Shepparton North-East Growth Corridor Development
|
|
- Marion Phelps
- 5 years ago
- Views:
Transcription
1 Sheppartn Nrth-East Grwth Crridr Develpment Traffic Impact Assessment Reprt Client: Greater Sheppartn City Cuncil Prject 3040 Final Reprt: 22/08/204 st Flr 32 Upper Heidelberg Rad Ivanhe Vic 309 PO Bx 4 Ivanhe Vic 309 Ph: (03) Fax: (03)
2 DOCUMENT CONTROL RECORD Dcument prepared by: Trafficwrks Pty Ltd ABN st Flr 32 Upper Heidelberg Rd, Ivanhe, Vic 309 PO Bx 4, Ivanhe, Vic 309 Ph (03) Fax (03) DISCLAIMER The infrmatin cntained in this dcument is intended t be received, used and relied upn by the named addressee r client nly fr the purpse fr which it has been prepared. Trafficwrks Pty Ltd des nt warrant the accuracy r relevance f the infrmatin, including by implicatin, cntained in this dcument if it is used r relied upn by any persn ther than the named addressee r client. Cpying, reprductin including by electrnic means, unauthrised use r disclsure f this dcument is prhibited except with the express written authrisatin f Trafficwrks Pty Ltd. Dcument Cntrl Sheppartn Nrth East Grwth Crridr Develpment Reprt Title Traffic Impact Assessment Reprt Prject Number 3040 Client Greater Sheppartn City Cuncil Client Cntacts Michael MacDnagh Rev Date Issued Revisin Details / Status Prepared by Draft 2/05/202 Fr review by client Bb Citrën Draft #2 3/05/202 Fr review by client Bb Citrën Draft #3 03/0/203 Fr review by client Bb Citrën Final Draft 03/09/203 Fr review by client Bb Citrën Final 22/08/204 Fr issue t client Bb Citrën Draft #2: 3/05/202 Reviewed by Ali Abdu i
3 TABLE OF CONTENTS EXECUTIVE SUMMARY... ii. References... ii 2 INTRODUCTION... 3 EXISTING CONDITIONS Land Use Rad Netwrk Traffic Envirnment Crash Histry PROPOSED DEVELOPMENT Overview External Traffic Internal Trip Generatin & Assignment... 5 ASSESSMENTS Turn Lane Selectin Intersectin Layut and Cntrl Internal Rads Access C Remte Impacts Public Transprt Bicycle Facilities Further PSP Develpment... CONCLUSIONS AND RECOMMENDATIONS... 8 ATTACHMENT A CONCEPT DEVELOPMENT PLANS ATTACHMENT B TRAFFIC COUNTS & CRASH DATA ATTACHMENT C DESIGN STANDARD REFERENCES ATTACHMENT D SIDRA MOVEMENT SUMMARIES ATTACHMENT E TRAFFIC ESTIMATES i
4 EXECUTIVE SUMMARY Trafficwrks Pty Ltd has been engaged by Greater Sheppartn City Cuncil t prepare a cmprehensive Traffic Impact Assessment Reprt fr the Sheppartn Nrth-East Grwth Crridr. In undertaking this assessment, Trafficwrks has relied extensively n the previus draft reprt prepared by Maunsell Australia Pty Ltd in Nvember 2008 fr Nrdic Pty Ltd, the draft reprt by AECOM dated December 2009 that frmed Appendix F f the Structure Plan, and the peer review f the AECOM reprt undertaken in March 20 by TraffixGrup. This assessment has aimed t update findings in the abve dcuments in the light f mre recent develpments and t present a cnslidated status reprt n traffic impacts fr the NrthEast Grwth Crridr. In preparing this reprt, nging design advice has been prvided t Greater Sheppartn City Cuncil thrughut the past tw years that has infrmed varius aspects f the Precinct Structure Plan (PSP), particularly with respect t the internal street netwrk and external rad cnnectins resulting frm investigatins int these aspects. This reprt incrprates the utcmes f this cllabrative apprach, with the key findings being summarised in Sectin.. References Technical references used in the preparatin f this reprt include the fllwing: Sheppartn Nrth East Grwth Crridr Develpment, Traffic Impact Assessment, draft reprt by Nrdic Pty Ltd, dated 2 Nvember 2008; Sheppartn Nrth East Grwth Crridr, Appendix F, Traffic Impact Assessment, draft by AECOM Australia Pty Ltd dated December 2009; Sheppartn Nrth East Grwth Crridr, Structure Plan, Traffic Engineering Assessment, by TraffixGrup Pty Ltd dated March 20; Austrads Guide t Rad Design, Part 4A Unsignalised and Signalised Intersectins, t establish criteria fr prvisin fr turning vehicles at intersectins; VicRads Crashstats database fr safety histry f the rad netwrk in the vicinity f the develpment; VicRads draft Access Management Plicies (AMPs), dated May 200 Versin.02; Sheppartn City s Infrastructure Design Manual, Versin 4.2, dated Nvember 203; The Greater Sheppartn Planning Scheme, fr land zning details; Public Transprt Guidelines fr Land Use Develpment by Department f Transprt, ii
5 2 INTRODUCTION The precinct identified in Figure belw, is lcated in the nrth-east crner f the existing develped area f Sheppartn City. It primarily cmprises farming land that is awaiting rezning fr future residential develpment. Trafficwrks Pty Ltd was initially engaged t review previus pertinent traffic reprts and prvide a cnslidated psitin statement n traffic-related issues that incrprates recent develpments impacting n traffic management fr the precinct. The key bjectives f the initial study were t: Reassess external rad cnnectins frm the precinct with regard t their lcatin and treatment ptins. In particular, t review: Access cnditins alng the Grahamvale Rad frntage against the VicRads draft Arterial Rad Access Management Plicies (AMPs); and The frm f access t Verney Rad fr cnsistency with the ultimate layut prpsals fr this rad; Review the internal street netwrk by way f input int the Precinct Structure Plan. Since preparatin f the initial draft reprt, Trafficwrks has wrked with Greater Sheppartn City Cuncil t cnslidate develpment prpsals fr the precinct that are nw summarised in this reprt. Figure Lcality and land use Plan (Curtesy f Department f Planning & Cmmunity Develpment website) Subject precinct
6 3 EXISTING CONDITIONS 3. Land Use The precinct cmprises arund 0ha f land at the nrtheast fringe f Sheppartn (see Figure ). All the land is included in the Farming Zne (FZ) in the Greater Sheppartn Planning Scheme, althugh it currently cntains tw schls and sme residential develpment. Land t the west and suthwest is included in the Residential Zne (RZ) whilst land in the Matilda Drive Estate t the nrthwest is included in the Lw Density Residential Zne (LDRZ). Land t the nrtheast and t the east (acrss Grahamvale Rad) is included in the Farming Zne (FZ) and land t the sutheast is included in the Industrial Zne (INZ). Several channels that crss the precinct are included in the Public Use Zne Service & Utility (PUZ). Grahamvale Rad, alng the eastern bundary f the land, is an arterial rad and is included in the Rad Zne Categry (RDZ). 3.2 Rad Netwrk Grahamvale Rad: frms part f the Sheppartn Alternative Rute (SAR), a State Arterial Rad (C39) managed by VicRads. The SAR prvides an imprtant bypass rute t the east f the city centre, particularly fr lng distance cmmercial traffic between Melburne and Brisbane alng the Gulburn Valley/Newell Highway crridr. It als ffers mre apprpriate access fr this cmmercial traffic t Sheppartn s industrial areas alng the eastern fringe f the city. Alng the precinct frntage, Grahamvale Rad cmprises a tw-lane tw-way sealed carriageway with sealed shulders, lcated centrally in a 20m rad reservatin, bunded t the east by the Sheppartn t Tcumwal railway line and t the west by irrigatin channels. It generally perates under an 80km/h speed limit. VicRads has develped ultimate layut prpsals fr the SAR that include a duplicated crss sectin (achieved by ccupying the redundant channel reserves alng this prtin f the rute), a large rural rundabut at the Frd Rad intersectin and prvisin fr a grade separatin ver the railway line at the existing rail level crssing near the suthern limit f the precinct. Verney Rad: frms the western bundary t the land and is included in the Rad Zne Categry 2 (RDZ2). This is a trunk cllectr rad in Sheppartn City s lcal rad netwrk managed by Cuncil. It has a tw-lane tw-way crss sectin, augmented with turn lanes at majr intersectins. It is currently subject t a 0km/h speed limit alng the precinct frntage, with a time-based 40 km/h schl zne alng the bundary f the Christian Schl perating within the precinct. An ff-rad shared path has been cnstructed in the western part f the reservatin frm suth f Pine Rad t Ryeland Drive. Cuncil has develped ultimate layut prpsals fr this rad alng the frntage f the precinct that include widening fr a tw-lane (ne lane in each directin) divided crss sectin t accmmdate sheltered right turn lanes at all significant intersectins while als prviding sectins f central right turning lane fr minr side streets and private access pints. The prpsed crss sectin is als t incrprate n-rad bicycle lanes. The layut prpsals make prvisin fr the prpsed access pints t the internal street netwrk fr the precinct. The 2
7 sectin f rad nrth frm Pine Rad is currently under cnstructin, while cncept plans fr the length t the suth are included as Figures A & A8 in Attachment A t this reprt. Frd Rad: frms part f the nrthern bundary t the land and is included in the Rad Zne Categry 2 (RDZ2). This is als a cllectr rad in Sheppartn City s lcal rad netwrk managed by Cuncil that currently has a tw-lane tw-way crss sectin within a 20m reservatin. Frd Rad perates under a 0km/h speed limit. There are currently n prpsals t upgrade this rad. 3.3 Traffic Envirnment A full assessment f traffic vlumes n the significant rutes surrunding the precinct is prvided in Sectin 4.2 f this reprt. A cmparisn f the abve extraplated traffic vlumes was attempted with traffic frecasts prepared by AECOM fr VicRads as part f a study t assess the traffic impacts f Sheppartn Bypass. As the subject precinct is at the fringe f the AECOM study area and their mdelling was at a strategic level, little crrelatin was fund. 3.4 Crash Histry The VicRads Crashstats database has recrded 2 casualty crashes alng rads surrunding the precinct during the mst recent 5 years f data (July 2008 t June 203). The lcatins f these crashes are pltted in Figure 2 belw and details have been summarised ver the page (refer t full listing in Figure B2 f Attachment B fr further infrmatin). Figure 2: Crashes n the rad netwrk surrunding the precinct Subject Precinct 3
8 2 crashes at the intersectin f Dkie-Sheppartn Rad with Sheppartn Alternative Rute: ne was a fall frm a bicycle (DCA 90) and ne a lss f cntrl crash (DCA 3). One ccurred at night, ne during the day, and bth under dry clear cnditins. Bth resulted in ther injuries. 2 crashes at the intersectin f Grahamvale Rad (Sheppartn Alternative Rute) with Frd Rad: invlving ne crss traffic crash (DCA 0) and ne a lss f cntrl crash (DCA 0). Bth ccurred during the day, under dry clear cnditins. Bth resulted in ther injuries. An additinal fatal cllisin has since ccurred at this intersectin n 2/3/204. It was a crss traffic crash (DCA 0) invlving a westbund car and nrthbund truck, during the day in dry and clear cnditins. 5 ther intersectin crashes; ne each at Frd Rad/Verney Rad (crss traffic DA 0), Pine Rad/Verney Rad (right near DCA 3), Oak Street/Verney Rad (right near DCA 3), Dkie-Sheppartn/Drummnd (right rear DCA 32) and Dkie-Sheppartn Rad/Hawdn Street/Verney Rad/Balaclava Rad (lss f cntrl DCA 4). Three ccurred at night r twilight, tw during the day, and all under dry clear cnditins. Tw invlved bicycles (Verney Rd at Oak St and Pine Rd) and ne a mtrcycle (DkieSheppartn Rd at Hawdn St). Tw resulted in serius injuries, three in ther injuries. 3 single vehicle mid-blck crashes: n King Richard Drive bicycle int parked car (DCA0), Grahamvale Rad ff rad (DCA 8) and McGill Street ff rad (DCA 3). One ccurred at night, tw during the day, all under dry clear cnditins. Tw resulted in serius injuries, ne in ther injuries. A plt f all reprted injury crashes since 98 is prvided in Figure 2, with thse that have ccurred in the last 5 years (as nted abve) circled. The rundabut at the intersectin f Dkie-Sheppartn Rad with Hawdn Street and Verney Rad shws a cnsistent and cntinuing crash histry. It was als identified in the TraffixGrup reprt as a site shwing a high crash frequency and it is recmmended that VicRads investigate this lcatin fr ptential remedial treatments independent f the develpment prpsals fr the grwth precinct. Cnsistent patterns that emerge frm scrutiny f all f the abve crash data are a high night time ccurrence (5/2 r 42%) and relatively high invlvement f bicycles (5 N, 3 alng Verney Rad). It can be cncluded that, apart frm the rundabut at the intersectin f Dkie-Sheppartn Rad and Verney Rad and the intersectin f Grahamvale Rad with Frd Rad, the rad netwrk in the vicinity f the precinct currently des nt have a traffic safety prblem that requires urgent remedial actin. 4
9 4 PROPOSED DEVELOPMENT Of the varius structure ptins cnsidered, the develpment prcess fr the precinct has settled n the layut prepared by Reeds Cnsulting entitled Prpsed Future Precinct Structure Plan (Versin H) and reprduced in Figure A f Attachment A. This plan dated /8/203 frms the basis fr the preparatin f a detailed internal rad netwrk and has been used t undertake the traffic assessments that fllw. 4. Overview The land is currently in five primary wnerships, with a number f additinal smaller alltments in different wnership abutting the Verney Rad and Grahamvale Rad frntages (as demnstrated in Figure 3 belw). Figure 3: Ownership Plan (Surce: Reeds Cnsulting Ownership Plan Versin C ). Plan includes access pint ntatin. B C A D The precinct is expected t generate a ttal lt yield in the rder f,35 residential lts (based n 5% at 4 lts/ha and 25% at 22 lts/ha applied t net develpable areas) as well as a small neighburhd centre and additinal prvisin fr expansin f the tw schls currently lcated 5
10 in the precinct. Develpment is anticipated t ccur in a clckwise manner, cmmencing with the Mndus land in the nrthwest quadrant and finishing with the Bennett and Sali prperties in the suthwest quadrant. The develpment stages that have been adpted are generally aligned with wnership bundaries and cincide with the prgressive pening f the external access pints discussed belw. That is: Stage : invlves develpment f areas and 2 (including the cmmunity hub) with all access btained via Access A t Verney Rad; Stage 2: invlves the additinal develpment f area 3 and pening f Access B t Frd Rad; Stage 3: invlves the additinal develpment f areas 4, 0, & 3, and the pening f Access C t Grahamvale Rad (including eventual rerientatin f access t Grahamvale Primary Schl); Stage 4: invlves develpment f the remaining areas 8 & 20, and pening f Access D t Verney Rad. External access t the precinct will be restricted t fur cntrlled intersectins as fllws (see als Figure 2): Access A: t Verney Rad ppsite Ryeland Drive frming a crss intersectin t be under signals cntrl frm cmmencement. A functinal layut fr this intersectin is prvided in Figure A3 f Attachment A; Access B: t Frd Rad with a T-junctin under STATCON cntrl west f Grahamvale Rad. A functinal layut is shwn in Figure A4 f Attachment A; Access C: t Grahamvale Rad as a signalised T-junctin nrth f the current drainage channel crssing. A functinal layut is shwn in Figure A5 f Attachment A; Access D: t Verney Rad diagnally ppsite Pine Rad under signals cntrl frm cmmencement. A functinal layut is shwn in Figure A f Attachment A. Access pint C t Grahamvale Rad has been the subject f cnsiderable discussin between Cuncil and VicRads t achieve cmpliance with the VicRads draft Access Management Plicies (refer mre detailed discussin in Sectin 5.4 f this reprt). This new access pint t the precinct frm Grahamvale Rad will require the lnger term clsure f direct access t Grahamvale Primary Schl and rerientatin f this schl access internally within the precinct. The investigatins in the AECOM and TraffixGrup reprts extended t cver the impact f traffic frm the precinct n the Gulburn Valley Highway at the highway intersectins with Pine Rad and Hawkins Street. This assessment has adpted the psitin that the intersectin f Pine Rad with the highway is currently signalised and has the capacity t cater fr the anticipated mdest increase in traffic frm the nrth-east precinct. The intersectin f Hawkins Street with the highway is t be signalised as part f the Fairley s redevelpment (including part funding by the McDnald s develpment n the suthwest crner) and will similarly have capacity t cater fr the anticipated future additinal traffic frm the nrth-east precinct. Neither intersectin is evaluated further in this reprt.
11 4.2 External Traffic Traffic cunts cnducted n surrunding streets by Sheppartn City are summarised in Table. These vlumes have been factred up, with grwth rates f 2% per annum (pa) fr Verney Rad and Grahamvale Rad, while a lwer factr f.5%pa was adpted fr Frd Rad, t apprximate traffic cnditins at 202 (representing apprximately years f develpment and aligning with the time-frame f VicRads traffic mdelling undertaken fr Sheppartn Bypass. The resultant vlumes were used t assess intersectin cnfiguratins at the precinct access pints (refer Sectin 5.2). In additin, Greater Sheppartn City Cuncil undertk a turning mvement cunt at the intersectin f Verney Rad with Pine Rad (results f this cunt are summarised in Figure B f Attachment B). Table : Summary f traffic cunt data btained frm Greater Sheppartn City Cuncil. Vlumes Street Lcatin Cunt Date Ttal (vpd) AM Peak (vph) PM Peak (vph) CVs Pine Rad Pntiac Ave t Prtea Crt /5/200 2, % Pine Rad Harrier St t Camar Nk 2/2/2009, % Balaclava Rad Dunrbin St t Burchier St 9/0/2004,29 3.8% Frd Rad Merin Dr t Verney Rd 29/4/200 2, % Grahamvale Rd McGill St t Dkie Rd 2/5/2003 4, % Grahamvale Rd McGill St t rail crssing 2/5/2003 3, % Hawkins Street Suthdwn St t Merin Dr 4/2/200 2, % New Dkie Rd Glenn St t Wheeler St 2/0/200 8, % Verney Rad Maple St t Clarke Crt 9/0/2004 9, % Verney Rad Nrth f Frd Rd /2/2005 2, % Verney Rad Herefrd Dr t Ryeland Dr 22//2008 3, % Verney Rad Hawkins St t Pine Rd 8//2009 5, % 4.3 Internal Trip Generatin & Assignment Fr cnsistency with the previus Traffic Impact Assessment reprt by AECOM (December 2009) and the peer review by TraffixGrup (March 20) the fllwing parameters have been adpted fr establishing traffic generatin frm within the precinct: Lt yield = dwellings/hectare applied t grss areas. Generatin rate = 8 trips/dwelling/day, with 0% ccurring in the AM and PM peaks. Traffic generatin by the neighburhd centre has assumed that 90% will be generated within the precinct and 0% externally.
12 Separate assessments have been cnducted n the basis f a 90% exiting/0% entering and an 80% exiting/20% entering directinal split in the AM peak. Bth have adpted a 0% entering/30% exiting directinal split in the PM peak. A suggested assignment f traffic nt the external netwrk was prvided in Figure 5. f the AECOM reprt. Hwever, the TraffixGrup review suggested a mdified distributin in Figure 8 f its reprt. The TraffixGrup distributin has been adpted fr this assessment and is reprduced in Figure 4. Figure 4: Adpted traffic distributin (Surce: Figure 8 frm TraffixGrup peer review reprt dated /3/20) 8
13 5 ASSESSMENTS The traffic generatin estimates and directinal assignments utlined in Sectin 4 have been inserted in spreadsheets that prvide the cumulative effects f this traffic n the internal cllectr rads. With these resultant traffic vlume data the fllwing assessments have been made fr each stage f the develpment: The entering and exiting traffic at each access pint has been cmpared with the prjected thrugh traffic n the external rad and apprpriate intersectin treatment ptins selected with reference t Figure 4.9(b) f the Austrads Guide t Rad Design, Part 4A Unsignalised and Signalised Intersectins (reprduced in Figure 5 belw). The turn mvements have been reviewed with SIDRA t cnfirm the mst apprpriate intersectin layut and t determine ptimum means f ultimate cntrl. The internal traffic vlumes have been assessed against the parameters in Table 2 f Cuncil s IDM and apprpriate internal street types nminated (reprduced in Figure C f Attachment C). These assessments have been extended t als review peratin at the intersectin f Verney Rad with Hawkins Street and prvide cmment n the intersectin f Dkie-Sheppartn Rad with Verney Rad/Hawdn Street/Balaclava Rad. The tw spreadsheets that assess the impacts f an AM split f 90% ut/0% in and an alternative AM split f 80% ut/20% in are reprduced in Figures E and E2 in Attachment E. Figure 5: Warrants fr turn treatments fr design speed <00 km/h (Surce: Figure 4.9(b) in Austrads Guide t Rad Design, 4A). 9
14 5. Turn Lane Selectin Frm the anticipated turn mvements the additinal turn lane arrangements recmmended at the assessed intersectins are as utlined in Table 2. The suggested turn lanes at the intersectins alng Verney Rad are cnsistent with thse described in Cuncil s Verney Rad Master Plan. The full intersectin layuts are further explred in Sectin 5.2. Table 2: Indicative turn lane treatments at external access pints. Intersectin Verney Rad at Access A/Ryeland Drive Apprach Treatment Suth Type CHR channelized right turn Nrth Type AUL(S) shrt auxiliary left turn Verney Rad at Hawkins Street Nrth Type CHR channelized right turn Frd Rad at Access B East Type AUL(S) shrt auxiliary left turn Grahamvale Rad at Access C Nrth Type CHR channelized right turn Suth Type AUL(S) shrt auxiliary left turn Suth Type CHR channelized right turn Verney Rad at Access D/Pine Rad 5.2 Intersectin Layut and Cntrl 5.2. SIDRA Assessment Analysis was cnducted fr the turn mvements and thrugh vlumes at the abve intersectins with the results summarised in Table 3 (full SIDRA Mvement Summaries are prvided in Attachment D). Frm this analysis it can be seen that: The Verney Rad intersectins at Access A/Ryeland Drive and with Hawkins Street are expected t functin satisfactrily under Give Way cntrl. Hwever, Access A/Ryeland Drive intersectin is t be prvided with signal cntrl in the first instance t prvide imprved safety fr pedestrian and cyclist access t the precinct (refer discussin in Sectin 5.5). The Frd Rad intersectin at Access B is expected t functin satisfactrily under Give Way cntrl. As a result f the anticipated heavy demand fr west t/frm suth mvements, the Grahamvale Rad intersectin at Access C is expected t experience ttal saturatin under Give Way cnditins; marginal peratin as a rundabut (requiring tw-lane circulating radway) but satisfactry peratin with signals cntrl. Signalisatin is the recmmended treatment fr this intersectin in the first instance. The SIDRA evaluatin indicates that a Give Way ptin at Access D/Verney Rad/Pine Rad is nt feasible, whilst signals can ffer satisfactry peratin in the critical PM peak, with the layut as indicated in the Verney Rad Master Plan. 0
15 Table 3: Results f SIDRA assessments fr external intersectins. Cntrl Leg Degree f Saturatin Average Delays (sec) 95% Queue (m) Access A at Verney Rd Give Way Hawkins St at Verney Rd Give Way Access B at Frd Rd Give Way Access C at Grahamvale Rd Give Way S E N S N W S E W S N W S N W S N W S E N W E Lcatin Rundabut Signals Access D at Verney/Pine Rds Signals GW ptin 5.3 Internal Rads 5.3 Traffic Vlumes and Street Types Frm the internal traffic generatin estimates develped in the spreadsheets in Attachment E, peak traffic generatin alng the internal rads can be deduced, as set ut in Table 4 belw: Table 4: Peak internal traffic vlumes and resultant rad types at precinct bundaries Lcatin Traffic At Access A,40vpd Trunk Cllectr Peak traffic vlume at cmpletin f Stage 3. (reduces t 4,050vpd at cmpletin f Stage 4) At Access B,040vpd Cllectr Level Peak achieved at cmpletin f Stage 4. At Access C 5,90vpd Trunk Cllectr Requires Trunk Cllectr at end f Stage 3. At Access D 4,590vpd Trunk Cllectr Required upn pening. Rad Type Cmment
16 The pertinent street characteristics are set ut in Table 2 f Cuncil s IDM (reprduced in Attachment C) fr each street type. An assessment f the extent f these traffic cnditins int the precinct wuld indicate that: The Trunk Cllectr (Cllectr Street Level 2) crss sectin shuld be maintained east frm Access A t midway thrugh areas /2 (sectin B-B), with the remaining length t the prpsed rundabut in area 4 reverting t Cllectr Street Level (sectin A-A); The Trunk Cllectr crss sectin shuld be maintained west frm Access C t the prpsed rundabut at the junctin with the nrth-suth cllectr midway thrugh area 4 (sectin B-B); The Trunk Cllectr crss sectin shuld be maintained east frm Access D t the eastern bundary f areas 8/20 (sectin B-B), with the remaining length t the nrthsuth cllectr in area 0 reverting t Cllectr Street Level (sectin C-C); Cllectr Street Level status shuld extend suth frm Access B t the prpsed rundabut at the cnnectin f this link with the east-west cllectr (sectin D-D, but including bicycle facilities); Cllectr Street Level status fr the primary internal nrth-suth cllectr servicing areas 4, 0 & (sectin A-A). The crss sectin shuld be reviewed in the vicinity f the schl t include a requirement t cater fr buses; All ther internal streets can be cnstructed as access streets r access places, as apprpriate t the extent f develpment they service. These rad prfiles are depicted in the typical crss sectins prvided in Figure A2 in Attachment A and crss referenced t the sectins abve Netwrk Layut Optins Underlying principles t guide the layut design shuld include the fllwing: The cllectr rad netwrk shuld service the ultimate internal access fr Grahamvale Primary Schl, with parent delivery/cllectin areas separated frm the bus interchange lcatin. A bus rute thrugh the precinct shuld be able t psitin bus stps at lcatins where 95% f residences are lcated within 400m walking distance f a bus stp. If this bus rute deviates frm the cllectr street netwrk, the crss sectins and intersectins f the minr streets travelled shuld be able t cater fr bus mvements and make prvisin fr bus stps. The street layut shuld avid crss rad intersectins. Where these are unavidable, safety cnsideratins wuld indicate it desirable t treat these lcatins with rundabuts. Althugh shwn as a thrugh rute n the PSP, it is cnsidered advisable nt t prvide a direct east-west cnnectin thrugh the precinct that may encurage rat running between the Verney Rad and Grahamvale Rad arterial rutes thrugh this essentially residential area. Cnsideratin shuld be given t an amendment t the east-west cllectr rute alignment t intrduce a stagger in this rute. 2
17 Staging f the internal develpment may require that cnsideratin be given t the prvisin f a frntage rad alng the western side f Grahamvale Rad t cnnect Access C t the schl car park. 5.4 Access C Lcatin Grahamvale Rad is a State Arterial Rad managed by VicRads. As such, its develpment shuld be cnsistent with VicRads Access Management Plicies as utlined in the VicRads draft Plicy Statement dated May 200 (Versin.02). Schedule 2 f this dcument sets ut the cnditins cvering Access Management Plicy 2 (AMP 2) fr majr urban limited-access rads, applicable t Grahamvale Rad. The perfrmance standards fr this categry f rad aim t minimise interference t traffic flw, reduce cllisins assciated with access mvements and prvide fr rderly develpment f, and vehicular access t, abutting land by allwing limited and well-planned minr lcal cnnectins between widely spaced cntrlled intersectins. The standards and principal characteristics fr AMP 2 rads include: Typical perating speed f 80 km/h, unimpeded by turn r crss traffic except at predetermined cntrlled lcatins; Divided r planned divided crss sectin; High level f cntrl ver intersectin spacing, vehicle turns and crss mvements; Agreed intersectin lcatins may be specified in an access management plan r lcal structure plan; Intersectins may be crss r T intersectins, cntrlled by rundabuts r signals and generally at a minimum spacing f 800m, varied t suit future signal prgressin and traffic flw requirements; Intermediate T intersectins are at least 200m apart and separated frm principal intersectins, cnfrming t the layuts in Figures C2 & C3 in Attachment C; N unrestricted individual site access t the thrugh carriageway. All access t be via: Alternative abutting rads, r A parallel frntage street r ne-way service rad, r Apprved access pints cmplying with the AMP 2 requirements. Applied t the Grahamvale Rad frntage f the precinct, the implicatins n ultimate access t the develpment include: A majr intersectin treatment at the Frd Rad intersectin (likely t be a rundabut); One additinal cntrlled majr access lcatin (Access C - t be signalised) apprximately midway between Frd Rad and the future rail verpass; 3
18 Full cntrl ver access t individual lts, requiring: Ultimate clsure and rerientatin f access t the current prperties at Ns 25, 3, 33 and 35 t the internal street netwrk r prvisin f a cntiguus service rad; Ultimate clsure and relcatin f access t Grahamvale Primary Schl and its parking area frm within the precinct; Prvisin f internal access t all new lts alng this bundary f the precinct. It is nt pssible t cmply with the AMP 2 criterin f 800m spacing between majr intersectins in the apprximate,20m between Frd Rad and the lcatin f a future rail verpass. A cmprmise site at abut the midpint has been prpsed and agreed in-principle by VicRads, subject t prgressive relcatin/cntrl f current direct access alng this length. Cnfiguratin As nted is Sectin 5.2. the anticipated strng tidal flws at this intersectin require its signalisatin by the cmpletin f Stage 3. Further SIDRA assessments have indicated that peratinal requirements at the signalised intersectin call fr tw eastbund apprach lanes and tw suthbund departure lanes. The design f any crssing structure ver the channel immediately west f Grahamvale Rad will need t be able t accmmdate three traffic lanes (tw eastbund and ne westbund). A functinal layut fr this signalised intersectin in accrdance with these criteira is prvided in Figure A5 f Attachment A. A private access t an rchard prperty t the east f the railway line cnnects with Grahamvale Rad, via an ccupatinal crssing f the rail line, t a pint apprximately 25m suth f the prpsed lcatin f Access C. This private access will be lcated in clse prximity t the signals and has the ptential t impact n the efficiency and safety f the intersectin peratin. As such, it is desirable that this cnnectin is relcated. An interim lcatin further suth shuld aim t achieve maximum separatin frm the signalised intersectin at Access C whilst prviding adequate clearance t the guard fencing at the apprach t the nearby channel crssing. 5.5 Remte Impacts Numurkah Rad As nted earlier in this reprt, the intersectins f Gulburn Valley Highway (Numurkah Rad) with Pine Rad is currently signalised, and with Hawkins Street t be signalised as part f adjacent develpment prpsals. Bth intersectins are expected t perate satisfactrily under ultimate traffic cnditins. Verney Rad Verney Rad currently carries between 0,000vpd at the suth end and 4,000vpd suth f Frd Rad (refer Table ). These vlumes can be expected t increase thrugh natural grwth t 3,000vpd and 5,00vpd respectively by the design year f 202 (adpting a 2%pa grwth rate). Under such traffic cnditins the IDM indicates a need fr upgrading this rute t Trunk Cllectr standard (divided carriageway) between Dkie-Sheppartn Rad and Hawkins Street; with 4
19 Cllectr Street Level standard required t the nrth f Hawkins Street. The ultimate develpment prpsals prepared by Cuncil fr Verney Rad g part way twards addressing this need but nly indicate prvisin f ne traffic lane in each directin. Full develpment f a Trunk Cllectr crss sectin (with tw traffic lanes in each directin) is expected t require widening alng the east side f the rad reservatin. It is recmmended that develpments alng the Verney Rad frntage f the precinct incrprate prvisin fr widening f the rad reservatin t accmmdate future full duplicatin. Ttal ultimate traffic generatin frm the precinct is in the rder f 5,500vpd. Frm Figure 4 it is estimated that % (2% + 5%) r 2,00vpd f generated traffic will travel alng the sectin f Verney Rad suth f Hawkins Street. It is cnsidered that the DCP fr the precinct shuld incrprate a cntributin t the cst f future rad upgrading wrks alng Verney Rad suth f Hawkins Street. Frd Rad Frd Rad currently carries arund 2,50vpd between Verney Rad and Grahamvale Rad (refer Table ). These vlumes can be expected t increase thrugh natural grwth t 3,200vpd by the design year f 202 (adpting a.5% annual grwth rate). Such traffic vlumes wuld require Cllectr Street Level cnditins with an.0m carriageway in a 24m reserve width. Frm Figure 3 it is estimated that 8% (3% + 5%) r,250vpd f generated traffic will travel alng the length f Frd Rad frm Access B t Grahamvale Rad. This represents in the rder f 39% f ttal traffic n this shrt sectin f rad in the design year. As indicated fr Verney Rad abve, it is suggested that the develpment f the precinct alng the Frd Rad frntage make prvisin fr future rad widening frm a 20m t a 24m rad reservatin fr the full length f this frntage and that a cntributin culd be cnsidered at permit stage fr any upgrading t be undertaken f the sectin f Frd Rad between Access B and Grahamvale Rad t satisfy Cllectr Street Level cnditins. Dkie-Sheppartn Rad at Hawdn Street, Balaclava Rad, Verney Rad The rundabut at the intersectin f Dkie-Sheppartn Rad, Verney Rad, Hawdn Street and Balaclava Rad has an nging crash histry (see Sectin 3.5) that is expected t require amelirative treatment fr imprved peratin under the anticipated increased future traffic demands. The TraffixGrup reprt undertk a SIDRA assessment f the peratin f this intersectin under estimated traffic cnditins at 2020 that indicated marginal perfrmance at this stage (degree f saturatin f 0.88 in AM peak with 44m queue lengths in the Verney Rad apprach). The surce f base traffic data n which this assessment was perfrmed is nt knwn. It is recmmended that peak hur turning mvement cunts be undertaken at this lcatin in rder t verify the TraffixGrup cnclusins regarding the peratin f this intersectin int the future in its current cnfiguratin. In additin it is recmmended that a detailed analysis f the crashes at this intersectin be undertaken t identify any peratinal deficiencies that require remedial actin. It is nted that a large cncrete high vltage pwer ple at the back f kerb in the nrtheast quadrant cnstitutes 5
20 a hazard and a cntrl n ptential imprvements that culd represent a significant cst item if needed t be relcated. Grahamvale Rad at Frd Rad Bth the AECOM and TraffixGrup reprts indicated that this intersectin has adequate capacity t absrb the additinal traffic frm the precinct and maintain peratin at lw degrees f saturatin, and minimal increases in queue lengths and delays. It is nted that ultimate develpment f Sheppartn Alternative Rute envisages the installatin f a rundabut at this lcatin, with black spt funding likely t see the installatin prceed in the shrt term. N additinal wrks are required at this lcatin as a result f the precinct develpment. Treatment f Access A As indicated in Tables 2 and 3 f this reprt, the layut f Access A is expected t functin satisfactrily as a crss intersectin with Ryeland Drive cntrlled by Give Way signs and including a channelized right turn (Type CHR) lane and auxiliary left turn (Type AUL) lane. In recent years Cuncil has installed a flagged children s crssing in Verney Rad at the Christian Schl between Hawkins Street and prpsed Access A. This crssing was prvided n advice that 2 students wuld use the crssing, thereby satisfying the minimum VicRads pedestrian (20 children) and traffic (50vph) criteria fr such a facility. Enrlments at the Christian Schl are grwing. The neighburhd activity centre planned immediately nrtheast f Access A is als likely t attract significant pedestrian traffic frm the residential areas west f Verney Rad in due curse. In additin, the prjected grwth f Grahamvale Primary Schl (t a student ppulatin f arund 00) has the ptential t attract students frm west f the precinct, wh wuld need t crss Verney Rad en-rute t and frm this schl. As a safety respnse t these anticipated increases in pedestrian mvements acrss Verney Rad, its intersectin with Access A/Ryeland Drive shuld be signalised at the cmmencement f the develpment as an item included in the DCP. This shuld be accmpanied by the remval f the existing flagged schl crssing and installatin f pedestrian fencing, with students at the Christian Schl instructed t use the signals fr their crssing mvements t/frm the west. 5. Public Transprt Public Transprt Victria (PTV) guidelines have established a target fr urban grwth areas t be designed s that 95% f residential land is lcated within 400m walking distance f public transprt services. The Precinct Structure Plan in Figure A f Attachment A, shws ntinal bus stp lcatins alng a future bus rute thrugh the precinct. These stps will capture 95% f residential lts with cnsiderable verlap, as demnstrated in Figure. There is scpe t adjust stp lcatins during detailed layut design t reduce the number f stps within the precinct and t make allwance fr any bus stps in Verney Rad, whilst still maintaining the desired cverage.
21 Figure : 400m radius catchment areas frm ntinal bus stp lcatins within the precinct. 5. Bicycle Facilities There are n cycling facilities in Frd Rad r Grahamvale Rad. Hwever, there are sectins f shared path alng the west side f Verney Rad frm Elm Terrace t Frd Rad and frm suth f Pine Rad t Ryeland Drive. It is expected that the Verney Rad paths will be extended t frm a cntinuus cycling rute frm Frd Rad t Hawdn Street where existing paths t the suth prvide access t Sheppartn High Schl. It is cnsidered imprtant that the internal street netwrk thugh the precinct cmplements this external path by prviding a cmprehensive cverage f bicycle facilities that links t Verney Rad as well as servicing access requirements t the tw primary schls within the precinct. This shuld include bicycle facilities alng the cllectr street suth frm Access B. 5.8 Further PSP Develpment Table f the TraffixGrup reprt prvides a detailed review f the Transprt and Mvement sectin f the draft PSP at Sectin 4.. The cmments n the planning and design guidelines in the draft PSP prvided in Table are supprted and shuld applied during the detailed design f the internal street netwrk.
22 CONCLUSIONS AND RECOMMENDATIONS This reprt has reviewed previus pertinent traffic reprts and prvided a cnslidated psitin statement n traffic-related issues fr the Sheppartn Nrth East Grwth Crridr. The fllwing cnclusins are drawn frm the review: Sectin 4. f the draft PSP needs t be reviewed t take n bard the cmments prvided in Table f the TraffixGrup reprt. The lng-term crash histry f the intersectin f Dkie-Sheppartn Rad with Verney Rad, Hawdn Street and Balaclava Rad needs detailed investigatin by VicRads t identify safety imprvements. Assciated with this investigatin, a Turning Mvement Cunt shuld be undertaken at this site t review its future peratin and identify any imprvements t cater fr the additinal traffic generated by the precinct. External rad access pints fr the precinct shuld be cnfigured as fllws: Access A at the nrthern end f Verney Rad frntage: shuld be aligned with Ryeland Drive ppsite and cntrlled by traffic signals in the first instance. Access B t Frd Rad: prvide with Type AUL(S) treatment n east apprach nly. Access C t Grahamvale Rad at apprximate midpint between Frd Rad and the ultimate rail grade separatin: signalised T intersectin in first instance. Access D at the suthern end f Verney Rad frntage diagnally ppsite Pine Rad: installatin f traffic signals in first instance. Verney Rad at Hawkins Street: prvide Type CHR treatment n nrth apprach. The abve recmmended treatments are cnsistent with the Verney Rad Master Plan. The underlying principles t guide the internal layut design shuld include the fllwing: The cllectr rad netwrk shuld service the ultimate internal access fr Grahamvale Primary Schl, with parent delivery/cllectin areas separated frm the bus interchange lcatin. A bus rute thrugh the precinct shuld be able t psitin bus stps at lcatins where 95% f residences are lcated within 400m walking distance f a bus stp. If this bus rute deviates frm the cllectr street netwrk, the crss sectins and intersectins f the minr streets travelled shuld be able t cater fr bus mvements and make prvisin fr bus stps. The street layut shuld avid crss rad intersectins. Where these are unavidable, safety cnsideratins wuld indicate it desirable t treat these lcatins with rundabuts. It is cnsidered advisable nt t prvide a direct east-west cnnectin thrugh the precinct t avid rat running between the Verney Rad and Grahamvale Rad. Cnsideratin shuld be given t a review f the alignment f this rute. 8
23 Staging f the internal develpment may require that cnsideratin be given t the prvisin f a frntage rad alng the western side f Grahamvale Rad t cnnect Access C t the current schl car park. Full cntrl ver access t Grahamvale Rad, requiring: Ultimate clsure and rerientatin f access t the current prperties at Ns 25, 3, 33 and 35 t the internal street netwrk r prvisin f a cntiguus service rad; Ultimate clsure and relcatin f access t Grahamvale Primary Schl and its parking area frm within the precinct; Prvisin f internal access t all new lts in the precinct. Street types cnsistent with the IDM based n traffic estimates within the precinct shuld be: Trunk Cllectr (Cllectr Street Level 2) crss sectin frm Access A t midway thrugh area /2, with Cllectr Street Level fr the remaining distance; Cllectr Street Level fr the link t Access B, including prvisin f bicycle facilities; Trunk Cllectr crss sectin frm Access C t the rundabut in area 4; Trunk Cllectr crss sectin frm Access D t the eastern bundary f areas 8/20, with Cllectr Street Level fr the remaining distance; Cllectr Street Level fr the nrth-suth cllectr street servicing areas 4, 0 & reviewed in the vicinity f the schl t ensure it caters fr bus mvements. Predicted future traffic levels in the surrunding street netwrk wuld indicate a need fr: Prvisin fr future rad widening alng the Verney Rad and Frd Rad frntages f the precinct; Allwance by way f permit cnditins fr a prprtinal cntributin t the upgrading f these rads t the required standard under ultimate traffic cnditins. 9
24 ATTACHMENT A CONCEPT DEVELOPMENT PLANS 20
25 Figure A: Prpsed Future Precinct Structure Plan (by Reeds Cnsulting versin H) 2
26 Figure A2: Typical Rad Prfiles Cllectr Rads 22
27 Figure A3: Functinal layut fr the intersectin f Verney Rad at Access A 23
28 Figure A4: Functinal layut fr the intersectin f Frd Rad at Access B 24
29 Figure A5: Functinal layut fr the intersectin f Grahamvale Rad at Access C 25
30 Figure A: Functinal layut fr the intersectin f Verney Rad at Access D 2
31 Figure A: Functinal layut fr Verney Rad upgrades between Balaclava Rad and Graham Street (cntinued in Figure A8). 2
32 Figure A8: Functinal layut fr Verney Rad upgrades between Graham Street and Pine Rad. 28
33 ATTACHMENT B TRAFFIC COUNTS & CRASH DATA 29
34 Figure B: Turning Mvement Cunt n Verney Rad at Pine Rad /4/202 30
35 Figure B2: Pages t 4 f Crash Data fr NEGC Precinct (July 2008 t June 203) 3
36 32
37 33
38 34
39 ATTACHMENT C DESIGN STANDARD REFERENCES Figure C: Table 2 frm Cuncil s Infrastructure Design Manual 35
40 Figure C2: AMP 2 Sheet (surce VicRads draft Access Management Plicies May 200) 3
41 Figure C3: AMP 2 Sheet 2 (surce VicRads draft Access Management Plicies May 200) 3
42 ATTACHMENT D SIDRA MOVEMENT SUMMARIES Site: Verney at Access A PM MOVEMENT SUMMARY Verney Rd at Access A Giveway / Yield (Tw-Way) Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: Verney Rd 2 T 35 3 R 40 Apprach 22 East: Internal Rad 4 L 524 R 05 Apprach 29 Nrth: Verney Rad L 8 8 T 258 Apprach 339 All Vehicles 9 HV Deg. Satn % v/c Average Delay sec Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h LOS A NA LOS E LOS C LOS A LOS A NA NA Site: Verney at Hawkins PM MOVEMENT SUMMARY Verney Rad at Hawkins Street Giveway / Yield (Tw-Way) Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: Verney Rad L 4 2 T 23 Apprach 359 Nrth: Verney Rad 8 T R 3 Apprach 9 West: Hawkins Street 0 L R 4 Apprach 40 All Vehicles 43 HV Deg. Satn % v/c Average Delay sec LOS A LOS A NA LOS A NA LOS A LOS E LOS C NA Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h 38
43 Site: Frd at Access B PM MOVEMENT SUMMARY Frd Rad at Access B Giveway / Yield (Tw-Way) Mvement Perfrmance - Vehicles Mv ID Turn Suth: Access B L 3 R Apprach East: Frd Rad 4 L 5 T Apprach West: Frd Rad T 2 R Apprach All Vehicles Demand Flw veh/h HV Deg. Satn % v/c Average Delay sec Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h LOS A LOS A NA LOS A LOS A NA NA Site: Grahamvale at Access C Rbt MOVEMENT SUMMARY Grahamvale Rad at Access C - Rundabut ptin Rundabut Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: Grahamvale Rad L T 285 Apprach 35 Nrth: Grahamvale Rad 8 T R 22 Apprach 2 West: Access C 0 L 2 2 R 355 Apprach 38 All Vehicles 2293 HV Deg. Satn % v/c Average Delay sec LOS A LOS A LOS A Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h 39
44 Site: Grahamvale at Access C Sig - 90:0 MOVEMENT SUMMARY Grahamvale Rad at Access C - Signals ptin Signals - Fixed Time Cycle Time = 40 secnds (Practical Cycle Time) Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: Grahamvale Rad L 29 2 T 285 Apprach 582 Nrth: Grahamvale Rad 8 T R 22 Apprach 2 West: Access C 0 L 2 2 R 355 Apprach 38 All Vehicles 240 HV Deg. Satn % v/c Average Delay sec Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h LOS C Site: Grahamvale at Access C Sig - 80:20 MOVEMENT SUMMARY Grahamvale Rad at Access C - Signals ptin Signals - Fixed Time Cycle Time = 40 secnds (Practical Cycle Time) Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: Grahamvale Rad L T 285 Apprach 05 Nrth: Grahamvale Rad 8 T R 24 Apprach 29 West: Access C 0 L 2 2 R 35 Apprach 383 All Vehicles 2 HV Deg. Satn % v/c Average Delay sec LOS C Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h 40
45 Site: Verney & Pine at Access D PM MOVEMENT SUMMARY Verney Rad at Pine Rad & Access D Signals - Fixed Time Cycle Time = 50 secnds (Practical Cycle Time) Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: Verney Rad L 2 T R 84 Apprach 45 East: Access "D" 4 L 95 5 T 29 R Apprach 393 Nrth: Verney Rad L 8 T R 4 Apprach 343 West: Pine Rad 0 L 20 T 23 2 R 0 Apprach 39 All Vehicles 2 HV Deg. Satn % v/c Average Delay sec Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h LOS C LOS C LOS C LOS C LOS C Site: Verney & Pine at Access D GW MOVEMENT SUMMARY Verney Rad at Pine Rad & Access "D" Giveway / Yield (Tw-Way) Mvement Perfrmance - Vehicles Mv ID Turn Demand Flw veh/h Suth: RadName L 2 T R 84 Apprach 45 East: Access "D" 4 L 95 5 T 29 R Apprach 393 Nrth: Verney Rad L 8 T R 4 Apprach 343 West: Pine Rad 0 L 20 T 23 2 R 0 Apprach 39 All Vehicles 2 HV Deg. Satn % v/c Average Delay sec LOS A LOS A LOS A NA LOS F LOS F LOS D LOS F LOS A LOS A NA LOS F LOS F LOS F NA Level f Service 95% Back f Queue Vehicles Distance veh m Prp. Effective Queued Stp Rate per veh Average Speed km/h 4
PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013
PUBLIC OPEN HOUSE Panet Rad / Mlsn Street Recnstructin April 24, 2013 T address issues assciated with traffic grwth arund Mlsn Street. Prject issues include: Delay at rail crssings Traffic cngestin at
More informationPUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012
PUBLIC OPEN HOUSE Preliminary Engineering Study t Upgrade the Pembina Highway Underpass MAY 9, 2012 The number f nrthbund traffic lanes at the Pembina Highway Underpass need t be increased frm tw lanes
More informationComments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY
Images f cmmunity cmments n the Study Area maps The first Public Infrmatin Centre was held fr bth the Casablanca Bulevard and GO Access Envirnmental Assessment and the Livingstn Avenue Extensin Envirnmental
More informationTechnical Memorandum. Introduction. Projected Traffic Volumes
Technical Memrandum T: Mr. Eduard Garcia, PSW Real Estate, LLC Frm: Christy Lambeth, P.E., PTOE Lambeth Engineering Assciates, PLLC, F-19508 Date: May 29, 2018 Re: Traffic Assessment fr Prpsed Single-Family
More informationCOMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission
Philadelphia City Planning Cmmissin INSTRUCTIONS This Checklist is an implementatin tl f the Philadelphia Cmplete Streets Handbk (the Handbk ) and enables City engineers and planners t review prjects fr
More informationFederal Way City Center Access Study Comment Log Summary
Prject verview The City f Federal Way is pursuing the City Center Access prject t find ways t imprve access t Federal Way s City Center and the surrunding area. The City is studying slutins t cngestin
More informationTechnical Briefing Rapid Transit
Technical Briefing Rapid Transit T Rapid Transit Implementatin Wrking Grup Date March 6, 2017 Frm Subject The Shift Team Preferred Dwntwn Ruting The preferred Dwntwn rutes fr Rapid Transit are illustrated
More informationAppendix C. Travel Demand Forecasting Technical Memorandum
Appendix C Travel Demand Frecasting Technical Memrandum MEMORANDUM Date: T: Frm: Subject: Bb Watts, Twn f Castle Rck Karl Buchhlz, Muller Engineering Chris Sheffer, Nick VanderKwaak, Fehr & Peers Travel
More informationPresented by: Presented to:
The Challenge f Implementing Prtected Bike Lanes Delaware Avenue: A Case Study Demnstratin Presented by: Presented t: Octber 25, 2016 Presentatin Outline FAST Act Impact n Bicycle Facilities Planning Ptential
More informationTECHNICAL MEMORANDUM
TECHNICAL MEMORANDUM Date: T: Frm: Subject: Adam Varat and Ilaria Salvadri, City f San Francisc Clin Burgett, Fehr & Peers Intersectin Level f Service Analysis f Ptential Missin Streetscape Plan Imprvements
More informationProject Advisory Team Existing Conditions Meeting Agenda
Prject Advisry Team Existing Cnditins Meeting Agenda April 25, 2017 Viera Gvernmental Center, Atlantic Rm, Building C, 3 rd Flr 10:00 AM 12:00 PM Wickham Rad Operatinal Analysis 1. Prject Backgrund/Overview
More informationThe timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.
100 20111 93A Avenue Langley, BC V1M 4A9 e bcta@bctrucking.cm t 604 888 5319 f 604 888 2941 tll free 1 800 565 2282 bctrucking.cm 16 th Avenue Crridr Imprvements BCTA Survey Results & Recmmendatins September
More informationNine Elms Lane and Battersea Park Road
Nine Elms Lane and Battersea Park Rad Sustrans respnse t Transprt fr Lndn Summary Sustrans welcmes the cnsultatin n prpsals fr changes t Nine Elms Lane and Battersea Park Rad, and supprts the ambitin t
More informationCompleted Project Justification Package Example
Cmpleted Prject Justificatin Package Example Nature f the Prblem: Describe the nature f the prblem that the prject intends t mitigate r fix. Fr example, is it designed t address a current cngestin, peratinal
More informationNorth Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4
MEETING SUMMARY Nrth Avenue Recnstructin Prject Cntext Sensitive Slutins Advisry Grup Meeting #4 ATTENDEES: LOCATION: PREPARED BY: COPIES: Sign-in sheet attached Brkfield Library, Snia Bielmeier Cmmunity
More informationSCENTRE GROUP JULY 2018 REF: 10869/1
SCENTRE GROUP TRAFFIC MANAGEMENT AND ACCESSIBILITY PLAN (TMAP) FOR THE SECTION 75W OF THE CONCEPT APPROVAL TO THE COMMERCIAL TOWER, WESTFIELD PARRAMATTA SHOPPING CENTRE JULY 2018 COLSTON BUDD ROGERS &
More informationCARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station
CARLSON BOULEVARD CORRIDOR OVERVIEW The prtin f Carlsn Bulevard within the study area stretches apprximately 3.25 miles nrth t suth frm Maine Avenue t the El Cerrit Plaza BART Statin area near San Pabl
More informationPSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.
MEMORANDUM PROJECT: Nrth Santa Mnica Bulevard Resnsturctin Prject N. 1BEVO41000 T: frm: City f Beverly Hills Traffic and Cmmissin Psmas Iteris Date: July,9 2015 Subject: Traffic Mitigatin During NSMB Cnstructin
More informationPhase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options
Glden Valley Rad Parking Management Strategies Assessment Purpse The purpse f the Parking Management Strategy Assessment is t synthesize parking discussins during the Metr Blue Line Extensin (Bttineau
More informationSANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.
SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN www.sandyfrdsmartertravel.ie What is a Mbility Management Plan? A wrkplace Mbility Management Plan is a lng-term management strategy
More informationEXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution
EXECUTIVB SUMMARY Regular Bard Actin Item 98 Apprval f Revised Reginal Radway Netwrk M"p, Revised Criteria and Jint Reslutin Objective: Fr the Bard t apprve the revised Reginal Radway Netwrk Map, Revised
More informationAmerican Association of State Highway and Transportation Officials
American Assciatin f State Highway and Transprtatin Officials Seven (7) Page Frm An Applicatin frm the State Highway r Transprtatin Department f Oklahma fr (select ne f the fllwing): Eliminatin f a U.S.
More informationTRANSPORTATION IMPACT ASSESSMENT. Executive Summary
TRANSPORTATION IMPACT ASSESSMENT Executive Summary OVERVIEW Early in ur dialgue with neighburs, the prject team fund that a number f cmmunity members had questins abut the impact that the prpsed develpment
More informationDemonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.
OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,
More informationCity of Ottawa. Transit Solutions. O c t o b e r
City f Ottawa Prject N. 101-16386 O c t b e r 2 0 1 1 O p e r a t i n a l I m p a c t s a n d P l i c y I m p l i c a t i n s f B u s B a y s i n t h e C i t y f O t t a w a - E x e c u t i v e S u m m
More informationConstruction Design and Management
Cnstructin Design and Management GUIDANCE ON THE CONSTRUCTION PHASE PLAN Veritas Cnsulting Safety Services 42 Haslucks Crft, Shirley, Slihull, B90 2EQ Tel: 0121 249 1281 Mb: 07814 203 977 www.veritas-cnsulting.c.uk
More information2017 Active Allegheny Grant Program Program Guidelines
Redevelpment Authrity f Allegheny Cunty Nte: Fr infrmatin purpses nly. Prgram guidelines subject t change prir t next funding cycle. 2017 Active Allegheny Grant Prgram Prgram Guidelines Intrductin The
More informationE25 FATIGUE MANAGEMENT
E25 FATIGUE MANAGEMENT PURPOSE AND SCOPE This Prcedure prvides the requirements and guidance needed t manage fatigue fr Laing O Rurke railway peratins. It will need t be read in cnjunctin with the rail
More information3 ways to build a healthy future for NSW
3 ways t build a healthy future fr NSW Healthy cities Healthy lifestyle Healthy children Dear Treasurer, As yu prepare fr the 2016-2017 Budget there are 3 key prgrams the Heart Fundatin NSW asks yu t fund
More informationCHAPTER 4 VISION, GOALS AND OBJECTIVES
CHAPTER 4 VISION, GOALS AND OBJECTIVES Defining a visin, gals, and bjectives creates the structure fr a plan. T develp the visin fr this Plan, the team reviewed the 2012 MPO Cmprehensive Pathways Plan
More informationUsers Requirements Statement
Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin
More informationIRATA Safety Bulletin No. 45
Page 1 f 7 A safety bulletin prepared by Internatinal (2017) SAFETY BULLETIN NO. 45: FALL FROM HEIGHT: AID CLIMBING A safety bulletin aimed at raising awareness f hazards in the rpe access industry. The
More informationEast Sussex Highways Highway Asset Inspection Guidance Document
Highways and Infrastructure Services Cntract 2016-23 East Sussex Highways Highway Asset Inspectin Guidance Dcument Dcument Histry: Further Infrmatin Date f Apprval Dcument Versin Dcument Revisin Histry
More informationATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019
Athletic Australia Selectin Plicy 2019 Wrld Crss Cuntry Champinships ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 This dcument sets ut the basis
More informationAlternative Ways to Improve Traffic on Loop 360 Paul Schumann 1
Alternative Ways t Imprve Traffic n Lp 360 Paul Schumann 1 February 13, 2015 Intrductin "Lp 360 prvides primary access t far west Austin, acting as a thrughfare fr residents and as a cmmuter rute fr thse
More informationA template mass rescue operations plan
The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general
More informationProcess Safety Management Program for Contractors
Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f
More informationSTATE OF NORTH CAROLINA Office of the State Auditor
STATE OF NORTH CAROLINA Office f the State Auditr Beth A. Wd, CPA State Auditr 2 S. Salisbury Street 20601 Mail Service Center Raleigh, NC 27699-0601 Telephne: (919) 807-7500 Fax: (919) 807-7647 Internet
More informationProject No.: Notes taken by:
Transprtatin Land Develpment Envirnmental S e r v i c e s 101 Walnut Street Pst Office Bx 9151 Watertwn, MA 02471-9151 Telephne (617) 924-1770 Fax (617) 924-2286 Meeting Ntes Attendees: Attached Date/Time:
More informationTHE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL
THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL Intrductin Implementing an effective disciplinary prcess is an imprtant factr fr all frmats f ftball, helping t establish a quality,
More informationAmerican Association of State Highway and Transportation Officials
American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the
More informationINFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS
INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls
More informationMinutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,
Minutes f the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE DATE: December 10, 2015 TIME: PLACE: 10:00 a.m. Cnference Rm B Kensha Cunty Center 19600 75 th Street Bristl, WI Members Present Gary
More informationDEDWORTH ROAD MASTERPLANNING AND DESIGN ADVICE Windsor Neighbourhood Plan Forum
Design Planning and Ecnmics Submitted t Windsr Neighburhd Plan Frum Submitted by AECOM 6-8 Greencat Place Lndn SW1P 1PL DEDWORTH ROAD MASTERPLANNING AND DESIGN ADVICE Windsr Neighburhd Plan Frum Draft
More informationAtherton Middlefield Road Bicycle Lane Improvements Public Meeting
MEETING MINUTES Athertn Middleield Rad Bicycle Lane Imprvements Public Meeting Date: Octber 2, 2017 Time: 4:00 pm 6:00 pm Lcatin: 94 Ashield Rad, Athertn, CA Presenters: Nadia Bsan, Interwest Cnsulting
More informationAdditional Investigation Report for a Second Bridge Across the Ashburton River
Additinal Investigatin Reprt fr a Secnd Bridge Acrss the Ashburtn River Cntract C554 Reprt Additinal Investigatins fr a Secnd Bridge Acrss the Ashburtn River Cntract C554 Prepared By Bill Rice Principal
More informationTraining Teams and Selection Criteria:
January 17, 2019 Biathln Canada 2019-2020 Training Selectin Criteria Intrductin: The purpse f this dcument is t define the selectin criteria fr athletes t be selected fr a Training. A Training is a grup
More informationCycling Strategy Group. Terms of Reference
Cycling Strategy Grup Terms f Reference 1. Cntext In May 2014 the Ecnmic and Envirnmental Wellbeing Scrutiny and Plicy Develpment Cmmittee cncluded its Cycling Inquiry. It set ut an ambitius visin fr cycling
More informationField Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.
Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs
More informationLivermore Harley Owners Group RIDING WITH LIVERMORE HOG
Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures
More informationSouth Portland Public Input Meeting Summary Notes and Public Comments
Prtland Suth Prtland Smart Crridr Plan Bradway Neighbrhd Meeting Intrductin Prtland Suth Prtland Smart Crridr Plan Suth Prtland Public Input Meeting Summary Ntes and Public Cmments Nvember 2, 2017, Suth
More informationJobs in Green and Healthy Transport
Infrmal dcument n. 6 THE PEP Steering Cmmittee, 11th sessin, 27-28 Nvember 2013 Item 7 (c) f the prvisinal agenda Implementing the Amsterdam Declaratin THE PEP Partnerships Implementing the Amsterdam Declaratin
More informationThe Facts About Brentwood School s Expansion Plans
The Facts Abut Brentwd Schl s Expansin Plans September 2016 Did Yu Knw In exchange fr a 30-year Master Plan that wuld increase enrllment by 38% and require 13 years f cnstructin, Brentwd Schl says it will
More informationNewmarket Level Crossing
Newmarket Level Crssing Scheme Assessment Reprt Prepared by: Public Transprt Capital Imprvements Dcument Infrmatin Client Title Prepared by Auckland Transprt Newmarket Level Crssing Scheme Assessment Reprt
More informationAdvisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.
Advisry Grup Meeting #7. March 9, 2017. Transcribed Breakut Grup Discussin Ntes. Discussin Questins. What feedback have yu heard frm yur cmmunities abut the near-term strategies? What d yu think wrks abut
More informationCanadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria
Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and BC Sailing Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved June 12, 2018 Kevin Black Representative Signature
More informationPILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 PILKINGTON RESPONSE Rich Martink returned call n 8/10/2014 at 2:50pm and spke with Ms. Pilkingtn The infrmatin belw was given t her. She thanked me fr the fllw-up. Thank
More informationEnvironmental Impact Assessment Report (EIAR) Volume 4 of 4: Appendices Appendix A14.1 Traffic and Transport Assessment
Envirnmental Impact Assessment Reprt (EIAR) Vlume 4 f 4: Appendices Appendix A14.1 Traffic and Transprt Assessment Page A14.3-1 Kildare C unty C uncil Kerdiffstwn Landfill Remediatin Prject Kildare Cunty
More informationKenmore South State School Executive Summary
Kenmre Suth State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kenmre Suth State Schl frm 26 t 28 Octber 2015. It prvides an evaluatin f the schl s
More informationPOWELL BOULEVARD ROAD SAFETY AUDIT
Oregn Department f Transprtatin POWELL BOULEVARD ROAD SAFETY AUDIT 20th Avenue t 33rd Avenue September 2014 Prepared fr: ODOT Regin 1 Traffic 123 NW Flanders Prtland, OR 97209 503.731.8220 Prepared by:
More information2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:
6.004. Plicy Cncerning Schl Attendance and Truancy 6.004. Plicy Cncerning Schl Attendance and Truancy Cperative Educatinal Services (C.E.S.) believes that regular schl attendance is essential fr an effective
More informationPolicy Document. Water Safety Policy
Plicy Dcument Water Safety Plicy Purpse This plicy has been created t ensure the safety and welfare f all children during water play and swimming activities and t remind educatrs f the inherent dangers
More informationOwner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013
Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees
More informationLong-Term Transportation Plan
Lng-Term Transprtatin Plan Implementatin & Mnitring Strategy TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 IMPLEMENTATION PLAN... 5 2.1 RESPONSIBILITY AND METHODS FOR IMPLEMENTATION...5 2.2 EVALUATION...8
More informationTopic Sheet No. 5 Safe rigging of rope access equipment
Dc. N.: HS-085ENG Date f Issue: 16/05/17 Issue N.: 001 Page 1 f 5 Tpic Sheet N. 5 Safe rigging f rpe access A tpic sheet prepared by IRATA Internatinal (2017) SAFETY AND HEALTH TOPIC SHEET NO. 5: SAFE
More informationCanadian Sport Institute Pacific and Badminton BC Athlete and Coach Nomination Criteria
Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Badmintn BC Athlete and Cach Nminatin Criteria Criteria Apprved March 28 th, 2018 CSI Pacific Representative L. Jennerich Signature
More informationW R E S T L I N G B C B r i t i s h C o l u m b i a W r e s t l i n g A s s o c i a t i o n
Athlete/Cach Nminatin Criteria 1 W R E S T L I N G B C B r i t i s h C l u m b i a W r e s t l i n g A s s c i a t i n Canadian Sprt Institute Pacific and BC Wrestling Athlete and Cach Nminatin Criteria
More informationDeer harvest objective for the Deer Plan
Deer harvest bjective fr the Deer Plan December 12, 2017 Summary and Backgrund fr DMPAC April 2018 NOTE: THIS IS A COPY OF A DOCUMENT DISCUSSED WITH DMPAC IN 2017. IT CONTAINS INFORMATION CONSIDERED BY
More informationSellwood Bridge AM Traffic Evaluation
Sellwd Bridge AM Traffic Evaluatin SMILE Transprtatin Cmmittee Meeting Prtland Bureau f Transprtatin Jamie Jeffrey, Rich Newlands, Jake Milligan Gals and Objectives Understand and reduce the impacts f
More informationStakeholder Working Group (SWG) Meeting #2 Summary
Stakehlder Wrking Grup (SWG) Meeting #2 Summary Date: Thursday, September 22, 2016 Time: 5:30-7:30 PM Lcatin: Fur Mile Histric Park Overview The G Speer Leetsdale Mbility Study is explring ptential imprvement
More information2.0 VISIONING DIRECTION
NOVEMBER 2013 TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 VISIONING DIRECTION...2 2.1 Cntext fr Sustainable Grwth The Official Cmmunity Plan...2 2.2 Transprtatin Visin...5 2.3 Integrated Gals & Objectives...6
More informationCITY of LOMPOC 2030 General Plan
2030 General Plan INTRODUCTION AND AUTHORITY The Circulatin Element is required by the Gvernment Cde [Sectin 65302(b)], which states that the Circulatin Element must include the general lcatin and extent
More informationHealth and Safety Policy for Groups Policy
Wdcraft Flk Plicy Health & Safety fr Grups Plicy Revised by: Debs McCahn & Sarah McGvern February 2013 Health and Safety Plicy fr Grups Plicy Last updated: February 2013 Revised by: Debs McCahn (Membership
More informationLamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV
Lamb Bulevard Safety Management Plan Between E. Desert Inn Rd. t Lake Mead Blvd. Clark Cunty, NV Tuesday, December 5, 2017 4-7 p.m. Presentatin at 5:30 p.m. Walnut Cmmunity Center 3075 N. Walnut Rd. Las
More informationELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)
ELLERSLIE AFC OPERATIONAL PLAN (Game Develpment and Ftball Success) Ellerslie AFC has a reputatin thrughut the Auckland ftball cmmunity as a family-friendly club that prvides an enjyable and rewarding
More informationPlain Language Summary
Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same
More informationFirst Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.
Nrth Halifax Grammar Schl First Aid Plicy Apprved by: Principal Date apprved: Nvember 2017 Next review: Autumn Term 2020 Plicy wner: Schl Welfare Officer Created April 2014 General The Academy is required
More informationNOISE MANAGEMENT PLAN CORAKI QUARRY
NOISE MANAGEMENT PLAN CORAKI QUARRY Date f Issue: Purpse The nise management plan is required t cmply with Cnditin 15 f the Develpment Cnsent Schedule 3. The Purpse f the nise management plan is t ensure
More informationIMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC
OBJECTIVE 14: IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE Demnstrate the capability and resurces t implement
More informationRunning a Raffle. There are 3 types of Legal Wisconsin Raffles
Running a Raffle Thank yu fr yur interest in running a raffle t benefit United Way f Prtage Cunty. We knw that raffles make great special events. Raffles cnducted t benefit United Way f Prtage Cunty must
More informationHot Work Policy and Procedures
1.0 Plicy Statement The University f New Haven has develped a ht wrk plicy and prcedure in accrdance with Occupatinal Health and Safety Administratin (OSHA) regulatins. 1.1 Purpse The University f New
More informationROAD SAFETY AUDIT. Main Street (Route 28) at Elm Street Main Street (Route 28) at William Street Town of Stoneham.
ROAD SAFETY AUDIT Main Street (Rute 28) at Elm Street Main Street (Rute 28) at William Street Twn f Stneham January 19, 2011 Prepared Fr: MassDOT Highway Divisin Prepared By: BETA Grup, Inc. Rad Safety
More informationWAIS Swimming Scholarship Selection Guidelines, Criteria and Process
WAIS Swimming Schlarship Selectin Guidelines, Criteria and Prcess Apprved by: Executive Directr Effective frm: January 19 2016 Next review date: January 2017 Last Date f Edit: January 2016 1. Athlete Selectin
More informationPositive Handling Policy
Hillcrest Children s Services Jubilee Schl Psitive Handling Plicy Lcal Prcedure Owner: Tim Rgers Issue date: September 2016 Review date: September 2017 Linked with lcal prcedures: Anti Bullying Behaviur
More informationExercise 2: Reviewing the Workplace Inspection Checklist (30 min) p
Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur
More informationCanadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria
Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Cycling BC Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved January 2018: Cycling BC Representative, Tara
More informationFirst Aid Policy Version 2.0
First Aid Plicy Versin 2.0 Cntents Definitins Page 3 Ratinale & Scpe Page 3 Guiding Principles Page 3 Relevant Legislatin Page 3 Plicy Statements Page 4 1. Respnse t injuries and illness Page 4 2. First
More informationGROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS
GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS 1. Intrductin 1.1 The gverning bdy f Grve Schl has adpted this plicy t help the schl meet its respnsibilities fr safeguarding and educating
More informationLAND 2 Aesthetic Resources Technical Study Plan Kaweah Project (FERC Project No. 298)
POTENTIAL RESOURCE ISSUE: Aesthetic cnditins, including visual quality and nise. PROJECT NEUS: The presence f Prject facilities culd affect visual resurces. Helicpter use fr rutine peratins and maintenance
More informationPORT MACQUARIE-HASTINGS PEDESTRIAN ACCESS AND MOBILITY PLAN
PORT MACQUARIE-HASTINGS PEDESTRIAN ACCESS AND MOBILITY PLAN May 2015 Table f Cntents Table f Cntents... 1 1 Intrductin... 2 1.1 What is a Pedestrian Access and Mbility Plan?... 2 1.2 Objectives... 2 1.3
More informationCanadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria
Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Cycling BC Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved December 5, 2018: Cycling BC Representative,
More informationEquipment Strategy For Earthing Transformers Strategy
ASM-STR-A683657 Versin: 2.0 Equipment Strategy Fr Earthing Transfrmers Strategy Equipment Strategy Fr Earthing Transfrmers Strategy Current versin: 28/06/2018 EXTERNAL USE Page 1 f 8 Next revisin due:
More informationIpswich Central State School Executive Summary
Ipswich Central State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Ipswich Central State Schl frm 8 t 11 September 2015. It prvides an evaluatin f
More informationWorking Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts
One Financial Plaza 1350 Main Street 3rd Flr, Cmmunity Rm A Springfield, Massachusetts 1 Leading the Natin in Transprtatin Excellence www.mass.gv/massdt April 9, 2015 Agenda Welcme & Intrductins Overview
More informationSubject: Recommended Updates to Transportation Development Parameters
T: Frm: Members f the Balba Reservir Cmmunity Advisry Cmmittee ( CAC ) Jeremy Shaw, Planning Department Date: 5/20/2016 Subject: Recmmended Updates t Transprtatin Develpment Parameters This memrandum cntains
More informationDRAFT - TRANSPORTATION AND PUBLIC HEALTH
DRAFT - TRANSPORTATION AND PUBLIC HEALTH Backgrund/Intrductin Transprtatin Outlk 2040, the Kansas City regin s lng-range transprtatin plan, includes a public health gal t facilitate healthy, active living.
More informationOPERATIONS CHALLENGE 2017
OPERATIONS CHALLENGE 2017 COLLECTION SYSTEM EVENT During the event, yur team will cmplete the fllwing: The event simulates cnnecting a 4-inch PVC lateral sewer t an existing 8-inch PVC sewer pipe while
More informationOFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO
OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO 1 Briefing Outline Review f Waterfrnt Seattle prjects Alaskan Way, Prmenade, and Overlk Walk ( AWPOW ) AWPOW Draft Envirnmental Impact Statement
More informationLocation Consider areas in your community to focus attention on pedestrian safety. Example locations include:
Crsswalk event verview (Saint Paul) A crsswalk event ccurs when an individual r grup f individuals prmte pedestrian safety by demnstrating the prper use f a crsswalk. During the event, a grup f cmmunity
More informationEquipment Strategy for Post Type High Voltage Current Transformers and Metering Units
ASM-STR-A2281256 Versin: 2.0 Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Metering Units Current versin: 20/06/2018
More information