1 SCENTRE GROUP TRAFFIC MANAGEMENT AND ACCESSIBILITY PLAN (TMAP) FOR THE SECTION 75W OF THE CONCEPT APPROVAL TO THE COMMERCIAL TOWER, WESTFIELD PARRAMATTA SHOPPING CENTRE JULY 2018 COLSTON BUDD ROGERS & KAFES PTY LTD ACN Level 18 Twer A Zenith Centre 821 Pacific Highway CHATSWOOD NSW 2067 Telephne: (02) Facsimile: (02) cbrk@cbrk.cm.au REF: 10869/1

2 TABLE OF CONTENTS TABLE OF CONTENTS 1. INTRODUCTION TRAFFIC MANAGEMENT AND ACCESSIBILITY PLAN

3 CHAPTER 1 1. INTRODUCTION 1.1 Clstn Budd Rgers and Kafes Pty Ltd has been cmmissined by Scentre Grup t prepare a Traffic Management and Accessibility Plan (TMAP) fr the S75W applicatin t amend the 2014 Cncept Apprval fr the cmmercial twer at Westfield Shpping Centre. The 2014 Cncept Apprval incrprates the fllwing additins t the shpping centre: 31,495m 2 GFA (24,500m 2 GLA) f additinal retail area; Building envelpe fr a cmmercial twer abve the retail pdium n the crner f Argyle Street and Church Street fr up t 35,000m 2 GFA f cmmercial area; additinal parking fr up t 562 cars t be prvided as part f the Stage 1 develpment mdificatins t access and parking arrangements t accmmdate the abve changes; and rad infrastructure t supprt the develpment (imprvements t intersectins f Church Street/Campbell Street and the Great Western Highway with Church Street, Marsden Street and O Cnnell Street). 1.2 The S75W prpses the fllwing changes: relcate the apprved cncept envelpe f the ffice twer t the west alng the Argyle Street frntage (abut midway between Church Street and Marsden Street) and increase the size f the twer t 112,000m 2 with n increase in the apprved 100 cmmercial parking spaces; 1

4 CHAPTER 1 t accmmdate the relcated ffice twer, existing retail area will be reduced; and mdificatins t the apprved develpment (parking layut and service arrangements) t accmmdate the abve changes with a reductin in additinal parking t be prvided. 1.3 The shpping centre is lcated in the suthern sectin f Parramatta CBD, suth f the railway and is generally bunded by Church Street, Argyle Street, O Cnnell Street and Campbell Street (with the exceptin f the cinema precinct which is lcated n the suth eastern crner f Church Street and Argyle Street) as shwn in Figure 1.1. The centre is sme 135,000m 2 GLA cmprising retail, cmmercial and cinemas with parking fr sme 4,450 cars in multi-deck car parks. Access is prvided frm Campbell Street, Aird Street and Marsden Street. Site lcatin Figure 1.1 Site Lcatin Basemap Surce; E-Way 2

5 CHAPTER NSW Planning & Envirnment requirements fr the S75W (SEARS), with regards t transprt and accessibility, are set ut in its letter f 29 September These are set ut belw: 5. Traffic, Car Parking, Transprt and Access (Operatin) Include a Transprt and Traffic Impact Assessment that prvides, but is nt limited t, the fllwing and prepared in accrdance with guidelines: Details f the current daily and peak hur vehicle, public transprt, pedestrian and bicycle mvements and existing traffic, public transprt, pedestrian and bicycle and facilities prvided n the rad netwrk lcated adjacent t the prpsed develpment; Estimated daily and peak hur trips likely t be generated by the prpsed develpment, including vehicle, public transprt, walking and cycling trips during peratin; An assessment f existing and future perfrmance f key intersectins prviding access t the site and impact f traffic generated n nearby intersectins and any rad infrastructure wrks require, taking int accunt cumulative impacts f traffic vlumes frm the prpsed tgether with existing and apprved develpments in the area. The assessment needs t be supprted by apprpriate mdelling and analysis t the satisfactin f Rads and Maritime Services; An assessment f the impacts n the pedestrian and public transprt facilities, the bus peratin and pedestrian mvements alng Argyle Street, in cnsultatin with Transprt fr NSW, as result f the reductin f the 3

6 CHAPTER 1 Argyle Street setback t zer and the relcatin f the ffice twer lbby and entry frm Church Street t Argyle Street; Prpsed bicycle and car parking prvisin, including justificatin, demnstrating cmpliance with relevant RMS guidelines and Australian Standards; The adequacy f existing and future public transprt, pedestrian and bicycle prvisins t meet the demand fr the prpsed develpment; Prpsed public transprt, pedestrian and bicycle facilities as part f the develpment; and Prpsed access arrangements including service and emergency vehicles. Prvide a Transprt Management and Accessibility Plan based n the findings f the Transprt and Traffic Impact Assessment including measures t encurage sustainable transprt and nn-car mde share, (e.g. implementing a sustainable travel plan and prvisin f end f trip facilities) An initial transprt assessment f the S75W was undertaken by Clstn Budd Rgers and Kafes in May 2018 (Parramatta Westfield Shpping Centre S75W Initial Transprt Assessment -30 May 2018). A cpy is prvided in Attachment A. After reviewing this initial assessment, NSW Planning and Envirnment requested that a TMAP addressing the SEARS be prepared. This reprt respnds t the request frm NSW Planning and Envirnment fr a TMAP. 1.6 The transprt and traffic assessment is prvided in Chapter 2 f this reprt and has been prepared in accrdance with the gals and bjectives f the EIS Guidelines Rad and Related Facilities, Guide t Traffic Management Part 12: Traffic Impacts f develpment (AUSROADS) and the RMS Guide t Traffic Generating Develpments. 4

7 CHAPTER 2 2. TRANSPORT AND TRAFFIC ASSESSMENT 2.1 The transprt and traffic assessment is set ut thrugh the fllwing sectins: site lcatin existing transprt cntext; S75W mdificatin; parking prvisin; access, internal layut and servicing; traffic effects; public transprt; pedestrians and cycling; respnse t SEARS; respnse t matters raised by TfNSW; and summary. Site Lcatin 2.2 Westfield Parramatta is a large reginal shpping centre lcated within the suthern sectin f Parramatta CBD, suth f the railway. It is generally bunded by Church Street, Argyle Street, O Cnnell Street and Campbell Street. Aird Street and Marsden Street bisect the centre in east/west and nrth/suth directins respectively. The cinema precinct is lcated n the suth eastern crner f Church Street and Argyle Street. It is sme 135,000m 2 in size (cmprising retail, cmmercial and cinemas) with parking prvided fr sme 4,450 cars in multideck parking areas. The car park has multiple access pints t the surrunding rad netwrk (t Campbell Street, Marsden Street and Aird Street). 5

8 CHAPTER 2 Lading dcks are prvided n Aird Street, Church Street, Campbell Street and Marsden Street. The lading dcks cater fr vehicles up t 19 metre articulated trucks. 2.3 Surrunding land use is a mix f retail, cmmercial and residential develpment within Parramatta CBD. The main western rail line is nrth f the site with Parramatta bus/rail interchange t the nrtheast, which has direct cnnectins t Westfield Parramatta. T the east is a mix f cmmercial/residential develpment, while t the suth there is predminantly residential develpment. T the west there is cmmercial develpment. Existing Transprt Cntext Traffic Assessment f 2014 Cncept Apprval 2.4 A detailed traffic and transprt assessment f the 2014 Cncept Apprval was undertaken as set ut the Supplementary Transprt Reprt (Respnse t Transprt Matters) Prpsed Extensins t Extensins t Parramatta Westfield Shpping Centre (CBHK June 2013). The traffic assessment included develpment f a PARAMICS micr simulatin mdel t assess the traffic effects f the prpsed develpment n the surrunding rad netwrk. The key findings f the traffic assessment are summarised belw: traffic generatin fr the cmmercial cmpnent was based n a rate f 0.3 trips per parking space. With 100 spaces the cmmercial cmpnent wuld generate 30 vehicles per hur (tw way) in the mrning and afternn peak hurs; the existing centre generates sme 1415 and 3705 vehicles per hur during the mrning and afternn peak perids respectively. These are generatin rates f 1 6

9 CHAPTER 2 trip per 100m 2 in the weekday mrning peak hur and 1 trip per 38m 2 in the weekday afternn peak hur. Applying these rates t the expanded centre, and allwing fr a 5% reductin (fr the increase in size f the centre), results in increases f 165 and 430 vehicles per hur (tw way) in the weekday mrning and afternn peak hurs respectively; three intersectin upgrades were identified by Cuncil and RMS (intersectins f Great Western Highway with O Cnnell Street, Marsden Street and Church Street/Parkes Street). The mdelling indicated that these upgrades prvide substantial benefits fr traffic flw n the Great Western Highway, particularly during the AM peak; a number f imprvements t the Westfield car park entries and exits were prpsed t facilitate easier entry and exit. These include an additinal right turn lane at the eastern Campbell Street exit, widening f the western Campbell Street exit, recnfiguratin f the Aird Street accesses (with imprved management), lengthening f the secnd shrt lane t the Marsden Street exit and prvisin f a secnd bm gate n the Mardsen Street speed ramp entry; the PARAMICS mdelling identified additinal upgrades t mitigate the impacts f the prpsed develpment including lengthening f the right turn bay frm the Great Western Highway (westbund) int Marsden Street, extensin f the tw lane sectin f Campbell Street (westbund) by extending the perid f n parking, and mdificatins t the traffic signal phasing at the intersectins f Marsden Street/Great Western Highway, Great Western Highway/Church Street and Church Street/Campbell Street 450 vehicles per hur (tw way) was used in the traffic assessment. 7

10 CHAPTER 2 The PARAMICS mdelling fund that: the identified Cuncil/RMS upgrades and prpsed upgrades mitigate the impacts f the prpsed extensins. Traffic cnditins in the AM and PM peaks wuld be similar r better than the existing situatin; and the internal car park upgrades reduce the impact f the Westfield traffic n the rad netwrk. 2.5 The rad netwrk imprvements alng the Great Western Highway (frm Pitt Street t Church Street) identified in the 2013 traffic study have either already been cmpleted r are being are currently being investigated by RMS. Details f the status f these wrks are prvided in Attachment B. Existing Travel Mdes 2.6 Estimates f the travel demand have been made based n surveys f travel demand f the shpping centre and census data fr the jurney t wrk t the Parramatta CBD fr the cmmercial cmpnent. These are set ut belw in Table 2.1. Table 2.1: Summary f Existing Travel Mdes Mde Retail Emplyees Car Driver 27% 33% Car Passenger 27% 5% Train 13% 39% Bus 15% 8% Walked 16% 12% Other (Taxi, Cycle) 2% 3% 8

11 CHAPTER Census data indicates that the largest grup f peple wh travel t Parramatta CBD cme frm within the Parramatta LGA. Beynd Parramatta the next highest set f rigins/destinatins are the adjining areas f Auburn, Blacktwn, Baulkham Hills and Hlryd. S75W Mdificatin 2.8 The S75W prpses the fllwing changes t the existing Cncept Apprval: relcate the apprved cncept envelpe f the ffice twer t the west alng the Argyle Street frntage (abut midway between Church Street and Marsden Street) and increase the size f the twer t sme 112,000m 2 GFA with n increase in 100 cmmercial parking spaces; t accmmdate the relcated ffice twer, existing retail area will be reduced by sme 265m 2 GFA (1,700m 2 GLA). This has the effect f reducing parking requirements fr the apprved expansin f the shpping centre as the net increase retail area (existing plus apprved) will be reduced by this amunt; and mdificatins t the apprved develpment (parking layut and service arrangements) t accmmdate the abve changes. This will result in the parking prvisin being reduced t sme 289 spaces. 9

12 CHAPTER 2 Parking Prvisin 2.9 Clause 7.3 f Parramatta LEP 2011 sets ut maximum parking rates fr develpment within Parramatta City Centre. Fr cmmercial and retail develpment the fllwing maximum parking rates are applicable: Cmmercial 1 space per 100m 2 GFA; and Retail 1 space per 30m 2 GFA The apprved develpment prvides parking less than the maximum prvisin with 100 spaces fr the 35,000m 2 ffice twer (1 space per 350m 2 GFA) and 462 spaces fr the additinal 31,495m 2 f retail area (1 space per 68m 2 GFA). In assessing parking requirements fr the apprved develpment, it was understd that the prvisin f 562 spaces was a maximum requirement (cnsistent with the LEP) As a result f the S75W, additinal parking prvisin will be reduced frm 562 spaces t 289 spaces, with 100 spaces allcated t the cmmercial parking and 189 spaces fr retail parking. The cmmercial parking prvisin is a rate f 1 space per 1,120m 2. This lw rate f parking reflects the site lcatin in the centre f Parramatta CBD with excellent access t public transprt services, being adjacent t the train and bus interchange. The additinal retail parking will increase the shpping centre car park t sme 4,640 spaces A review f 12 mnths car parking data (frm 1 March 2017 t 28 February 2018, between 9.00am and 6.00pm) fr the existing shpping centre, fund that the 85 th percentile parking demand was 3,985 spaces (90% ccupancy). This equates t a 10

13 CHAPTER 2 parking rate f 1 space per 34m 2 GLA (based n the existing shpping centre being 135,000m 2 GLA). Applying this rate t the S75W (expanded retail area f 157,800m 2 GLA) results in a requirement fr sme 4,640 spaces. The prpsed parking prvisin f sme 4,640 spaces satisfies this requirement and is cnsidered apprpriate In additin t car parking, DCP 2011 sets ut the fllwing requirements with regards t car share spaces, accessible parking; bicycle parking and mtrcycle parking: car share spaces t be prvided in business develpments with a flr space f mre than 5,000m 2 and within 800 metres f a railway statin. One car share space can be prvided lieu f 3 parking spaces; 1-2% f spaces t be designated accessible parking; bicycle parking 1 space per 200m 2 f ffice and retail flr space; and mtr cycle parking - the area f ne parking space per 50 spaces t be prvided fr mtrcycle parking (typically 3 mtrcycle spaces per 50 car spaces) Applying these rates t the S75W results in the fllwing requirements: 2 accessible cmmercial spaces (2%) and 4 accessible retail spaces (2.2%); 550 cmmercial bicycle spaces and 156 retail bicycle spaces. These will be split between secure (emplyee) and accessible (visitr) bicycle parking areas. Apprpriate end f trip facilities will be prvided fr emplyees (shwers, change rms and lckers); and 17 mtr cycle spaces 11

14 CHAPTER Within the shpping centre car park, car share parking will be prvided. Access, Internal Layut and Servicing 2.16 The S75W prpses n change in access arrangements cmpared t the apprved develpment With regards t internal layut, the relcatin f the ffice twer t the west will result in changes t the existing Level 5M2 car park level with a net lss f sme 123 spaces n this level. As per the apprved develpment, where practical (that is, nt limited by the existing clumn grid) new parking will be designed t cmply with the requirements f AS Parking fr the ffice twer (100 spaces) will be lcated within the shpping centre car park (within the vicinity f the ffice twer), but separated frm access by shppers The apprved ffice twer is serviced via the existing lading dck accessed frm Aird Street (east) which wuld be mdified t service the ffice twer. With the ffice twer prpsed t be relcated west, the ffice twer will nw be serviced via the existing nrthern Marsden Street lading dck. This dck will be expanded t service the ffice twer. Mdificatins t this dck will cmply with the requirements f AS Further infrmatin n the peratin f the ffice twer lading dck (including truck turning paths) will be prvided as part f the develpment applicatin fr the ffice twer. Traffic Effects 2.19 The apprved develpment was assessed using the fllwing generatin rates: 12

15 CHAPTER 2 cmmercial cmpnent 0.3 vehicles per hur per parking space in the weekday AM and PM peak hurs ; and retail cmpnent 1 vehicle per hur 100m 2 GLA and 1 vehicle per 38m 2 GLA in the weekday AM and PM peak hurs respectively 2.20 Applying these rates, the S75W with a reductin f sme 1,700m 2 retail GLA and the same prvisin f cmmercial parking (100 spaces), wuld generate sme 20 t 40 vehicles per hur (tw way) less than assessed fr the apprved develpment As nted previusly a number rad netwrk imprvements were identified in the traffic studies fr the apprved develpment and were included as cnditins f cnsent in the apprval. As the S75W wuld generate less traffic than the apprved develpment, the apprved rad netwrk imprvements are als apprpriate fr the S75W and n further traffic analysis is warranted. Public Transprt 2.22 The site is in the centre f Parramatta CBD, adjacent t the bus/rail interchange and the transitways that perate alng Argyle Street adjacent t the site. Thus the site is highly accessible t lcal and reginal public transprt services with direct cnnectins t them. The future Parramatta light rail will further increase access by public transprt t/frm Parramatta. The prpsed extensins will maintain and enhance these cnnectins with cmmercial and additinal retail develpment integrated int the existing pedestrian netwrk Public transprt services ffer viable alternatives t travel by mdes ther than car. Cnsistent with prmting access by public and active transprt mdes, n- 13

16 CHAPTER 2 site parking has been prvided at rates much lwer than maximum LEP rates. Furthermre car sharing will be prvided n site. T supprt accessibility by bicycles, apprpriate bicycle parking is prpsed t be prvided fr emplyees and shppers/visitrs alng with end f trip facilities fr retail and ffice emplyees (such as change rms, shwers and secure bicycle parking areas) The S75W will therefre satisfy the bjectives f NSW Making it Happen, A Plan fr Grwing Sydney, NSW Lng Term Transprt Masterplan, and Directins fr a Greater Sydney , as fllws: enabling emplyees and shppers t readily access buses and trains clse t the site, fr jurneys t wrk and ther travel; prviding pedestrian cnnectins within and thrugh the centre; prviding an apprpriate level f n-site parking, with reference t apprpriate cuncil and RMS requirements, t encurage public transprt use and increase the prprtin f jurney t wrk trips by public transprt; prviding retail/emplyment develpment clse t residential develpment and ther retail, cmmercial and transprt facilities t reduce the need fr external travel; being lcated clse t emplyment centres in Parramatta CBD, which are readily accessible by public transprt; and prviding apprpriate bicycle parking n the site t increase the prprtin f trips made by bicycle T encurage travel mdes ther than private vehicle, a travel demand management apprach will be adpted, thrugh a travel access guide t meet the specific needs f emplyees. The specific requirements and needs f the future emplyees, including access t surrunding retail and residential develpment, 14

17 CHAPTER 2 plus lcal services and facilities, shuld be incrprated in the travel access guide t supprt the bjectives f encuraging the use f public transprt The principles f the travel access guide shuld be develped in cnsultatin with Cuncil, RMS, public transprt prviders and ther stakehlders. Principles wuld include the fllwing: encurage the use f public transprt, including bus and train services clse t the site; identify existing public transprt services that perate near the site, including the lcatin f bus stps and pedestrian crssings at signalised intersectins; wrk with public transprt prviders t imprve services; encurage public transprt by emplyees thrugh the prvisin f infrmatin, maps and timetables in the travel access guide; raise awareness f health benefits f walking and cycling (including maps shwing walking and cycling rutes, including thrugh and adjacent t the site); encurage cycling by prviding safe and secure bicycle parking, including the prvisin f lckers and rails fr emplyees and visitrs; prvide apprpriate n-site parking prvisin, cnsistent with apprpriate Cuncil/RMS cntrls and the bjective f reducing traffic generatin. 15

18 CHAPTER The S75W wuld increase the size f the apprved ffice twer by sme 77,000m 2. Fr the ffice twer, n-site parking will be highly cnstrained (with prvisin f 100 parking spaces). As per the previus assessment, an emplyee density f 1 persn per 25m 2 GFA fr the ffice twer has been assumed. This results in an increase in emplyee ppulatin (cmpared t the cncept apprval) f sme 3,080 peple. Based n an average car ccupancy f 1.2 peple per car, this results in an additinal 2,960 peple travelling t wrk by means ther than car. Census data indicates that 63% f nn-car travel t wrk within Parramatta CBD is by train and 11% by bus. Based n 40% f peple travelling t wrk in the peak hurs, the prpsed ffice twer wuld generate the fllwing trips by bus/train: AM peak hur peple in by train, +175 peple in by bus; and PM peak hur peple ut by train, +175 peple ut by bus 2.28 The abve des nt accunt fr any absenteeism by ffice emplyees (such as hlidays, wrking away frm the ffice r sick leave). This can typically be sme 10% f emplyees Trips by train wuld be split between the three lines entering/departing Parramatta with 60% t/frm the west/nrthwest, 30% frm the east and 10% frm the suth. Thus the increase in trips wuld range between 100 and 600 trips per hur in the peak directin. Based n previus wrk undertaken, this level f increase culd be accmmdated by the existing spare capacity n each line (at least 1,300 peple) Trips by bus wuld be split between the varius bus services entering/departing Parramatta. Based n previus wrk undertaken the increase in trips generated 16

19 CHAPTER 2 by the prpsed develpment culd be accmmdated by the existing spare capacity n these services (at least 3,900 peple) The prpsed light rail wuld result in sme f the existing and future trips by bus and train t/frm Parramatta CBD being diverted t the light rail. This wuld increase capacity f bus and rail services and reduce the number f additinal trips frm the S75W n the bus and rail services Thus in summary the existing bus and train services that perate ut f Parramatta CBD fund that there is sufficient spare capacity t accmmdate the additinal demand generated by the S75W. Pedestrians and Cyclists 2.33 The site is lcated within the Parramatta CBD which prvides emplyees fr the prpsed ffice twer with cycling and walking pprtunities t lcatins such as shps, restaurants, services and recreatinal facilities lcated within the Parramatta CBD. The bus/rail interchange and prpsed light rail are lcated within clse walking distance t the prpsed ffice twer with bus stps lcated alng the Argyle Street frntage f the site. Figure 2.1 shws the existing cycle paths arund Parramatta. 17

20 CHAPTER 2 Figure 2.1: Parramatta Cycle Map Surce: Sydney Cycleways 2.34 As nted previusly the relcated ffice twer will prvide secure (emplyee) and accessible (visitr) bicycle parking areas. Apprpriate end f trip facilities will be prvided fr emplyees (shwers, change rms and lckers) With respect t pedestrian flws alng Argyle Street, Parramatta City Cuncil has prepared a Parramatta CBD Pedestrian Strategy (Cardn 2017). With respect t Argyle Street (between Marsden Street and Church Street), the strategy identifies future (2056) peak flws f between 500 t 1,000 pedestrians per hur (tw way). The strategy identifies that based n ftpath widths f either 1.8 metres r 2.2 metres, with these flws, the ftpath wuld perate at level f service A (based n a Fruin analysis) The relcated ffice twer will have pedestrian access t Argyle Street and t the adjacent shpping centre. Thus a majr pedestrian path will be alng Argyle Street between the ffice twer and transprt interchange. Based n the 18

21 CHAPTER 2 estimated ppulatin f the ffice twer, and mde f travel, pedestrian flws alng Argyle Street (between the ffice stre and Church Street) culd duble frm thse set ut in Cuncil s Pedestrian Strategy. It is nted that the existing ftpath alng the suthern side f Argyle Street is sme fur t five metres wide (taking int accunt the prmenade lcated within the Westfield site). On this basis the additinal pedestrian flws frm the relcated ffice twer wuld result in the ftpath cntinuing t perate at LOS A: Respnse t SEARS 2.37 Our respnse t the SEARS issued by NSW Planning and Envirnment is set ut in the fllwing sectins. Details f the current daily and peak hur vehicle, public transprt, pedestrian and bicycle mvements and existing traffic, public transprt, pedestrian and bicycle and facilities prvided n the rad netwrk lcated adjacent t the prpsed develpment; 2.38 These matters have been addressed in the sectins n Existing Traffic Cntext, Public Transprt and Pedestrians/Cyclists. Estimated daily and peak hur trips likely t be generated by the prpsed develpment, including vehicle, public transprt, walking and cycling trips during peratin; 2.39 These matters are addressed in the sectins Traffic Effects, Public Transprt and Pedestrians/Cyclists. 19

22 CHAPTER 2 An assessment f existing and future perfrmance f key intersectins prviding access t the site and impact f traffic generated n nearby intersectins and any rad infrastructure wrks require, taking int accunt cumulative impacts f traffic vlumes frm the prpsed tgether with existing and apprved develpments in the area. The assessment needs t be supprted by apprpriate mdelling and analysis t the satisfactin f Rads and Maritime Services; 2.40 These matters are addressed in the sectin n Traffic Effects. An assessment f the impacts n the pedestrian and public transprt facilities, the bus peratin and pedestrian mvements alng Argyle Street, in cnsultatin with Transprt fr NSW, as result f the reductin f the Argyle Street setback t zer and the relcatin f the ffice twer lbby and entry frm Church Street t Argyle Street; 2.41 These matters are addressed in the sectins n Public Transprt and Pedestrians/Cyclists. Prpsed bicycle and car parking prvisin, including justificatin, demnstrating cmpliance with relevant RMS guidelines and Australian Standards; 2.42 These matters are addressed in the sectin n Parking Prvisin. The adequacy f existing and future public transprt, pedestrian and bicycle prvisins t meet the demand fr the prpsed develpment; 2.43 These matters are addressed in the sectins n Public Transprt and Pedestrians/Cyclists. 20

23 CHAPTER 2 Prpsed public transprt, pedestrian and bicycle facilities as part f the develpment; and 2.44 These matters are addressed in the sectins Parking Prvisin, Public Transprt and Pedestrians/Cyclists. Prpsed access arrangements including service and emergency vehicles These matters are addressed in the sectin n Access, Internal Layut and Servicing. Prvide a Transprt Management and Accessibility Plan based n the findings f the Transprt and Traffic Impact Assessment including measures t encurage sustainable transprt and nn-car mde share, (e.g. implementing a sustainable travel plan and prvisin f end f trip facilities) This reprt is a TMAP that includes measures t encurage sustainable transprt and nn-car mde share thrugh: cnstrained parking fr the prpsed ffice twer; implementatin f a travel access guide fr emplyees; the site being highly accessible by travel mdes ther than car (being lcated within Parramatta CBD allws fr emplyees t easily walk t retail, service and recreatinal use and it is adjacent t the bus/rail interchange); prvisin f n-site bicycle parking with end f trip facilities; and prvisin f n-site car share parking. 21

24 CHAPTER 2 Respnse t Matters Raised by TfNSW 2.47 In a letter dated 26 April 2018, TfNSW has raised the fllwing with regards t the S75W. These are summarised belw: prpsed changes alng Argyle Street a level f service assessment t demnstrate that the ftpath can accmmdate increased pedestrian activity; lading dck fr prpsed ffice twer prvide an assessment f prpsed service arrangements and impacts; and Draft Cnstructin Pedestrian and Traffic Management Plan Prepare a draft CPTMP taking int accunt the cumulative effects f ther majr cnstructin prjects in the area (such as the Parramatta Light Rail Prject and Parramatta Square Develpment With respect t pedestrian flws alng Argyle Street, this has been addressed in the sectin n Pedestrians and Cyclists With respect t servicing f the relcated ffice twer, this is prpsed t ccur via the existing lading dcks lcated n Marsden Street. These will be expanded t prvide separate dcks fr the ffice details. Vehicles servicing the ffice twer will predminantly be vans and small trucks with the ccasinal larger truck. The number f deliveries t the ffice twer will be minr in cmparisn t the traffic generatin f the existing shpping centre and thus result in n material changes t the surrunding rad netwrk. Further infrmatin n the peratin f the ffice twer lading dck (including truck turning paths) will be prvided as part f the develpment applicatin fr the ffice twer. 22

25 CHAPTER With respect preparatin f a CPTMP, we nte that Cnditin 11 f the Cncept Apprval requires a CPTMP t be submitted as part f any future develpment applicatin. It is suggested that Cnditin 11 be updated t include the matters raised by TfNSW. Summary 2.51 In summary, the key findings f this traffic and transprt assessment f the S75W are set ut belw: the S75W prvides fr a relcated and larger ffice twer and reduced retail area; car parking fr the S75W satisfies the requirements f LEP 2011; bicycle, accessible, mtrcycle and car share parking will be prvided in accrdance with the requirements f DCP 2011; n changes are prpsed t the apprved access arrangements; nly minr changes are prpsed with regards t internal layut and servicing; the S75W will generate less traffic than the apprved develpment; the increase in bus and rail trips generated by the prpsed develpment culd be accmmdated by the existing spare capacity n these services; existing pedestrian paths n Argyle Street can accmmdate the additinal pedestrian trips between the relcated ffice twer and the interchange; measures are prpsed t encurage sustainable transprt and travel by nncar mdes; the matters raised by TfNSW have been addressed; and a TMAP has been prepared that respnds t the SEARS issued by NSW Planning and Envirnment. 23

26 Attachment A ATTACHMENT A INITIAL S75W TRANSPORT ASSESSMENT 24

27 as Trustee fr C & B Unit Trust ABN Our Ref: TR/10869/jj 30 May, 2018 Transprt Planning Traffic Studies Parking Studies Scentre Grup PO Bx 4004 SYDNEY NSW 2001 Attentin: Craig Marshall CMarshall@scentregrup.cm Dear Sir, RE: PARRAMATTA WESTFIELD SHOPPING CENTRE S75W INITIAL TRANSPORT ASSESSMENT 1. As requested we have undertaken an initial transprt assessment f the Sectin 75W (S75W) t amend the 2014 Cncept Apprval fr the expansin f Parramatta Westfield Shpping Centre. The 2014 Cncept Apprval incrprates the fllwing additins t the shpping centre: 31,495m 2 GFA (24,500m 2 GLA) f additinal retail area; Building envelpe fr a cmmercial twer abve the retail pdium n the crner f Argyle Street and Church Street fr up t 35,000m 2 GFA f cmmercial area; additinal parking fr up t 562 cars t be prvided as part f the Stage 1 develpment mdificatins t access and parking arrangements t accmmdate the abve changes; and rad infrastructure t supprt the develpment (imprvements t intersectins f Church Street/Campbell Street and the Great Western Highway with Church Street, Marsden Street and O Cnnell Street). 2. The S75W prpses the fllwing changes: relcate the apprved cncept envelpe f the ffice twer t the west alng the Argyle Street frntage (abut midway between Church Street and Marsden Street) and increase the size f the twer t sme 112,000m 2 GFA; t accmmdate the relcated ffice twer, existing retail area will be reduced by sme 265m 2 GFA (1,700m 2 GLA). This has the effect f reducing parking requirements fr the apprved expansin f the shpping centre as the Suite 1801/Twer A, Zenith Centre, 821 Pacific Highway, Chatswd NSW 2067 P.O. Bx 5186 West Chatswd NSW 1515 Tel: (02) Fax: (02) Directrs - Geff Budd - Stan Kafes - Tim Rgers - Jshua Hllis ACN cbrk@cbrk.cm.au 1

28 net increase retail area (existing plus apprved) will be reduced by this amunt; and mdificatins t the apprved develpment (parking layut and service arrangements) t accmmdate the abve changes. This will result in the parking prvisin being reduced t sme 289 spaces. 3. The findings f ur initial transprt assessment are set ut thrugh the fllwing sectins: parking; access, internal layut and servicing; traffic effects; public transprt; staging; review f SEARS; respnse t matters raised by TfNSW; and summary. Parking 4. Clause 7.3 f Parramatta LEP 2011 sets ut maximum parking rates fr develpment within Parramatta City Centre. Fr cmmercial and retail develpment the fllwing maximum parking rates are applicable: Cmmercial 1 space per 100m 2 GFA; and Retail 1 space per 30m 2 GFA. 5. The apprved develpment prvides parking less than the maximum prvisin with 100 spaces fr the 35,000m 2 ffice twer (1 space per 350m 2 GFA) and 462 spaces fr the additinal 31,495m 2 f retail area (1 space per 68m 2 GFA). In assessing parking requirements fr the apprved develpment, it was understd that the prvisin f 562 spaces was a maximum requirement (cnsistent with the LEP). 6. As a result f the S75W, additinal parking prvisin will be reduced frm 562 spaces t 289 spaces, with 100 spaces allcated t the cmmercial parking and 189 spaces fr retail parking. The cmmercial parking prvisin is a rate f 1 space per 1,120m 2. This lw rate f parking reflects the site lcatin in the centre f Parramatta CBD with excellent access t public transprt services, being adjacent t the train and bus interchange. The additinal retail parking will increase the shpping centre car park t sme 4,640 spaces. 7. A review f 12 mnths car parking data (frm 1 March 2017 t 28 February 2018, between 9.00am and 6.00pm) fr the existing shpping centre, fund that the 85 th 2

29 percentile parking demand was 3,985 spaces (90% ccupancy). This equates t a parking rate f 1 space per 34m 2 GLA (based n the existing shpping centre being 135,000m 2 GLA). Applying this rate t the S75W (expanded retail area f 157,800m 2 GLA) results in a requirement fr sme 4,640 spaces. The prpsed parking prvisin f sme 4,640 spaces satisfies this requirement and is cnsidered apprpriate. 8. In additin t car parking, DCP 2011 sets ut the fllwing requirements with regards t car share spaces, accessible parking; bicycle parking and mtrcycle parking: car share spaces t be prvided in business develpments with a flr space f mre than 5,000m 2 and within 800 metres f a railway statin. One car share space can be prvided lieu f 3 parking spaces; 1-2% f spaces t be designated accessible parking; bicycle parking 1 space per 200m 2 f ffice and retail flr space; and mtr cycle parking - the area f ne parking space per 50 spaces t be prvided fr mtrcycle parking (typically 3 mtrcycle spaces per 50 car spaces). 9. Applying these rates t the S75W results in the fllwing requirements: 2 accessible cmmercial spaces (2%) and 4 accessible retail spaces (2.2%); 550 cmmercial bicycle spaces and 156 retail bicycle spaces. These will be split between secure (emplyee) and accessible (visitr) bicycle parking areas. Apprpriate end f trip facilities will be prvided fr emplyees (shwers, change rms and lckers); and 17 mtr cycle spaces. 10. Within the shpping centre car park, car share parking will be prvided. Access, Internal layut and Servicing 11. The S75W prpses n change in access arrangements cmpared t the apprved develpment. 12. With regards t internal layut, the relcatin f the ffice twer t the west will result in changes t the existing Level 5M2 car park level with a net lss f sme 123 spaces n this level. As per the apprved develpment, where practical (that is, nt limited by the existing clumn grid) new parking will be designed t cmply with the requirements f AS Parking fr the ffice twer (100 spaces) will be lcated within the shpping centre car park (within the vicinity f the ffice twer), but separated frm access by shppers. 3

30 13. The apprved ffice twer is serviced via the existing lading dck accessed frm Aird Street (east) which wuld be mdified t service the ffice twer. With the ffice twer prpsed t be relcated west, the ffice twer will nw be serviced via the existing nrthern Marsden Street lading dck. This dck will be expanded t service the ffice twer. Mdificatins t this dck will cmply with the requirements f AS Traffic Effects 14. The apprved develpment was assessed using the fllwing generatin rates: cmmercial cmpnent 0.3 vehicles per hur per parking space in the weekday AM and PM peak hurs ; and retail cmpnent 1 vehicle per hur 100m 2 GLA and 1 vehicle per 38m 2 GLA in the weekday AM and PM peak hurs respectively. 15. Applying these rates, the S75W with a reductin f sme 1,700m 2 retail GLA and the same prvisin f cmmercial parking (100 spaces), wuld generate sme 20 t 40 vehicles per hur (tw way) less than assessed fr the apprved develpment. 16. A number rad netwrk imprvements were identified in the traffic studies fr the apprved develpment and were included as cnditins f cnsent in the apprval. As the S75W wuld generate less traffic than the apprved develpment, the apprved rad netwrk imprvements are als apprpriate fr the S75W and n further traffic analysis is warranted. Public Transprt 17. The site is in the centre f Parramatta CBD, adjacent t the bus/rail interchange and the transitways that perate alng Argyle Street adjacent t the site. Thus the site is highly accessible t lcal and reginal public transprt services with direct cnnectins t them. The future Parramatta light rail will further increase access by public transprt t/frm Parramatta. The prpsed extensins will maintain and enhance these cnnectins with cmmercial and additinal retail develpment integrated int the existing pedestrian netwrk. 18. Public transprt services ffer viable alternatives t travel by mdes ther than car. Cnsistent with prmting access by public and active transprt mdes, nsite parking has been prvided at rates much lwer than maximum LEP rates. Furthermre car sharing will be prvided n site. T supprt accessibility by bicycles, apprpriate bicycle parking is prpsed t be prvided fr emplyees and shppers/visitrs alng with end f trip facilities fr retail and ffice emplyees (such as change rms, shwers and secure bicycle parking areas). 4

31 19. The S75W will therefre satisfy the bjectives f NSW Making it Happen, A Plan fr Grwing Sydney, NSW Lng Term Transprt Masterplan, and Directins fr a Greater Sydney , as fllws: enabling emplyees and shppers t readily access buses and trains clse t the site, fr jurneys t wrk and ther travel; prviding pedestrian cnnectins within and thrugh the centre; prviding an apprpriate level f n-site parking, with reference t apprpriate cuncil and RMS requirements, t encurage public transprt use and increase the prprtin f jurney t wrk trips by public transprt; prviding retail/emplyment develpment clse t residential develpment and ther retail, cmmercial and transprt facilities t reduce the need fr external travel; being lcated clse t emplyment centres in Parramatta CBD, which are readily accessible by public transprt; and prviding apprpriate bicycle parking n the site t increase the prprtin f trips made by bicycle. 20. T encurage travel mdes ther than private vehicle, a travel demand management apprach shuld be adpted, thrugh a travel access guide t meet the specific needs f the site, future shppers and emplyees. The specific requirements and needs f the future emplyees, including access t surrunding retail and residential develpment, plus lcal services and facilities, shuld be incrprated in the travel access guide t supprt the bjectives f encuraging the use f public transprt. Respnse t SEARS 21. The SEARs issued by the Department f Planning and Envirnment fr the S75W (dated 29 September 2017) require preparatin f a TMAP addressing a range f traffic and transprt matters (trip generatin, assessment f traffic effects n the surrunding rad netwrk, assessment f public transprt effects, justificatin f parking prvisin and measures t encurage travel by public and active transprt). A TMAP which builds upn this initial transprt assessment will be prepared as part f a develpment applicatin fr the prpsed ffice twer. Hwever, because the traffic generatin f the S75W will be less than the apprved develpment a detailed traffic assessment is nt cnsidered t be necessary. Thus the relevant prvisins, gals and bjectives f the EIS Guidelines Rad and Related Facilities, Guide t Traffic Management Part 12: Traffic Impacts f develpment (AUSROADS) and the RMS Guide t Traffic Generating Develpments have been addressed. 5

32 Respnse t Matters Raised by TfNSW 22. In its letter dated 26 April 2018, TfNSW has raised the fllwing matters with regards t the S75W. These are summarised belw: Prpsed Changes alng Argyle Street a level f service assessment t demnstrate that the ftpath can accmmdate increased pedestrian activity; Lading Dck fr Prpsed Cmmercial prvide an assessment f prpsed service arrangements and impacts; and Draft Cnstructin Pedestrian and Traffic Management Plan Prepare a draft CPTMP taking int accunt the cumulative effects f ther majr cnstructin prjects in the area (such as the Parramatta Light Rail Prject and Parramatta Square Develpment. 23. With respect t pedestrian flws alng Argyle Street, Parramatta City Cuncil has prepared a Parramatta CBD Pedestrian Strategy (Cardn 2017). With respect t Argyle Street (between Marsden Street and Church Street), the strategy identifies future (2056) peak flws f between 500 t 1,000 pedestrians per hur (tw way). The strategy identifies that based n ftpath widths f either 1.8 metres r 2.2 metres, with these flws, the ftpath wuld perate at level f service A (based n a Fruin analysis). 24. The relcated ffice twer will have pedestrian access t Argyle Street and t the adjacent shpping centre. Thus a majr pedestrian path will be alng Argyle Street between the ffice twer and transprt interchange. Based n the estimated ppulatin f the ffice twer, and mde f travel, pedestrian flws alng Argyle Street (between the ffice stre and Church Street) culd duble frm thse set ut in Cuncil s Pedestrian Strategy. It is nted that the existing ftpath alng the suthern side f Argyle Street is sme fur t five metres wide (taking int accunt the prmenade lcated within the Westfield site). On this basis the additinal pedestrian flws frm the relcated ffice twer wuld result in the ftpath cntinuing t perate at LOS A. 25. With respect t servicing f the relcated ffice twer, this is prpsed t ccur via the existing lading dcks lcated n Marsden Street. These will be expanded t prvide separate dcks fr the ffice details. Vehicles servicing the ffice twer will predminantly be vans and small trucks with the ccasinal larger truck. The number f deliveries t the ffice twer will be minr in cmparisn t the traffic generatin f the existing shpping centre and thus result in n material changes t the surrunding rad netwrk. Further infrmatin n the peratin f the ffice twer lading dck (including truck turning paths) will be prvided as part f the develpment applicatin fr the ffice twer. 6

33 26. With respect preparatin f a CPTMP, we nte that Cnditin 11 f the Cncept Apprval requires a CPTMP t be submitted as part f any future develpment applicatin. We suggest that Cnditin 11 be updated t include the matters raised by TfNSW. Summary 27. In summary, the key findings f this initial transprt assessment f the S75W are set ut belw: The S75W prvides fr a relcated and larger ffice twer and reduced retail area; car parking fr the S75W satisfies the requirements f LEP 2011; bicycle, accessible, mtrcycle and car share parking will be prvided in accrdance with the requirements f DCP 2011; n changes are prpsed in the apprved access arrangements; nly minr changes are prpsed with regards t internal layut and servicing; the S75W will generate less traffic than the apprved develpment; and a TMAP will be prepared t supprt a future develpment applicatin fr the ffice twer. 28. We trust the abve prvides the infrmatin yu require. Finally, if yu shuld have any queries, please d nt hesitate t cntact us. Yurs faithfully, COLSTON BUDD ROGERS & KAFES PTY LTD T Rgers Directr 7

34 Attachment B ATTACHMENT B RMS ROADWORKS UPDATE 25

35 Octber 2017 Have yur say Prpsed intersectin imprvements at Great Western Highway, Church Street and Parkes Street, Parramatta The NSW Gvernment is funding this prpsal as part f its $300 millin Urban Rads Pinch Pint Prgram, which aims t reduce cngestin and imprve travel times n Sydney s busiest crridrs. Rads and Maritime Services is inviting yur feedback by Friday 3 Nvember n prpsed intersectin imprvements at Great Western Highway, Church Street and Parkes Street, Parramatta. The prpsed imprvements include: prviding an additinal right turn lane frm the Great Western Highway nt Church Street by relcating the median island n the Great Western Highway prviding an additinal right turn lane frm Church Street nt Parkes Street by widening n the western side f Church Street relcating utilities upgrading traffic lights recnstructing ftpaths line marking. Key benefits Reduced traffic cngestin and queue lengths Imprved travel times particularly during busy perids at the intersectin and n apprach rads Imprved traffic flw thrugh the intersectin Imprved safety fr pedestrians and rad users. We have included a map t shw the lcatin f the prpsal. Have Yur Say We invite yur feedback n ur prpsal by Friday 3 Nvember. Yu can prvide yur cmments by: ing pinchpints@rms.nsw.gv.au Writing t Pinch Pint Prgram, Rads and Maritime Services, PO Bx 973, Parramatta, NSW, 2124 Calling ur Prject Manager, Gerge Elhage, during business hurs, n

36 Next Steps We will cnsider all feedback befre deciding whether t prceed with this prpsal. A cmmunity cnsultatin reprt will be prepared summarising the matters raised during the cnsultatin perid and will be made available n ur website. We will keep yu updated as the prpsal prgresses.

37 August 2017 Have Yur Say Prpsed intersectin imprvements alng the Great Western Highway at Pitt Street and Marsden Street, Parramatta The NSW Gvernment has cmmitted $30 millin t reduce cngestin arund the Parramatta lcal gvernment area by upgrading key intersectins that access the Parramatta Central Business District. Rads and Maritime Services is seeking feedback by Wednesday 23 August n prpsed intersectin imprvements alng the Great Western Highway at Pitt Street and Marsden Street, Parramatta. The prpsed imprvements include: prvisin f an eastbund left turn lane n the Great Western Highway int Marsden Street by relcating the median island n the Great Western Highway between O Cnnell Street and Marsden Street prvisin f a westbund left turn lane n the Great Western Highway int Pitt Street by widening the suthern side f the Great Western Highway prvisin f three nrthbund lanes in Pitt Street n apprach t the Great Western Highway and ne suthbund lane in Pitt Street n the departure frm Great Western Highway extensin f the westbund right turn lane n the Great Western Highway int Pitt Street by up t seven car spaces remval f up t 16 trees and shrubs at the intersectin f the Great Western Highway and Pitt Street t accmmdate the new left turn lane n the crner f Pitt Street mdificatin t the layut f traffic lights at bth intersectins. We have included a map t shw the lcatin and detail f the prpsal. Key benefits The prpsal will: Imprve the peratinal efficiency f the tw intersectin alng the Great Western Highway reduce queue lengths and increase thrugh traffic increase access t and frm the Parramatta CBD imprve safety fr all rad users. Have yur say Rads and Maritime welcmes yur cmments n the prpsal by Wednesday 23 August. Yu can prvide yur cmments by: Online rms.nsw.gv.au/pcip Calling and leaving a message fr the prject team

38 ing Writing t the Parramatta Cngestin Imprvement Prgram, Rads and Maritime Services, PO Bx 973, Parramatta, NSW, Fr mre infrmatin n ur prjects, visit rms.nsw.gv.au. Next Steps We will carefully cnsider all feedback received befre deciding whether r nt t prceed with this prpsal. A cmmunity cnsultatin reprt will be prepared, summarising the matters raised and ur respnses. This will be made available n ur website. We will keep yu updated as the prpsal prgresses.

Federal Way City Center Access Study Comment Log Summary

Federal Way City Center Access Study Comment Log Summary Prject verview The City f Federal Way is pursuing the City Center Access prject t find ways t imprve access t Federal Way s City Center and the surrunding area. The City is studying slutins t cngestin

More information

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013 PUBLIC OPEN HOUSE Panet Rad / Mlsn Street Recnstructin April 24, 2013 T address issues assciated with traffic grwth arund Mlsn Street. Prject issues include: Delay at rail crssings Traffic cngestin at

More information

3 ways to build a healthy future for NSW

3 ways to build a healthy future for NSW 3 ways t build a healthy future fr NSW Healthy cities Healthy lifestyle Healthy children Dear Treasurer, As yu prepare fr the 2016-2017 Budget there are 3 key prgrams the Heart Fundatin NSW asks yu t fund

More information

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012 PUBLIC OPEN HOUSE Preliminary Engineering Study t Upgrade the Pembina Highway Underpass MAY 9, 2012 The number f nrthbund traffic lanes at the Pembina Highway Underpass need t be increased frm tw lanes

More information

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN. SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN www.sandyfrdsmartertravel.ie What is a Mbility Management Plan? A wrkplace Mbility Management Plan is a lng-term management strategy

More information

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY Images f cmmunity cmments n the Study Area maps The first Public Infrmatin Centre was held fr bth the Casablanca Bulevard and GO Access Envirnmental Assessment and the Livingstn Avenue Extensin Envirnmental

More information

NSW HEALTH HOSPITAL CAR PARKING FEES FOR STAFF POLICY DRAFT FOR CONSULTATION PURPOSES FROM THE MINISTRY OF HEALTH

NSW HEALTH HOSPITAL CAR PARKING FEES FOR STAFF POLICY DRAFT FOR CONSULTATION PURPOSES FROM THE MINISTRY OF HEALTH NSW HEALTH HOSPITAL CAR PARKING FEES FOR STAFF POLICY DRAFT FOR CONSULTATION PURPOSES FROM THE MINISTRY OF HEALTH 1 NSW HEALTH HOSPITAL CAR PARKING FEES FOR STAFF POLICY 20 July 2012 Intrductin Currently,

More information

CHAPTER 4 VISION, GOALS AND OBJECTIVES

CHAPTER 4 VISION, GOALS AND OBJECTIVES CHAPTER 4 VISION, GOALS AND OBJECTIVES Defining a visin, gals, and bjectives creates the structure fr a plan. T develp the visin fr this Plan, the team reviewed the 2012 MPO Cmprehensive Pathways Plan

More information

Technical Memorandum. Introduction. Projected Traffic Volumes

Technical Memorandum. Introduction. Projected Traffic Volumes Technical Memrandum T: Mr. Eduard Garcia, PSW Real Estate, LLC Frm: Christy Lambeth, P.E., PTOE Lambeth Engineering Assciates, PLLC, F-19508 Date: May 29, 2018 Re: Traffic Assessment fr Prpsed Single-Family

More information

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission Philadelphia City Planning Cmmissin INSTRUCTIONS This Checklist is an implementatin tl f the Philadelphia Cmplete Streets Handbk (the Handbk ) and enables City engineers and planners t review prjects fr

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Seven (7) Page Frm An Applicatin frm the State Highway r Transprtatin Department f Oklahma fr (select ne f the fllwing): Eliminatin f a U.S.

More information

Appendix C. Travel Demand Forecasting Technical Memorandum

Appendix C. Travel Demand Forecasting Technical Memorandum Appendix C Travel Demand Frecasting Technical Memrandum MEMORANDUM Date: T: Frm: Subject: Bb Watts, Twn f Castle Rck Karl Buchhlz, Muller Engineering Chris Sheffer, Nick VanderKwaak, Fehr & Peers Travel

More information

Nine Elms Lane and Battersea Park Road

Nine Elms Lane and Battersea Park Road Nine Elms Lane and Battersea Park Rad Sustrans respnse t Transprt fr Lndn Summary Sustrans welcmes the cnsultatin n prpsals fr changes t Nine Elms Lane and Battersea Park Rad, and supprts the ambitin t

More information

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No. MEMORANDUM PROJECT: Nrth Santa Mnica Bulevard Resnsturctin Prject N. 1BEVO41000 T: frm: City f Beverly Hills Traffic and Cmmissin Psmas Iteris Date: July,9 2015 Subject: Traffic Mitigatin During NSMB Cnstructin

More information

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated. 100 20111 93A Avenue Langley, BC V1M 4A9 e bcta@bctrucking.cm t 604 888 5319 f 604 888 2941 tll free 1 800 565 2282 bctrucking.cm 16 th Avenue Crridr Imprvements BCTA Survey Results & Recmmendatins September

More information

E25 FATIGUE MANAGEMENT

E25 FATIGUE MANAGEMENT E25 FATIGUE MANAGEMENT PURPOSE AND SCOPE This Prcedure prvides the requirements and guidance needed t manage fatigue fr Laing O Rurke railway peratins. It will need t be read in cnjunctin with the rail

More information

Technical Briefing Rapid Transit

Technical Briefing Rapid Transit Technical Briefing Rapid Transit T Rapid Transit Implementatin Wrking Grup Date March 6, 2017 Frm Subject The Shift Team Preferred Dwntwn Ruting The preferred Dwntwn rutes fr Rapid Transit are illustrated

More information

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options Glden Valley Rad Parking Management Strategies Assessment Purpse The purpse f the Parking Management Strategy Assessment is t synthesize parking discussins during the Metr Blue Line Extensin (Bttineau

More information

Presented by: Presented to:

Presented by: Presented to: The Challenge f Implementing Prtected Bike Lanes Delaware Avenue: A Case Study Demnstratin Presented by: Presented t: Octber 25, 2016 Presentatin Outline FAST Act Impact n Bicycle Facilities Planning Ptential

More information

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4 MEETING SUMMARY Nrth Avenue Recnstructin Prject Cntext Sensitive Slutins Advisry Grup Meeting #4 ATTENDEES: LOCATION: PREPARED BY: COPIES: Sign-in sheet attached Brkfield Library, Snia Bielmeier Cmmunity

More information

STATE OF NORTH CAROLINA Office of the State Auditor

STATE OF NORTH CAROLINA Office of the State Auditor STATE OF NORTH CAROLINA Office f the State Auditr Beth A. Wd, CPA State Auditr 2 S. Salisbury Street 20601 Mail Service Center Raleigh, NC 27699-0601 Telephne: (919) 807-7500 Fax: (919) 807-7647 Internet

More information

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network Mp, Revised Criteria and Joint Resolution EXECUTIVB SUMMARY Regular Bard Actin Item 98 Apprval f Revised Reginal Radway Netwrk M"p, Revised Criteria and Jint Reslutin Objective: Fr the Bard t apprve the revised Reginal Radway Netwrk Map, Revised

More information

Cycling Strategy Group. Terms of Reference

Cycling Strategy Group. Terms of Reference Cycling Strategy Grup Terms f Reference 1. Cntext In May 2014 the Ecnmic and Envirnmental Wellbeing Scrutiny and Plicy Develpment Cmmittee cncluded its Cycling Inquiry. It set ut an ambitius visin fr cycling

More information

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary TRANSPORTATION IMPACT ASSESSMENT Executive Summary OVERVIEW Early in ur dialgue with neighburs, the prject team fund that a number f cmmunity members had questins abut the impact that the prpsed develpment

More information

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include: Crsswalk event verview (Saint Paul) A crsswalk event ccurs when an individual r grup f individuals prmte pedestrian safety by demnstrating the prper use f a crsswalk. During the event, a grup f cmmunity

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: T: Frm: Subject: Adam Varat and Ilaria Salvadri, City f San Francisc Clin Burgett, Fehr & Peers Intersectin Level f Service Analysis f Ptential Missin Streetscape Plan Imprvements

More information

The Facts About Brentwood School s Expansion Plans

The Facts About Brentwood School s Expansion Plans The Facts Abut Brentwd Schl s Expansin Plans September 2016 Did Yu Knw In exchange fr a 30-year Master Plan that wuld increase enrllment by 38% and require 13 years f cnstructin, Brentwd Schl says it will

More information

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting MEETING MINUTES Athertn Middleield Rad Bicycle Lane Imprvements Public Meeting Date: Octber 2, 2017 Time: 4:00 pm 6:00 pm Lcatin: 94 Ashield Rad, Athertn, CA Presenters: Nadia Bsan, Interwest Cnsulting

More information

Project No.: Notes taken by:

Project No.: Notes taken by: Transprtatin Land Develpment Envirnmental S e r v i c e s 101 Walnut Street Pst Office Bx 9151 Watertwn, MA 02471-9151 Telephne (617) 924-1770 Fax (617) 924-2286 Meeting Ntes Attendees: Attached Date/Time:

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons: 6.004. Plicy Cncerning Schl Attendance and Truancy 6.004. Plicy Cncerning Schl Attendance and Truancy Cperative Educatinal Services (C.E.S.) believes that regular schl attendance is essential fr an effective

More information

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020. Nrth Halifax Grammar Schl First Aid Plicy Apprved by: Principal Date apprved: Nvember 2017 Next review: Autumn Term 2020 Plicy wner: Schl Welfare Officer Created April 2014 General The Academy is required

More information

City of Ottawa. Transit Solutions. O c t o b e r

City of Ottawa. Transit Solutions. O c t o b e r City f Ottawa Prject N. 101-16386 O c t b e r 2 0 1 1 O p e r a t i n a l I m p a c t s a n d P l i c y I m p l i c a t i n s f B u s B a y s i n t h e C i t y f O t t a w a - E x e c u t i v e S u m m

More information

Completed Project Justification Package Example

Completed Project Justification Package Example Cmpleted Prject Justificatin Package Example Nature f the Prblem: Describe the nature f the prblem that the prject intends t mitigate r fix. Fr example, is it designed t address a current cngestin, peratinal

More information

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad. Selectin Plicy fr Badmintn Australia Supprt Structure (BASS) and Natinal Squad. Prgram Outline The main purpse f the Badmintn Australia s (BA) High Perfrmance (HP) prgram is t achieve internatinal success.

More information

DUBLIN CYCLING CAMPAIGN

DUBLIN CYCLING CAMPAIGN DUBLIN CYCLING CAMPAIGN Psitin: Chregrapher fr Cycling Presence in 2016 St Patrick s Day Parade DRAFT BRIEF V2 - Wednesday, 03 February 2016 ----------------------------------------------------------------------------------------------------------------------------------------------------------

More information

DEDWORTH ROAD MASTERPLANNING AND DESIGN ADVICE Windsor Neighbourhood Plan Forum

DEDWORTH ROAD MASTERPLANNING AND DESIGN ADVICE Windsor Neighbourhood Plan Forum Design Planning and Ecnmics Submitted t Windsr Neighburhd Plan Frum Submitted by AECOM 6-8 Greencat Place Lndn SW1P 1PL DEDWORTH ROAD MASTERPLANNING AND DESIGN ADVICE Windsr Neighburhd Plan Frum Draft

More information

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV Lamb Bulevard Safety Management Plan Between E. Desert Inn Rd. t Lake Mead Blvd. Clark Cunty, NV Tuesday, December 5, 2017 4-7 p.m. Presentatin at 5:30 p.m. Walnut Cmmunity Center 3075 N. Walnut Rd. Las

More information

2017 Active Allegheny Grant Program Program Guidelines

2017 Active Allegheny Grant Program Program Guidelines Redevelpment Authrity f Allegheny Cunty Nte: Fr infrmatin purpses nly. Prgram guidelines subject t change prir t next funding cycle. 2017 Active Allegheny Grant Prgram Prgram Guidelines Intrductin The

More information

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill. OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,

More information

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner, Minutes f the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE DATE: December 10, 2015 TIME: PLACE: 10:00 a.m. Cnference Rm B Kensha Cunty Center 19600 75 th Street Bristl, WI Members Present Gary

More information

Health and Safety Policy for Groups Policy

Health and Safety Policy for Groups Policy Wdcraft Flk Plicy Health & Safety fr Grups Plicy Revised by: Debs McCahn & Sarah McGvern February 2013 Health and Safety Plicy fr Grups Plicy Last updated: February 2013 Revised by: Debs McCahn (Membership

More information

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station CARLSON BOULEVARD CORRIDOR OVERVIEW The prtin f Carlsn Bulevard within the study area stretches apprximately 3.25 miles nrth t suth frm Maine Avenue t the El Cerrit Plaza BART Statin area near San Pabl

More information

First Aid Policy Version 2.0

First Aid Policy Version 2.0 First Aid Plicy Versin 2.0 Cntents Definitins Page 3 Ratinale & Scpe Page 3 Guiding Principles Page 3 Relevant Legislatin Page 3 Plicy Statements Page 4 1. Respnse t injuries and illness Page 4 2. First

More information

Mount Gravatt State School Executive Summary

Mount Gravatt State School Executive Summary Munt Gravatt State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Munt Gravatt State Schl frm 27 t 29 April 2015. It prvides an evaluatin f the schl

More information

Deer harvest objective for the Deer Plan

Deer harvest objective for the Deer Plan Deer harvest bjective fr the Deer Plan December 12, 2017 Summary and Backgrund fr DMPAC April 2018 NOTE: THIS IS A COPY OF A DOCUMENT DISCUSSED WITH DMPAC IN 2017. IT CONTAINS INFORMATION CONSIDERED BY

More information

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls

More information

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success) ELLERSLIE AFC OPERATIONAL PLAN (Game Develpment and Ftball Success) Ellerslie AFC has a reputatin thrughut the Auckland ftball cmmunity as a family-friendly club that prvides an enjyable and rewarding

More information

Subject: Recommended Updates to Transportation Development Parameters

Subject: Recommended Updates to Transportation Development Parameters T: Frm: Members f the Balba Reservir Cmmunity Advisry Cmmittee ( CAC ) Jeremy Shaw, Planning Department Date: 5/20/2016 Subject: Recmmended Updates t Transprtatin Develpment Parameters This memrandum cntains

More information

City of London Transport Strategy

City of London Transport Strategy City f Lndn Transprt Strategy Sustrans respnse August 2018 Abut Sustrans Sustrans is the charity making it easier fr peple t walk and cycle. We are engineers and educatrs, experts and advcates. We cnnect

More information

East Sussex Highways Highway Asset Inspection Guidance Document

East Sussex Highways Highway Asset Inspection Guidance Document Highways and Infrastructure Services Cntract 2016-23 East Sussex Highways Highway Asset Inspectin Guidance Dcument Dcument Histry: Further Infrmatin Date f Apprval Dcument Versin Dcument Revisin Histry

More information

Kenmore South State School Executive Summary

Kenmore South State School Executive Summary Kenmre Suth State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kenmre Suth State Schl frm 26 t 28 Octber 2015. It prvides an evaluatin f the schl s

More information

Construction Design and Management

Construction Design and Management Cnstructin Design and Management GUIDANCE ON THE CONSTRUCTION PHASE PLAN Veritas Cnsulting Safety Services 42 Haslucks Crft, Shirley, Slihull, B90 2EQ Tel: 0121 249 1281 Mb: 07814 203 977 www.veritas-cnsulting.c.uk

More information

Kilkivan State School Executive Summary

Kilkivan State School Executive Summary Kilkivan State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kilkivan State Schl frm 17 t 18 August 2015. It prvides an evaluatin f the schl s perfrmance

More information

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1 Alternative Ways t Imprve Traffic n Lp 360 Paul Schumann 1 February 13, 2015 Intrductin "Lp 360 prvides primary access t far west Austin, acting as a thrughfare fr residents and as a cmmuter rute fr thse

More information

Environmental Impact Assessment Report (EIAR) Volume 4 of 4: Appendices Appendix A14.1 Traffic and Transport Assessment

Environmental Impact Assessment Report (EIAR) Volume 4 of 4: Appendices Appendix A14.1 Traffic and Transport Assessment Envirnmental Impact Assessment Reprt (EIAR) Vlume 4 f 4: Appendices Appendix A14.1 Traffic and Transprt Assessment Page A14.3-1 Kildare C unty C uncil Kerdiffstwn Landfill Remediatin Prject Kildare Cunty

More information

CITY of LOMPOC 2030 General Plan

CITY of LOMPOC 2030 General Plan 2030 General Plan INTRODUCTION AND AUTHORITY The Circulatin Element is required by the Gvernment Cde [Sectin 65302(b)], which states that the Circulatin Element must include the general lcatin and extent

More information

Canadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and BC Sailing Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved June 12, 2018 Kevin Black Representative Signature

More information

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK DEPARTMENT f SOCIAL WORK Student Name: Applicatin fr Emplyment-Based Field Practicum Directins: The field educatin prcess is a partnership invlving the scial wrk prgram, field educatin Prgram, scial wrk

More information

Parking Committee Report to Commissioners AUGUST 17, 2018

Parking Committee Report to Commissioners AUGUST 17, 2018 Parking Cmmittee Reprt t Cmmissiners AUGUST 17, 2018 REHOBOTH IN THE SUMMER The Cmmittee Linda Kauffman Chair Trey Krause Mark Saunders Je Hill Jess Behringer Randy Masn Brian Barry Jeff Hamer The Basics

More information

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

DRAFT - TRANSPORTATION AND PUBLIC HEALTH DRAFT - TRANSPORTATION AND PUBLIC HEALTH Backgrund/Intrductin Transprtatin Outlk 2040, the Kansas City regin s lng-range transprtatin plan, includes a public health gal t facilitate healthy, active living.

More information

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3 Supplement t Plicy 7 - Rep Hckey Date Revised: July 2017 Versin 1.3 1 Table f Cntents Table f Cntents 1 Rep Tryut Prcedure Guidelines 2 Intrductin: 2 Rep Tryut Objectives: 2 Purpse f Player Evaluatin and

More information

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018 District 6 and Unit 190 (D4) STaC - Cnditins f Cntest & Reprting Instructins Fall 2018 Key Infrmatin fr Club Owners: Please read and pst near the scring cmputer fr the directrs use during STaC week. Sanctin

More information

Rotorua Racing Club. Submission to the Commerce Select Committee. On the. Gambling (Gambling Harm Reduction) Amendment Bill

Rotorua Racing Club. Submission to the Commerce Select Committee. On the. Gambling (Gambling Harm Reduction) Amendment Bill Rtrua Racing Club Submissin t the Cmmerce Select Cmmittee On the Gambling (Gambling Harm Reductin) Amendment Bill Rtrua Racing Club P.O. Bx 1445 Rtrua 3040 Phne: (07) 348 2024 Email: racingrtrua@trac.c.nz

More information

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures

More information

A template mass rescue operations plan

A template mass rescue operations plan The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general

More information

Training Teams and Selection Criteria:

Training Teams and Selection Criteria: January 17, 2019 Biathln Canada 2019-2020 Training Selectin Criteria Intrductin: The purpse f this dcument is t define the selectin criteria fr athletes t be selected fr a Training. A Training is a grup

More information

USTA Atlanta Combo Doubles Registration Information Play begins in late April

USTA Atlanta Combo Doubles Registration Information Play begins in late April Serving Cbb, Fultn, Dekalb, Gwinnett and Frsyth cunties USTA Atlanta Cmb Dubles Registratin Infrmatin Play begins in late April Spring 2011 League Infrmatin and Dates NEW! Team Match Frmat: Each team match

More information

PORT MACQUARIE-HASTINGS PEDESTRIAN ACCESS AND MOBILITY PLAN

PORT MACQUARIE-HASTINGS PEDESTRIAN ACCESS AND MOBILITY PLAN PORT MACQUARIE-HASTINGS PEDESTRIAN ACCESS AND MOBILITY PLAN May 2015 Table f Cntents Table f Cntents... 1 1 Intrductin... 2 1.1 What is a Pedestrian Access and Mbility Plan?... 2 1.2 Objectives... 2 1.3

More information

Project Advisory Team Existing Conditions Meeting Agenda

Project Advisory Team Existing Conditions Meeting Agenda Prject Advisry Team Existing Cnditins Meeting Agenda April 25, 2017 Viera Gvernmental Center, Atlantic Rm, Building C, 3 rd Flr 10:00 AM 12:00 PM Wickham Rad Operatinal Analysis 1. Prject Backgrund/Overview

More information

Long-Term Transportation Plan

Long-Term Transportation Plan Lng-Term Transprtatin Plan Implementatin & Mnitring Strategy TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 IMPLEMENTATION PLAN... 5 2.1 RESPONSIBILITY AND METHODS FOR IMPLEMENTATION...5 2.2 EVALUATION...8

More information

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes. Advisry Grup Meeting #7. March 9, 2017. Transcribed Breakut Grup Discussin Ntes. Discussin Questins. What feedback have yu heard frm yur cmmunities abut the near-term strategies? What d yu think wrks abut

More information

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION 1 MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION The Missuri State 4-H Cuncil is an elected bdy f 4-H yuth wh serve fr ne year. Cuncil members help plan and carry ut State 4-H Cngress and

More information

NOISE MANAGEMENT PLAN CORAKI QUARRY

NOISE MANAGEMENT PLAN CORAKI QUARRY NOISE MANAGEMENT PLAN CORAKI QUARRY Date f Issue: Purpse The nise management plan is required t cmply with Cnditin 15 f the Develpment Cnsent Schedule 3. The Purpse f the nise management plan is t ensure

More information

2.0 VISIONING DIRECTION

2.0 VISIONING DIRECTION NOVEMBER 2013 TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 VISIONING DIRECTION...2 2.1 Cntext fr Sustainable Grwth The Official Cmmunity Plan...2 2.2 Transprtatin Visin...5 2.3 Integrated Gals & Objectives...6

More information

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts One Financial Plaza 1350 Main Street 3rd Flr, Cmmunity Rm A Springfield, Massachusetts 1 Leading the Natin in Transprtatin Excellence www.mass.gv/massdt April 9, 2015 Agenda Welcme & Intrductins Overview

More information

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 PILKINGTON RESPONSE Rich Martink returned call n 8/10/2014 at 2:50pm and spke with Ms. Pilkingtn The infrmatin belw was given t her. She thanked me fr the fllw-up. Thank

More information

Pomona State School Executive Summary

Pomona State School Executive Summary Pmna State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Pmna State Schl frm 13 t 15 July 2015. It prvides an evaluatin f the schl s perfrmance against

More information

W R E S T L I N G B C B r i t i s h C o l u m b i a W r e s t l i n g A s s o c i a t i o n

W R E S T L I N G B C B r i t i s h C o l u m b i a W r e s t l i n g A s s o c i a t i o n Athlete/Cach Nminatin Criteria 1 W R E S T L I N G B C B r i t i s h C l u m b i a W r e s t l i n g A s s c i a t i n Canadian Sprt Institute Pacific and BC Wrestling Athlete and Cach Nminatin Criteria

More information

Canadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Cycling BC Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved January 2018: Cycling BC Representative, Tara

More information

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK Page 2 Event Details Page 3.5k Vlunteer Descriptins Page 4-5..Vlunteer FAQs Please nte the Firefighters Field Map can be viewed at gtrnyc.rg/5kinf

More information

Cecil Plains State School Executive Summary

Cecil Plains State School Executive Summary Cecil Plains State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Cecil Plains State Schl frm 2 t 4 June 2015. It prvides an evaluatin f the schl s perfrmance

More information

Kowanyama State School Executive Summary

Kowanyama State School Executive Summary Kwanyama State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kwanyama State Schl frm 16 t 19 March 2015. It prvides an evaluatin f the schl s perfrmance

More information

Go Ride A Wave - Employment Information Sheet (V13)

Go Ride A Wave - Employment Information Sheet (V13) G Ride A Wave - Emplyment Infrmatin Sheet (V13) Welcme t G Ride A Wave! Established in 1987, G Ride A Wave (GRAW) is an industry leader in utdr adventure educatin and recreatin. The cmpany perates in tw

More information

Hot Work Policy and Procedures

Hot Work Policy and Procedures 1.0 Plicy Statement The University f New Haven has develped a ht wrk plicy and prcedure in accrdance with Occupatinal Health and Safety Administratin (OSHA) regulatins. 1.1 Purpse The University f New

More information

American Water Works Association. Organizational & Technical Strategic Data Management Assessment Request for Proposal

American Water Works Association. Organizational & Technical Strategic Data Management Assessment Request for Proposal American Water Wrks Assciatin Organizatinal & Technical Strategic Data Management Assessment Request fr Prpsal 08/01/2018 1 Overview 1.1 Abut AWWA The American Water Wrks Assciatin (AWWA) is an internatinal,

More information

Shepparton North-East Growth Corridor Development

Shepparton North-East Growth Corridor Development Sheppartn Nrth-East Grwth Crridr Develpment Traffic Impact Assessment Reprt Client: Greater Sheppartn City Cuncil Prject 3040 Final Reprt: 22/08/204 st Flr 32 Upper Heidelberg Rad Ivanhe Vic 309 PO Bx

More information

Bucasia State School Executive Summary

Bucasia State School Executive Summary Bucasia State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Bucasia State Schl frm 8 t 10 March 2016. It prvides an evaluatin f the schl s perfrmance

More information

Norfolk Village State School Executive Summary

Norfolk Village State School Executive Summary Nrflk Village State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Nrflk Village State Schl frm 9 t 11 June 2015. It prvides an evaluatin f the schl

More information

DRAFT Active Transportation Work Plan

DRAFT Active Transportation Work Plan DRAFT Active Transprtatin Wrk Plan T achieve the visin and gals utlined in the Plicy Framewrk SCAG will adpt the Active Transprtatin Wrk Plan which is based n plicies and gals frm the 2012 RTP/SCS. The

More information

Jobs in Green and Healthy Transport

Jobs in Green and Healthy Transport Infrmal dcument n. 6 THE PEP Steering Cmmittee, 11th sessin, 27-28 Nvember 2013 Item 7 (c) f the prvisinal agenda Implementing the Amsterdam Declaratin THE PEP Partnerships Implementing the Amsterdam Declaratin

More information

NX2 Albany to Universities bus route and service layovers public feedback report Total number of public submissions received = 71

NX2 Albany to Universities bus route and service layovers public feedback report Total number of public submissions received = 71 1 NX2 Albany t Universities bus rute and service layvers public feedback reprt Ttal number f public submissins received = 71 1 2 Cntents Summary... 3 Outcme f cnsultatin... 3 Key themes identified in feedback...

More information

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur

More information

Wondall Heights State School Executive Summary

Wondall Heights State School Executive Summary Wndall Heights State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Wndall Heights State Schl frm 15 t 19 May 2015. It prvides an evaluatin f the schl

More information

Hambledon State School Executive Summary

Hambledon State School Executive Summary Hambledn State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Hambledn State Schl frm 9 t 11 September 2015. It prvides an evaluatin f the schl s perfrmance

More information

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008 Binghamtn Metrplitan Transprtatin Study Pedestrian & Bicycle Advisry Cmmittee Meeting Minutes April 14, 2008 Attendance: Sctt Reigle, Tby Wllin, Christine Muss, Kris Gilbert, Warren Wetzelberg, Steven

More information

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW REGIONAL SWIMMING HUB STRATEGIC OVERVIEW Updated 1 May 2017 P a g e 1 INDEX EXECUTIVE SUMMARY THE REQUIREMENT THE SOLUTION LAYING THE FOUNDATION THE GOALS THE IMPLEMENTATION POSITION DESCRIPTION HUB HEAD

More information

Positive Handling Policy

Positive Handling Policy Hillcrest Children s Services Jubilee Schl Psitive Handling Plicy Lcal Prcedure Owner: Tim Rgers Issue date: September 2016 Review date: September 2017 Linked with lcal prcedures: Anti Bullying Behaviur

More information

Byfield State School Executive Summary

Byfield State School Executive Summary Byfield State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Byfield State Schl frm 3 t 4 August, 2015. It prvides an evaluatin f the schl s perfrmance

More information

Canadian Sport Institute Pacific and Badminton BC Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and Badminton BC Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Badmintn BC Athlete and Cach Nminatin Criteria Criteria Apprved March 28 th, 2018 CSI Pacific Representative L. Jennerich Signature

More information