1 MARTIN COUNTY CRASH SURVEILLANCE REPORT FROM JULY 1, 2011 TO JUNE 30, 2013 IDENTIFICATION AND ANALYSIS OF CRASHES AT INTERSECTIONS & RAIL CROSSINGS AND INVOLVING PEDESTRIANS & BICYCLISTS APRIL 14, 2014

2 1 Introduction 1.1 Background / Purpose The Martin County Comprehensive Growth Management Plan requires the Engineering Department prepare a crash surveillance report every other year that identifies, analyzes, and provides recommendations for reducing high-hazard intersections and fatal crashes as well as crashes involving pedestrians and bicyclists. Crash surveillance is also a requirement of the Martin Metropolitan Planning Organization s (MPO) Unified Planning Work Program (UPWP). The purpose of the report is to provide a tool to assist in setting priorities for improvements for the five-year Capital Improvement Plan. The last Crash Surveillance Report was through June 30, The report is divided into three sections: by intersection type; non-motorized types; and fatalities. The intersection types are further broken down into signalized, unsignalized, and rail crossings. The non-motorized types are broken down into those involving bicyclists and pedestrians. 1.2 Data Source The data source utilized in the preparation of the report is the Martin County Traffic Division s crash database. The Martin County Traffic Division s database is populated with data from crash reports provided by the Division of Highway Safety and Motor Vehicles (DHSMV) and local law enforcement agencies. In Florida, traffic crashes are reported by the use of two forms commonly referred to as the Long Form and the Short Form. A Long Form crash report is used when one or more of the following criteria are met: Death or personal injury Leaving the scene involving damage to - vehicles or property Driving while under the influence The Short Form crash report is used to report all other types of traffic crashes. A study of crash patterns in central Florida found that nearly 65 percent of crashes at signalized intersections were reported on Short Forms. 1 The Martin County crash database contains data from both Short and Long Form crash reports. However, on July 1 st 2010, legislation was affected that eliminated the requirement of the DHSMV to collect and track Short Form crash reports. Although Short Form crash reports were collected and maintained by local law enforcement agencies, many were not formatted in a manner that could be entered into the Martin County database. On July 1 st 2012, the requirement of the DHSMV to collect and track Short Form crash reports was reinstated. Subsequently, the Martin County crash database has a lower number of crashes reported between July 2010 and July 2012 than other years. 1 ITE Journal Type of Collision and Crash Data Evaluation at Signalized Intersections FEBRUARY 2006 Crash Surveillance Report Page 1 7/01/2011 through 6/30/2013

3 It is also important to note that other agencies, such as the Florida Department of Transportation (FDOT), record only Long Form crash data. So, when comparing crash statistics in this report to statistics provided by another agency, one must determine if the other agency s data includes both Short and Long Form crash reports. The Martin County crash database classifies crashes by cardinal direction (North, East, South, and West) and crash type. The crash types utilized by the Martin County database are: Head on Bicycle Pedestrian Off Road Other Rollover Rear end Right / Left Right / Through Right / U-Turn Left Rear Left Leaving Left Entering Right angle Same direction sideswipe Opposing sideswipe Unknown The crash types are self-explanatory with the exception of Other. Some examples of Other crashes include vehicles backing up at a signalized intersection, cargo falling off of a vehicle, or crashes involving a vehicle exiting a driveway near a signalized intersection. 2 Intersections Signalized intersections In selecting an intersection for a detailed safety analysis, the key questions are: What is the safety performance of the location in comparison with similar locations? Is the safety performance at the location acceptable or not acceptable? 2 In order to answer these questions a novel method by Adebel-Aty, Lee, and Brady was utilized. 3 Adebel-Aty, Lee, and Brady found that the number of approach lanes of an intersection has a high correlation to the number of crashes by type. The advantage of this method is that the number of approach lanes per intersection is readily obtainable. Whereas other methods, such as the crash rate per million vehicles, require additional data that is not always readily available, such as the number of vehicles approaching the intersection every day during the time period in question. All intersections that were signalized on or before July 1 st 2011 were queried for crashes within 300 feet of the intersection. The number of approach lanes (excluding non-channelized right turn lanes) was determined from the County s January 2013 aerial photos. 2 FHWA Signalized intersection information guide 3 ITE Journal April 2006 Crash Surveillance Report Page 2 7/01/2011 through 6/30/2013

4 When summarizing crashes at signalized intersection by type, the direction of travel of crashes was ignored. Due to the relatively low number of crashes at signalized intersections, the following subset of crash types were combined as shown in Table 1: Database Type Right / Left Right / Through Right / U-Turn Left Rear Left Leaving Left Entering Same direction sideswipe Opposing sideswipe Combined Type Right Left Sideswipe Table 1 : Combined Crash Types The crash data for signalized intersections is summarized in Appendix A. The relationship of the average number of crashes per year to the number of approach lanes for all signalized intersections was plotted and an equation was fitted to the data. The intersections that exceed 60% of the expected (fitted curve) value of the fitted equation were chosen for detailed study Results Rear end collisions were found to be the most frequent type and directly related to the number of approach lanes. An equation was fitted for rear end collisions to assist in determining whether rear end crashes are overrepresented at a particular intersection. Equations were not fitted to the other crash types. The resulting scatter plots are located in Appendix B. These plots allow analysts to determine if a particular crash type is overrepresented when performing a safety study of a signalized intersection. The relationship of the average number of crashes per year to the number of approach lanes for all signalized intersections was plotted for all crash types with the exception of crash types Unknown and Rollover, since their occurrence at signalized intersections was insignificant. The relationship of the average number of crashes per to the number of approach lanes for T and four-way intersections is shown in Figure 1 and Figure 2, respectively. Crash Surveillance Report Page 3 7/01/2011 through 6/30/2013

5 Figure 1 : Relationship between average number of crashes per year and total number of approach lanes (T-intersection) Crash Surveillance Report Page 4 7/01/2011 through 6/30/2013

6 Figure 2 : Relationship between average number of crashes per year and total number of approach lanes (4 way-intersections) Crash Surveillance Report Page 5 7/01/2011 through 6/30/2013

7 The intersections that exceed 60% of the expected value of the fitted equation are identified in Table 2. Crash diagrams and aerial photos of the intersections can be found in Appendix C. T Intersections Number of crashes in reporting period SR-76 (S Kanner Highway) at SE Indian Street 40 SR-76 (S Kanner Highway) at SE Cove Road 28 CR-711 (SW Pratt Whitney Road) at SW Bulldog Way 17 SE Willoughby Boulevard at SE Cove Road 11 Four-way Intersections SR-5 (US-1 / NW Federal Highway) at NW Britt Road 101 SR-5 (US-1 / SE Federal Highway) at SE Salerno Road 78 SR-714 (SW Martin Downs Boulevard) at SW Mapp Road 68 SR-76 (S Kanner Highway) at SE Lost River Road 55 SR5 (US-1 / SE Federal Highway) at CR-708 (SE Bridge Road) 39 SR-714 (SE Monterey Road) at SE Willoughby Boulevard 39 SR-714 (SW Martin Downs Boulevard) at SW Matheson Avenue 35 SR5 (US-1 / SE Federal Highway) at SE Osprey Street 20 CR-714 (SW Martin Highway) at CR-713 (SW High Meadow Avenue 20 CR-A1A (SE Dixie Highway) at SE Osprey Street 14 CR-707 (NE Indian River Drive) at CR-707A (NE Jensen Beach Boulevard) 13 Table 2 : Signalized intersections chosen for detailed study Analysis of intersections SR-76 (S Kanner Highway) at SE Indian Street 40 crashes were reported with 18 crashes expected (based on fitted curve value) over two years. The intersection was under construction to be expanded and converted from a T intersection to a four-way intersection as part of the Veterans Memorial Bridge construction. Due to the significant changes in intersection geometry, no recommendations are provided. SR-76 (S Kanner Highway) at SE Cove Road 28 crashes were reported with 15 crashes expected (based on fitted curve value) over two years. The predominant crash type was rear end on SR-76 (S Kanner Highway), which is not correctable. The volume of traffic on S Kanner Highway is approaching capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. The remaining crashes did not appear in a pattern that warrants further action. Crash Surveillance Report Page 6 7/01/2011 through 6/30/2013

8 The 2008 to 2011 crash surveillance report identified a high number of westbound off road crashes. It should be noted that only one westbound off road crash was reported in the current reporting period. CR-711 (SW Pratt Whitney Road) at SW Bulldog Way 17 crashes were reported with 6 crashes expected (based on fitted curve value) over two years. The predominant crash type was rear end on SW Bulldog Way, which is not correctable. The remaining crashes did not appear in a pattern that warrants further action. SE Willoughby Boulevard at SE Cove Road 10 crashes were reported with 6 crashes expected (based on fitted curve value) over two years. The predominant (eight of the ten) crash type was rear end, which is not correctable. The remaining crashes did not appear in a pattern that warrants further action. SR-5 (US-1 / NW Federal Highway) at NW Britt Road 101 crashes were reported with 47 crashes expected (based on fitted curve value) over two years. The predominant (nearly 60%) crash type was rear end, which is not correctable. The volume of traffic on US-1 (NW Federal Highway) was approaching capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. Because of the congestion, the County began construction of additional north and southbound left turns and an additional northbound auxiliary lane to this intersection in May The construction was complete in November Due to the significant changes in intersection geometry, no recommendations are provided. SR-5 (US-1 / SE Federal Highway) at SE Salerno Road 78 crashes were reported 27 crashes expected (based on fitted curve value) over two years. The predominant (fifty of seventy eight) crash type was rear end, which is not correctable. SR-714 (SW Martin Downs Boulevard) at SW Mapp Road 68 crashes were reported with 22 crashes expected (based on fitted curve value) over two years. The predominant (thirty seven of sixty eight) crash type was rear end, which is not correctable. It appears the number of westbound rear end crashes may be under-reported because many crashes that occur on SW Martin Downs Boulevard as a result of the left turn queue at SW Mapp Road and are recorded as being at the SW Feroe Avenue intersection. The volume of traffic on SR-714 (SW Martin Downs Boulevard) was over capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. Because of the congestion, the Veteran Memorial Bridge was constructed and opened to traffic in December This facility is a new route parallel to SR-714 (SW Martin Downs Boulevard) that will reduce congestion at this intersection. With reduced congestion, it is anticipated that the rear end crashes frequency will be reduced. The remaining crashes did not appear in a pattern that warrants further action. Crash Surveillance Report Page 7 7/01/2011 through 6/30/2013

9 SR-76 (S Kanner Highway) at SE Lost River Road 55 crashes were reported with 14 crashes expected (based on fitted curve value) over two years. The predominant crash type was rear end on SR-76 (S Kanner Highway), which is not correctable. The volume of traffic on S Kanner Highway is approaching capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. Because of the congestion and its proximity to Interstate 95, the County is designing improvements to the intersection and the interchange that will minimize the weaving traffic between the northbound off-ramp and this signalized intersection. The construction of these improvements is anticipated in the fall of Constrained access is an issue that residents south of the intersection have reported. There is a potential to relocate the residents shared driveway further from the intersection to alleviate issues with the vehicles queued on SW Lost River Road blocking access to their driveway. SR5 (US-1 / SE Federal Highway) at CR-708 (SE Bridge Road) 39 crashes were reported with 17 crashes expected (based on fitted curve value) over two years. The predominant (twenty of thirty nine) crash type was rear end, which is not correctable. The remaining crashes did not appear in a pattern that warrants further action. SR-714 (SE Monterey Road) at SE Willoughby Boulevard 39 crashes were reported with 14 crashes expected (based on fitted curve value) over two years. The predominant crash type was rear end on SR-714 (SE Monterey Road), which is not correctable.. The volume of traffic on SR-714 (SW Martin Downs Boulevard) was over capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. Because of the congestion, the Veteran Memorial Bridge was constructed and opened to traffic in December This facility is a new route parallel to SR-714 (SE Monterey Road) that will reduce congestion at this intersection. With reduced congestion, it is anticipated that the rear end crashes frequency will be reduced. The remaining crashes did not appear in a pattern that warrants further action. SR-714 (SW Martin Downs Boulevard) at SW Matheson Avenue 35 crashes were reported with 17 crashes expected (based on fitted curve value) over two years. The predominant (over 70%) crash type was rear end on SR-714 (SW Martin Downs Boulevard), which is not correctable. The volume of traffic on SR-714 (SW Martin Downs Boulevard) was over capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. Because of the congestion, the Veteran Memorial Bridge was constructed and opened to traffic in December This facility is a new route parallel to SR-714 (SW Martin Downs Boulevard) that will reduce congestion at this intersection. With reduced congestion, it is anticipated that the rear end crashes frequency will be reduced. The remaining crashes did not appear in a pattern that warrants further action. Crash Surveillance Report Page 8 7/01/2011 through 6/30/2013

10 SR-5 (US-1 / SE Federal Highway) at SE Osprey Street 20 crashes were reported with 11 crashes expected (based on fitted curve value) over two years. The predominant (55%) crash type was rear end, which is not correctable. The remaining crashes did not appear in a pattern that warrants further action. CR-714 (SW Martin Highway) at SW High Meadow Avenue 20 crashes were reported with 11 crashes expected (based on fitted curve value) over two years. No predominant crash type was identified. The crashes did not appear in a pattern that warrants further action. This intersection will be widened as part of the CR-714 (SW Martin Highway) widening project that is anticipated to start in the summer of CR-A1A (SE Dixie Highway) at SE Osprey Street 14 crashes were reported with 8 crashes expected (based on fitted curve value) over two years. The predominant (64%) crash type was rear end, which is not correctable. The remaining crashes did not appear in a pattern that warrants further action. CR-707 (NE Indian River Drive) at CR-707A (NE Jensen Beach Boulevard) 13 crashes were reported with 8 crashes expected (based on fitted curve value) over two years. No predominant crash type was identified. The crashes did not appear in a pattern that warrants further action. 2.2 Unsignalized Intersections The Martin County crash database was utilized to develop a list of unsignalized intersections (without roundabouts) with fifteen or more crashes in the two year period from July 1, 2011 to June 30, Three intersections met the criteria. Aerial photos and crash diagrams of the intersections are contained in Appendix D. Analysis and recommendations for the three intersections are as follows: SR-714 (SW Monterey Road) at SW Palm City Road This intersection is a T intersection that prohibits left turns by a raised median. The predominant crash type was rear end, with most occurring in the southbound lane on SW Palm City Road and the westbound lane on SR-714 (SW Monterey Road). The volume of traffic on SR-714 (SW Monterey Road) was over capacity at this intersection and it is typical for a high number of rear end crashes to occur on a congested facility. Because of the congestion, the Veteran Memorial Bridge was constructed and opened to traffic in December This facility is a new route parallel to SR-714 (SW Monterey Road) that will reduce congestion at this intersection. With reduced congestion, it is anticipated that the rear end crashes frequency will be reduced. If the frequency of rear end crashes is not reduced, an acceleration / merge lane for the southbound to westbound right turn movement could be constructed, which bear significant costs since it would would entail widening the Palm City Bridge on SR-714 (SW Monterey Road). Similarly, a westbound right turn lane could be constructed. The remaining crashes did not appear in a pattern that warrants further action. Crash Surveillance Report Page 9 7/01/2011 through 6/30/2013

11 SW Martin Downs Boulevard at SW Feroe Avenue The predominant crash type is westbound rear end that is caused by queuing from the signalized intersection on SR-714 (SW Martin Downs Boulevard at SW Mapp Road. See the discussion regarding that intersection in Section above. The remaining crashes did not appear in a pattern that warrants further action. SR-5 (US-1 / NW Federal Highway at the Treasure Coast Square Mall entrance The predominant (nine of sixteen) crash type is rear end, which is not correctable. The remaining crashes did not appear in a pattern that warrants further action. 2.3 Rail Crossings Although the Martin County database contains where a crash occurs, the software s reporting of the type of crashes is limited. Since the Martin County database lacks the ability to crashes at rail crossings it was necessary to utilize the Federal Railroad Administration (FRA) Office of Safety website. The FRA reports that from July 1, 2011 to June 30, 2013 there were two such crashes reported in Martin County: NE 1 st Street over the FEC Railway The train was headed north on the Florida East Coast (FEC) Railway and a pickup truck was stopped on the track with its headlights off. The driver made no attempt to move from the path of the train and was struck by the lead engine. The driver was transported to trauma center with unspecified injuries. S Colorado Avenue over the FEC Railway The train was traveling south on the FEC Railway and a vehicle was stopped on the track. Although the engineer attempted to stop, the driver made no attempt to move from the path of the train and was struck by the plow on the lead engine. No injuries were sustained. It does not appear these crashes are correctable. However, it should be noted that the FEC Railway has plans to add another track to support passenger rail service between Orlando and Miami. It is anticipated that the locations where the roadways cross railroad tracks will be enhanced with additional safety devices. 3 Non-motorized The number of crashes involving bicyclists and pedestrians in the reporting period is summarized in the Table 3: Type Number reported on Long Form Number reported on Short Form Total number reported Number of fatalities Bicyclist Pedestrian Table 3 Summary of Bicycle and Pedestrian Crashes Crash Surveillance Report Page 10 7/01/2011 through 6/30/2013

12 3.1 Analysis of Bicyclist Crashes Table 4 lists the intersections that had more than one bicyclist crash reported between July 1, 2011 and June 30, 2013: Intersection Total number reported SR-5 (US-1 / SE Federal Highway) at SE Salerno Road 3 SR-5 (US-1 / SE Federal Highway) at SE Gran Park Way/SE Natalie Estates 2 SR-5 (US-1 / NW Federal Highway) at NW Eugenia Street 2 SR-714 (SE MONTEREY Road) at CR-A1A (SE Dixie Highway ) and SE Palm Beach Road 2 SR-5 (US-1 / NW Federal Highway) & NW Sunset Boulevard 2 SR-5 (US-1 / SE Federal Highway) at SE Fischer Street 2 Table 4 - Cyclist Crash Count by Intersection The crash reports at the listed intersections were reviewed. The crashes did not appear in a pattern that warrants further action. 3.2 Analysis of Pedestrian Crashes Only the intersection of US-1 / SE Federal Highway at SE Contractors Way had more than one pedestrian crash reported between July 1, 2011 and June 30, There were two pedestrian crashes reported at this intersection. Both of the crashes involved pedestrians that tested positive for blood alcohol levels above the legal limit. 4 Fatalities Excluding Florida s Turnpike and Interstate 95 there were a total of thirty fatalities in Martin County for the two year study period. Twenty-two motorists suffered fatalities. 50% of the fatal crashes occurred as a result of the driver s condition (blood alcohol content above the legal limit or medical emergency) or the vehicle s condition. The other 50% occurred because of the driver s failure to yield the right-of-way or failure to stay in the proper lane. It should be noted however, that two separate fatal crashes occurred on SR-5 (US-1 / SE Federal Highway) at SE Eaglewood Way due to a driver s failure to yield the right-of-way to southbound traffic on SR-5 (US-1 / SE Federal Highway). As a result, the Florida Department of Transportation lowered the speed limit on SR-5 (US-1 / SE Federal Highway) and added signs to warn motorists of the side street traffic. Three bicyclists suffered fatalities. The first bicyclist was struck crossing five lanes of traffic on SR-714 (SW Martin Downs Boulevard) at a location without traffic control devices or a marked crosswalk. The second bicyclist was struck while stopped on the side of the SE Beach Road; the bicyclist was wearing dark clothing and it was after dark. The third bicyclist was struck crossing S. Colorado Ave. at a location without traffic control devices or a marked crosswalk. The bicyclist had a blood alcohol limit above the legal limit. Crash Surveillance Report Page 11 7/01/2011 through 6/30/2013

13 All five pedestrian fatalities occurred at locations without traffic control devices or a marked crosswalk and at night. The crash reports indicate three of the five pedestrians had a blood alcohol level above the legal limit. Crash Surveillance Report Page 12 7/01/2011 through 6/30/2013

14 Appendix A Signalized Intersection crash type summary per number of approach lanes Crash Surveillance Report 7/01/2008 THROUGH 6/30/2011

15 SIGNAL # LOCATION # of appr. lanes crash count 3 years Other Head on Bike Pedestri an Offr oad Crash Type T intersections 5 SR5 WESTMORELAND BLVD No 30 SR5 RIVER SHORE BLVD No 189 CR A1A (DIXIE CHRISTIE WAY No 93 SR5 LILLIAN COURT No 96 SR5 SEABRANCH BLVD No 120 SR 76 (KANNER INDIAN ST Yes 123 SR 76 (KANNER POMEROY ST No 127 SR 76 (KANNER COVE RD Yes 129 SR 76 (KANNER I 95 NB off WB No 130 SR 76 (KANNER I 95 SB off EB No 137 SR 707 (DIXIE WRIGHT BLVD No 145 SR 732 (JB CR723 (SAVANNAH RD) No 155 CR 711 (PRATT WHITNEY SOUTH FORK HS Yes 181 CR 713 (HIGH MEADOW GOLDEN BEAR No 185 CR 723 (SAVANNA 24TH ST No 195 CR A1A (DIXIE AIRPORT RD No 250 SR A1A (EAST OCEAN VISTA PINES No 275 CR 708 (BRIDGE GOMEZ AVE No 276 INDIAN ASTER LANE No 313 WILLOUGHBY COVE RD Yes 4 Way intersections 7 SR5 EUGENIA ST No 9 SR5 GOLDEN ROD RD No 10 SR5 SUNSET DRIVE No 15 SR5 SR 732 (JENSEN BEACH BLVD) No 20 SR5 ACCESS RD "D" (NW Mall Entry So) No 25 SR5 BRITT RD Yes 27 SR5 BAKER RD No 35 SR5 WRIGHT BLVD No 40 SR5 JOAN JEFFERSON ST No 45 SR5 WEST OCEAN BLVD No 47 SR5 PALM CITY RD No 50 SR5 SR 76 (KANNER HWY/COLORADO AVE) No 55 SR5 JOHNSON AVE No 60 SR5 MONTEREY RD No 65 SR5 MONTEREY RD EXTENSION No 70 SR5 LUCKHARDT ST No 75 SR5 INDIAN ST No 80 SR5 FISCHER ST No 83 SR5 POMEROY/MARKET ST No 85 SR5 MONROE ST No 90 SR5 SALERNO RD Yes 91 SR5 COVE RD No 92 SR5 SUMMERFIELD WAY No 94 SR5 MARINER SANDS DRIVE No Rear End Right Left Right angle Sides wipe Rollo ver Unknow n average yearly crash count Expecte d Yearly value Expecte d value +60% Exceeds Signalized intersection crash type and number of approach lanes 7/1/2011 to 6/30/2013 A-1

16 SIGNAL # LOCATION # of appr. lanes crash count 3 years Other Head on Bike 97 SR5 HERITAGE BLVD No 98 SR5 OSPREY ST Yes 99 SR5 PETTWAY ST No 100 SR5 CR 708 (BRIDGE RD) Yes 105 COLORADO MARTIN LUTHER KING No 110 COLORADO KINDRED ST No 115 SR 76 (KANNER MONTEREY RD No 125 SR 76 (KANNER SALERNO RD No 128 SR 76 (KANNER LOST RIVER RD Yes 132 SR 76 (KANNER LOCKS No 133 SR 76 (KANNER CR76A (PW ROAD) No 135 SR 707 (DIXIE CR723 SAVANNAH/BAKER RD No 139 CR707 (INDIAN RIVER CR707A (JB BLVD) Yes 140 CR707A (JENSEN BEACH SKYLINE DRIVE No 147 SR 732 (JB PINECREST LAKES BLVD No 148 SR 732 (JB GREEN RIVER PKWY No 150 SR 732 (JENSEN BEACH GOLDENROD RD No 157 CR 714 (MARTIN HIGH MEADOW AVE Yes 158 CR 714 (MARTIN BERRY AVE No 159 CR 714 (MARTIN MAPP RD No 160 SR 714 (MARTIN DOWNS MAPP RD Yes 163 MAPP RD/MATHESON MURPHY RD No 165 SR 714 (MARTIN DOWNS MATHESON RD Yes 166 SR 714 (MARTIN DOWNS MONARCH CLUB No 168 SR 714 (MARTIN DOWNS BLVD)@ WATERFALL BLVD) No 170 SR 714 (MARTIN DOWNS HIGH MEADOW AVE No 175 SR 714 (MARTIN DOWNS CRANE CREEK RD No 180 SR 714 (MARTIN DOWNS TURNPIKE ENT No 182 SR 714 (MARTIN 42ND ST No 183 SR 714 (MARTIN CITRUS BLVD (48TH AVE) No 186 CR A1A (DIXIE MARTIN LUTHER KING JR No 187 CR A1A (DIXIE FLORIDA ST No 190 CR A1A (DIXIE MONTEREY RD No 197 CR A1A (DIXIE AVIATION WAY No 200 CR A1A (DIXIE INDIAN ST No 205 CR A1A (DIXIE JEFFERSON ST No 214 CR A1A (DIXIE SEAWARD ST No 215 CR A1A (DIXIE SALERNO RD No 217 CR A1A (DIXIE ANCHOR AVE No 223 CR A1A (DIXIE PETTWAY ST No 225 CR A1A (DIXIE OSPREY ST Yes 228 CR A1A (DIXIE CR 708 (BRIDGE RD) No 235 SR A1A (EAST OCEAN MACARTHUR BLVD No 240 SR A1A (EAST OCEAN SEWALLS RD No 245 SR A1A (EAST OCEAN ST. LUCIE BLVD No 255 SR A1A (EAST OCEAN OCEAN EAST MALL No 260 SR A1A (EAST OCEAN SR 714 (MONTEREY RD) No 265 OCEAN MARTIN AVE No Pedestri an Offr oad Rear End Right Left Right angle Sides wipe Rollo ver Unknow n average yearly crash count Expecte d Yearly value Expecte d value +60% Exceeds Signalized intersection crash type and number of approach lanes 7/1/2011 to 6/30/2013 A-2

17 SIGNAL # LOCATION # of appr. lanes crash count 3 years Other Head on Bike 270 OCEAN PALM BEACH RD No 278 SR 714 (MONTEREY MONTERY RD EXT No 290 PALM BEACH 10TH ST No 300 SR 714 (MONTEREY WILLOUGHBY BLVD Yes 305 WILLOUGHBY BLVD.@ INDIAN ST No 307 WILLOUGHBY POMEROY No 310 WILLOUGHBY SALERNO RD No 325 BAKER FELIX WILLIAMS MS No 350 SR710 (WARFIELD ADAMS ST No Pedestri an Offr oad Rear End Right Left Right angle Sides wipe Rollo ver Unknow n average yearly crash count Expecte d Yearly value Expecte d value +60% Exceeds Signalized intersection crash type and number of approach lanes 7/1/2011 to 6/30/2013 A-3

18 Appendix B Signalized intersection crash type scatter plots Crash Surveillance Report 7/01/2011 THROUGH 6/30/2013

19 Figure B1 - Crash type Other Crash Surveillance Report B-1 7/01/2011 THROUGH 6/30/2013

20 Figure B2 - Crash Type Head on Crash Surveillance Report B-2 7/01/2011 THROUGH 6/30/2013

21 Figure B3 - Crash Type "Bike" Crash Surveillance Report B-3 7/01/2011 THROUGH 6/30/2013

22 Figure B4 - Crash Type Pedestrian Crash Surveillance Report B-4 7/01/2011 THROUGH 6/30/2013

23 Figure B5 - Crash Type Off Road Crash Surveillance Report B-5 7/01/2011 THROUGH 6/30/2013

24 Figure B6 - Crash Type "Rear end" Crash Surveillance Report B-6 7/01/2011 THROUGH 6/30/2013

25 Figure B7 - Crash Type "Right" Crash Surveillance Report B-7 7/01/2011 THROUGH 6/30/2013

26 Figure B8 - Crash Type "Left" Crash Surveillance Report B-8 7/01/2011 THROUGH 6/30/2013

27 Figure B9 - Crash Type "Right Angle" Crash Surveillance Report B-9 7/01/2011 THROUGH 6/30/2013

28 Figure B10 - Crash Type "Side Swipe" Crash Surveillance Report B-10 7/01/2011 THROUGH 6/30/2013

29 Appendix C Signalized Intersection Detail Sheets Crash Surveillance Report 7/01/2008 THROUGH 6/30/2011

30 SR-76 (Kanner Indian St. Crash Surveillance Report Page C-1 7/01/2011 THROUGH 6/30/2013

31 SR-76 (Kanner SE Cove Road. Crash Surveillance Report Page C-2 7/01/2011 THROUGH 6/30/2013

32 CR-711 (Pratt Whitney South Fork High School Crash Surveillance Report Page C-3 7/01/2011 THROUGH 6/30/2013

33 Willoughby Cove Road Crash Surveillance Report Page C-4 7/01/2011 THROUGH 6/30/2013

34 SR-5 Britt Road Crash Surveillance Report Page C-5 7/01/2011 THROUGH 6/30/2013

35 SR-5 Salerno Rd. Crash Surveillance Report Page C-6 7/01/2011 THROUGH 6/30/2013

36 SR-714 (Martin Downs Mapp Road Crash Surveillance Report Page C-7 7/01/2011 THROUGH 6/30/2013

37 SR-76 (Kanner Lost River Road Crash Surveillance Report Page C-8 7/01/2011 THROUGH 6/30/2013

38 SR-5 CR-708 (Bridge Rd.) Crash Surveillance Report Page C-9 7/01/2011 THROUGH 6/30/2013

39 SR-714 (Monterey Willoughby Blvd. Crash Surveillance Report Page C-10 7/01/2011 THROUGH 6/30/2013

40 SR-714 (Martin Downs Matheson Rd. Crash Surveillance Report Page C-11 7/01/2011 THROUGH 6/30/2013

41 SR-5 Osprey St. Crash Surveillance Report Page C-12 7/01/2011 THROUGH 6/30/2013

42 CR-714 (Martin High Meadow Ave. Crash Surveillance Report Page C-13 7/01/2011 THROUGH 6/30/2013

43 CR-A1A (Dixie Osprey St. Crash Surveillance Report Page C-14 7/01/2011 THROUGH 6/30/2013

44 CR-707 (Indian River CR707A (JB Blvd.) Crash Surveillance Report Page C-15 7/01/2011 THROUGH 6/30/2013

45 Appendix - D Unsignalized Intersections Detail Sheets

46 SW Monterey Rd. / SW Palm City Rd. Crash Surveillance Report D-1 7/01/2011 THROUGH 6/30/2013

47 SW Martin Downs Blvd. / SW Feroe Ave. Crash Surveillance Report D-2 7/01/2011 THROUGH 6/30/2013

48 Federal Highway / Mall Entry Mid Crash Surveillance Report D-3 7/01/2011 THROUGH 6/30/2013

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Analysis from January 1, 1991 to June 30, 2002 Richard C. Moeur, PE Traffic Design Manager, Northern Region Michelle N. Bina

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Stephen L. Benson, AICP, CNU-A FDOT District Seven Safety Office Presentation Overview Safety

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for: TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

EXHIBIT ''A'' INDIAN RIVER COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION TRAFFIC CONTROL DEVICES MAINTAINED BY INDIAN RIVER COUNTY

EXHIBIT ''A'' INDIAN RIVER COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION TRAFFIC CONTROL DEVICES MAINTAINED BY INDIAN RIVER COUNTY EXHIBIT ''A'' INDIAN RIVER COUNTY JULY,2016 TABLE OF CONTENTS Traffic Signals... Page 2 Flashing Beacons... Page 6 20 M.P.H. School Flashing Beacons... Page 7 Speed Warning/Driver Feedback Signs... Page

More information

Analysis of Signalized Intersection Crashes Nasima Bhuiyan, EmelindaM. Parentela and Venkata S. Inapuri

Analysis of Signalized Intersection Crashes Nasima Bhuiyan, EmelindaM. Parentela and Venkata S. Inapuri Analysis of Signalized Intersection Crashes Nasima Bhuiyan, EmelindaM. arentela and Venkata S. Inapuri Abstract The goals of providing high levels of mobility and intersection efficiency while simultaneously

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Waterford Lakes Small Area Study Report

Waterford Lakes Small Area Study Report Waterford Lakes Small Area Study Report Orange County District 4 Prepared for: Orange County Public Works Department Traffic Engineering Division 4200 S. John Young Parkway Orlando, FL 32839-9205 Prepared

More information

2012 TOWN OF CASTLE ROCK MOTOR VEHICLE ACCIDENT FACTS PREPARED BY THE PUBLIC WORKS DEPARTMENT

2012 TOWN OF CASTLE ROCK MOTOR VEHICLE ACCIDENT FACTS PREPARED BY THE PUBLIC WORKS DEPARTMENT ATTACHMENT A 2012 TOWN OF CASTLE ROCK MOTOR VEHICLE ACCIDENT FACTS PREPARED BY THE PUBLIC WORKS DEPARTMENT ACKNOWLEDGEMENTS This report was assembled from data provided by the Castle Rock Police Department

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report MPO Board July 8, 2015 2 Crash Data Collection Motorcycle drove between stopped cars, ran a red light and collided with a

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719) LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC

More information

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM TO: FROM: Christa Johnson, Assistant City Manager Jason C. Kravetz, Captain DATE: January 16, 2015 SUBJECT: Laguna Canyon Road Collision Analysis Within the last

More information

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US

More information

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

Delaware Avenue Corridor Study

Delaware Avenue Corridor Study Delaware Avenue Corridor Study City of Marysville, Ohio February 19, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers

More information

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE 1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange

More information

FINAL REPORT Intersection Control Evaluation Planning Study for the Duluth Area

FINAL REPORT Intersection Control Evaluation Planning Study for the Duluth Area FINAL REPORT Intersection Control Evaluation Planning Study for the Duluth Area March 2013 E NGINEERS P LANNERS D ESIGNERS Consulting Group, Inc. Intersection Control Evaluation Planning Study for the

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Cheyenne Metropolitan Planning Organization

Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study PHASE II SECTION 20 DRAFT Prepared for: Cheyenne Metropolitan Planning Organization November 20, 2015 (Section 20 is bordered by Powderhouse Road on the west, Storey

More information

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Corridor Studies. LA 415 and LA 73

Corridor Studies. LA 415 and LA 73 Corridor Studies LA 415 and LA 73 Project Approach for Both Corridors 1. Data Collection 2. Data Summary 3. Traffic Analysis 4. Micro-Simulation modeling 5. Generation of alternatives 6. Modeling alternatives

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Pedestrian Safety Action Plan Bicycle Safety Action Plan

Pedestrian Safety Action Plan Bicycle Safety Action Plan Pedestrian Safety Action Plan Bicycle Safety Action Plan January 24, 2017 VISION: Safe travel for all MISSION STATEMENT: Partner with the community to plan and fund transportation projects and programs

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Characteristics of Traffic Accidents in Highway Work Zones

Characteristics of Traffic Accidents in Highway Work Zones Characteristics of Traffic Accidents in Highway Work Zones A DETAILED ANALYSIS OF WORK ZONE ACCIDENTS REPORTED ON NEW YORK STATE DEPARTMENT OF TRANSPORTATION CONSTRUCTION PROJECTS ESTABLISHED THE PREDOMINANT

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1)

Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1) Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1) Canal Pointe Boulevard Study - March 2015 10 Table of Contents INTRODUCTION... 1 EXISTING CONDITIONS... 1 Existing Roadway Conditions and Controls...

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Focused Traffic Analysis for the 200 Nellen Avenue Project

Focused Traffic Analysis for the 200 Nellen Avenue Project March 13, 2017 Mr. Phil Boyle Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94976-0159 Focused Traffic Analysis for the 200 Nellen Avenue Project Dear Mr. Boyle; W-Trans has completed a focused

More information

Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Project Advisory Group (PAG) Meeting #2 January 31, 2018 Welcome & Introductions AGENDA 1. Where are we at? 2. Project Survey / Virtual Comment Tool / PAG Meeting #1 / Visioning Workshop Corridor Map Exercise

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.

PUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida Financial Project ID No.: 441210-1-32-0 1 Welcome to the Public Hearing for State Road (S.R.) 5/U.S. 1 Roundabout

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for: SCHOOL ROUTE PLAN For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering Division 42 South John

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

City of Madison, WI. Crash Report

City of Madison, WI. Crash Report City of Madison, WI 2009 Crash Report 2009 City of Madison, WI Traffic Engineering Division Crash Report Table of Contents Page Annual Crash Overview... 1 Crash Totals... 1 5-Year Graphical Crash History...

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study www.sr514malabar.com SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study LOCATION: Palm Bay Hospital Auditorium 1425 Malabar

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

Mission Bay Loop (MBL) Public Meeting

Mission Bay Loop (MBL) Public Meeting Mission Bay Loop (MBL) Public Meeting La Scuola Internazionale di San Francisco, November 18, 2014 Frequently Asked Questions 1. When would construction have to start before the SFMTA loses TIGER funds?

More information

VDOT Crash Analysis Procedures for Roadway Safety Assessments

VDOT Crash Analysis Procedures for Roadway Safety Assessments Crash analysis is a critical component of road safety analysis. The crash analysis procedures defined in this document will help: Identify where to target resources for detailed crash analysis Assess the

More information

Average Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection

Average Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection Attachment: Traffic Analysis Results Traffic simulation modeling analysis was completed for Santa Cruz Ave from Alameda De Las Pulgas to Junipero Serra Blvd. Analysis was performed for existing conditions

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

Executive Summary. North Florida Transportation Planning Organization Argyle Traffic Study

Executive Summary. North Florida Transportation Planning Organization Argyle Traffic Study North Florida Transportation Planning Organization i Executive Summary The Argyle Forest area is a highly congested transportation area located in southern Duval County. SR 9A (I-295) and SR 21 (Blanding

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information