1 PCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING JANUARY 22, 2014

2 MEETING AGENDA 1. INTRODUCTION OF STAFF 2. PROJECT SCHEDULE 3. PROJECT SCOPE 4. GENERAL CONCERNS 5. COMMUNICATIONS 6. ODDS AND ENDS 7. FEEDBACK AND MEETING WRAP UP

3 INTRODUCTION OF STAFF Brad Fowler Director of Public Works Matthew Sinacori City Engineer Archie Rempher Construction Manager Werner Abrajano Project Engineer Reggie Jurado Project Support/Survey Alan Hill City Inspector Jill DeCriscio Public Outreach

4 PHOTOS OF STAFF ARCHIE REMPHER CONSTRUCTION MANAGER ALAN HILL CONSTRUCTION INSPECTOR WERNER ABRAJANO PROJECT ENGINEER

5 REVISED PHASING/SCHEDULE MAPPING SCWD PHASE 1 CITY PHASE 1A WORK AREA

6 SCWD PHASE 2 CITY PHASE 2A WORK AREA REVISED PHASING/SCHEDULE MAPPING

7 SCHEDULE

8 SCOPE OF PHASE 1A IMPROVEMENTS General Scope of Work on PCH (Blue Lantern to Crystal Lantern): 1. Construction of new signalized intersections on PCH at Del Prado, and PCH at Ruby Lantern; 2. Modification of traffic signals on PCH at Amber Lantern, Violet Lantern, Golden Lantern and Copper Lantern to accommodate two-way traffic; 3. Installation of a new signalized pedestrian crosswalk on PCH between Silver Lantern and Malaga Drive; 4. Construction of new PCC bus pads, bus turn-outs and parking cut-outs at various locations along PCH; 5. Rehabilitation of existing driveway approaches and cross gutters at various locations; 6. Sidewalk and pedestrian ramp rehabilitation at various locations to meet current ADA requirements; 7. Street rehabilitation of PCH from Blue Lantern to Crystal Lantern; 8. Storm drain & necessary electrical utility improvements at various locations; 9. Construction of two landscape medians along PCH between Blue Lantern and Amber Lantern; 10. Street improvements on Blue Lantern, Ruby Lantern, and Golden Lantern; 11. Remove existing Tipu trees and install Palms; and 12. Re-striping PCH from Blue Lantern to Crystal Lantern for two-way traffic

9 SCOPE OF PHASE 1A IMPROVEMENTS (Continued) General Scope of Work on Del Prado (Blue Lantern to Ruby Lantern): 1. Construct bulb-outs with landscaping at the intersection of Del Prado and Ruby Lantern 2. Sidewalk and pedestrian ramp addition/ replacement meeting current ADA requirements; 3. Curb & gutter rehabilitation; 4. Removal of existing driveways on Del Prado at various locations (ingress/ egress to various properties shall be limited to the alleyway south of Del Prado); 5. Relocation of existing catch basins and construction of new storm drain laterals; 6. Removal of the existing street lights, modification of the street light spacing to meet current County of Orange Standards, and the installation of new Victorian luminaires; 7. Install bike racks, street furniture, and dog fountain; 8. Remove existing Tipu trees and install Palms and bulb-out trees; 9. Vacate south end portion of Del Prado in favor of turfed green space & new pervious areas; 10. Install necessary utilities, i.e. storm drain and electrical; 11. Street rehabilitation of Del Prado from Blue Lantern to Ruby Lantern; 12. Add parking on PCH at Blue Lantern (south side); 13. Re-striping of Del Prado from Blue Lantern to Ruby Lantern for two-way traffic; and 14. Add way finding signage and parking signage.

10 GENERAL CONCERNS - Retain two lanes for vehicles most of the time. - Retain access to businesses. - Business signage. - Communicate well with everyone. - Reduce construction impacts, e.g. noise/dust. - Help Contractor move quickly to finish. - Accomplish work safely.

11 COMMUNICATIONS Outreach Plan - Project Wide: - /Twitter/Facebook Sites - Project Fact Sheet - Frequent Construction Alerts: - Construction Alerts with Map Distributed as Needed - Monthly: - Chamber Blast - Construction Hotline/ Site - Website - Vendor specials publicity

12 COMMUNICATIONS (CONT.) Site Specific Notification - Frequent Construction Alerts With Map - Notification Strive for 10 Days in Advance (Note: May be shorter at times due to construction issues and progress) - Coordinate Access / Parking / Schedule Issues

13 COMMUNICATIONS (CONT.) Signage - Business Open Banners Each Block - Parking in Rear - Forgive Our Dust - Project Architectural Renderings - Detours (if needed)

14 CONTRACTOR SCHEDULE

15 ODDS & ENDS - Bike Route Detour/Bike Warning Signage - Transit Stops - Limited Night Work - Work Hours Will Vary based on Location (Generally 7AM-5PM)

16 FEEDBACK & WRAP-UP

17

18 SIDEWALK CAFÉ PHOTOS

19 PROJECT AMENETIES

20 PCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING JANUARY 22, 2014

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project West Capitol Avenue Road Rehabilitation and Safety Enhancement Project Stakeholder Focus Group Meeting #2 Tuesday, August 28, 2018 7:00 8:00 a.m. West Sacramento City Hall 1110 West Capitol Avenue, West

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 AGENDA Introductions Project Benefits Progress to Date Schedule for Remaining Work Phase 3 Activities, Impacts & Traffic Detours Phase 4 Activities

More information

Victoria Park Master Plan

Victoria Park Master Plan Victoria Park Master Plan Phase I Presented By: ARCHITECTURAL ALLIANCE & HUGHES HUGHES INC. History of Victoria Park Phase I Purpose Inventory of Existing Conditions Identification of Options by Type (for

More information

C Line Rapid Bus Preliminary Station Design

C Line Rapid Bus Preliminary Station Design C Line Rapid Bus Preliminary Station Design C Terrence Anderson, Community Outreach Coordinator Shawn Walding, Senior Engineer Metro Transit TAAC February 1, 2016 1 C Line project overview Substantially

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Technical Working Group November 15, 2017

Technical Working Group November 15, 2017 Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II. North Glebe Road to 38 th Street N

Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II. North Glebe Road to 38 th Street N Old Dominion Drive (Route 309) Pedestrian Safety Project Phase II North Glebe Road to 38 th Street N Prepared: 12/2010 The presentation you are about to review represents a 90 percent completed design.

More information

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006 Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)

More information

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: May 10, 2016 Department: Submitted By: Prepared By: Agenda Title: Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

Community Task Force November 15, 2017

Community Task Force November 15, 2017 Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

4 GENERIC COST ESTIMATING TOOL

4 GENERIC COST ESTIMATING TOOL 4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Fulton Market Streetscape

Fulton Market Streetscape Fulton Market Streetscape Ogden Avenue to Halsted Street Public Meeting Recommended Improvements December 10th, 2014 Meeting Purpose and Goals Present Existing Conditions Community Input and Charrette

More information

WalkSafe Vocabulary Matching. 1 pedestrian A marked place to cross the street. 2 intersection A person who is walking. 3 crosswalk. 4 curb.

WalkSafe Vocabulary Matching. 1 pedestrian A marked place to cross the street. 2 intersection A person who is walking. 3 crosswalk. 4 curb. WalkSafe Vocabulary Matching Name Directions: Draw a line from the vocabulary word to its definition. 1 pedestrian A marked place to cross the street. 2 intersection A person who is walking. 3 crosswalk

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015 Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015 Agenda Welcome and introductions Project overview, history and goals Concept

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES 092775000 Carson City ADA Transition Plan 2015-03-25 Carson City ADA Transition Plan.docx March 2015 APPENDIX This page intentionally left blank.

More information

ADA Technical Frequently Asked Questions

ADA Technical Frequently Asked Questions ADA Technical Frequently Asked Questions 1. What is the correct way to select and label curb ramp types using the Standard Construction Details?... 2 2. When do you label a curb ramp as modified (e.g.

More information

Lincoln Neighborhood Corridor Plan The LiNC

Lincoln Neighborhood Corridor Plan The LiNC CITY OF SANTA MONICA Lincoln Neighborhood Corridor Plan The LiNC PLANNING COMMISSION September 2, 2015 COMMUNITY DESIGN + ARCHITECTURE TEAM: Community Design + Architecture Iteris Studio 111 Urban Place

More information

Bristol Street Improvements Civic Center Dr. to Washington Ave. Washington Square Artesia Pilar Flower Park. Tuesday, September 27, 2016

Bristol Street Improvements Civic Center Dr. to Washington Ave. Washington Square Artesia Pilar Flower Park. Tuesday, September 27, 2016 Street Civic Center Dr. to Washington Ave. Special Joint Neighborhoods Meeting Washington Square Artesia Pilar Flower Park Tuesday, September 27, 2016 El Salvador Recreation Center 1 Previous Informational

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

Neighborhood Meeting

Neighborhood Meeting Street Warner Ave. to Saint Andrew Pl. Neighborhood Meeting Memorial Park Shadow Run /Warner Friday, September 30, 2016 1 Previous Informational Outreach Meetings Memorial, /Warner October 17, 2014, June

More information

4.0 STREETSCAPE ELEMENTS

4.0 STREETSCAPE ELEMENTS .0 Table 3 lists streetscape elements and their maintenance requirements. The figures that follow the table illustrate the streetscape elements. With respect to maintenance, if an element is required as

More information

Meade Street Bridge Design Alternative Study

Meade Street Bridge Design Alternative Study Meade Street Bridge Design Alternative Study Preferred Alternative Presentation Stakeholder Meeting #3 June 23, 2011 Presented by: Dan Biggs, RLA Meeting Agenda Purpose: 1. Review Meeting #2 Feedback 2.

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Derby Street. Project Updates. Salem, Massachusetts

Derby Street. Project Updates. Salem, Massachusetts Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets

More information

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 June 8, 2017 Meeting Agenda Study Overview Community Survey Existing Conditions Access Management Potential Safety Countermeasures Potential

More information

Lawrence Avenue Streetscape Concepts August 30, 2011

Lawrence Avenue Streetscape Concepts August 30, 2011 Lawrence Avenue Streetscape Concepts August 30, 2011 Neighborhood Context Phase II: River to Western Ave. Phase I: Western Ave. to Clark St. Key Map Lawrence Ave. Existing Streetscape Conditions East of

More information

COMPLETE STREET DESIGN: CHALLENGES AND SOLUTIONS. John Pulliam PE and Frederik Venter PE APWA Monterey Bay Chapter November 13, 2013

COMPLETE STREET DESIGN: CHALLENGES AND SOLUTIONS. John Pulliam PE and Frederik Venter PE APWA Monterey Bay Chapter November 13, 2013 COMPLETE STREET DESIGN: CHALLENGES AND SOLUTIONS John Pulliam PE and Frederik Venter PE APWA Monterey Bay Chapter November 13, 2013 ASSHTO Transportation engineers know that the entire system works more

More information

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION City Hall - Council Chambers 1000 San Pablo Avenue, Albany, CA 94706 Wednesday, November 30, 2016, 7:00 PM 1. CALL TO ORDER The meeting was called to order

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments 1 City of Beverly Hills Samer Elayyan, Project Manager Mark

More information

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update Enforcement Ordinance & Construction Update December 2015 Project Purpose Provide high-capacity, high-quality transit service Support redevelopment in Crystal City and in Potomac Yard in Alexandria and

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

Project update for the Boones Ferry Road Improvement Project Phase 1, Work Order 183.

Project update for the Boones Ferry Road Improvement Project Phase 1, Work Order 183. 5.1 TO: FROM: SUBJECT: Kent Studebaker, Mayor Members of the City Council Crystal M. Shum, PE, Project Lead Boones Ferry Road Project Engineering Department Project update for the Boones Ferry Road Improvement

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

COMMUNITY MEETING AGENDA

COMMUNITY MEETING AGENDA COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community

More information

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:

More information

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us

More information

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA DATE: MONDAY, 5/22/2017 TIME: 6:00 8:00 P.M. LOCATION: CITY HALL, CONFERENCE ROOM #107 Call to Order/Approval of

More information

GENERAL. 1. Description

GENERAL. 1. Description GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Bus Stops in the design and construction of elements for Arlington County Horizontal Design Standards. This

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION

PUBLIC COMMENTS ITEMS FOR CONSIDERATION/ACTION ATTACHMENT D Page 1 of 5 MINUTES OF THE COMPLETE STREETS COMMISSION (FORMERLY THE BICYCLE AND PEDESTRIAN ADVISORY COMMISSION) OF THE CITY OF LOS ALTOS, HELD ON WEDNESDAY, MAY 23, 2018 AT 7:00 P.M. AT THE

More information

Appendix D: Planning Level Cost Calculator

Appendix D: Planning Level Cost Calculator Appendix D: Planning Level Cost Calculator Network Costs by Facility Type Facility Type Total Miles of Facility Total Number of Intersections Cost per feature or per mile Total Cost Bicycle Boulevard 52.14

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Approval of Resolution 18-11-G Appropriating Measure J TLC

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828 WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828 CONSTRUCTION UPDATE #17 October 9 th, 2018 Hi Everyone! This is our seventeenth update to the community regarding the Western Placerville Interchanges

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Lee County Department of Transportation

Lee County Department of Transportation Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015

More information

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,

More information

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010 CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE

More information

Option W: N. Washington Street Project

Option W: N. Washington Street Project Option W: N. Washington Street Project Location: one block of North Washington Street, between West Broad Street and Park Avenue Description: upgrades to existing lighting new brick sidewalk to replace

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION

CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION City Hall - Council Chambers 1000 San Pablo Avenue, Albany, CA 94706 Thursday, November 2, 2017, 7:00 PM 1. CALL TO ORDER The meeting was called to order at

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

MARTIN LUTHER KING JR. WAY

MARTIN LUTHER KING JR. WAY OCTOBER 2011 40 Vision and Goals The Martin Luther King, Jr. Way Illustrative Master Plan that follows has been developed through a process of community involvement. It expresses a long term vision for

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

Tempe Streetcar Public Meeting

Tempe Streetcar Public Meeting Tempe Streetcar Public Meeting April 19, 2017 Agenda Project Background and Status Design Progress Streetcar Stops Art Program Streetcar Vehicles Mill Avenue Configuration Utility Relocation 2 Route and

More information

APPENDIX A Urban Control Zone Corridor Study Reports

APPENDIX A Urban Control Zone Corridor Study Reports APPENDIX A Urban Control Zone Corridor Study Reports California Sites Table A-1. California Study Corridors California Study Corridor County Name Length (miles) State Highway 1 Orange 7.0 State Highway

More information

Bicycle and Pedestrian Recommendations for MarketFair Mall

Bicycle and Pedestrian Recommendations for MarketFair Mall October 4, 2012 Bicycle and Pedestrian Recommendations for MarketFair Mall Overview After a few hours looking at the existing facilities at MarketFair, please consider the following biking/walking scenarios

More information