1 LETTING SCHEDULE REPORT Transportation Improvement Projects Date: September 29, 24 Cobb ROW /UTL Cobb County Projects E2460 DRAINAGE SYS IMPRMTS-NORTH HADAWAY ROAD Category: DRAINAGE/HEADWALL MIS#: North Hadaway Road Drainage DRAINAGE SYS IMPRMTS-NORTH HADAWAY ROAD Scope: Drainage Repair project - In-House Design JOHN MOREY 24/09/12 24/10/09 Final plans and cost estimate received , 24/08/29, JM. Double 48" P and single 54" P failing roadway floods under moderate rain event., 24/08/19, DM. Install new 14'x8" x 4'x1" aluminum box culvert, 24/08/19, DM. Parcel Ct: 1 Parcel Possessed: 1 E6100 WALKER DR-EXTENSION MIS#: WALKER DRIVE EXTENSION - E6100 GP#L5281 WALKER DR-EXTENSION CHURCH ST OLD FLOYD RD Scope: Widen, add sidewalks and curb/gutter, and extend Walker Dr, currently a dead end street off Old Floyd Rd, west to intersect Church St at Mableton Elementary School. Will improve pedestrian, bicycle, vehicle, and school bus access to the new school 04 KARYN MATTHEWS 24/09/12 24/10/09 prebid: 10am, 24/09/26, MK. New Road Name: Mableton Town Square Walker Drive will turn off the new road to serve 3 drives, 24/09/, MK. Landscape plans to be pulled out and let separately next summer., 24/08/06, MK. 4 total takes: 2 removed, 2 remain, 24/06/, MK. Moving forward with lighting within the lighting district (Church Street, part of Walker Dr) as well as grading/landscape plan for the square. Need final concurrence from Parks for both plans. Parks to maintain square landscaping and lighting., 24/03/31, MK. Parcel Ct: 19 Parcel Possessed: 11 24//15 24/06/10 E6030 PINE MOUNTAIN ROAD- MIS#: Pine Mountain Road S&O Improvements-Phase 1/E6030 GP#L5238 PINE MOUNTAIN ROAD- STILESBORO ROAD SHILLING ROAD Scope: Safety, traffic flow and drainage improvements, between Stilesboro Rd and Shillings Rd, including turn lanes at key intersections, sidewalks, and curb/gutter. To be coordinated with City of Kennesaw Pine Mtn Rd Project Shillings Rd to Cobb Pkwy RUSTAVIUS FORD 24/09/26 24/10/23 2nd submission sent 6/27/14., 24/06/30, AR. Awaiting 2nd submittal for utilities. Required, relocation plans, staging, agreements, work schedules., 24/05/09, AR. Hill cut summer of 25, 24/03/31, MW. right of way plans on hold pending decision about permanent easements., 23/09/30, MW. Utilities awaiting 2nd submittal - AGL, CCWS, CWA, CEMC, Comcast, Charter, AT&T(D)., 23/09/18, AR. Parcel Ct: 43 Parcel Possessed: 42 23/10/14 UTL:1 of 8 Concep Page 1 of 19

2 ROW /UTL E6080 SIX FLAGS DRIVE- MIS#: Six Flags Drive Roadway Safety and Operational Improvements - E6080 GP#L3879 E6080 Riverside to Six Flags Pkwy RIVERSIDE PKY SIX FLAGS PKWY Scope: Improvements consist of widening the road to accommodiate a three (3) lane section, and sidewalk on both sides. Project will also consist of adding traffic and pedestrian signals at the Six Flags Drive and Six Flags Parkway Intersection. 04 BRIAN LOUDERMILK 24/09/26 24/10/23 Buffer variance advertised on 8/1/14., 24/08/06, BL. USACOE permit approved on 6/27/14., 24/07/09, BL. Schedule and budget updated based on scope change 2/28/14., 24//28, BL. Will Need to coordinate with possible road name change., 24//18, BL. Scope change approved by Board on 2/11/14., 24//18, BL. Parcel Ct: 6 Parcel Possessed: 2 24/03/14 23/10/09 E4050 I-75-/WADE GREEN ROAD INTERCHANGE MIS#: 0007 I-75 AT WADE GREEN ROAD DDI - E I-75-/WADE GREEN ROAD INTERCHANGE BUSBEE DR SHILOH ROAD Scope: Divergent Diamond Interchange 03 JANE STRICKLIN 24/10/03 24/11/13 FHWA approval for IMR- Short Version on 8/15/14. All revised Design-Build RFP documents have been uploaded to GDOT's FTP site on 8/29/14., 24/09/, JS. Met with GDOT and FHWA on 6/19/14 to discuss Design-Build local let RFP comments from GDOT. Working on formal response to the Design-Build RFP comments. Arcadis is working on IMR (short version). A Utility Workshop needs to be scheduled., 24/06/30, JS. Project was on hold based on GDOT wanting CCDOT to do $300,000 in maintenance to bridge. Now resolved. Concept should be submitted this week. Don't have revised schedulel from Arcadis yet., 23/11/04, MW. Awaiting utility submittal. AGL, CCWS, Comcast, GPC(D), CEMC, GTC, AT&T(D), 23/09/18, AR. No right of way required., 23/08/05, MW. UTL:0 of 6 D7110 SIDEWALKS-HICK S ROAD Category: SIDEWALKS MIS#: 0000 HICKS ROAD SIDEWALK D7110 SIDEWALKS-HICKS ROAD Silver Comet Trail existing sidewalk North of Dunes Way Scope: In-House design project KRISTEN ORTON 24/11/14 24/12/11 All right of way for this project was acquired in 2009 when the original project was intended to be let. No further right of way needed., 24/07/, KO. Plan to hit the 7/17/24 PFPR date. A 2nd Utle submittal needs to be made., 24/06/, KO. Parcel Ct: 6 Parcel Possessed: 6 E9150 RESURFACING FY15 LMIG Category: RESURFACING MIS#: RESURFACING 25-1 LMIG RESURFACING FY15 LMIG Scope: Resurfacing 25-1 LMIG MIKE LEHNER 24/11/14 24/12/11 LMIG application to be approve by BOC 9/9/14 $3,910,200.95, 24/09/, DM. 25 LMIG funding anticipated to be $3.9 million, 24/03/07, DM. Submit FY25 LMIG application to GDOT in July/August 24., 24/03/07, DM. No ROW needed, 24/03/07, DM. Page 2 of 19

3 ROW /UTL TR463 I-75-CUMBERLAN D BOULEVARD BRIDGESCAPE Category: CUMBERLAND AREA MIS#: TASK ORDER CONTRACT POND & CO- CAT B I-75-CUMBERLAND BOULEVARD BRIDGESCAPE Scope: Pond & Co. - Master Task Order Cotnract for On-call Services Catergory B - Hwy Design: Roadway, Bridge & Surveying BRIAN LOUDERMILK 24/11/14 24/12/11 Received PFPR comments from MA on 5/29/14., 24/06/30, BL. Approved concept on 10/7/13, 23/12/20, DM. Utility owners unidentified., 23/12/10, DM. Need to add language to agreement on maintenace and accent lighting., 23/12/10, DM. Concept mtg on 7/26/13, 23/12/10, DM. D4070 CEDARCREST ROAD-(CO-344) MIS#: 0057 Cedarcrest Rd - D4070 CO CEDARCREST ROAD-(CO-344) PAULDIN COUNTY LINE GOVERNORS TOWNE DRIVE Scope: Engineering to widen to 4 lanes from Cobb/Paulding Cty line to US TIP. ARC# CO-344. MIS#0048-original contract w/long Eng. TranSystems acquired Long Eng - this is the contract going forward from that acquisition. KARYN MATTHEWS 24/12/12 25//08 Required: revised and updated 2nd utility submittal., 24/05/09, AR. 2 houses scheduled to be burned 2/21., 24//18, MK. anticipate NTP for house demo at parcels 10 & 14 by , 24//23, MK. GDOT has January 25 Let, 24//10, DM. Waiting on RW NTP to start acquisition., 23/07/31, SJ. Parcel Ct: 28 Parcel Possessed: 26 23//25 23/03/07 E9160 RESURFACING LOCAL ROADS SOUTH Category: RESURFACING MIS#: RESURFACING 25-2 LOCAL ROADS SOUTH RESURFACING LOCAL ROADS SOUTH Scope: Resurfacing 25-2 Local Roads South MIKE LEHNER 25//15 25//12 Resurface local residential streets primarily within Commission s 2 & 4, 24/03/07, DM. E9170 RESURFACING LOCAL ROADS NORTH Category: RESURFACING MIS#: RESURFACING 25-3 LOCAL ROADS NORTH RESURFACING LOCAL ROADS NORTH Scope: Resurfacing 25-3 Local Roads North MIKE LEHNER 25//13 25/03/12 Resurface local residential streets primarily within Commission s 1 & 3, 24/03/07, DM. Page 3 of 19

4 ROW /UTL E7310 WEST SANDTOWN ROAD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL Category: SIDEWALKS MIS#: WEST SANDTOWN ROAD SIDEWALK - E7310 WEST SANDTOWN ROAD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL FRIENDSHIP CHURCH ROAD existing sidewalk near BRODY LANE Scope: Add sidewalk on the west side of West Sandtown Rd, from existing sidewalk near Alan Dr to Macland Rd (approximately 0.2 miles), to provide sidewalks in the vicinity of Dowell Elementary School. KRISTEN ORTON 25//15 25/03/15 2nd Utility submittal 6/27/14., 24/06/30, AR. In-House Design group incorporating changes made by ARCADIS. Plan to make a 2nd Utle submittal this week., 24/06/, KO. ARCADIS is in the process of converting the original v7 Microstation/Cacie database to an updated v8i Microstation/InRoads database., 24/03/03, KO. Need additional survey to complete the drainage changes., 23/09/27, KO. Awaiting revised Utility Submittal. AGS, AGL, AGL(T), CCWS, CEMC, AT&T, Comcast, Sunesys., 23/09/18, AR. Parcel Ct: 7 E1070 PITNER ROAD-OVER LITTLE ALLATOONA CREEK Category: BRIDGE REPLACEMENTS MIS#: TASK ORDER CONTRACT-RS&H - CAT B PITNER ROAD-OVER LITTLE ALLATOONA CREEK Scope: Reynolds Smith & Hills - Master Task Order Contract for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying CHRIS PRUITT 25//27 25/03/26 Project briefing with Corp (7/24/14)regarding temporary construction easements. Easement requeist package is being prepared., 24/08/05, DM. 24/07/ E6060 SANDY PLAINS ROAD- MIS#: SANDY PLAINS ROAD - E6060 SANDY PLAINS ROAD- EAST PIEDMONT ROAD EBENEZER RD Scope: Sandy Plains Road East Piedmont Road to Ebenezer Road 03 KRISTEN ORTON 25//27 25/03/26 Meeting with Sandy Plains Baptist Church Tuesday, September 30th to evaluate moving the widening towards the cemetary instead of the church. Michael Baker to provide staking to show location of proposed sidewalk and wall., 24/09/25, KO. Michael Baker was given NTP for preliminary plans on July 29, 24., 24/08/04, KO. PIOH went well with few concerns. Sandy Plains Baptist Church is concerned about us taking their new sign. Meeting with them 07//14 to discuss. Zaxby's would like a u-turn bay at median break in front of their store. Many citizens wanted a protected left coming out of The Corners Shopping Center., 24/07/, KO. Dry Run scheduled for June 12, 24 PIOH scheduled for June 18, 24, 24/06/, KO. Andy Rickard to schedule a meeting to discuss pole relocations with Ga Power Transmission., 24/03/03, KO. Page 4 of 19

5 ROW /UTL E8050 POST OAK TRITT ROAD-HIGHTOWE R TRAIL MIDDLE SCHOOL Category: SCHOOL ZONE IMPRVMNT MIS#: HIGHTOWER TRAIL MS - E8050 POST OAK TRITT ROAD-HIGHTOWER TRAIL MIDDLE SCHOOL Long Grove Dr Twin Leaf Trail Scope: Turn lanes and improvements at school entrances - Hightower Middle School. In-house design. 03 DAVE GARRETT 25//27 25/03/26 Follow-up meeting with CCSD after DOT PFPR on 10/15/14., 24/09/25, GD. CCSD (Nick Parker) agreed to fund CCSD (off R/W) portion. Concept meeting with Principal on 4/25/24. Principal in agreement with minor parking lot revision., 24/05/, GD. Concept team meeting held with CCSD on 3/ CCSD in agreement with concept, but must determine if they can fully fund CCSD portion of cost estimate. A decision from CCSD is excepted in April, 24., 24/03/28, GD. Concept team meeting with CCSD rescheduled for March, 24 due to Terrell Mill Rd trafic study., 24/03/05, GD. In-house design for summer of 25. Joint project (IGA) with CCSD pending approval by both Boards., 24//14, GD. UTL:0 of 6 E8090 SPRING HILL PWY-TEASLEY ELEMENTARY SCHOOL Category: SCHOOL ZONE IMPRVMNT MIS#: TEASLEY ELEMENTARY SCHOOL SPRING HILL PWY-TEASLEY ELEMENTARY SCHOOL Paces Ferry Road Spring Hill Road Scope: Provide a left turn lane and other school zone improvements on Spring Hill Parkway to accommodate a new Teasley Elementary School driveway (driveway being built by Cobb County School ). In-house design. DAVE GARRETT 25//27 25/03/26 Concept Team meeting on 9/23/24. Will require roadway and signal unit price work (separate but coordinated). Possibly move up to spring 25 since work is not within an existing school zone and typical set of plans not needed., 24/09/25, GD. In-house design. Summer 25 project - being coordinated with separate CCSD project., 24//14, GD. Likely unit price given project scope. Being coordinated with CCSD new driveway project but is a separate project., 24//30, GD. E4060 BARRETT PARKWAY-AT BUSBEE PARKWAY MIS#: TASK ORDER CONTRACT-JACOBS-CAT C BARRETT PARKWAY-AT BUSBEE PARKWAY Scope: JACOBS ENGINEERING - Master Task Order Contract for on-call services. Category C - Traffic Engineering 03 BRIAN LOUDERMILK 25/03/27 25/04/23 GDOT PFPR on 5/29/14., 24/05/15, BL. Kickoff meeting and concept meeting combined 9/9/13, 24//21, MW. Dates per GDOT, we are actually shooting for a January 25 let., 23/12/10, DM. GDOT wants to revise schedule. Revision sent but no yet approved, 23/12/10, DM. No ROW required, 23/12/10, DM. UTL:0 of 8 D7260 SIDEWALKS-Hurt Road Category: SIDEWALKS MIS#: Hurt Road Sidewalk - Merry Oak Rd to Floyd Rd SIDEWALKS-Hurt Road Merry Oak Rd Floyd Rd Scope: In House Design 04 JOHN MOREY 25/04/17 25/05/14 Waiting on contract approval., 24/08/29, JM. Utility assessment required., 23/09/19, AR. In-house design. Survey underway 9/1/09. Design not started yet., 23/07/09, MS. UTL:0 of 6 Page 5 of 19

6 ROW /UTL D3220 JOHNSON FERRY ROAD-SEWELL MILL ROAD (CO-365) Category: INTERSECTIONS MIS#: Johnson Ferry Rd at Sewell Mill Rd JOHNSON FERRY ROAD-SEWELL MILL ROAD (CO-365) JOHNSON FERRY ROAD SEWELL MILL ROAD Scope: Completion of deferred project. I/S imprvmts to include relocating Pine Rd, reducing vertical curve on Sewell Mill to improve sight distance, turn lanes and S/W JOHN MOREY 25/03/24 25/05/26 First RW submittal , 24/09/12, JM. Updated schedule received. Utility submittals (1st and 2nd combined) made on Thursday September 4., 24/09/08, JM. Utility survey information provided to consultant. Waiting on updated schedule., 24/08/29, JM. Anticipate to require acquisition on 12 parcels., 24/04/, JM Deferred project revised scope., 24/03/03, JM. Parcel Ct: 15 24/09/04 E7360 LITTLE WILLEO RD-PHASE 2-FILL-IN-THE-GA PS SIDEWALK Category: SIDEWALKS MIS#: LITTLE WILLEO ROAD SIDEWALK, PHASE 2 LITTLE WILLEO RD-PHASE 2-FILL-IN-THE-GAPS SIDEWALK LAKE FJORD PASS TIMBER RIDGE RD Scope: To extend the sidewalk along Little Willeo Road from Lake Fjord Pass to Timber Ridge Road JOHN MOREY 25/05/ 25/05/28 Waiting on water plans. Need response from utilities for pole relocation design., 24/08/29, JM. RW plans approved , 24/08/29, JM. RW plan Review back to Consultant , 24/07/, JM. 2nd Utility submittal on 6/6/14., 24/06/30, AR. Prelim RW plans received for review , 24/06/13, JM. Parcel Ct: 20 24/07/03 24/06/03 UTL:0 of 6 E4080 COBB PARKWAY-AT CEDARCREST ROAD/AWTREY CHURCH ROAD MIS#: 0057 Cedarcrest Rd - D Cobb Cedarcrest/Awtrey Church Scope: Engineering to widen to 4 lanes from Cobb/Paulding Cty line to US TIP. ARC# CO-344. MIS#0048-original contract w/long Eng. TranSystems acquired Long Eng - this is the contract going forward from that acquisition. RUSTAVIUS FORD 25/05/05 25/06/ Concept Report approved by GDOT on 8/14/24., 24/08/04, RF. Updated schedule rec'd 5/2: Concept GDOT 5/20 if needed, 24/05/05, KP. Concept rept sub 3/27 to GDOT, 24/03/31, KP. Sched updated 3/14 (env, let), 24/03/18, KP. Needs GDOT TIP# (not avail yet per GDOT PM), 24/03/03, KP. UTL:0 of 8 E6090 SIX FLAGS DRIVE- MIS#: Six Flags Drive Roadway Safety and Operational Improvements - E6080 E6090 Factory Shoals to Riverside FACTORY SHOALS RD RIVERSIDE PKY Scope: Improvements consist of widening the road to accommodiate a three (3) lane section, and sidewalk on both sides. Project will also consist of adding traffic and pedestrian signals at the Six Flags Drive and Six Flags Parkway Intersection. 04 BRIAN LOUDERMILK 25/05/15 25/06/11 Schedule and budget updated based on scope change 2/28/14., 24//28, BL. Scope change approved by Board on 2/11/14., 24//18, BL. Awaiting scope change, fee & schedule. draft agendas needed., 23/12/11, DM. Scope change fee and schedule requested from KH on 11/13/13, 23/12/11, DM. Awaiting utility submittal; AGS, CCWS, CWA, Comcast, GPC, GEMC, AT&T(D), 23/12/11, DM. Page 6 of 19

7 ROW /UTL D6040 BELLS FERRY ROAD- Category: INTERSECTIONS MIS#: BELLS FERRY ROAD at Peidmont Road/Barrett Parkway - D6040 GP#L3880 BELLS FERRY ROAD- Scope: ROADWAY SAFETY & OPERATIONAL MENTS 03 KRISTEN ORTON 25/05/22 25/06/26 Pond & Co was approved by the board on September 9 to finish up this task order. The final contracts have not been signed but once that is done the vendor will change in ProjectView., 24/09/25, KO. Schedule and Budget will be updated once received from the new consultant., 24/08/04, KO. This project has been turned over to Pond & Company to complete. CH2MHill was asked to turn in their final invoice and electronic files., 24/08/04, KO. Received Final Construction Plans 03/13/24. Received Final R/W Plans 03/19/24. Scheduled FFPR for 03/31/24. Plans were insufficient for review., 24/03/31, KO. Received updated scheduele from CH2MHill 2/21/24., 24/03/03, KO. Parcel Ct: 45 Parcel Possessed: 1 D7280 SIDEWALKS-BIG SHANTY ROAD Category: SIDEWALKS MIS#: TASK ORDER CONTRACT - LPA - CAT A SIDEWALKS-BIG SHANTY ROAD CHASTAIN MEADOWS PARKWAY BELLS FERRY ROAD Scope: LPA GROUP - MASTER TASK ORDER CONTRACT FOR ON-CALL SERVICES CATEGORY A - TRANSPORTATION PLANNING & ENVIRONMENTAL SERVICES 03 RUSTAVIUS FORD 25/03/26 25/06/26 Addressed and resubmitted ROW plan on 6/20/24. Plan to submit 2nd utility submittal week of August 4, 24. According to MAAI, this project is projected for FY 28., 24/08/04, RF. Awaiting 2nd utility submittal; AGL, AT&T(D), CCWS, CEMC, CWA, GPC(D), GPC(T), Charter., 23/12/10, DM. Waiting on ENV approval to submit plans to MAI for TE project reivew, 23/12/10, DM. Eng-$75k, ROW-$165k, Const-$937.5k. TE Agmt signed. In house design. TOC with LAP for environemntal-7/10/12 BOC. Concept approved, Environ underway, 23/12/10, DM. CE Approved on 11/14/23; Submitted PFPR and ROW Plans on 3/3/14, 23/12/03, RF. Parcel Ct: 2 24/03/03 D7140 SIDEWALKS-LOG CABIN ROAD Category: SIDEWALKS MIS#: 0024 LOG CABIN ROAD SIDEWALK D7140 SIDEWALKS-LOG CABIN ROAD Log Cabin Church Woodland Brook Drive Scope: In-House Design project JOHN MOREY 25/06/26 25/07/23 Waiting on contract approval., 24/08/29, JM. Proposal reviewed and approved for price. Waiting on new Task Order Contract before proceeding., 24/07/, JM. Waiting on new proposal from RS&H for limited scope project Log Cabin Church to Woodland Brook., 24/06/, JM. Project assigned to Morey RS&H previous consultant., 24/05/15, JM. Page 7 of 19

8 ROW /UTL E4100 I-75-WINDY HILL ROAD INTERCHANGE MIS#: WINDY HILL ROAD DDI - E4100 CO Windy Hill Road DDI CIRCLE 75 PARKWAY ROTTENWOOD CREEK BRIDGE Scope: I-75 at Windy Hill Road JAMES HUDGINS 25/07/17 25/08/13 Construction Public Meeting held on 9/16/14, 24/09/26, DM. C approved 72K for bridgescape work SA to MA 08/28/14, 24/09/, DM. AQ = $6,000,000.00; GTIP = $2,400,000.00; C = $4,500,000.00; SPLOST = $7,100,000.00, 24/07/30, DM. C to fund $450,000 for bridge enhancements, 24/03/20, DM. Utility AGL, AT&T(D), AT&T(T), CCWS, CWA, CEMC, CCTS, GPC(D), GPC(T), MEAG, Verizon, Comcast, Zayo, MP, 23/11/26, DM. 24/09/24 UTL:0 of 8 E3030 COBB PARKWAY-AT WINDY HILL ROAD Category: INTERSECTIONS MIS#: Cobb Parkway/US41/SR3 at Windy Hill Road - Cobb Parkway/US41 Corridor Queue Jumper Lanes CO Cobb Parkway at Windy Hill Road E3030 COBB PARKWAY WINDY HILL ROAD Scope: Proposed improvements include the addition/extension of turn and/or through lanes, a potential median along the western leg of the intersection, and the footprint of the Queue Jumper Lanes on Cobb Parkway/US41. The actual project limits will be determined KARYN MATTHEWS 25/07/31 25/08/27 Plans to Utility Cos upon completion of SUE (mid-march), 24//18, MK. Project moving forward. Concept Report approved by GDOT, pavement and SUE testing to begin in Jan-24. Coordinating ROW and Util with Windy Hill West., 24//16, MK. Project on Hold as per Director 11/12/13, 23/11/27, DM. Awaiting utility identifications., 23/11/26, DM. Need to determine if queue jumper lanes will be added to this project or not. Also City of Marietta request decorative mast arms. GDOT requested mast arms not in the raised islands and design variance maybe required for mast arm lengths over 65 ft., 23/11/26, DM. Parcel Ct: 17 24/08/26 UTL:0 of 13 Page 8 of 19

9 ROW /UTL E8030 HEMBREE RD-POPE HIGH SCHOOL Category: SCHOOL ZONE IMPRVMNT MIS#: POPE HIGH SCHOOL ON HEMBREE ROAD - E8030 GP#L3885 HEMBREE RD-POPE HIGH SCHOOL Weymouth Drive Liberty Ridge Trail Scope: Construct a possible roundabout, with right turn by-pass lanes, at Pope High School to improve traffic flow and safety. 03 DAVE GARRETT 25/08/14 25/09/10 Project being reevaluated since CCSD only agrees to fund max. $300,000 for off ROW portion and by-pass lane. Estimated cost exceeds this amount., 24/09/25, GD. CCSD agrees to joint roundabout project - June 24., 24/07/16, GD. Community Forum held by CCSD at Pope HS on 5/15/14 - still need Superintendent Ragsdale's approval. CCDOT concept team meeting on 5/22/14. Alternate concept discussed should Superintendent Ragsdale not support - decision expected week of 5/26/14., 24/05/27, GD. Traffic Ops concept team meeting (roundabout concept) held on 4/14/24. Concept meetings (roundabout concept) held with CCSD SPLOST on 4/17/24, CCSD Transportation on 4/24, and Pope HS Principal on 4/30. All in agreement. CCSD Community Forum to be held in May at Pope., 24/05/, GD. Department reviewing two concept options - roundabout vs. signal split phasing to accomplish dual left turn lanes (without major widening). Will meet with CCSD in April after determining which option is recommended., 24/03/28, GD. UTL:0 of 6 Page 9 of 19

10 ROW /UTL C1033 C-BOB CALLAN TRUNK TRAIL, PHASE II Category: CUMBERLAND AREA MIS#: C-Bob Callan Trunk Trail Phase II A PI B Segment A INTERSTATE NORTH PKWY Terrell Mill Road Scope: Design and construction of approx 2.1 miles of 10' trail. Segement A (PI 00009) limits are from Interstate North Pkwy to Interstate North Pkwy. Segement B (PI 02808) limits are from Interstate North Pkwy to Terrell Mill Rd., RUSTAVIUS FORD 25/08/18 25/09/18 Submitted L&D Affidavit to GDOT on 6/10/24. Bat survey is scheduled for August 24. ROW cost estimates submitted to GDOT on 8/1/24., 24/08/04, RF. Prel. Pedestrian bridge & retaining wall plans approved on 2/3/14; Will upgrade from PCE to CE because of CLOMAR and Northern Long-Eared Bat; PFPR and ROW held on Mar 4 & 5,24; CFA will be on 3/25/14 BOC meeting; Jacobs & KHA are working on utility cost estimate., 24/03/03, RF. Utilities handled by Jacobs for C., 23/09/18, AR. Finalizing plans, changing all permanent easement to required right of way, then submitting to GDOT for PFPR. Also need an CFA with C for right of way, utility cost and any other forseeable cost associated with this project., 23/07/31, SJ. Kimley-Horn - C funded. SA1 awarded for NEPA. SA2 for additional boardwalk design. No. const. funding - 15% in TIA. Concept submitted to GDOT for approval. PFPR -January 23, 23/06/25, MS. 24/03/31 C1033 C-BOB CALLAN TRUNK TRAIL, PHASE II Category: CUMBERLAND AREA MIS#: C-Bob Callan Trunk Trail Phase II A PI B Segment B INTERSTATE NORTH PKWY Terrell Mill Road Scope: Design and construction of approx 2.1 miles of 10' trail. Segement A (PI 00009) limits are from Interstate North Pkwy to Interstate North Pkwy. Segement B (PI 02808) limits are from Interstate North Pkwy to Terrell Mill Rd., RUSTAVIUS FORD 25/08/18 25/09/18 Bat survey is scheduled for August 24. Legal ad for L&D is currently running., 24/08/04, RF. Prel. Pedestrian bridge & retaining wall plans approved on 2/3/14; Will upgrade from PCE to CE because of CLOMAR and Northern Long-Eared Bat; PFPR and ROW held on Mar 4 & 5,24; CFA & PFA will be on 3/25/14 BOC meeting; Jacobs & KHA are working on utility cost estimate., 24/03/03, RF. TR472 TOWN CENTER MALL-NOONDAY CREEK TRAIL/KSU BIKE/PEDESTRIAN CONNECTOR Category: TOWN CENTER AREA MIS#: TASK ORDER CONTRACT- Heath & Lineback-CAT B CO Town Center/Noonday Creek Trail/KSU Ped/Bike Connector Scope: Master Task order contract for Cat B - Hwy design, Roadway, Bridge & Surveying RUSTAVIUS FORD 25/08/28 25/09/18 Concept Report was submitted to GDOT on 7/31/24. Concept Team meeting is scheduled for 9/x/24., 24/08/04, RF. Met with TCA Quality of Life on 6/18/24. Met with KSU on 6/27/24. Met with TCA P&I Committee on 7/10/24. Project presentation at TCA board meeting on 7/22/24., 24/08/04, RF. TCA- funding matching funds. GDOT TAP funding., 24/03/26, NR. Page 10 of 19

11 ROW /UTL D11J0 FLOYD ROAD-TRAIL, PHASE 2 Category: MULTI-USE TRAILS MIS#: TASK ORDER CONTRACT-HNTB-CAT B FLOYD ROAD-TRAIL, PHASE 2 HICKS RD SILVER COMET TRAIL Scope: HNTB - Master Task Order Agmt for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying 04 BRIAN LOUDERMILK 25/08/28 25/09/24 FFPR plans sent to MA on 7/7/14., 24/06/30, BL. Received FFPR plans to send to MA on 6/27/14., 24/06/30, BL. In=House FFPR was held on 4/29/14., 24/05/05, BL. ROW approval notice received on 3/3/14. Approval date 1/28/14., 24/03/04, BL. ROW plans submitted to MA on 8/30/13, 23/12/10, DM. Parcel Ct: 11 24//28 UTL:2 of 6 D6130 LOWER ROSWELL ROAD- MIS#: 0006 Lower Roswell Road (West) - D6130 LOWER ROSWELL ROAD- Scope: Safety and operational improvements to Lower Roswell Road (West) to widen existing lanes/shoulders, add LT and RT lanes, add/modify traffic signals and fill-in-the gap sidewalks JANE STRICKLIN 25/12/04 25/11/09 ROW staking has been requested for the project., 24/09/, JS. Signal and ATMS plans to Consultant on June 24, 24., 24/06/30, JS. Revised ROW plans delivered on June 2, 24. Consultant working on final construction plans. PIOH is planned for September., 24/06/30, JS. Kickoff meeting/ scoping meeting on March 19, 24., 24/03/31, JS. Contract was sent to the Chairman for signature on February 17, 24. The agenda item was approved on January 14, 24., 24/03/03, JS. Parcel Ct: 40 Parcel Possessed: 2 T-26 T-SOUTH BARRETT RELIEVER, PHASE 2 Category: TOWN CENTER AREA MIS#: T-South Barrett Pkwy Reliever, Ph 2 T-26 CO-450A T-SOUTH BARRETT RELIEVER, PHASE 2 Scope: Preliminary conceptual development to include roadway concept, traffic analysis and environmental screening to verify construction of S. Barrett Reliever, Ph2-between Barrett Lakes Blvd and Roberts Ct. would provide benefits to Barrett Pkwy. T BRIAN LOUDERMILK 25/10/16 25/11/12 Can't change engineering proj. number to E4110. Construction mony will be paid under E4110., 24/06/30, BL. Phase 2 is fully funded and moving forward., 24/06/09, BL. Current contract for concept and environmental only. concept still in development 8/28/13., 23/08/28, MW. E4090 WINDY HILL ROAD-TERRELL MILL ROAD CONNECTOR MIS#: TASK ORDER CONTRACT-GRESHAM SMITH-CAT A CO-380 E4090-TO# Windy Hill/Terrell Mill Connector WINDY HILL ROAD TERRELL MILL ROAD Scope: Gresham Smith & Partners - Master TOC for on-call services Catergory A - Transportation, Planning & Environment Services KARYN MATTHEWS 25/12/ 25/12/17 Waiting on decision to move forward with design, 24/06/, MK. GSP contract for scoping 3 alignments (incl old Leland Dr Ext alignment, C-12); env risks & costs., 24//18, MK. Waiting on mtg w Ott to discuss alignments/development plans., 24//18, MK. Page 11 of 19

12 ROW /UTL E6040 RIVER VIEW RD- MIS#: RIVER VIEW RD S&O MENTS-E6040 RIVER VIEW RD- VETERANS MEMORIAL HWY NICHOLS DR Scope: S&O Imprvmt from Veterans Mem Hwy to Nichols Dr., adding turn lanes at key I/S, sidewalk, improved alignment at Veterans Mem Hwy and changes to vertical alignment to improve drainage. 04 JANE STRICKLIN 25/11/20 25/12/17 Working with County Attorney on moving the project to Smyrna and making sure SPLOST commitments are met., 24/09/, JS. Informed by manangement that project is now Smyrna's oversite., 24/06/30, JS. Smyrna's annexation of the development is complete. Project is on hold pending discussion between Smyrna and Cobb County. Discussed briefly with Eric Randall of Smyrna and he said that he is holding them to all Cobb County requirements. The County is waiting to see the approved development transportation plan., 24/03/03, JS. Smyrna has deferred annexation decision until December 23. Concept decision is on hold until annexation decision is made., 23/11/05, JS. Awaiting utility submittals - AGL, CCWS, CWA, Comcast, GPC(D), GPC(T), AT&T(D), 23/09/18, AR. CTBD1 POWERS FERRY RD-BIKE/PEDESTR IAN ENHANCEMENTS Category: CUMBERLAND AREA MIS#: Powers Ferry Road Bike/Pedestrian Enchancements - Reference Contract POWERS FERRY RD-BIKE/PEDESTRIAN ENHANCEMENTS Scope: Powers Ferry Road Bike/Pedestrian Enchancements (3 projects - South, Central & North) JANE STRICKLIN 25/12/31 25/12/31 On hold - C is evaluating if they want to move forward with this project or try to move the LCI funds to another project., 24/09/, JS. Requested revised funding sheet for PFA from GDOT's PM, Carlton Fisher., 24/09/, JS. C is moving forward with this project. The scope includes a multiuse trail along the west side of Powers Ferry Rd. The CFA is with C and the scope of the PFA needs to be revised. Site visit with Atkins and CCId on June 12, 24., 24/06/30, JS. The project is on hold per C. They are assessing all their projects and developing a new list for their board to approve., 24/03/03, JS. C is funding the design. C is looking for funding for the construction. Widening will take place on the east side., 23/11/05, JS. CTBD2 WINDY RIDGE PKY-BIKE/PEDEST RIAN ENHANCEMENTS Category: CUMBERLAND AREA MIS#: Windy Ridge Bike/Pedestrian Enchancements WINDY RIDGE PKY-BIKE/PEDESTRIAN ENHANCEMENTS Scope: Windy Ridge Bike/Pedestrian Enchancements 2 Phases - Powers Ferry to Trunk Trail and Trunk Trail to Circle 75) JANE STRICKLIN 25/12/31 25/12/31 Project is still on hold by C., 24/09/, JS. C has placed this project on hold. They are assessing all their projects and developing a new list for their board to approve., 24/03/03, JS. Utilities - C, 23/09/19, AR. Page 12 of 19

13 ROW /UTL CTBD3 ROTTENWOOD CK-TRAIL EXTENSION Category: CUMBERLAND AREA MIS#: Rottenwood Creek Trail Extension ROTTENWOOD CK-TRAIL EXTENSION Scope: Rottenwood Creek Trail Extension to University Trail and to East Cobb Trail JANE STRICKLIN 25/12/31 25/12/31 C has placed this project on hold. They are assessing all their projects and developing a new list for their board to approve., 24/03/03, JS. Utilities - C, 23/09/19, AR. Request Funding 8/, 23/07/09, MS. D6250 WEST SANDTOWN ROAD- MIS#: 0073 West Sandtown Road - D6250 WEST SANDTOWN ROAD- South of Macland Road South of Sarina Dr/Mullins Pass Scope: Curb & gutter, sidewalk, lane widening, turn lanes, etc to West Sandtown Rd from south of Macland Rd to South of Sarina Dr/Mullins Pass. RUSTAVIUS FORD 25/12/04 25/12/31 Meet with Parsons Transportatin Group on 7/15/24 to discuss moving forward with project. Before BOC on 8/12/24 for Parsons to complete engineering of project., 24/03/03, RF. Include Dowell Elem. Improvements. Parson Eng - award 1/22/09. Bridge replacement is Phase 1. Final Plans complete., 23/07/09, MS. Parcel Ct: 51 Parcel Possessed: 8 UTL:0 of 0 TTBD1 NOONDAY CREEK TRAIL-CONNECT OR Category: TOWN CENTER AREA MIS#: Noonday Creek Trail Connector NOONDAY CREEK TRAIL-CONNECTOR Noonday Creek Trail (Barrett Lakes Blvd) Big Shanty Road Scope: Noonday Creek Trail Connector -Connection to Busbee Park and Ride Lot This project is will extend along Barret Lakes Blvd from Noonday Trail, Phase 2C to Big Shanty Road (Approx 815') RUSTAVIUS FORD 25/12/31 25/12/31 New Developement (auto dealership) was approved for site at the intersection Big Shanty Road and Barret Lakes Blvd. One of the conditions imposed on the zoning is wider sidewalks across their frontage. This will assist in the use of the parking lots on the north side of Big Shanty Road., 23/12/23, RF. In-house survey and design for spur connection between the trail and Big Shanty Rd Conn. May be able to proceed after GRTA P&R is done. Probably as unit price contract. Maybe needed to connect to existing P&R Lot. In-house proejct w/ possible in-house construction., 23/07/09, MS. E4070 COBB PARKWAY-AT DALLAS ACWORTH HIGHWAY Category: INTERSECTIONS MIS#: Cobb Parkway at Dallas Acworth Hwy (US41@SR92) COBB PARKWAY-AT DALLAS ACWORTH HIGHWAY Scope: Improvements consisting of dual left turn lanes for northbound Cobb Pkwy, widening SR 92/Dallas Acworth Hwy for two southbound receiving lanes, and realigning Dallas Acworth Road. Includes traffic signal upgrades. BRIAN LOUDERMILK 25/12/15 26//15 Concept approved 6/6/14., 24/06/30, BL. Envir & Survey underway, 24/05/05, KP. Concept report finalized & signed 3/14, 24/03/18, KP. Revising concept report per GDOT; resubmitting ~3/7/14; Envir&Survey began in Feb, 24//28, KP. GDOT on 2/4/14, 24//04, KP. UTL:0 of 8 Page 13 of 19

14 ROW /UTL E7400 CASTEEL RD- (EAST) FILL-IN-THE-GAP S SIDEWALK Category: SIDEWALKS MIS#: TASK ORDER CONTRACT KIMLEY-HORN - CAT B Casteel Road Sidewalks MITCHELL RD BILL MURDOCK ROAD Scope: Kimley-Horn - 22 Master TOC for On-Call Services Category B - Hwy Design: Roadway, Bridge & Surveying 03 JOHN MOREY 26/04/10 26/05/23 Project put on hold until cross funding becomes available., 24//05, JM. No environmental study required. No geotech required. No WFI or BFI required. No pavement analysis required., 23/12/10, DM. TO awarded to Kimley-Horn 6/11/13, 23/12/10, DM. 23/10/15 UTL:0 of 6 E60 LOWER ROSWELL ROAD- MIS#: LOWER ROSWELL ROAD - E60 GP#L5279 LOWER ROSWELL ROAD- WOODLAWN DRIVE DAVIDSON RD Scope: adding a median, access management, turn lanes at Woodlawn Drive, improved turn lanes at Johnson Ferry Road and Davidson Road, and improved alignment of Lower Roswell Road across Johnson Ferry Rd. Project also includes sidewalks on both sides and landscap JAMES HUDGINS 26/08/26 26/09/22 PROJECT ON HOLD PENDING BOC DIRECTION ON CONCEPT., 24/07/30, DM. Utilities need plans, 23/07/30, DM. Meeting with Commissioner, County Manager, and Chairman on the Concept the week of July 8th to complete getting their direction and move forward., 23/07/, BR. Parcel Ct: 1 UTL:0 of 10 E10D0 COBB PARKWAY-CORR IDOR - QUEUE JUMPER LANES Category: TRANSIT INFRASTRUCTURE MENTS MIS#: COBB PARKWAY QUEUE JUMPER LANES - E10D0 GPC L5273 COBB PARKWAY-CORRIDOR - QUEUE JUMPER LANES CUMBERLAND-GALLERIA AREA TOWN CENTER AREA Scope: Add special bus lanes at major intersections on Cobb Parkway, from Cumberland Galleria area to Town Center area, for Cobb Community Transit to move passengers along this highway in less travel time KARYN MATTHEWS 26/11/ 26/11/28 Project on hold as per Director 11/12/13, 23/11/26, DM. RFP w/e3030 Cobb Windy Hill for E10D0. Wating on prototype project at Cobb Pkwy/Windy Hill to be completed., 23/06/24, DM. UTL:0 of 12 C1045 C-POWERS FERRY/WINDY HILL ROAD STREETSCAPES Category: CUMBERLAND AREA MIS#: Powers Ferry Road/Windy Hill Road Streetscapes C-POWERS FERRY/WINDY HILL ROAD STREETSCAPES Scope: Development of design and construction docs for approx. 9,500 linear feet of streetscape improvements along Powers Ferry Rd from Windy Ridge Pkwy to Terrell Mill Rd and along Windy HIll Rd from Spectrum Cir/Interstate N. to Powers Ferry Rd. C JANE STRICKLIN 26/11/21 26/12/18 Project on hold until C evaluates if they want to go forward with project. A few of the streetscape elements are included in the Windy Hill Rd Far East project, D4230., 24/09/, JS. Project on hold., 24/09/, JS. Awaiting utility submittal., 23/09/18, AR. Utilities - C, 23/07/30, DM. Design by ARCADIS. Powers Ferry Rd from Windy Ridge to Terrell Mill Rd and Windy Hill Rd from Spectrum Circle/Interstate N Pkwy to Windy Hill Rd, approx 9500 lf. Concept Mtg in Apr. Mtg w/ Comm. Ott - 4/12/10. Prelim plans underway. PFPR held -4//11. Waiting on changes from PFPR. C applied for SRTA Grant for $2.5Mdid not get. ON HOLD until funding identified., 23/06/25, MS. Page 14 of 19

15 ROW /UTL E10B0 COBB PARKWAY-CORR IDOR - SIGNAL PRE-EMPTION UPGRADES Category: TRANSIT INFRASTRUCTURE MENTS MIS#: COBB PARKWAY SIGNAL PRE-EMPTION - E10B0 COBB PARKWAY-CORRIDOR - SIGNAL PRE-EMPTION UPGRADES CUMBERLAND-GALLERIA AREA TOWN CENTER AREA Scope: Upgrade traffic signals on Cobb Pkwy, from Cumberland Galleria area to Town Center area, to allow Cobb Community Transit buses to move passengers along this highway in less travel time DAVID JACKSON 26/12/13 26/12/22 Project on hold as per Director on 11/12/13, 23/11/26, DM. AGL, CCWS, CWA, MP, GPC(D), CEMC, AT&T(D), Comcast, Zayo, Sunesys, Charter, X/O, T/W, Level(3), AT&T(T), Verizon,, 23/11/26, DM. AGL, CCWS, CWA, MP, GPC(D), CEMC, AT&T(D), Comcast, Zayo, Sunesys, Charter, X/O, T/W, Level(3), AT&T(T), Verizon,, 23/10/, AR. UTL:0 of 12 Page 15 of 19

16 ROW /UTL GDOT Projects D5120 TRAFFIC SIG/PLANNING-TR ANS PLANNING STUDIES Category: TRANSP MGMT SYSTEMS MIS#: SR6 Corridor Truck-Friendly Lanes - D5120 DO TRAFFIC SIG/PLANNING-TRANS PLANNING STUDIES I-20 in Douglas Co Garrett Rd Scope: Scoping / Concept Study and Environmental Documentation SR6 Corridor Truck-Friendly Lanes - D KARYN MATTHEWS 25/05/15 25/06/15 Douglas has $1.64M AQ funds in FY15, 24/03/31, MK. Per Gary Westmoreland, Douglas Co: Adding turn lanes, signal mod, communication, etc, incl. truck rollover warning detection system in Cobb. Consultant getting acquired now, need to know if we want to contribute - ASAP., 24//14, MK. Waiting to See if Douglas County Does a project that we contribute on., 23/07/31, SJ. Includes Cobb, Douglas, NSRR, GDOT. Funding: Douglas & NSRR $35K each. MOA approved 8/24/10. Selection 10/26/10 BOC - Pond & Co. Engr. schedule 18 mos. Award 1/25/11. KO Mtg. Concept Team Mtg Jan 22. 2/22 - Concept Team Mtg. Mtg w/ Douglas Cty 4/22. Need to schedule Concept TeamMtg., 23/07/09, MS GDOT-MACLAND ROAD/SR360 Category: GDOT MIS#: Macland Road/SR360 (GDOT) CO GDOT-MACLAND ROAD/SR360 NEW MACLAND RD Scope: Macland Road/SR360-4 lane divided from SR176/New Macland Rd. into Paulding County, SR92 and to SR BRIAN LOUDERMILK 25/07/31 25/07/31 GDOT project. Currently acquiring ROW., 23/12/12, BL. 2/21/05 - GDOT no longer holding local gov't responsible for utility relocation costs. Design recently awarded (9/05) to Mulkey Engineers, Scott Gero. concept Team Mtg. 11/14/06. Design proceeding despite no funding (12/07)., 23/07/09, MS GDOT-I-75 MANAGED LANES AND I-575 MANAGED LANES Category: GDOT MIS#: GDOT I-75 Managed Lanes (Akers Mill Rd - Wade Green Road) and I-575 managed lanes GPC - PI GDOT-I-75 MANAGED LANES AND I-575 MANAGED LANES I-75 from Akers Mill Road to Wade Green Road I-575 from I-75 to Sixes Road Scope: I-75 Managed Lanes and I-575 Managed Lanes, and I-75/I575 Interchange Modification. ROBERT GALANTE 25/12/31 25/12/31 Groudbreaking scheduled for 4:00 pm Construction NTP anticipated in October 24, 24/09/, DM. McDuff attending coordination meetings at GDOT. Project put on hold by Governor, 10/21. Managed lanes design/build. 4 firms have been short listed. Construction expected to start June year duration - bids due 6/10/13, 24/03/20, DM. Page 16 of 19

17 ROW /UTL D4260 THIRD ARMY ROAD INTERCHANGE MIS#: I-75 at Third Army Road Interchange - Scoping Phase (D4260) I-75-@ THIRD ARMY ROAD INTERCHANGE Scope: Project consists of fully directional interchange on I-75 at Third Army Rd approx 2.67 miles north of the I-75/Glade Rd I/C with a multi-lane connector to US 41 (N Cobb Pkwy) and Dabbs Bridge Rd JANE STRICKLIN 25/12/04 25/12/31 Need to get the project in ARC Region before the project can move forward., 24/09/, JS. Arcadis is working on revised concept so a Concept Team Meeting can be scheduled with GDOT in August 24. Faye is still working on a funding strategy for the project. IJR expires in November 27 and ROW needs to be authorized by November 27., 24/06/30, JS. Met with GDOT (Ryan Fernandez) on April 21, 24 to discuss the project., 24/06/30, JS. Chairman Lee met with the Chairmen of Bartow and Paulding Counties on March 29, 24. All three counties are in support of the project. Faye is working on a funding strategy for the project., 24/03/31, JS. GDOT PM is Ryan Fernandez. Possible internal concept meeting in April 24. Concept Team Meeting with GDOT projected in August 24. It should be enough time to revise the concept and create the concept report., 24/03/03, JS. 23/05/16 26/05/15 GDOT GDOT-SR PROCTOR CREEK/LAKE ACWORTH IN SW ACWORTH Category: GDOT MIS#: SR Proctor Creek/Lake Acworth in SW Acworth SR Proctor Creek Scope: New bridge downstream of dam,, 03, 04 KARYN MATTHEWS 27/09/15 27/10/15 bridge with , 24/09/, MK. UTL:5 of 5 D4190 SR 92-(CO-3) MIS#: SR92 from US41 to Cherokee/Glade at I75 CO SR 92-(CO-3) SR 3/US 41 GLADE ROAD Scope: Design by GDOT KARYN MATTHEWS 27/11/15 Interim intersection improvements requested by Acworth. 4-lane divided and triple lefts on US41 or direct connection (via 3rd Army Rd.) to I-75. URS selected.pioh scheduled for 7/8/08. Revised length showed 4 lane divided with bike lanes that fails 22. Reduced environ impacts, no 4F. FHWA challenged reasonable termini 12/08 - delay. Team concept mtg 2/ /09. Concept being approved (4/09). Prelim Design underway. Environ. Doc underway. New design contract., 23/07/09, MS. Page 17 of 19

18 ROW /UTL Recently Let Projects E3040 COOPER LAKE ROAD-AT KING SPRINGS ROAD Category: INTERSECTIONS MIS#: TASK ORDER CONTRACT-GRESHAM SMITH- CAT B GP#L4154 COOPER LAKE ROAD-AT KING SPRINGS ROAD Scope: Gresham Smith & Partners - Master TOC for on-call services Category B-Hwy Design: Roadway, Bridge & Surveying KELLY PATRICK 24/08/ 24/08/28 Prebid scheduled for Aug 18, 24, 24/08/05, KP. Water plans received July 14, 24, 24/07/15, KP. Water System plans due June 13, 24/05/30, KP. Still need Cobb Water comments - once received, Adv/Let dates can be accelerated., 24/05/05, KP. FFPR plans rec'd 3/14; review sched on 4/3, 24/03/18, KP. Parcel Ct: 4 Parcel Possessed: 4 23/09/30 23/10/ UTL:6 of 6 E60 FLOYD ROAD- MIS#: Floyd Road (Veterans Mem to Clay Rd) E60 GP#L5257 FLOYD ROAD- VETERANS MEMORIAL HWY CLAY RD Scope: S&O Improvements from Veterans Memorial Hwy to Clay Rd. Widen to 4-lanes w/ median and sidewalks (both sides). Dual Turn lanes from Floyd Rd onto Veterans Memorial Hwy. 04 BRIAN LOUDERMILK 24/08/ 24/08/28 NSR Const. Agreement sent to County Attorney for approval on 7/11/14., 24/08/06, BL. Final plans sent back to NSR after addressing comments. Waiting on Const. Agreement., 24/05/05, BL. Plans sent to NSR on 1/2/14., 24//18, BL. Let date moved to 7/10/14 to allow for ROW acquisition., 24//08, BL. FFPR set for 12/12/13., 23/12/, BL. Parcel Ct: 21 Parcel Possessed: 17 23/10/07 23/06/27 UTL:10 of 12 D4230 WINDY HILL ROAD- MIS#: WINDY HILL ROAD/POWERS FERRY ROAD CORRIDOR - D4230 CO-382 Far East Powers Ferry Road Spectrum Circle Scope: WB Lane on Windy Hill Road from Powers Ferry to Spectrum Circle. JAMES HUDGINS 24/07/18 24/09/11 Sent to EPD on June 26, 24, 24/09/29, DM. Project Let 9/11/24 / ES bid $1,651,067.24, 24/09/26, DM. R/W & Utility cost included in E40, 24/03/20, DM. To be Let with West and East, 24/03/03, DM. We have 7 Parcels from this project., 23/11/26, DM. Parcel Ct: 11 Parcel Possessed: /03/ 23/11/15 UTL:9 of 10 E2260 DRAINAGE SYS IMPRMTS-CIRCLE 75 PARKWAY Category: DRAINAGE/HEADWALL MIS#: TASK ORDER CONTRACT-HNTB-CAT B Circle 75 Drainage Imrvmts Scope: HNTB - Master Task Order Agmt for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying JOHN MOREY 24/08/15 24/09/11 Updated Cost Estimate, 24/08/29, JM. Prebid meeting , 24/08/29, JM. Should receive final plans by week of July 14th., 24/07/, JM. Final plans received for review , 24/06/03, JM. Cost estimate looks low., 24/04/, JM. Parcel Ct: 4 Parcel Possessed: 4 Page 18 of 19

19 ROW /UTL E40 WINDY HILL ROAD-(EAST) MIS#: WINDY HILL ROAD EAST - E40 CO-455 C-16 WINDY HILL ROAD-(EAST) Rottenwood Creek Bridge Spectrum Circle Scope: I-75 NB to Spectrum Circle/Interstate North JAMES HUDGINS 24/07/18 24/09/11 Sent to EPD June 26, 24, 24/09/29, DM. Project Let 9/11/14 / ES Bid of $2,857,830.50, 24/09/26, DM. Revised plans received for utilities 6/27/14, 24/06/30, AR. Need revised submittal to utility owners., 24/05/09, AR. New revision on "East" recieved and distributed - ROW no longer on hold on East section, 24/03/03, DM. Parcel Ct: 3 Parcel Possessed: 1 23/08/13 23/10/08 UTL:8 of 10 E4030 WINDY HILL ROAD-(WEST) MIS#: WINDY HILL ROAD WEST - E4030 CO-454 C-15 WINDY HILL ROAD-(WEST) COBB PARKWAY CIRCLE 75 PARKWAY Scope: Cobb Parkway to I-75 JAMES HUDGINS 24/07/18 24/09/11 Sent to EPD June 26, 24, 24/09/29, DM. Project Let 9/11/24 - ES bid $10,978,470.00, 24/09/26, DM. Project to be Let with East and Far East Sections, 24/03/03, DM. Project PE is being provided by C, 23/11/26, DM. Awaiting 2nd Utility submittal. AGL, AT&T(D), AT&T(T), CCWS, CWA, CEMC, CCTS, GPC(D), GPC(T), MEAG, Verizon, Comcast, Zayo, MP., 23/11/26, DM. Parcel Ct: 43 Parcel Possessed: 17 23/08/13 23/10/08 UTL:11 of 13 Page 19 of 19

LETTING SCHEDULE REPORT

LETTING SCHEDULE REPORT LETTING SCHEDULE REPORT Transportation Improvement Projects Date: June, 25 Cobb Cobb DOT Projects E1070 PITNER ROAD-OVER LITTLE ALLATOONA CREEK Category: BRIDGE REPLACEMENTS MIS#: 000574 22 TASK ORDER

More information

LETTING SCHEDULE REPORT

LETTING SCHEDULE REPORT LETTING SCHEDULE REPORT Transportation Improvement Projects Date: March 31, 24 Cobb Cobb County Projects D4100 I-285-ATLANTA ROAD (CO-AR-070B) MIS#: 0005* E-W CONN EXT TO I-285 ENG DSN CO-ARC-070B 752300

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 10, 2018 CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Contractor Notice to Proceed Estimated Completion

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT October 1, 2018 CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Contractor East Cherokee Dr at Old Hwy 5 Notice to

More information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 29, 2017 CONSTRUCTION STATUS MONTHLY REPORT 12/2017 Project Description Contractor Notice to Proceed Estimated Completion

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Cobb County Government Facilities Schedule

Cobb County Government Facilities Schedule Administrative Building 0 East Park Square 8 5 M,T,W,H,F 0 0 0 0 Adult Detention Center 825 County Services Parkway 30090 Adult Detention Center 2 825 County Services Parkway Adult Detention Center Intake

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

CUMBERLAND AREA PEDESTRIAN PLAN

CUMBERLAND AREA PEDESTRIAN PLAN CUMBERLAND AREA PEDESTRIAN PLAN Prepared for Cobb County Board of Commissioners Prepared by Gresham, Smith and Partners In collaboration with Alta Planning + Design JULY 2016 Please note that the content

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

Austell Road Access Management Plan Public Meeting February 17, 2009

Austell Road Access Management Plan Public Meeting February 17, 2009 Austell Road Access Management Plan Public Meeting February 17, 2009 Laraine Vance: Dan Cohen: Cobb DOT Project Manager Pond & Company Planning Director 1 Access Management What is Access Management? The

More information

Atlanta Braves Stadium and Mixed- Use Development

Atlanta Braves Stadium and Mixed- Use Development Transportation Analysis Atlanta Braves Stadium and Mixed- Use Development DRI #2381 Cobb County, Georgia Prepared for: BRED Co., LLC Prepared by: Kimley-Horn and Associates, Inc. 817 West Peachtree Street

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA Overview The Atlanta Braves strategically selected the location for SunTrust Park to provide an environment rich in transportation

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

n/a n/a $2,000,000 n/a n/a $1,018,000 n/a n/a $1,000,000 $50,000,00 $18,500,00 n/a n/a $1,600,000 $15,000,00 $84,263,46 7 n/a n/a $2,000,000

n/a n/a $2,000,000 n/a n/a $1,018,000 n/a n/a $1,000,000 $50,000,00 $18,500,00 n/a n/a $1,600,000 $15,000,00 $84,263,46 7 n/a n/a $2,000,000 x Advanced Systems Incident Inclement Weather Equipment and Supply Shortage Integrated Corridor Local Match for Future Federal/State/Other Funding and (only funding category divided equally by District)

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

GRIFFIN-SPALDING AREA TRANSPORTATION COMMITTEE AFTER AGENDA March 16, :30 p.m.

GRIFFIN-SPALDING AREA TRANSPORTATION COMMITTEE AFTER AGENDA March 16, :30 p.m. GRIFFIN-SPALDING AREA TRANSPORTATION COMMITTEE AFTER AGENDA March 16, 2016 1:30 p.m. Meeting Room (#108), Spalding County Annex, 119 East Solomon Street, Griffin Members present: Brant Keller, Bonnie Pfrogner,

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

Current Roadway Projects Wednesday, September 03, 2014

Current Roadway Projects Wednesday, September 03, 2014 Current Roadway Projects Wednesday, September 03, 2014 Restore our Roads Projects 1 US 72 East at Moores Mill Road Additional lane WB from Moores Mill to Sparkman Drive and intersection improvements at

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

Design of Stanley Park S-Curve

Design of Stanley Park S-Curve ADMINISTRATIVE REPORT Date: May 4, 2001 TO: FROM: Author/Local: F. Klotzbach/7118 RTS NO. 01644 CC File No. Standing Committee on Transportation and Traffic General Manager of Engineering Services, in

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

3.0 Future Conditions

3.0 Future Conditions 3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected

More information

Diamond Springs Parkway Project

Diamond Springs Parkway Project Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

STATE OF GEORGIA OFFICE OF THE GOVERNOR

STATE OF GEORGIA OFFICE OF THE GOVERNOR STATE OF GEORGIA OFFICE OF THE GOVERNOR Nathan Deal GOVERNOR For Immediate Release May 28, 2014 Deal announces $33 million in transportation infrastructure project awards 18 governments and CIDs to receive

More information

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Presentation Format Project Goals and Overview Sidewalk

More information

2015 Data review. Capturing Ready Lane NEXUS vehicles

2015 Data review. Capturing Ready Lane NEXUS vehicles 2015 Data review Capturing Ready Lane NEXUS vehicles Problem: NEXUS users make up the majority of traffic using the Ready Lane, but they are currently considered either standard traffic or Ready Lane traffic.

More information

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017 CITY OF FRANKLIN, TENNESSEE Columbia Avenue Widening & Improvements Project Public Meeting May 16, 2017 Agenda 6:00 6:30 Formal Presentation 6:30 8:00 Town Hall Forum City of Franklin Columbia Avenue Alternatives

More information

State Road (S.R.) 61 (U.S. 319) FPID s and

State Road (S.R.) 61 (U.S. 319) FPID s and State Road (S.R.) 61 (U.S. 319) FPID s 220496 2 22 01 and 219747 2 22 01 Crawfordville Highway Conceptual Design and Environmental Reevaluation May 6, 2014 END PROJECT PROJECT LOCATION/LIMITS Project Limits:

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report. COUNCIL REPORT Report No. ENG 08-018 Executive Committee Date: May 0, 018 File No: 5400-1 To: From: Subject: Mayor and Council Purvez Irani, Senior Transportation Engineer Bluejay Street Road Improvements

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Public Information Meeting

Public Information Meeting Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information