenda Bridges 2 or 3-car trains/platforms Reconstruction of right-ofway Traffic signals and pedestrian crossings Design Criteria 1/30/08 CoW 2
3 Bridges 1/30/08 CoW 3
4 Minnesota Commercial Rail Road Bridge 1/30/08 CoW 4
5 Bridges in St. Paul Cedar St. bridge over I-94 University Ave. bridge over 280 1/30/08 CoW 5
6 2 or 3-car Trains and Platforms 1/30/08 CoW 6
7 2 or 3-Car Trains and Platforms 2-car train capacity Peak hour passenger demand Capacity is adequate in car platforms adequate in short-term Need 3-car platforms in longterm 1/30/08 CoW 7
8 Peak Hour Passenger Demand Eastbound -- Year 2014 Central Corridor Peak Hour Passenger Demand Eastbound -- Year /30/08 CoW 8 Multimodal Terminal Warehose District Nicollet Mall Government Plaza DTE Metrodome West Bank East Bank Stadium Village 29th Avenue Westgate Drive Raymond Avenue Fairview Avenue Snelling Avenue Lexington Parkway Dale Street Rice Street Capitol East 10th Avenue 6th Avenue 4th Street St. Paul Union Depot Station (Percentages are portion of total daily ridership occuring in the peak hour) Hiawatha LRT PM Peak Hour 2007 Actual (10.6%) Central Corridor LRT AM Peak Hour Model (13.1%) Central Corridor Route 16/50 Bus Actual (7.9%) Capacity (1,795) Peak Hour Loads
9 Peak Hour Passenger Demand Westbound -- Year 2014 Central Corridor Peak Hour Passenger Demand Westbound -- Year /30/08 CoW 9 St. Paul Union Depot 4th Street 6th Avenue 10th Avenue Capitol East Rice Street Dale Street Lexington Parkway Snelling Avenue Fairview Avenue Raymond Avenue Westgate Drive 29th Avenue Stadium Village East Bank West Bank DTE Metrodome Government Plaza Nicollet Mall Warehose District Multimodal Terminal Station (Percentages are portion of total daily ridership occuring in the peak hour) Hiawatha LRT PM Peak Hour 2007 Actual (10.6%) Central Corridor LRT AM Peak Hour Model (13.1%) Central Corridor Route 16/50 Bus Actual (7.9%) Capacity (1,795) Peak Hour Loads
10 Peak Hour Passenger Demand Eastbound -- Year 2030 Central Corridor Peak Hour Passenger Demand Eastbound -- Year /30/08 CoW 10 Multimodal Terminal Warehose District Nicollet Mall Government Plaza DTE Metrodome West Bank East Bank Stadium Village 29th Avenue Westgate Drive Raymond Avenue Fairview Avenue Snelling Avenue Lexington Parkway Dale Street Rice Street Capitol East 10th Avenue 6th Avenue 4th Street St. Paul Union Depot Station Hiawatha LRT PM Peak Hour 2007 Actual (10.6%) Central Corridor LRT AM Peak Hour Model (13.1%) Central Corridor Route 16/50 Bus Actual (7.9%) Capacity (1,795) (Percentages are portion of total daily ridership occuring in the peak hour) Peak Hour Loads
11 Peak Hour Passenger Demand Westbound -- Year 2030 Central Corridor Peak Hour Passenger Demand Westbound -- Year /30/08 CoW 11 St. Paul Union Depot 4th Street 6th Avenue 10th Avenue Capitol East Rice Street Dale Street Lexington Parkway Snelling Avenue Fairview Avenue Raymond Avenue Westgate Drive 29th Avenue Stadium Village East Bank West Bank DTE Metrodome Government Plaza Nicollet Mall Warehose District Multimodal Terminal Station Hiawatha LRT PM Peak Hour 2007 Actual (10.6%) Central Corridor LRT AM Peak Hour Model (13.1%) Central Corridor Route 16/50 Bus Actual (7.9%) Capacity (1,795) (Percentages are portion of total daily ridership occuring in the peak hour) Peak Hour Loads
12 University Ave. Reconstruction, Traffic Signals and Pedestrian Crossings 1/30/08 CoW 12
13 University Ave. Reconstruction DEIS Assumed full reconstruction including street, curb and sidewalk Preliminary Engineering findings Roadway condition Amount of impacted curb/sidewalk Utility relocations Storm water issues 13
14 University Ave. Reconstruction 1/30/08 CoW 14
15 University Ave. Reconstruction Mill & overlay vs. full reconstruction Savings $24-27 Million Reduces construction time and impacts Curb & sidewalk replacement Local cost share 1/30/08 CoW 15
16 University Ave. Central Corridor Reconstruction Next Steps Continued soil borings Utility impacts Review section from 29 th Ave. to city limits (Mpls. Section) 1/30/08 CoW 16
17 Traffic Signals on University 1/30/08 CoW 17
18 Traffic Signals on University 1/30/08 CoW 18
19 Traffic Signals on University Left turns Protected phasing (green arrow) U turns Cross street signal phasing Pedestrian accommodations Accessible pedestrian signals 1/30/08 CoW 19
20 Traffic Signals on University Priority vs. Pre-Emption Hiawatha operation Signal priority for LRT Cross street impacts 1/30/08 CoW 20
21 Traffic Signals on University Next Steps VISSIM traffic modeling Cross streets LRT travel time Hardware and software specifications Continue evaluation in downtown Mpls. and downtown St. Paul 1/30/08 CoW 21
22 University Avenue Pedestrian Crossings Signalized Crossings ¼ Mile Spacing Walk/Don t Walk Pedestrian Activation 1/30/08 CoW 22
23 University Avenue Pedestrian Crossings Unsignalized Crossings 1/8 mile spacing Street crossing vs. track crossing Active warning devices Impacts to on-street parking 1/30/08 CoW 23
24 University Avenue Pedestrian Crossings Possible Spacing 1/30/08 CoW 24
25 University Avenue Pedestrian Crossings Possible Designs 1/30/08 CoW 25
26 Design Criteria 1/30/08 CoW 26
27 Design Criteria Update to current codes, laws and regulations Increase emphasis on local standards Standardize stations 1/30/08 CoW 27
28 Design Criteria Increase emphasis on providing safe and consistent access and crossing opportunities Comply with Homeland Security guidelines Add inter-operability features for safety at Hiawatha and Central Corridor connection 1/30/08 CoW 28
29 More Information Check out our website: Contact Central Corridor Project Office: 540 Fairview Avenue North St. Paul, MN Phone: /30/08 CoW 29
WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationPublic Event 1 Community Workshops
Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More information122 Avenue: 107 Street to Fort Road
: 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed
More informationPurpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system
Purpose + Need I-29 NW Barry Road 64/68/72 MAIN STREET Connect: < Strengthen the spine of our regional transportation system Leavenworth Road Parallel Parkway State Avenue 18th Street Expressway Shawnee
More informationMain-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation
Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional
More informationSnelling Bus Rapid Transit June 17, 2013 Technical Advisory Committee Meeting #2 & VISSIM Traffic / TSP Evaluation Wrap-Up
Snelling Bus Rapid Transit June 17, 2013 Technical Advisory Committee Meeting #2 & VISSIM Traffic / TSP Evaluation Wrap-Up 1 Today s meeting Introductions VISSIM Traffic Modeling / TSP Evaluation SRF Design
More informationNorfolk Tide LRT System Weaving Transit in Downtown Norfolk
Rail-Volution 2010 Weaving Transit into Existing Communities Norfolk Tide LRT System Weaving Transit in Downtown Norfolk Dan Meyers, AICP URS, Planning Manager Minneapolis, Minnesota Norfolk Tide LRT Alignment
More informationFrom Disarray to Complete Street:
From Disarray to Complete Street: Utilizing BRT to improve bus service, pedestrian safety, and traffic organization in the South Bronx BRT, TOD and Complete Streets TRB BRT Conference June 19, 2018 We
More informationC Line Rapid Bus Preliminary Station Design
C Line Rapid Bus Preliminary Station Design C Terrence Anderson, Community Outreach Coordinator Shawn Walding, Senior Engineer Metro Transit TAAC February 1, 2016 1 C Line project overview Substantially
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationGeometric and Trafc Conditions Summary
2 Geometric and Trafc Conditions Summary m, RETHNKNG -94 APPENDX T2 GEOMETRC AND TRAFFC CONDTONS SUMMARY ntroduction This memorandum summarizes the geometric and traffic conditions within the Rethinking
More informationDowntown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services
Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationCOMMUNITY WORKSHOP (CW) 3 February 21, 2015
QEW Improvements QEW Improvements COMMUNITY WORKSHOP (CW) 3 February 21, 2015 1 WORKSHOP PURPOSE MOVING FORWARD Review of Technically Preferred alternative Seeking feed back for progressing to next design
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationBaseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive
Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive Planning and Environmental Assessment Study Consultation Group Meetings May 2014 Presentation Agenda Study Overview Study Progress
More informationFeasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017
Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More informationTunnel Reconstruction Brooklyn CB 1 August 14, 2018
Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service
More informationMetropolitan Council Transportation Committee
Nicollet-Central Transit Alternatives Metropolitan Council Transportation Committee August 2013 Project Purpose (approved by Policy Advisory Committee 10/25/2012) The purpose is to improve transit connectivity,
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationTopics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps
Topics To Be Covered Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps Tier 2 Council Direction Dismiss Bus Rapid Transit along the Union Pacific Railroad Dismiss Bus Rapid
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationADVANCED TRANSIT OPERATIONS AND MODELING
SOUTHERN DISTRICT OF INSTITUTE OF TRANSPORTATION ENGINEERS (SDITE) 2017 ADVANCED TRANSIT OPERATIONS AND MODELING SURESH KARRE, PE, PTOE ROBERT DUBNICKA, PE, TE, PTOE AGENDA Background Transit operations
More informationPreliminary Transportation Analysis
Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More informationWater Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &
Public Information Meeting No. 2 Water Street Promenade Maplewood Avenue & Engineering and Design Services Adjacent Areas July 16,2014Portsmouth, NH May 10, 2016 Education / Infrastructure / Innovation
More informationthe Story of the 30s & 70s Bus Lines James Hamre - WMATA
Evaluation of a Service Restructuring: the Story of the 30s & 70s Bus Lines James Hamre - WMATA Metrorail is the second largest rail transit system in the nation 230 million annual riders 780,000 weekday
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationMumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites
Welcome Replacement Opportunities Neighbourhood Open House. AGENDA PURPOSE 1. REVIEW the information boards 2. DISCUSS aspects of the project with the project team 3. SHARE your thoughts on replacement
More informationThank you for attending
Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather
More informationPOLICY ADVISORY COMMITTEE
September 27, 2018 POLICY ADVISORY COMMITTEE ENVIRONMENTAL ANALYSIS PHASE Agenda 1. Welcome and introductions. 2. Overview of project activities and process. 3. Public engagement update. 4. Community Advisory
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationSimulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer
Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Abstract The Exposition Corridor transit project is a light rail project
More informationWISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017
WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND
More information95 th Street Corridor Transportation Plan. Steering Committee Meeting
95 th Street Corridor Transportation Plan Steering Committee Meeting August 11, 2014 PROJECT OBJECTIVES Develop a Transportation and Economic Plan for the 95 th Street Corridor Improve public transit efficiency
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationMASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018
MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 AGENDA Introductions Project Benefits Progress to Date Schedule for Remaining Work Phase 3 Activities, Impacts & Traffic Detours Phase 4 Activities
More informationCSAH 101 Preliminary Design
CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,
More informationColchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016
Colchester/Riverside/Barrett/ Mill Intersection Study PAC Meeting #3 September 22, 2016 Tonight s Agenda Review Project Purpose and Need Describe short term and long improvements and changes since public
More informationRequest for Authorization to Open Public Comment Period
Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New
More informationTunnel Reconstruction South 5 th Street Association October 16, 2018
Tunnel Reconstruction South 5 th Street Association October 16, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of
More informationTABLE OF CONTENTS FIGURES TABLES. Executive Summary Report: BLUE LINE
TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Blue Line Project Goals... 1 1.2 Corridor Travel Demand... 2 1.2.1 Market Analysis... 2 1.2.2 Existing Transit Operations... 2 2.0 RECOMMENDED ALTERNATIVE...
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationState Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities
State Street Transit and Traffic Operational Plan June 2011 FLOATING FEATHER RD $+ «16 PALMER LN Intersection Expansions SH 16 Extension Roadway Improvements èé Signalized Intersection $+ Intersection
More informationStation Plan: Penn & 43rd Avenue
Station Plan: Penn & 43rd Avenue This station will serve the northern portion of the Penn Avenue corridor, including the commercial node at 44th Avenue. Ridership and roadway geometry support station siting
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationAPWA. Presenters. Joseph Shaffer, P.E. Director of Engineering for GCRTA Project Manager of ECTP
Cutting Through the Heart of Cleveland Constructing the Euclid Corridor HealthLine APWA Presenters Joseph Shaffer, P.E. Director of Engineering for GCRTA Project Manager of ECTP Bonnie Teeuwen, P.E. District
More informationWEST SEVENTH COMMUNITY INFORMATION SESSION
WEST SEVENTH COMMUNITY INFORMATION SESSION State Representative Dave Pinto Councilmember Chris Tolbert RAMSEY COUNTY REGIONAL RAIL AUTHORITY RIVERVIEW CORRIDOR Presented by Michael Rogers Work In Progress;
More informationInterim Transit Ridership Forecast Results Technical Memorandum
Interim Transit Ridership 401 South Jackson Street Seattle, WA 98104-2826 September 2012 Table of Contents 1 INTRODUCTION... 1-1 1.1 Project Background... 1-1 2 RIDERSHIP FORECASTS... 2-1 2.1 System Ridership
More informationBrian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project
MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October
More informationNew Park Avenue Corridor West Hartford
New Park Avenue Corridor West Hartford Current TOD Investment in the Corridor Mixed-use building currently under development by the Trout Brook Realty Advisors: a separate non-profit corporation, established
More informationM Street SW-Southeast Federal Center
Section 1 M Street SW-Southeast Federal Center 1 2 M Street SW M Street SW and the Southeast Federal Center, located in Southeast and Southwest Washington, DC, comprise an activity center area that is
More informationVictoria Transit Priority Corridor Plan
Options Evaluation Report This report is prepared for the sole use of BC Transit. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd.
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More informationChapter 9: Pedestrians and Bicyclists
Chapter 9: Pedestrians and Bicyclists Walking and bicycling are essential modes of transportation. These modes allow people to travel without contributing to congestion and air pollution, to access other
More informationSTONY PLAIN ROAD STREETSCAPE
Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where
More informationArterial Transitway Corridors Study. Ave
Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationI-20 East Transit Initiative
I-20 East Transit Initiative Public Meetings Tuesday, October 26 DeKalb Medical Center Hillandale Community Room 2801 DeKalb Medical Parkway Lithonia, GA 30058 6:00pm 8:00pm Wednesday, October 27 East
More informationMPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017
MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business
More informationProvidence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016
Providence Downtown Transit Connector STAKEHOLDER MEETING #2 Stakeholder Meeting #1 October 24, 2016 February 2017 1 AGENDA 1 DTC Goals and Expectations 2 Street Design Concepts 3 Potential Benefits and
More informationStaunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed for the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationDRAFT INVESTMENT CORRIDORS
DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR
More informationNORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will
More informationDecision on North Waterloo Routing
Next Steps Decision on North Waterloo Routing Two route variations remain in north Waterloo. The final preferred route will include only one of the two variations. Please consider these two variations
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationPrinceton Avenue and Spruce Street Transportation and Site Access Enhancements Project
Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationI-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.
RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290
More information5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION
5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs
More informationRoute 79/Davol Street Corridor Study
Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process
More informationFleur Drive Reconstruction
Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths
More informationCalgary Transit Route 302 Southeast BRT Year One Review June
Calgary Transit Route 302 Southeast BRT Year One Review 2011 June Calgary Transit Route 302 Southeast BRT: Year One Review 2011 April Table of Contents 1.0 Executive Summary... 1 2.0 Introduction... 3
More informationRapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion
RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products
More informationDRAFT. Memo. Range of the Alternatives Considered in the EIS
Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationDRAFT BUENA VISTA 2020 TRANSPORTATION PLAN
DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL
More informationAppendix B Workshop Materials
Appendix B Workshop Materials Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure
More informationQueensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011
: Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses
More informationPractical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors
Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors Presented by Gilmer D. Gaston, P.E., PTOE October 14, 2014 San Antonio Austin Houston Fort Worth Dallas When
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationCherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary
Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary I. LEAD-IN TO SMALL GROUP DISCUSSION, POLLING AND STEERING COMMITTEE/TECHNICAL TASK FORCE DISCUSSION The meeting began
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,
More informationIowa Highway 58 Corridor Improvement Study
1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project
More informationDIVISION TRANSIT PROJECT COMMUNITY ADVISORY COMMITTEE MEETING
DIVISION TRANSIT PROJECT COMMUNITY ADVISORY COMMITTEE MEETING CAC MEMBERS PRESENT Thursday June 15, 6:00 p.m. - 8:00 p.m. Gresham City Hall, 1333 NW Eastman Parkway, Gresham, OR 97030 Chabre Vickers, Portland
More informationBETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY
DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR
More informationCommunity Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007
Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines
More informationExecutive Summary. September 3, 2014
D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,
More informationDowntown Redevelopment Project Update
Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 8-1-18
More informationBENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016
BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash
More informationI-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM
I-20 East Transit Initiative Stakeholder Advisory Committee Meeting September 9, 2010 4:00-6:00 PM Meeting Agenda Introductions Project Background Study Overview Role of the SAC Initial Study Findings
More informationA Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study
A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study Chirantan Kansara, P.E. Engineering Construction Design Planning 2018 ITE Northeastern District Annual Meeting Lake George,
More information