1 TECHNICAL MEMORANDUM Date: T: Frm: Subject: Adam Varat and Ilaria Salvadri, City f San Francisc Clin Burgett, Fehr & Peers Intersectin Level f Service Analysis f Ptential Missin Streetscape Plan Imprvements SF This memrandum prvides an intersectin level f service () analysis f ptential fur-tthree lane cnversins n three Missin Streetscape Plan (MSP) crridrs: Bryant Street, Flsm Street and Suth Van Ness Avenue, between 15 th and 26 th Streets. The findings f this analysis are intended t cmplement the cnceptual analysis f ptential MSP imprvements prvided by Nelsn/Nygaard Cnsulting Assciates 1. In additin t evaluating ptential traffic impacts t key intersectins n the affected crridrs, the analysis als assesses whether ptential fur-t-three lane cnversins n thse streets culd result in significant transprtatin impacts t parallel crridrs, including Missin Street, and/r delays t transit service. SUMMARY OF FINDINGS Alternative 1 (Flsm Street) The analysis f Alternative 1 is prvided n pages f this memrandum. Key findings are as fllws: Flsm Street (17 th t 26 th Street): Implementatin f the prpsed fur-t-three cnversin n the prtin f Flsm Street between 17 th and 26 th Streets is nt anticipated t result in significant impacts t intersectin Given the planned installatin f far-side bus stps and signal pririty measures n Flsm Street (described n Page 6 f this memrandum), implementatin f the prpsed fur-t-three lane cnversin n Flsm Street culd be carried ut withut significantly increasing transit travel time n the Flsm Street crridr. Key factrs that that culd serve t further reduce effects n travel time fr buses are as fllws: Since intersectin delay is largely limited t the queues that frm when vehicles must stp fr a red traffic signal, effective pre-emptin measures culd reduce 1 Cnceptual Analysis f Transprtatin Impacts f Missin Streetscape Plan Imprvements, Memrandum frm Jeremy Nelsn and Francesca Naplitan, Nelsn\Nygaard Cnsulting Assciates, t Adam Varat and Ilaria Salvadri, City f San Francisc, June 19, Pine Street, 4 th Flr, San Francisc, CA (415) Fax (415)

2 Page 2 ptential delays t transit resulting frm increased queue lengths 2. By extending the green signal cycle when buses apprach, queues shuld be effectively dispersed prir t the arrival f each bus (assuming that buses wuld ften arrive at the end f the cycle, which may be the case if buses are frequently triggering the signal ver-ride t extend the cycle). With pririty measures, a prtin f buses wuld benefit frm extended green time, but a prtin f buses wuld be required t stp at red lights, thus leading t increased transit delay due t lnger queues at signalized intersectins. A quantifiable analysis f transit delay is nt pssible using the TRAFFIX methdlgy; therefre, a VISSIM analysis is recmmended t quantify transit delay if signal pririty measures are used. The effective installatin f signal pre-emptin measures (nt just signal pririty measures) t extend the green signal cycle when all buses apprach, culd ensure that buses wuld rarely be required t stp fr a red light alng Flsm Street. s t transit culd ccur, hwever, if Transit Effectiveness Prgram (TEP) recmmendatins are limited t signal pririty (but nt full pre-emptin ) measures t extend green time when buses apprach. Prvisin f center left-turn lanes (as prpsed with the fur-t-three lane cnversin) shuld further ensure that queues are cleared when buses apprach. This wuld ccur by eliminating the delay caused when vehicles attempt t make a left-turn within the travel lane (as required by the current cnfiguratin). Due t the high vlume f east-west traffic n 16 th Street (including east-west transit service), it is nt likely t be feasible t allw fr full signal pre-emptin fr buses at the Flsm Street/16 th Street intersectin. Therefre, the prpsed fur-t-three cnversin wuld result in added delay t buses at that intersectin. Since intersectins n Flsm (suth f 16 th ) wuld perate at C r better (indicating average r slight delays) there wuld be little incentive fr mtrists t divert t parallel crridrs such as Missin, Suth Van Ness r Bryant Streets, since each f thse crridrs include intersectins perating with greater delay based n existing vlumes. Flsm Street (nrth f 17 th Street): At the Flsm Street/16 th Street intersectin, excessive queue lengths and increased transit delay wuld result if just ne thrugh lane is prvided fr nrthbund & suthbund traffic n Flsm Street at that intersectin. Additinal measures are recmmended, such as maintaining tw thrugh lanes, r installing queue-jump lanes fr buses. Alternatively, installatin f a 3+1 radway cnfiguratin (with a parking tw-away zne in the peak directin f travel) culd be cnsidered fr the segment f Flsm Street between 15 th and 17 th Streets. 2 See page 19 fr discussin f the increased transit travel time n the Flsm Street crridr that wuld result if signal pririty measures were nt t be prvided.

3 Page 3 Further technical analysis is recmmended if ptential changes are cnsidered nrth f 15 th Street. Alternative 2: Suth Van Ness Avenue The analysis f Alternative 2 is prvided n pages f this memrandum. Key findings are as fllws: Implementatin f the prpsed fur-t-three cnversin n Suth Van Ness Avenue (between 15 th and 26 th Streets) wuld likely result in significant impacts t at key intersectins n Suth Van Ness Avenue. Increased delay n Suth Van Ness Avenue wuld likely divert a prtin f traffic t Flsm Street (given excess capacity n that crridr), which culd impact transit perating speeds. There is less likelihd f traffic diverting t Missin Street, given existing delays (including E peratins at Misisn/16 th ) and slwer travel speeds n the crridr. Impacts culd be ptentially mitigated by prviding a 3+1 lane cnfiguratin n Suth Van Ness Avenue: A secnd thrugh lane wuld be prvided in the peak directin (nrthbund in the AM, and suthbund in the PM). The 3+1 cnfiguratin culd be accmmdated by installing curb-side parking lanes that culd cnvert t travel lanes during the peak travel perids. With this cnfiguratin, intersectin under future-year cnditins wuld represent an imprvement ver future baseline ( withut prject ) cnditins, due t the prvisin f a center left-turn lane and remval f n-street parking. Therefre, this alternative is nt anticipated t result in diversin f traffic t parallel crridrs. Ptential impacts t pedestrians (resulting frm remval f the buffer prvided by parked vehicles) wuld be limited t the peak perids (typically 7-9 AM nrthbund, and 3-7 PM suthbund) and culd be mitigated by prviding wider sidewalks, pedestrian bulbuts and/r median refuges. Traffic diversin wuld be limited t the ff-peak directin (suthbund in the AM, and nrthbund in the PM). Such trips wuld likely be diverted t Flsm Street. Given excess capacity n that crridr, especially in the ff-peak directin, impacts are anticipated t be less than significant.

4 Page 4 Alternative 3: Bryant Street + Flsm Street The analysis f Alternative 3 is prvided n pages f this memrandum. Key findings are as fllws: Bryant Street (23 rd t 26 th Street): The prpsed fur-t-three lane cnversin n the three-blck segment f Bryant Street is nt expected t significantly impact traffic peratins r result in significant increases in transit perating time. Operatins n this segment, fllwing a ptential cnversin t three lanes, wuld be superir t existing tw-lane segment f Bryant Street (nrth f 23 rd Street). Diversin f traffic t adjacent crridrs is nt anticipated, since the existing tw-lane segment f Bryant Street already serves t effectively limit capacity n the crridr. Flsm Street (15 th t 26 th ) Findings d nt differ frm the Alternative 1 analysis (summarized abve and described in greater detail n pages 18-24).

5 Page 5 PURPOSE AND OVERVIEW OF ANALYSIS The fllwing infrmatin is prvided in this memrandum: Existing AM and PM peak hur at eight study intersectins, based n turning mvement cunts cnducted n April 30, 2009 (see pages 10-12) Future Year AM and PM peak hur at each f the eight study intersectins, based n a grwth frecast derived by Fehr & Peers frm the Eastern Neighbrhds EIR fr Year 2025 (see pages 13-17) With Prject analysis f three ptential fur-t-three lane cnversin cnversins within the MSP area: Alternative 1: Flsm Bulevard wuld be cnverted frm the current cnfiguratin (tw thrugh lanes in each directin) t a prpsed three-lane cnfiguratin (ne thrugh lane in each directin with a tw-way center left-turn lane) between 15 th and 26 th Streets. Alternative 2: Suth Van Ness Avenue wuld be cnverted frm the current cnfiguratin (tw thrugh lanes in each directin) t a prpsed three-lane cnfiguratin (ne thrugh lane in each directin with a tw-way center left-turn lane) between 15 th and 26 th Streets. Alternative 3: Flsm Bulevard wuld be cnverted t a three-lane cnfiguratin between 15 th and 26 th Street (as prpsed in Alternative 1), and the suthern segment f Bryant Street (between 23 rd and 26 th Streets) wuld als be cnverted frm the current cnfiguratin (tw thrugh lanes in each directin) t a prpsed three-lane cnfiguratin (ne thrugh lane in each directin with a tw-way center left-turn lane).

6 Page 6 BACKGROUND As part f the MSP, the City f San Francisc Planning Department is evaluating a number f streetscape amenities and traffic calming imprvements, including ptential lane reductin(s) n ne f the nrth-suth crridrs (such as Bryant, Flsm, Missin r Suth Van Ness). Nelsn\Nygaard s cnceptual analysis prvided the fllwing infrmatin: Assessment f the feasibility f ptential MSP imprvements, fcusing n identifying ptential transit and aut traffic impacts and design r peratinal mitigatins Overview f daily traffic vlumes and peak hur turning mvements at key intersectins n each f the crridrs Review f applicable traffic peratins guidelines and street design standards Cnceptual evaluatin f the ptential feasibility f reducing number f traffic lanes n Flsm and/r Bryant Streets 3 Discussin f ptential mitigatin measures (if necessary) t minimize the diversin f vehicles t surrunding streets TRANSIT ASSUMPTIONS FOR FUTURE-YEAR ANALYSIS The City f San Francisc s Transit Effectiveness Prgram (TEP) has identified transit enhancement measures that will be implemented n key crridrs t increase transit perating speeds and frequency f service. Missin and Flsm Streets have bth been identified in the TEP. Based n input frm MTA staff, the fllwing TEP measures will likely be installed n Missin and Flsm Street (with r withut the prpsed Alternatives 1, 2 r 3): A. Bus stps wuld be lcated at the far-side f intersectins, and signal pririty 4 devices wuld be installed n buses, allwing the green signal phase fr nrth-suth mvements t be extended when buses apprach. These tw measures wuld allw mst buses t reach the nearest far-side bus stp withut being stpped at an upstream traffic signal. B. Curb extensins wuld be installed at bus stp lcatins(als knwn as bus bulbs ), thus allwing buses t stp within a travel lane, allwing fr shrter stp time and quicker reentry int traffic fllwing each stp. Hwever, MTA staff nted that current City plicy wuld nt allw fr the installatin f bus bulbs if Flsm were t be reduced t ne thrugh lane in each directin (as prpsed with Alternatives 1 and 3). 3 Cnceptual evaluatin f lane reductin(s) n Suth Van Ness Avenue may be perfrmed later, pending the utcme f this level-f-service analysis, review f travel speed and cllisin data, and cmmunity input at upcming wrkshps. 4 The qualitative analysis f ptential impacts t transit delay prvided in this memrandum assumes that transit pririty signal verride measures wuld be installed t extend the green signal phase fr a prtin f nrthbund and suthbund buses n Flsm Street (except at 16 th Street). The transit assessment assumes that just a prtin f buses wuld trigger the pririty signal ver-ride, cnsistent with the use f such measures elsewhere in San Francisc.

7 Page 7 STUDY INTERSECTIONS The analysis was perfrmed at the fllwing eight study intersectins selected by the City f San Francisc and Nelsn\Nygaard: 1. Bryant Street / 16 th Street 2. Bryant Street / 24 th Street 3. Flsm Street / 16 th Street 4. Flsm Street / 24 th Street 5. Suth Van Ness Avenue / 16 th Street 6. Suth Van Ness Avenue / 24 th Street 7. Missin Street / 16 th Street 8. Missin Street / 24 th Street Evaluatin Criteria Mtr vehicle peratins at intersectins are typically described in terms f level f service (). is a qualitative measure f the effect f several factrs n traffic perating cnditins including speed, travel time, traffic interruptins, freedm t maneuver, safety, driving cmfrt, and cnvenience. Transprtatin planners and engineers generally measure quantitatively in terms f vehicular delay and describe using a scale that ranges frm A, the best perating cnditins, t F, the wrst perating cnditins. E represents at-capacity peratins. When traffic vlumes exceed capacity, stp-and-g cnditins result, and peratins are designated as F. Fehr & Peers cnducted the analysis f the study intersectins (all signalized) using a methd dcumented by the Transprtatin Research Bard (TRB) in the 2000 Highway Capacity Manual (HCM). Fr signalized intersectins, is based n cntrl delay. Transprtatin engineers and planners define cntrl delay as the delay directly assciated with the traffic cntrl device (i.e., a stp sign r a traffic signal) and specifically include initial deceleratin delay, queue mveup time, stpped delay, and final acceleratin delay. These delay estimates are cnsidered meaningful indicatrs f driver discmfrt and frustratin, fuel cnsumptin, and lst travel time. Table 1 presents the relatinship between and cntrl delay fr signalized intersectins. The analysis perfrmed fr this analysis was cnducted using TRAFFIX sftware, cnsistent with the preferred methdlgy fr mst transprtatin impact studies in San Francisc that are prepared under the directin f the San Francisc Planning Department s Majr Envirnmental Analysis (MEA) divisin. This analysis incrprated the fllwing adjustments t the sftware t accunt fr the unique perating characteristics f the affected crridrs: Missin Street: vehicle cmpressin rates were adjusted t accunt fr reduced travel speeds, narrw lane widths, duble-parking and frequency f stpped buses. These adjustments were cnsistent with the Eastern Neighbrhds EIR analysis at the Missin/16 th and Missin/24 th intersectins.

8 Page 8 Suth Van Ness, Flsm and Bryant Street: analysis accunts fr narrw lane widths and frequency f stpped buses. At the Suth Van Ness/16 th intersectin, inclusin f these variables differs frm the Eastern Neighbrhds EIR, which used default values withut adjustment fr the analysis. (The remaining study intersectins were nt evaluated in the Eastern Neighbrhds EIR). Peak hur factr (PHF) f 0.90 was used fr existing and future-year cnditins. Futureyear analyses typically use a PHF f (t accunt fr greater spreading f peak hur vlumes as future traffic grwth ccurs. In this case, the 0.90 PHF was used the future-year analysis fr cnsistency purpses, and t prvide a mre cnservative assessment. Based n City f San Francisc plicy significant impacts t intersectin culd ccur if Alternatives 1, 2 r 3 were t cause an intersectin t degrade frm D r better t E r F. TABLE 1 SIGNALIZED INTERSECTION CRITERIA Cntrl (secnds/vehicle) Descriptin A < 10.0 Operatins with very slight delay, with n apprach phase fully utilized. B Operatins with slight delay and an ccasinal apprach phase are fully utilized. C Operatins with average delay. Individual cycle failures begin t appear. D E F > 80.0 Operatins with tlerable delay. Many vehicles stp and individual cycle failures are nticeable. Operatins with high delay, up t several signal cycles. Lng queues frm upstream f intersectin. Operatin with excessive and unacceptable delays. Vlumes vary widely depending n dwnstream queue cnditins. Surce: Transprtatin Research Bard, Highway Capacity Manual, Special Reprt 209, 2000.

9 Bryant Bryant St. St. St. Harrisn Harrisn St. St. St. Missin Missin St. St. St. LEGEND: 15th St = Prpsed 4 t 3 Lane Cnversin Segments = Study Intersectins 17th St. 18th St. Capp St. St. S. Van Van Ness Ness Ave. Ave. Flsm St. St. N Nt t Scale 19th St. 20th St st St. 22nd St. 23rd St. 25th St th St. Cesar Chavez July 2009 SF \graphics\ Missin Streetscape PROPOSED 4 TO 3 CONVERSION CORRIDORS AND STUDY INTERSECTIONS FIGURE 1

10 Page 10 BASELINE LEVEL OF SERVICE ANALYSIS EXISTING LANE CONFIGURATIONS The baseline analysis is based n the current (year 2009) lane cnfiguratins at each study intersectin. Existing (Year 2009) Traffic Vlumes Existing AM and PM peak hur 5 was analyzed based n turning mvement cunts cnducted at each study intersectin n April 30, The results are summarized in Table 2. Key findings are that: Bryant Street intersectins perate at C r better, indicating acceptable peratins with average delays. Flsm Street intersectins perate at B r better, indicating acceptable peratins with slight delays. Suth Van Ness Avenue/16 th Street perates at D during the AM peak hur, indicating acceptable peratins with tlerable delays, and C during the PM peak hur; while Suth Van Ness Avenue/24 th Street perates at B during bth peak hurs. Missin Street/16 th Street perates at E during the AM peak hur, indicating unacceptable peratins with high delay. Lengthy queues frm n the ne-lane eastbund 16 th Street apprach, while frequent bus blckages and vehicle drp-ffs serve t cnstrain peratins. Operatins at this intersectin imprve t D during the PM peak hur, mainly due t reduce queue lengths n the eastbund 16 th Street apprach (cmpared t the AM peak hur). Missin Street/24 th Street perates at C during the AM peak hur and D during the PM peak hur. 5 based n stand-alne analysis f each intersectin using TRAFFIX sftware. This methdlgy des nt accunt fr the metering effects f delay at upstream intersectins, which can imprve peratins at dwnstream lcatins.

11 Page 11 Intersectin TABLE 2 EXISTING CONDITIONS LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION AM Peak Hur Intersectin (secnds) PM Peak Hur (secnds) Peak Nrth-Suth Thrugh Mvement 1 Queue Length (Number f Vehicles per Lane) 2 AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 21.8 B veh. 7 veh. 2. Bryant Street / 24 th Street B 13.6 B veh. 2 veh. 3. Flsm Street / 16 th Street B 12.0 B veh. 4 veh. 4. Flsm Street / 24 th Street B 12.9 B veh. 3 veh. 5. S. Van Ness Avenue /16 th Street D 36.2 C veh. 10 veh. 6. S. Van Ness Avenue / 24 th Street B 14.6 B veh. 6 veh. 7. Missin Street / 16 th Street E 68.5 D veh. 5 veh. 8. Missin Street/ 24 th Street C 26.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur, and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-f-magnitude cmparisn f existing queues and the impact f ptential lane reductins. Surce: Fehr & Peers, 2009

12 1 41 (89) 98 (210) 47 (70) 53 (89) 526 (421) 20 (43) Bryant St. 149 (209) 357 (691) 38 (91) 156 (48) 294 (318) 110 (140) 17th St LEGEND: 1 = Study Intersectins = Traffic Signal XX (YY) = AM (PM) Traffic Vlumes = Lane Cnfiguratins 2 38 (39) 165 (273) 18 (33) Bryant St. 38 (30) 142 (211) 19 (16) 18th St. Missin Missin St. St. St. Capp St. St. S. Van Van Ness Ness Ave. Ave. Flsm St. St. Harrisn Harrisn St. St. St. Bryant Bryant St. St. St. 24 (23) 156 (169) 56 (51) 49 (23) 237 (215) 52 (36) 19th St. N Nt t Scale (33) 155 (497) 30 (38) Flsm St. 48 (64) 331 (739) 23 (48) 20th St. 21st St. 58 (63) 459 (360) 47 (63) 24 (37) 580 (398) 50 (56) 22nd St (50) 153 (346) 29 (58) 23 (25) 190 (176) 21 (32) Flsm St. 51 (34) 167 (165) 7 (20) 35 (32) 503 (385) 20 (23) 23rd St (60) 283 (728) 48 (72) S. Van Ness Ave. 36 (74) 318 (717) 14 (13) 6 25 (31) 350 (790) 21 (49) S. Van Ness Ave. 48 (39) 160 (195) 17 (12) 7 34 (58) 196 (399) 7 (0) Missin St. 63 (61) 305 (726) 4 (30) 8 30 (119) 230 (363) 19 (14) Missin St. 54 (75) 145 (140) 27 (55) 21 (10) 475 (330) 36 (70) 35 (47) 610 (382) 67 (70) 32 (20) 167 (169) 47 (48) 30 (30) 590 (404) 20 (16) 15 (4) 459 (335) 63 (85) 3 (2) 363 (345) 69 (83) 21 (28) 156 (126) 24 (44) 22 (8) 370 (332) 63 (115) July 2009 SF \graphics\ xvl_lc Missin Streetscape EXISTING PEAK HOUR VOLUMES AND LANE CONFIGURATIONS FIGURE 2

13 Page 13 Future (Year 2025) Traffic Vlumes Future was evaluated fr the AM and PM peak hur. The Baseline analysis assumes the current lane cnfiguratins will be retained at each study intersectin. The results are summarized in Table 3. Grwth Frecast Methdlgy Future (Year 2025) traffic vlume frecasts were derived frm grwth frecasts cntained in the Eastern Neighbrhds EIR. Althugh the City prvided the TRAFFIX files frm the Eastern Neighbrhds EIR analysis t Fehr & Peers, it was nt pssible t derive the paths used t predict future grwth n specific crridrs. Therefre, Fehr & Peers derived a grwth frecast using the fllwing methdlgy: Frecasts f PM peak hur traffic grwth at the Suth Van Ness/16 th, Missin/16 th and Missin/24 th intersectins were derived frm the net change in traffic vlumes between 2005 and 2025 (as frecasted by the Eastern Neighbrhds EIR) PM peak hur traffic grwth at Flsm/16 th and Bryant/16 th was directly derived frm the Suth Van Ness/16 th grwth frecast. This methdlgy assumed an identical increase in trips at all three intersectins, with turning mvements distributed based n existing vlumes. PM peak hur traffic grwth at Suth Van Ness/24 th, Flsm/24 th and Bryant/24 th was directly derived frm the Missin/24 th grwth frecast. This methdlgy assumed an identical increase in trips at all three intersectins, with turning mvements distributed based n existing vlumes. Since the Eastern Neighbrhds EIR did nt cntain an AM peak hur analysis, the AM peak hur traffic grwth frecasts fr this memrandum were derived frm the PM peak hur grwth frecast: Number f trips was pr-rated dwnward (frm the PM peak hur frecast), t accunt fr lwer vlumes during the AM peak hur Directin f frecasted trips was reversed (i.e., eastbund AM grwth frecast was derived frm westbund PM grwth frecast; nrthbund AM grwth frecast was derived frm suthbund PM frecast, etc.)

14 Page 14 Future-Year Findings The ptential increase in trips at each intersectin was determined fr each turning mvement, and then added t the existing vlumes. Based n this methdlgy: Bryant Street/16 th Street wuld decline frm C t E 6 (indicating unacceptable peratins), during the PM peak hur. This ccurs due t increased nrthbund vlumes n Bryant Street, and eastbund vlumes n 16 th Street. During the AM peak hur, peratins decline frm B t C. Bryant Street/24 th Street wuld perate at B during the AM peak hur and C during the PM peak hur, indicating acceptable peratins with average r slight delay. Flsm Street intersectins at 16 th and 24 th Streets wuld cntinue t perate at B r better, indicating acceptable peratins with slight delays. Suth Van Ness Avenue/16 th Street wuld cntinue t perate at D during the AM peak hur, indicating acceptable peratins with tlerable delays, and C during the PM peak hur. Suth Van Ness Avenue/24 th Street wuld cntinue t perate at B during bth peak hurs. Missin Street/16 th Street wuld cntinue t perate unacceptably during the AM peak hur, with declining frm E t F. During the PM peak hur, this intersectin wuld cntinue t perate at D. Missin Street/24 th Street wuld degrade frm C t D during the AM peak hur, and the intersectin wuld cntinue t perate at D during the PM peak hur. 6 A mre refined future-year grwth frecast wuld likely yield an imprvement in. The methdlgy used fr this analysis based Bryant/16 th traffic grwth n the frecasted grwth at Suth Van Ness/16 th, which will likely be higher than what materializes at Bryant/16 th.

15 1 6 (2) 13 (17) 5 (2) 4 (8) 42 (30) 2 (16) Bryant St. 15 (50) 36 (47) 4 (22) 5 (4) 9 (37) 3 (13) LEGEND: 1 XX (YY) = Study Intersectins = AM (PM) Traffic Vlumes 17th St (2) 79 (40) 9 (2) Bryant St. 6 (22) 24 (47) 3 (50) 18th St. Missin Missin St. St. St. Capp St. St. Flsm St. St. Harrisn Harrisn St. St. St. Bryant Bryant St. St. St. N Nt t Scale 1 (3) 8 (23) 3 (7) 5 (30) 24 (170) 5 (15) 19th St. S. Van Van Ness Ness Ave. Ave (1) 20 (25) 4 (1) Flsm St. 5 (19) 33 (59) 2 (15) 20th St. 21st St. 5 (11) 37 (30) 4 (1) 1 (4) 17 (48) 2 (7) 22nd St (3) 73 (38) 14 (2) 1 (4) 10 (25) 1 (5) Flsm St. 9 (2) 28 (11) 1 (1) 4 (0) 50 (190) 2 (11) 23rd St (2) 46 (27) 3 (0) S. Van Ness Ave. 5 (8) 16 (59) 2 (0) 6 12 (2) 168 (45) 10 (3) S. Van Ness Ave. 8 (2) 27 (11) 3 (1) 7 4 (3) 25 (13) 1 (0) Missin St. 6 (5) 31 (55) 0 (1) 8 14 (9) 110 (41) 9 (0) Missin St. 9 (3) 25 (9) 5 (2) 3 (-10) 13 (36) 4 (14) 1 (0) 18 (50) 1 (9) 2 (3) 8 (24) 2 (7) 3 (0) 59 (195) 2 (8) 1 (1) 37 (19) 5 (9) 0 (-2) 11 (66) 2 (20) 1 (3) 8 (21) 1 (9) 2 (0) 37 (164) 6 (53) Missin Streetscape YEAR 2025 TRAFFIC GROWTH FORECAST * July 2009 SF \graphics\ frecast_2025 * Derived by Fehr & Peers frm EN EIR PM peak hur frecast fr Missin/16th, Missin/24th, and S. Van Ness/16th. FIGURE 3

16 1 47 (91) 111 (227) 52 (72) 57 (97) 568 (451) 22 (59) Bryant St. 164 (259) 393 (738) 42 (113) 161 (52) 303 (355) 113 (153) 17th St LEGEND: 1 = Study Intersectins = Traffic Signal XX (YY) = AM (PM) Traffic Vlumes = Lane Cnfiguratins 2 56 (41) 244 (313) 27 (35) Bryant St. 44 (52) 166 (258) 22 (66) 18th St. Missin Missin St. St. St. Capp St. St. S. Van Van Ness Ness Ave. Ave. Flsm St. St. Harrisn Harrisn St. St. St. Bryant Bryant St. St. St. 25 (26) 164 (192) 59 (58) 54 (53) 261 (385) 57 (51) 19th St. N Nt t Scale (34) 175 (522) 34 (39) Flsm St. 53 (84) 364 (813) 25 (64) 20th St. 21st St. 63 (99) 496 (534) 51 (89) 25 (41) 597 (446) 52 (63) 22nd St (53) 226 (384) 43 (60) 24 (29) 200 (201) 22 (37) Flsm St. 60 (36) 195 (176) 8 (21) 39 (32) 553 (575) 22 (34) 23rd St (62) 329 (755) 51 (72) S. Van Ness Ave. 56 (82) 183 (776) 16 (13) 6 37 (33) 518 (835) 31 (52) S. Van Ness Ave. 56 (41) 187 (206) 20 (13) 7 38 (61) 221 (412) 8 (0) Missin St. 69 (66) 336 (781) 4 (31) 8 44 (128) 340 (404) 28 (14) Missin St. 63 (78) 170 (149) 32 (57) 24 (0) 488 (366) 40 (84) 36 (47) 628 (432) 68 (79) 34 (23) 175 (193) 49 (55) 33 (30) 649 (599) 22 (24) 16 (5) 496 (354) 68 (94) 3 (0) 374 (411) 71 (103) 22 (31) 164 (147) 25 (53) 24 (8) 407 (496) 69 (168) Missin Streetscape YEAR 2025 PEAK HOUR VOLUMES AND LANE CONFIGURATIONS July 2009 SF \graphics\ FIGURE 4

17 Page 17 TABLE 3 FUTURE VOLUMES LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION CURRENT LANE CONFIGURATIONS Intersectin Peak Nrth-Suth Thrugh Mvement 1 AM Peak Hur PM Peak Hur Queue Length (Number f Vehicles per Lane) 2 Intersectin (secnds) (secnds) AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 24.8 E veh. 8 veh. 2. Bryant Street / 24 th Street B 13.8 C veh. 2 veh. 3. Flsm Street / 16 th Street B 12.3 B veh. 4 veh. 4. Flsm Street / 24 th Street B 13.4 B veh. 3 veh. 5. S. Van Ness Avenue /16 th Street D 40.7 C veh. 11 veh. 6. S. Van Ness Avenue / 24 th Street B 15.9 B veh. 7 veh. 7. Missin Street / 16 th Street F >80 D veh. 3 5 veh. 8. Missin Street/ 24 th Street D 36.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-f-magnitude cmparisn f existing queues and the impact f ptential lane reductins. 3 Reflects PM peak hur suthbund mvement n Missin Street. Eastbund apprach n 16 th Street wuld experience the lngest delay and queue length. Surce: Fehr & Peers, 2009

18 Page 18 ALTERNATIVE 1 (FOLSOM STREET) Under this alternative, Flsm Street wuld be cnverted frm its current cnfiguratin (tw thrugh lanes in each directin) t a three-lane cnfiguratin (ne thrugh lane in each directin with a tw-way center left-turn lane). This analysis assumes the cnversin wuld extend between 15 th and 25 th Streets. In rder t prvide a wrst-case analysis fr cnditins n Flsm Street, the analysis belw des nt assume that reducing the number f travel lanes wuld result in a diversin f traffic t adjacent crridr. Level f Service & Bus Analysis Alternative 1 with Existing Traffic Vlumes AM and PM peak hur with the prpsed 4 t 3 cnversin was analyzed based n turning mvement cunts cnducted at each study intersectin n April 30, The results are summarized in Table 4. Key findings, based n existing vlumes, are that: Impacts t intersectin at Flsm Street/16 th Street (based n existing vlumes) wuld be less than significant during bth peak hurs: During the AM peak hur, wuld degrade frm B t C (indicating acceptable peratins with average delays). Hwever, the length f the nrthbund queue wuld increase frm five vehicles per lane (based n existing lane cnfiguratins) t 13 vehicles (due t the reductin in travel lanes). delays wuld increase by 14 secnds per vehicle fr the nrthbund apprach, and ne secnd per vehicle fr the suthbund apprach. During the PM peak hur, wuld remain at B, and the length f the peak directin (suthbund) queue wuld increase frm fur t seven vehicles per lane (due t the lane reductin). delays wuld increase by five secnds per vehicle fr the nrthbund apprach, and seven secnds per vehicle fr the suthbund apprach. Impacts t intersectin at Flsm Street/24 th Street (based n existing vlumes) wuld be less than significant bth peak hurs: During bth peak hurs, wuld remain at B. Peak queue lengths wuld increase frm three t eight vehicles (nrthbund) during the AM peak hur, and frm three t five vehicles (suthbund) during the PM peak hur delays wuld fr the nrthbund apprach wuld increase by fur secnds during the AM peak hur, and tw secnds during the PM peak hur delays wuld fr the suthbund apprach wuld increase by less than ne secnd during the AM peak hur, and tw secnds during the PM peak hur

19 Page 19 s t transit culd ccur, due t the effect f increased queue length n bus travel time. Based n current transit perating characteristics: At mst intersectins n the study crridr (between 15 th and 26 th ), the increased delay is likely t be less than that predicted fr Flsm/24 th as 24 th Street has the highest vlume (excluding 16 th Street) amng crss streets. Based n that assumptin, average nrthbund delay (excluding the Flsm/16 th intersectin) wuld increase by fur secnds per intersectin during the AM peak hur, and tw secnds per intersectin during the PM peak hur. Based n these assumptins, ttal nrthbund delay between 15 th and 26 th (including the 16 th Street intersectin) wuld increase by up t 50 secnds during the AM peak hur, and by up t 23 secnds during the PM peak hur. Ttal suthbund delay between 15 th and 25 th (including the 16 th Street intersectin) wuld increase by less than 10 secnds during the AM peak hur, and by up t 25 secnds during the PM peak hur. Actual increases in delay t transit cmpared t existing cnditins will be reduced frm the amunts shwn here, since TEP measures will extend the green time fr a prtin f buses traveling n Flsm Street.. Based n these findings: Sme diversin f traffic t Suth Van Ness Avenue culd ccur. Hwever, such diversin shuld be limited, particularly due t existing delays at the Suth Van Ness/16 th intersectin. Transit enhancement measures envisined by the TEP culd reduce the likelihd f traffic diversin frm Flsm, since mtrists culd als benefit frm traffic signal enhancements such as extended green time. T the extent sme traffic wuld divert frm Flsm t Suth Van Ness, the minr transit travel time increases described abve wuld be even less than described.

20 Page 20 Alternative 1 with Future Traffic Vlumes AM and PM peak hur was analyzed based n the future (year 2025) grwth frecast derived by Fehr & Peers. The results are summarized in Table 5. Results d nt substantially change frm thse fund with existing vlumes. Flsm/16 th and Flsm/24 th wuld cntinue t perate at B during bth peak hurs, and peak queue lengths wuld increase. s t transit culd ccur, due t the effect f increased queue length n bus travel time. Hwever, the installatin f TEP signal pririty measures wuld allw many, if nt mst, buses t pass thrugh intersectins unimpeded by increased queues. The benefits f such measures culd be evaluated mre precisely using a micr-simulatin tl, such as VISSIM sftware, t evaluate the ptential effect n transit travel time. Significant diversin f traffic t adjacent crridrs is nt anticipated. Given increased delay n Missin, Suth Van Ness and Bryant, resulting frm future traffic grwth, the likelihd f future traffic diversin is further reduced (cmpared t the prbability f diversin based n existing vlumes).

21 Page 21 Intersectin TABLE 4 ALTERNATIVE 1 -- EXISTING VOLUMES LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION FOLSOM FOUR-TO-THREE CONVERSION AM Peak Hur Intersectin (secnds) PM Peak Hur (secnds) Peak Nrth-Suth Thrugh Mvement 1 Queue Length (Number f Vehicles per Lane) 2 AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 21.8 B veh. 7 veh. 2. Bryant Street / 24 th Street B 13.6 B veh. 2 veh. 3. Flsm Street / 16 th Street B 17.1 B veh. 7 veh. 4. Flsm Street / 24 th Street B 14.0 B veh. 5 veh. 5. S. Van Ness Avenue /16 th Street D 36.2 C veh. 10 veh. 6. S. Van Ness Avenue / 24 th Street B 14.6 B veh. 6 veh. 7. Missin Street / 16 th Street E 68.5 D veh. 5 veh. 8. Missin Street/ 24 th Street C 26.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur, and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-fmagnitude cmparisn f existing queues and the impact f ptential lane reductins. Surce: Fehr & Peers, 2009

22 Page 22 TABLE 5 FUTURE VOLUMES ALTERNATIVE 1 LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION FOLSOM FOUR-TO-THREE CONVERSION Intersectin Peak Nrth-Suth Thrugh Mvement 1 AM Peak Hur PM Peak Hur Queue Length (Number f Vehicles per Lane) 2 Intersectin (secnds) (secnds) AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 24.8 E veh. 8 veh. 2. Bryant Street / 24 th Street B 13.8 C veh. 2 veh. 3. Flsm Street / 16 th Street B 17.9 B veh. 11 veh. 4. Flsm Street / 24 th Street B 15.1 B veh. 5 veh. 5. S. Van Ness Avenue /16 th Street D 40.7 C veh. 11 veh. 6. S. Van Ness Avenue / 24 th Street B 15.9 B veh. 7 veh. 7. Missin Street / 16 th Street F >80 D veh. 3 5 veh. 8. Missin Street/ 24 th Street D 36.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-f-magnitude cmparisn f existing queues and the impact f ptential lane reductins. 3 Reflects PM peak hur suthbund mvement n Missin Street. Eastbund apprach n 16 th Street wuld experience the lngest delay and queue length. Surce: Fehr & Peers, 2009

23 Page 23 Ptential Transit Strategy Given the planned installatin f far-side bus stps and signal pririty measures n Flsm Street (described n Page 6 f this memrandum), implementatin f the prpsed fur-t-three lane cnversin n Flsm Street culd be carried ut withut significantly increasing transit travel time n the Flsm Street crridr. Key factrs that that culd serve t further reduce effects n travel time fr buses are as fllws: The effective installatin f signal pre-emptin measures (nt just signal pririty measures) t extend the green signal cycle when all buses apprach, culd ensure that buses wuld rarely be required t stp fr a red light alng Flsm Street. Since intersectin delay is largely limited t the queues that frm when vehicles must stp fr a red traffic signal, effective pre-emptin measures culd reduce ptential delays t transit resulting frm increased queue lengths. By extending the green signal cycle when buses apprach, queues shuld be effectively dispersed prir t the arrival f each bus (assuming that buses wuld ften arrive at the end f the cycle, which may be the case if buses are frequently triggering the signal ver-ride t extend the cycle). Prvisin f center left-turn lanes (as prpsed with the fur-t-three lane cnversin) shuld further ensure that queues are cleared when buses apprach. This wuld ccur by eliminating the delay caused when vehicles attempt t make a left-turn within the travel lane (as required by the current cnfiguratin). Due t the high vlume f east-west traffic n 16 th Street (including east-west transit service), it is nt likely t be feasible t allw fr full signal pre-emptin fr buses at the Flsm Street/16 th Street intersectin. Therefre, the prpsed fur-t-three cnversin wuld result in added delay t buses at that intersectin. Therefre, based n the transit assumptins described abve: The prpsed fur-t-three lane cnversin n Flsm Street is nt anticipated t result in significant impacts at intersectins suth f 16 th Street. Given the likelihd f impacts at Flsm Street/16 th Street, it may be advisable t adjust the bundaries f the prpsed 4 t 3 cnversin t extend frm 17 th t 26 th (thus excluding 16 th Street). Alternatively, mitigatin measures culd be investigated t reduce ptential the likelihd f ptential transit delay at Flsm/16 th. T avid ptential delays t transit at the Flsm Street/16 th Street intersectin, it is advisable t cnsider measures t reduce ptential transit delay due t increased queues at that intersectin. Such measures culd include: Installatin f queue-jump lanes, t allw nrthbund and suthbund buses t bypass the extended queue that wuld result if just ne thrugh lane is prvided at this intersectin; and/r Maintaining tw thrugh lanes at this intersectin, by limiting the fur-t-three cnversin t the segment f Flsm Street between 17 th and 26 th Streets; r

24 Page 24 Prviding a secnd thrugh lane during peak perids nly, by installing parking tw-away lanes that culd be cnverted t travel lanes. Prvisin f a secnd thrugh lane culd be limited t the traditinal peak directin f travel (nrthbund in the AM, and suthbund in the PM). ALTERNATIVE 2 (SOUTH VAN NESS AVENUE) Under this alternative, Suth Van Ness Avenue wuld be cnverted frm its current cnfiguratin (tw thrugh lanes in each directin) t a three-lane cnfiguratin (ne thrugh lane in each directin with a tw-way center left-turn lane). This analysis assumes the cnversin wuld extend between 15 th and 26 th Streets. In rder t prvide a wrst-case analysis fr cnditins n Suth Van Ness Avenue, the analysis belw des nt assume that reducing the number f travel lanes wuld result in a diversin f traffic t adjacent crridr. Level f Service Analysis Existing Traffic Vlumes AM and PM peak hur was analyzed based n turning mvement cunts cnducted at each study intersectin n April 30, The results are summarized in Table 6. Future Traffic Vlumes AM and PM peak hur was analyzed based n the future (year 2025) frecast. The results are summarized in Table 7. Findings Key findings f the Alternative 2 analysis (with existing and future vlumes) are that: Significant impacts t wuld ccur at the Suth Van Ness/16 th and Suth Van Ness/24 th intersectins. Suth Van Ness/16 th wuld perate unacceptably, at E during bth peak hurs, and peak-hur queue lengths wuld exceed 20 vehicles per lane Suth Van Ness/24 th wuld perate acceptably at C during the AM peak hur, with a lengthy peak-directin queue f 13 vehicles (based n existing vlumes) and 17 vehicles (based n future vlumes). During the PM peak hur, peratins wuld decline t E (indicating unacceptable peratins) with a peak-hur queue length exceeding 20 vehicles per lane Given excessive queue lengths, significant diversin f traffic wuld ccur. Given excess capacity n Flsm Street, this wuld result in a substantial number f trips diverting t a primarily residential crridr. Direct impacts t transit are nt anticipated, since Suth Van Ness Avenue is nt a MTA transit crridr. Hwever, diversin f traffic t adjacent crridrs culd affect transit perating speeds, particularly n Flsm Street.

25 Page 25 Intersectin TABLE 6 ALTERNATIVE 2 -- EXISTING VOLUMES LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION SOUTH VAN NESS FOUR-TO-THREE CONVERSION AM Peak Hur Intersectin (secnds) PM Peak Hur (secnds) Peak Nrth-Suth Thrugh Mvement 1 Queue Length (Number f Vehicles per Lane) 2 AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 21.8 B veh. 7 veh. 2. Bryant Street / 24 th Street B 13.6 B veh. 2 veh. 3. Flsm Street / 16 th Street B 12.0 B veh. 4 veh. 4. Flsm Street / 24 th Street B 12.9 B veh. 3 veh. 5. S. Van Ness Avenue /16 th Street E 64.0 E 66.0 >20 veh. >20 veh. 6. S. Van Ness Avenue / 24 th Street C 20.0 D veh. >20 veh. 7. Missin Street / 16 th Street E 68.5 D veh. 5 veh. 8. Missin Street/ 24 th Street C 26.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur, and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-f-magnitude cmparisn f existing queues and the impact f ptential lane reductins. 3 Assumes secnd suthbund lane n Suth Van Ness Avenue at 16 th Street during PM peak hur (due t use f parking lane). Surce: Fehr & Peers, 2009

26 Page 26 TABLE 7A ALTERNATIVE 2 WITH FUTURE (YEAR 2025) VOLUMES INTERSECTION LEVEL OF SERVICE & PEAK DIRECTION QUEUE LENGTH SOUTH VAN NESS FOUR-TO-THREE CONVERSION (UNMITIGATED) Intersectin AM Peak Hur Intersectin (secnds) PM Peak Hur Peak Nrth-Suth Thrugh Mvement 1 Queue Length (Number f Vehicles) (secnds AM PM 1. Bryant Street / 16 th Street C 24.8 E veh. 8 veh. 2. Bryant Street / 24 th Street B 13.8 C veh. 2 veh. 3. Flsm Street / 16 th Street B 12.3 B veh. 4 veh. 4. Flsm Street / 24 th Street B 13.4 B veh. 3 veh. 5. S. Van Ness Avenue /16 th Street E 72.0 E 75.1 >20 veh. >20 veh. 6. S. Van Ness Avenue / 24 th Street C 25.1 E veh. >20 veh. 7. Missin Street / 16 th Street F >80 D veh. 3 5 veh. 8. Missin Street/ 24 th Street D 36.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur and suthbund during the PM peak hur. Surce: Fehr & Peers, 2009

27 Page 27 Mitigated Alternative 2 Analysis Given the findings discussed abve, Fehr & Peers evaluated a mitigated Alternative 2 scenari, in which ne additinal travel lane wuld be prvided in the peak directin (nrthbund in the AM, and suthbund in the PM) by installing parking tw-away lanes that culd be cnverted t travel lanes during peak perids. Table 7B shws the findings with the Mitigated Alternative 2 ( 3+1 lane cnfiguratin n Suth Van Ness). As shwn, bth study intersectins (Suth Van Ness/16 th and Suth Van Ness/24 th ) wuld perate acceptably during bth peak hurs. Overall wuld nt differ substantially frm withut prject cnditins, since peak-directin capacity wuld increase slightly cmpared t the existing lane cnfiguratin (due t the prvisin f a center left-turn lane). Based n this analysis, the mitigated Alternative 2 ( 3+1 cnversin) culd be implemented with less than significant impacts n intersectin and transit. Further study may be warranted t cnsider ptential impacts n pedestrian circulatin and/r parking. TABLE 7B ALTERNATIVE 2 WITH FUTURE (YEAR 2025) VOLUMES INTERSECTION LEVEL OF SERVICE & PEAK DIRECTION QUEUE LENGTH SOUTH VAN NESS FOUR-TO-THREE CONVERSION (MITIGATED 3+1 ) Intersectin AM Peak Hur Intersectin (secnds) PM Peak Hur Peak Nrth-Suth Thrugh Mvement 1 Queue Length (Number f Vehicles) (secnds AM PM 1. Bryant Street / 16 th Street C 24.8 E veh. 8 veh. 2. Bryant Street / 24 th Street B 13.8 C veh. 2 veh. 3. Flsm Street / 16 th Street B 12.3 B veh. 4 veh. 4. Flsm Street / 24 th Street B 13.4 B veh. 3 veh. 5. S. Van Ness Avenue /16 th Street D 41.0 C veh. 10 veh. 6. S. Van Ness Avenue / 24 th Street B 18.1 C veh. 7 veh. 7. Missin Street / 16 th Street F >80 D veh. 5 veh. 8. Missin Street/ 24 th Street D 36.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur and suthbund during the PM peak hur. Surce: Fehr & Peers, 2009

28 Page 28 ALTERNATIVE 3: FOLSOM STREET + BRYANT STREET Under this alternative, Flsm Street wuld be cnverted frm 4 t 3 lanes (as called fr by Alternative 1) and Bryant Street wuld be cnverted frm 4 t 3 lanes (between 23 rd and 26 th Streets). Level f Service Analysis Existing Traffic Vlumes AM and PM peak hur was analyzed based n turning mvement cunts cnducted at each study intersectin n April 30, The results are summarized in Table 8. Future Traffic Vlumes The results, based n future (year 2025) traffic vlumes, are summarized in Table 9. Findings Based n the existing and future-year analysis: Impact findings n Flsm Street wuld nt differ frm the findings f Alternative 1 (see pages 15-19) The Bryant/24 th intersectin wuld perate at B during the AM peak hur, B (existing vlumes) r C (future vlumes) during the PM peak hur. The minr increase in queue length and vehicle delay culd be alleviated by remval f stp signs at ne r mre intersectins Given the relatively shrt length f the Bryant study crridr, the relatively minr change in queue lengths, and the likelihd that increased delay culd be mitigated with stp sign remval, perating speeds fr transit service n Bryant Street are anticipated t be less than significant. Since Bryant Street is already limited t ne lane in each directin (nrth f 23 rd ), diversin f traffic t adjacent crridrs is nt anticipated.

29 Page 29 Intersectin TABLE 8 ALTERNATIVE 3 -- EXISTING VOLUMES LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION FOLSOM & BRYANT FOUR-TO-THREE CONVERSION AM Peak Hur Intersectin (secnds) PM Peak Hur (secnds) Peak Nrth-Suth Thrugh Mvement 1 Queue Length (Number f Vehicles per Lane) 2 AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 21.8 B veh. 7 veh. 2. Bryant Street / 24 th Street B 14.0 B veh. 3 veh. 3. Flsm Street / 16 th Street B 17.1 B veh. 7 veh. 4. Flsm Street / 24 th Street B 14.0 B veh. 5 veh. 5. S. Van Ness Avenue /16 th Street D 36.2 C veh. 10 veh. 6. S. Van Ness Avenue / 24 th Street B 14.6 B veh. 6 veh. 7. Missin Street / 16 th Street E 68.5 D veh. 5 veh. 8. Missin Street/ 24 th Street C 26.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur, and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-fmagnitude cmparisn f existing queues and the impact f ptential lane reductins. Surce: Fehr & Peers, 2009

30 Page 30 TABLE 9 FUTURE VOLUMES ALTERNATIVE 3 LEVEL OF SERVICE & NORTH/SOUTH QUEUE COMPARISION FOLSOM & BRYANT FOUR-TO-THREE CONVERSION Intersectin Peak Nrth-Suth Thrugh Mvement 1 AM Peak Hur PM Peak Hur Queue Length (Number f Vehicles per Lane) 2 Intersectin (secnds) (secnds) AM Peak Hur PM Peak Hur 1. Bryant Street / 16 th Street C 24.8 E veh. 8 veh. 2. Bryant Street / 24 th Street B 14.4 C veh. 6 veh. 3. Flsm Street / 16 th Street B 17.9 B veh. 11 veh. 4. Flsm Street / 24 th Street B 15.1 B veh. 5 veh. 5. S. Van Ness Avenue /16 th Street D 40.7 C veh. 11 veh. 6. S. Van Ness Avenue / 24 th Street B 15.9 B veh. 7 veh. 7. Missin Street / 16 th Street F >80 D veh. 3 5 veh. 8. Missin Street/ 24 th Street D 36.8 D veh. 4 veh. Ntes: 1 Peak directin nrth-suth mvement is nrthbund during the AM peak hur and suthbund during the PM peak hur. 2 Theretical queue length based n TRAFFIX analysis sftware f stand-alne intersectin. Actual queue length will differ due t upstream metering effect (at adjacent signalized and stp-cntrlled intersectins) and ther site-specific factrs. As prvided here, the queue length values are intended t prvide an rder-f-magnitude cmparisn f existing queues and the impact f ptential lane reductins. 3 Reflects PM peak hur suthbund mvement n Missin Street. Eastbund apprach n 16 th Street wuld experience the lngest delay and queue length. Surce: Fehr & Peers, 2009

31 Page 31 CONCLUSIONS Based n the findings described abve: Intersectin Level f Service Under Alternatives 1 and 3, impacts t intersectin wuld be less than significant based n City f SF Guidelines. Althugh queue lengths wuld increase in the peak directin (nrthbund during the AM peak and suthbund during the PM peak) n Flsm Street, average delays wuld remain acceptable. Significant impacts t intersectin n Suth Van Ness Avenue wuld result frm Alternative 2. Hwever, such impacts culd be avided with Mitigated Alternative 2 (prvisin f an additinal peak directin lane by creating parking tw-away lanes, nrthbund in the AM and suthbund in the PM). Traffic Diversin Diversin f traffic t parallel crridrs is nt anticipated t result in significant impacts under Alternatives 1 r 3, r Mitigated Alternative 2 ( 3+1 lane cnfiguratin n Suth Van Ness): Traffic is unlikely t divert t Missin r Bryant Streets based n the analysis f traffic vlumes, queue lengths, and field bservatins cnducted by Fehr & Peers and Nelsn\Nyggard. The existing peak queue lengths at Missin/16 th, Missin/24 th, and Bryant/16 th shuld serve t discurage the use f thse tw crridrs as an alternate rute. In additin, travel speeds 7 appear t be slwer n Missin and Bryant Streets, particularly in cmparisn with Suth Van Ness Avenue. Therefre, traffic diversin under all alternatives is likely t be limited t the Flsm and Suth Van Ness crridrs. Fr purpses f the initial draft f this analysis, the analysis did nt assume that diversin wuld ccur, in rder t prvide a wrst-case assessment f impacts n the selected crridrs (with n diversin f traffic frm the selected crridr). Under Alternative 1 ( 4 t 3 cnversin n Flsm Street), increased queue length wuld cause a prtin f traffic t divert t Suth Van Ness Avenue. Hwever, such diversin wuld be limited, given wrse at Suth Van Ness/16th (relative t intersectins n Flsm). Measures t reduce delay at the Flsm/16 th intersectin (r excluding Flsm/16 th frm the prpsed lane cnversin) shuld reduce the likelihd f such diversin ccurring. Under Alternative 2 ( 4 t 3 cnversin n Suth Van Ness Avenue), increased queue length wuld likely cause a substantial prtin f traffic t divert t Flsm Street. Given current and future excess capacity, diverted traffic culd be accmmdated n Flsm Street withut degrading, but culd impact transit service. 7 Further review f travel speed data is recmmended, if available, t augment this reprt.

Technical Memorandum. Introduction. Projected Traffic Volumes

Technical Memorandum. Introduction. Projected Traffic Volumes Technical Memrandum T: Mr. Eduard Garcia, PSW Real Estate, LLC Frm: Christy Lambeth, P.E., PTOE Lambeth Engineering Assciates, PLLC, F-19508 Date: May 29, 2018 Re: Traffic Assessment fr Prpsed Single-Family

More information

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013 PUBLIC OPEN HOUSE Panet Rad / Mlsn Street Recnstructin April 24, 2013 T address issues assciated with traffic grwth arund Mlsn Street. Prject issues include: Delay at rail crssings Traffic cngestin at

More information

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No. MEMORANDUM PROJECT: Nrth Santa Mnica Bulevard Resnsturctin Prject N. 1BEVO41000 T: frm: City f Beverly Hills Traffic and Cmmissin Psmas Iteris Date: July,9 2015 Subject: Traffic Mitigatin During NSMB Cnstructin

More information

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012 PUBLIC OPEN HOUSE Preliminary Engineering Study t Upgrade the Pembina Highway Underpass MAY 9, 2012 The number f nrthbund traffic lanes at the Pembina Highway Underpass need t be increased frm tw lanes

More information

City of Ottawa. Transit Solutions. O c t o b e r

City of Ottawa. Transit Solutions. O c t o b e r City f Ottawa Prject N. 101-16386 O c t b e r 2 0 1 1 O p e r a t i n a l I m p a c t s a n d P l i c y I m p l i c a t i n s f B u s B a y s i n t h e C i t y f O t t a w a - E x e c u t i v e S u m m

More information

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY Images f cmmunity cmments n the Study Area maps The first Public Infrmatin Centre was held fr bth the Casablanca Bulevard and GO Access Envirnmental Assessment and the Livingstn Avenue Extensin Envirnmental

More information

Technical Briefing Rapid Transit

Technical Briefing Rapid Transit Technical Briefing Rapid Transit T Rapid Transit Implementatin Wrking Grup Date March 6, 2017 Frm Subject The Shift Team Preferred Dwntwn Ruting The preferred Dwntwn rutes fr Rapid Transit are illustrated

More information

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission Philadelphia City Planning Cmmissin INSTRUCTIONS This Checklist is an implementatin tl f the Philadelphia Cmplete Streets Handbk (the Handbk ) and enables City engineers and planners t review prjects fr

More information

Appendix C. Travel Demand Forecasting Technical Memorandum

Appendix C. Travel Demand Forecasting Technical Memorandum Appendix C Travel Demand Frecasting Technical Memrandum MEMORANDUM Date: T: Frm: Subject: Bb Watts, Twn f Castle Rck Karl Buchhlz, Muller Engineering Chris Sheffer, Nick VanderKwaak, Fehr & Peers Travel

More information

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4 MEETING SUMMARY Nrth Avenue Recnstructin Prject Cntext Sensitive Slutins Advisry Grup Meeting #4 ATTENDEES: LOCATION: PREPARED BY: COPIES: Sign-in sheet attached Brkfield Library, Snia Bielmeier Cmmunity

More information

Sellwood Bridge AM Traffic Evaluation

Sellwood Bridge AM Traffic Evaluation Sellwd Bridge AM Traffic Evaluatin SMILE Transprtatin Cmmittee Meeting Prtland Bureau f Transprtatin Jamie Jeffrey, Rich Newlands, Jake Milligan Gals and Objectives Understand and reduce the impacts f

More information

Presented by: Presented to:

Presented by: Presented to: The Challenge f Implementing Prtected Bike Lanes Delaware Avenue: A Case Study Demnstratin Presented by: Presented t: Octber 25, 2016 Presentatin Outline FAST Act Impact n Bicycle Facilities Planning Ptential

More information

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station CARLSON BOULEVARD CORRIDOR OVERVIEW The prtin f Carlsn Bulevard within the study area stretches apprximately 3.25 miles nrth t suth frm Maine Avenue t the El Cerrit Plaza BART Statin area near San Pabl

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Seven (7) Page Frm An Applicatin frm the State Highway r Transprtatin Department f Oklahma fr (select ne f the fllwing): Eliminatin f a U.S.

More information

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated. 100 20111 93A Avenue Langley, BC V1M 4A9 e bcta@bctrucking.cm t 604 888 5319 f 604 888 2941 tll free 1 800 565 2282 bctrucking.cm 16 th Avenue Crridr Imprvements BCTA Survey Results & Recmmendatins September

More information

Project Advisory Team Existing Conditions Meeting Agenda

Project Advisory Team Existing Conditions Meeting Agenda Prject Advisry Team Existing Cnditins Meeting Agenda April 25, 2017 Viera Gvernmental Center, Atlantic Rm, Building C, 3 rd Flr 10:00 AM 12:00 PM Wickham Rad Operatinal Analysis 1. Prject Backgrund/Overview

More information

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes. Advisry Grup Meeting #7. March 9, 2017. Transcribed Breakut Grup Discussin Ntes. Discussin Questins. What feedback have yu heard frm yur cmmunities abut the near-term strategies? What d yu think wrks abut

More information

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary TRANSPORTATION IMPACT ASSESSMENT Executive Summary OVERVIEW Early in ur dialgue with neighburs, the prject team fund that a number f cmmunity members had questins abut the impact that the prpsed develpment

More information

The Facts About Brentwood School s Expansion Plans

The Facts About Brentwood School s Expansion Plans The Facts Abut Brentwd Schl s Expansin Plans September 2016 Did Yu Knw In exchange fr a 30-year Master Plan that wuld increase enrllment by 38% and require 13 years f cnstructin, Brentwd Schl says it will

More information

Federal Way City Center Access Study Comment Log Summary

Federal Way City Center Access Study Comment Log Summary Prject verview The City f Federal Way is pursuing the City Center Access prject t find ways t imprve access t Federal Way s City Center and the surrunding area. The City is studying slutins t cngestin

More information

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV Lamb Bulevard Safety Management Plan Between E. Desert Inn Rd. t Lake Mead Blvd. Clark Cunty, NV Tuesday, December 5, 2017 4-7 p.m. Presentatin at 5:30 p.m. Walnut Cmmunity Center 3075 N. Walnut Rd. Las

More information

Completed Project Justification Package Example

Completed Project Justification Package Example Cmpleted Prject Justificatin Package Example Nature f the Prblem: Describe the nature f the prblem that the prject intends t mitigate r fix. Fr example, is it designed t address a current cngestin, peratinal

More information

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network Mp, Revised Criteria and Joint Resolution EXECUTIVB SUMMARY Regular Bard Actin Item 98 Apprval f Revised Reginal Radway Netwrk M"p, Revised Criteria and Jint Reslutin Objective: Fr the Bard t apprve the revised Reginal Radway Netwrk Map, Revised

More information

Users Requirements Statement

Users Requirements Statement Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin

More information

E25 FATIGUE MANAGEMENT

E25 FATIGUE MANAGEMENT E25 FATIGUE MANAGEMENT PURPOSE AND SCOPE This Prcedure prvides the requirements and guidance needed t manage fatigue fr Laing O Rurke railway peratins. It will need t be read in cnjunctin with the rail

More information

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options Glden Valley Rad Parking Management Strategies Assessment Purpse The purpse f the Parking Management Strategy Assessment is t synthesize parking discussins during the Metr Blue Line Extensin (Bttineau

More information

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur

More information

POWELL BOULEVARD ROAD SAFETY AUDIT

POWELL BOULEVARD ROAD SAFETY AUDIT Oregn Department f Transprtatin POWELL BOULEVARD ROAD SAFETY AUDIT 20th Avenue t 33rd Avenue September 2014 Prepared fr: ODOT Regin 1 Traffic 123 NW Flanders Prtland, OR 97209 503.731.8220 Prepared by:

More information

Deer harvest objective for the Deer Plan

Deer harvest objective for the Deer Plan Deer harvest bjective fr the Deer Plan December 12, 2017 Summary and Backgrund fr DMPAC April 2018 NOTE: THIS IS A COPY OF A DOCUMENT DISCUSSED WITH DMPAC IN 2017. IT CONTAINS INFORMATION CONSIDERED BY

More information

CHAPTER 4 VISION, GOALS AND OBJECTIVES

CHAPTER 4 VISION, GOALS AND OBJECTIVES CHAPTER 4 VISION, GOALS AND OBJECTIVES Defining a visin, gals, and bjectives creates the structure fr a plan. T develp the visin fr this Plan, the team reviewed the 2012 MPO Cmprehensive Pathways Plan

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting MEETING MINUTES Athertn Middleield Rad Bicycle Lane Imprvements Public Meeting Date: Octber 2, 2017 Time: 4:00 pm 6:00 pm Lcatin: 94 Ashield Rad, Athertn, CA Presenters: Nadia Bsan, Interwest Cnsulting

More information

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 Athletic Australia Selectin Plicy 2019 Wrld Crss Cuntry Champinships ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 This dcument sets ut the basis

More information

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

DRAFT - TRANSPORTATION AND PUBLIC HEALTH DRAFT - TRANSPORTATION AND PUBLIC HEALTH Backgrund/Intrductin Transprtatin Outlk 2040, the Kansas City regin s lng-range transprtatin plan, includes a public health gal t facilitate healthy, active living.

More information

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures

More information

Highway Construction

Highway Construction Ohi Department f Transprtatin Traffic Advisry DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 Nrth McCullugh St. Lima, Ohi 45801 www.transprtatin.hi.gv/dist1 www.facebk.cm/odotdistrict1; https://twitter.cm/dt_nwhi

More information

STATE OF NORTH CAROLINA Office of the State Auditor

STATE OF NORTH CAROLINA Office of the State Auditor STATE OF NORTH CAROLINA Office f the State Auditr Beth A. Wd, CPA State Auditr 2 S. Salisbury Street 20601 Mail Service Center Raleigh, NC 27699-0601 Telephne: (919) 807-7500 Fax: (919) 807-7647 Internet

More information

3 ways to build a healthy future for NSW

3 ways to build a healthy future for NSW 3 ways t build a healthy future fr NSW Healthy cities Healthy lifestyle Healthy children Dear Treasurer, As yu prepare fr the 2016-2017 Budget there are 3 key prgrams the Heart Fundatin NSW asks yu t fund

More information

Blue Crab Traffic Light 2015 Update and Management Options. March 23, 2016

Blue Crab Traffic Light 2015 Update and Management Options. March 23, 2016 Blue Crab Traffic Light 2015 Update and Management Optins March 23, 2016 Amendment 2 t the Nrth Carlina Blue Crab Fishery Management Plan adpted by the Marine Fisheries Cmmissin in Nvember 2013 incrprated

More information

Creston Road Complete and Sustainable Streets Corridor Plan

Creston Road Complete and Sustainable Streets Corridor Plan Crestn Rad Cmplete and Sustainable Streets Crridr Plan Prepared fr the City f Pas Rbles Submitted by W-Trans TRAFFIC ENGINEERING TRANSPORTATION PLANNING Balancing Functinality and Livability since 1995

More information

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill. OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,

More information

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner, Minutes f the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE DATE: December 10, 2015 TIME: PLACE: 10:00 a.m. Cnference Rm B Kensha Cunty Center 19600 75 th Street Bristl, WI Members Present Gary

More information

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1 Alternative Ways t Imprve Traffic n Lp 360 Paul Schumann 1 February 13, 2015 Intrductin "Lp 360 prvides primary access t far west Austin, acting as a thrughfare fr residents and as a cmmuter rute fr thse

More information

2017 Active Allegheny Grant Program Program Guidelines

2017 Active Allegheny Grant Program Program Guidelines Redevelpment Authrity f Allegheny Cunty Nte: Fr infrmatin purpses nly. Prgram guidelines subject t change prir t next funding cycle. 2017 Active Allegheny Grant Prgram Prgram Guidelines Intrductin The

More information

Additional Investigation Report for a Second Bridge Across the Ashburton River

Additional Investigation Report for a Second Bridge Across the Ashburton River Additinal Investigatin Reprt fr a Secnd Bridge Acrss the Ashburtn River Cntract C554 Reprt Additinal Investigatins fr a Secnd Bridge Acrss the Ashburtn River Cntract C554 Prepared By Bill Rice Principal

More information

Subject: Recommended Updates to Transportation Development Parameters

Subject: Recommended Updates to Transportation Development Parameters T: Frm: Members f the Balba Reservir Cmmunity Advisry Cmmittee ( CAC ) Jeremy Shaw, Planning Department Date: 5/20/2016 Subject: Recmmended Updates t Transprtatin Develpment Parameters This memrandum cntains

More information

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE 14: IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE Demnstrate the capability and resurces t implement

More information

LAND 2 Aesthetic Resources Technical Study Plan Kaweah Project (FERC Project No. 298)

LAND 2 Aesthetic Resources Technical Study Plan Kaweah Project (FERC Project No. 298) POTENTIAL RESOURCE ISSUE: Aesthetic cnditins, including visual quality and nise. PROJECT NEUS: The presence f Prject facilities culd affect visual resurces. Helicpter use fr rutine peratins and maintenance

More information

South Portland Public Input Meeting Summary Notes and Public Comments

South Portland Public Input Meeting Summary Notes and Public Comments Prtland Suth Prtland Smart Crridr Plan Bradway Neighbrhd Meeting Intrductin Prtland Suth Prtland Smart Crridr Plan Suth Prtland Public Input Meeting Summary Ntes and Public Cmments Nvember 2, 2017, Suth

More information

Nine Elms Lane and Battersea Park Road

Nine Elms Lane and Battersea Park Road Nine Elms Lane and Battersea Park Rad Sustrans respnse t Transprt fr Lndn Summary Sustrans welcmes the cnsultatin n prpsals fr changes t Nine Elms Lane and Battersea Park Rad, and supprts the ambitin t

More information

DOG AGILITY MASTERS TEAM 2012 Tournament Rules

DOG AGILITY MASTERS TEAM 2012 Tournament Rules DOG AGILITY MASTERS TEAM 2012 Turnament Rules Descriptin: This turnament series is pen t all cmpetitrs with any dg, regardless f cmpetitin level (i.e., starters, advanced and masters). A team may be cmprised

More information

Lamorinda Action Plan

Lamorinda Action Plan Lamrinda Actin Plan Final Prepared by: 1970 Bradway, Suite 740 Oakland, CA 94612 September 2017 1 Intrductin... 1 1.1 The Actin Plan... 2 1.2 2014 Actin Plan... 3 1.3 Outline f the Dcument... 5 2 Actin

More information

Highway Construction

Highway Construction Ohi Department f Transprtatin Traffic Advisry DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 Nrth McCullugh St. Lima, Ohi 45801 www.transprtatin.hi.gv/dist1 www.facebk.cm/odotdistrict1; https://twitter.cm/dt_nwhi

More information

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls

More information

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013 Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees

More information

Kingsthorpe State School Executive Summary

Kingsthorpe State School Executive Summary Kingsthrpe State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kingsthrpe State Schl frm 7 t 11 May 2015. It prvides an evaluatin f the schl s perfrmance

More information

CITY OF SACRAMENTO. Regulatory Compliance Program

CITY OF SACRAMENTO. Regulatory Compliance Program CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03

More information

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals. OBJECTIVE 20: MEDICAL SERVICES - TRANSPORTATION OBJECTIVE Demnstrate the adequacy f vehicles, equipment, prcedures, and persnnel fr transprting cntaminated, injured, r expsed individuals. INTENT This bjective

More information

Bikeway Classification

Bikeway Classification Bikeway Classificatin Classificatin f bikeway types is an imprtant step t help planners cmprehend hw parts f the bike netwrk functin and wrk tgether. Classificatin can als prvide an understanding f the

More information

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO 1 Briefing Outline Review f Waterfrnt Seattle prjects Alaskan Way, Prmenade, and Overlk Walk ( AWPOW ) AWPOW Draft Envirnmental Impact Statement

More information

A template mass rescue operations plan

A template mass rescue operations plan The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general

More information

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts One Financial Plaza 1350 Main Street 3rd Flr, Cmmunity Rm A Springfield, Massachusetts 1 Leading the Natin in Transprtatin Excellence www.mass.gv/massdt April 9, 2015 Agenda Welcme & Intrductins Overview

More information

Technical Memorandum #18 - Transit Solutions - DRAFT

Technical Memorandum #18 - Transit Solutions - DRAFT Technical Memrandum #18 - Transit Slutins - DRAFT DATE: Octber 24, 2017 TO: FROM: SUBJECT: Crvallis TSP/TDP Prject Management Team and Stakehlders Nelsn\Nygaard Cnsulting Assciates Crvallis Transprtatin

More information

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018 District 6 and Unit 190 (D4) STaC - Cnditins f Cntest & Reprting Instructins Fall 2018 Key Infrmatin fr Club Owners: Please read and pst near the scring cmputer fr the directrs use during STaC week. Sanctin

More information

RGGI 101. Webinar for NEPOOL Participants IMAPP Proceeding. August 19, 2016

RGGI 101. Webinar for NEPOOL Participants IMAPP Proceeding. August 19, 2016 RGGI 101 Webinar fr NEPOOL Participants IMAPP Prceeding August 19, 2016 1 Why Market-Based Multi-State Cap? Prven mdel (see EPA webpage What is emissins trading? https://www.epa.gv/emissins-tradingresurces/what-emissins-trading

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specificatin Gen DB MF Cnslidatin and Gas Burn Reprt UI/API Dc ID: GNFDMDEHU6BB-46-53 Page 1 f 18 Disclaimer All infrmatin cntained in this draft Business Requirements Specificatin

More information

Core Measure: Functional Gait Assessment (FGA)

Core Measure: Functional Gait Assessment (FGA) Cre Measure: Functinal Gait Assessment (FGA) Overview The FGA is used t assess pstural stability during walking and assesses an individual's ability t perfrm multiple mtr tasks while walking. The tl is

More information

Project No.: Notes taken by:

Project No.: Notes taken by: Transprtatin Land Develpment Envirnmental S e r v i c e s 101 Walnut Street Pst Office Bx 9151 Watertwn, MA 02471-9151 Telephne (617) 924-1770 Fax (617) 924-2286 Meeting Ntes Attendees: Attached Date/Time:

More information

Shepparton North-East Growth Corridor Development

Shepparton North-East Growth Corridor Development Sheppartn Nrth-East Grwth Crridr Develpment Traffic Impact Assessment Reprt Client: Greater Sheppartn City Cuncil Prject 3040 Final Reprt: 22/08/204 st Flr 32 Upper Heidelberg Rad Ivanhe Vic 309 PO Bx

More information

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field COLORS Object: Successfully run yur chice f ne f the tw ver-lapping mini-agility curses n the same field Scring: All bstacles must be perfrmed successfully t qualify unless within the faults allwed Levels

More information

Tenderloin Little Saigon Area Study

Tenderloin Little Saigon Area Study Tenderlin Little Saign Area Study Summary f past studies Nelsn\Nygaard Cnsulting Assciates 785 Market Street, Suite 1300 San Francisc, CA 94103 Octber 2005 Page ii Nelsn\Nygaard Cnsulting Assciates Intrductin

More information

Recreational Sports Racquetball Rules

Recreational Sports Racquetball Rules Recreatinal Sprts Racquetball Rules Mdificatins have been made t suit BYU-Idah Recreatinal Sprts prgrams. Rule 1: Players Racquetball is an individual sprt, as such each team shall cnsist f ne (1) player.

More information

LOS ANGELES COUNTYWIDE Bicycle Policy. ~M_~ Metropolitan. Transportation.. Authority. I.E" Korve. I...Engineering

LOS ANGELES COUNTYWIDE Bicycle Policy. ~M_~ Metropolitan. Transportation.. Authority. I.E Korve. I...Engineering LOS ANGELES COUNTYWIDE Bicycle Plicy ~M_~ Metrplitan Transprtatin.. Authrity I.E" Krve I...Engineering Adpted by Ls Angeles Cunty Metrplitan Transprtatin Authrity April 1994 Patti Helm, Prject Manager

More information

Stakeholder Working Group (SWG) Meeting #2 Summary

Stakeholder Working Group (SWG) Meeting #2 Summary Stakehlder Wrking Grup (SWG) Meeting #2 Summary Date: Thursday, September 22, 2016 Time: 5:30-7:30 PM Lcatin: Fur Mile Histric Park Overview The G Speer Leetsdale Mbility Study is explring ptential imprvement

More information

REGIONAL ADMINISTRATORS. PATRICK J. KAPUST Acting Director, Directorate of Enforcement Programs DATE: October 19, 2017

REGIONAL ADMINISTRATORS. PATRICK J. KAPUST Acting Director, Directorate of Enforcement Programs DATE: October 19, 2017 MEMORANDUM FOR: REGIONAL ADMINISTRATORS THROUGH: THOMAS GALASSI Acting Deputy Assistant Secretary FROM: PATRICK J. KAPUST Acting Directr, Directrate f Enfrcement Prgrams DATE: Octber 19, 2017 SUBJECT:

More information

Hambledon State School Executive Summary

Hambledon State School Executive Summary Hambledn State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Hambledn State Schl frm 9 t 11 September 2015. It prvides an evaluatin f the schl s perfrmance

More information

Process Safety Management Program for Contractors

Process Safety Management Program for Contractors Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f

More information

Tewantin State School Executive Summary

Tewantin State School Executive Summary Tewantin State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Tewantin State Schl frm 6 t 8 Octber 2015. It prvides an evaluatin f the schl s perfrmance

More information

Jobs in Green and Healthy Transport

Jobs in Green and Healthy Transport Infrmal dcument n. 6 THE PEP Steering Cmmittee, 11th sessin, 27-28 Nvember 2013 Item 7 (c) f the prvisinal agenda Implementing the Amsterdam Declaratin THE PEP Partnerships Implementing the Amsterdam Declaratin

More information

Transportation Vision

Transportation Vision TRANSPORTATION 77 2.8 Transprtatin Visin Successful mixed-use develpments are busy places where peple want t be fr a wide variety f reasns. Successful streets cllect wrkers, visitrs, turists, custmers,

More information

Parking Committee Report to Commissioners AUGUST 17, 2018

Parking Committee Report to Commissioners AUGUST 17, 2018 Parking Cmmittee Reprt t Cmmissiners AUGUST 17, 2018 REHOBOTH IN THE SUMMER The Cmmittee Linda Kauffman Chair Trey Krause Mark Saunders Je Hill Jess Behringer Randy Masn Brian Barry Jeff Hamer The Basics

More information

Vista Field Redevelopment Project Transportation System Impact Evaluation Volume II Additional Analysis Completed for Mitigation Requirements

Vista Field Redevelopment Project Transportation System Impact Evaluation Volume II Additional Analysis Completed for Mitigation Requirements Vista Field Redevelpment Prject Transprtatin System Impact Evaluatin Vlume II Additinal Analysis Cmpleted fr Mitigatin Requirements Prepared fr Prt f Kennewick May 2016 Prepared by Vista Field Redevelpment

More information

CITY of LOMPOC 2030 General Plan

CITY of LOMPOC 2030 General Plan 2030 General Plan INTRODUCTION AND AUTHORITY The Circulatin Element is required by the Gvernment Cde [Sectin 65302(b)], which states that the Circulatin Element must include the general lcatin and extent

More information

Urangan State High School Executive Summary

Urangan State High School Executive Summary Urangan State High Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Urangan SHS frm 22 t 25 June, 2015. It prvides an evaluatin f the schl s perfrmance

More information

Voltage Stability IROL Monitoring

Voltage Stability IROL Monitoring Vltage Stability IROL Mnitring RC Users Grup April 11, 2017 Tny Burt Saad Malik Purpse IROL Mnitring IROL Prcedures Insight int Peak RTVSA tl Lessns Learned Cntinuus Imprvement 2 IROLs in Peak s Ftprint

More information

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success) ELLERSLIE AFC OPERATIONAL PLAN (Game Develpment and Ftball Success) Ellerslie AFC has a reputatin thrughut the Auckland ftball cmmunity as a family-friendly club that prvides an enjyable and rewarding

More information

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work Field Instructin 5.2 Ples Inspectin and Supprt Prir t Cmmencement f Wrk Purpse This instructin utlines the minimum inspectin and supprting requirements fr wrk n ples. Safety Befre cmmencement f wrk, a

More information

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W Bl vd lb e ville Rd N Maripsa St n NG N 5 E 35th Ave Int er sta te 2 Br ig ht E 36th Ave E Bruce Randlph Ave E Martin Luther King Blvd E 31St Ave 30 St er St St ut th n al W rim St th St Pl m ar en Gl

More information

Softball Umpire Fitness Testing Protocols. Softball Umpire Fitness Testing Protocols

Softball Umpire Fitness Testing Protocols. Softball Umpire Fitness Testing Protocols Sftball Umpire Fitness Testing Prtcls Sftball Umpire Fitness Testing Prtcls 1 Sftball Umpire Fitness Testing Prtcls PHYSICAL ACTIVITY READINESS QUESTIONAIRE LIST OF STRETCHES CHAIR STAND TEST WALL SIT

More information

Long-Term Transportation Plan

Long-Term Transportation Plan Lng-Term Transprtatin Plan Implementatin & Mnitring Strategy TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 IMPLEMENTATION PLAN... 5 2.1 RESPONSIBILITY AND METHODS FOR IMPLEMENTATION...5 2.2 EVALUATION...8

More information

All Students MUST fly with the assistance of a Club approved Instructor until such time as he/she has passed his/her Wings Test.

All Students MUST fly with the assistance of a Club approved Instructor until such time as he/she has passed his/her Wings Test. 6 th Divisin Flyers/Orillia Aermdelers Wings Prgram The 6 th Divisin Flyers/Orillia Aermdelers Wings Prgram is an Instructin prgram with tried and prven methds f teaching newcmers t the hbby/sprt f aer

More information

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include: Crsswalk event verview (Saint Paul) A crsswalk event ccurs when an individual r grup f individuals prmte pedestrian safety by demnstrating the prper use f a crsswalk. During the event, a grup f cmmunity

More information

Care and Maintenance of Polytan STI Athletics Surfaces

Care and Maintenance of Polytan STI Athletics Surfaces h Care and Maintenance f Plytan STI Athletics Surfaces Intrductin Maintenance f yur synthetic Plytan STI athletic track surface is essential t ensure quality perfrmance fr athletes, minimisatin f ptential

More information

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature Fire Chief Signature Date Effective: 01apr13 Revised: Page: 1 f 5 Purpse: T establish standards fr GFD peratins when facilitatings ice r water rescue incidents,including safety cnsideratins, respnsibility,

More information

Risk Reduction Vehicle Collision Mitigation. Gregg Slintak, Consolidated Edison Co Dan Gamboa, Ameren Missouri

Risk Reduction Vehicle Collision Mitigation. Gregg Slintak, Consolidated Edison Co Dan Gamboa, Ameren Missouri Risk Reductin Vehicle Cllisin Mitigatin Gregg Slintak, Cnslidated Edisn C Dan Gamba, Ameren Missuri Risk Reductin, Vehicle Cllisins Gregg Slintak Cn Edisn f New Yrk Agenda Mtr Vehicle Cllisins Measuring

More information

Operating Parameters of Trawl Gear in Relation to Fur Seal Mitigation

Operating Parameters of Trawl Gear in Relation to Fur Seal Mitigation Operating Parameters f Trawl Gear in Relatin t Fur Seal Mitigatin JUNE 2008 Reprt Prepared by: FISHERIES ADVISORS & ANALYSTS 1 98 Vickerman St PO Bx 1460 Nelsn, New Zealand Phne: 64 3 545 7020 Fax: 64

More information

2016 CONGU Handicapping Changes

2016 CONGU Handicapping Changes 2016 CONGU Handicapping Changes The changes fr the 2016 glfing seasn are nw finalised and will be implemented frm 1 st March 2016. It was intended that these changes came int frce n 1 st January 2016,

More information

Newmarket Level Crossing

Newmarket Level Crossing Newmarket Level Crssing Scheme Assessment Reprt Prepared by: Public Transprt Capital Imprvements Dcument Infrmatin Client Title Prepared by Auckland Transprt Newmarket Level Crssing Scheme Assessment Reprt

More information

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3 Supplement t Plicy 7 - Rep Hckey Date Revised: July 2017 Versin 1.3 1 Table f Cntents Table f Cntents 1 Rep Tryut Prcedure Guidelines 2 Intrductin: 2 Rep Tryut Objectives: 2 Purpse f Player Evaluatin and

More information

Training Teams and Selection Criteria:

Training Teams and Selection Criteria: January 17, 2019 Biathln Canada 2019-2020 Training Selectin Criteria Intrductin: The purpse f this dcument is t define the selectin criteria fr athletes t be selected fr a Training. A Training is a grup

More information