LETTING SCHEDULE REPORT

Size: px
Start display at page:

Download "LETTING SCHEDULE REPORT"

Transcription

1 LETTING SCHEDULE REPORT Transportation Improvement Projects Date: March 31, 24 Cobb Cobb County Projects D4100 I-285-ATLANTA ROAD (CO-AR-070B) MIS#: 0005* E-W CONN EXT TO I-285 ENG DSN CO-ARC-070B I-285-ATLANTA ROAD (CO-AR-070B) ATLANTA ROAD PACES FERRY ROAD Scope: EAST-WEST CONNECTOR EXTENSION FROM SOUTH COBB DRIVE TO I-285ENVIRONMENENVIRONMENTAL AND DESIGN SERVICES KARYN MATTHEWS 24//21 24/03/21 Waiting on util cert fm GDOT, 24//18, MK. Noise Wall added at Springhill Suites using standard details., 24//18, MK. GDOT Let., 24//16, MK. AGL, AT&T(D), Comcast, Colonial, GPC(D), CCWS, CWA, Fiberlight, Verizon, Susesys, X/O, Charter, Zayo, Plantation, Qwest., 23/09/18, AR. Make sure the 23 spec book is referenced, 23/08/13, BR. Parcel Ct: 40 Parcel Possessed: 40 22//25 22/08/22 UTL:9 of 9 E10 BURNT HICKORY ROAD-OVER MUD CREEK Category: BRIDGE REPLACEMENTS MIS#: TASK ORDER CONTRACT-RS&H - CAT B Burnt Hickory Road Bridge over Mud Creek BURNT HICKORY ROAD BURNT HICKORY ROAD Scope: Reynolds Smith & Hills - Master Task Order Contract for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying JOHN MOREY 24//28 24/03/27 Utility Submittal combined., 24//28, JM. Encroachment Agreement with CWA required; agreement with Attorneys., 24//17, AR. Summer 24 closure., 24//05, JM. Finishing final comments. Waiting on utilities. WA encroachment agreement needed., 24//05, JM. Cannot close bridge until Barrett Pkwy complete. Construction in March 24, 23/12/10, DM. Parcel Ct: 6 Parcel Possessed: 4 23/08/05 UTL:0 of 6 E1080 STOUT PARKWAY-OVER GOTHARDS CREEK Category: BRIDGE REPLACEMENTS MIS#: STOUT PARKWAY OVER GOTHARDS CREEK BRIDGE REPLACEMENT STOUT PARKWAY-OVER GOTHARDS CREEK Scope: The project intent is to replace the existing weight-restricted bridge and provide pedestrian accommodations on the bridge to connect to pedestrian facilities in the area. 24//28 24/03/27 Preconstruction Notification sent to COE on 2/18/14., 24//18, BL. FFPR/Construct review on 1/14/14, 24//06, BL. Austell Gas System has requested bridge attachment for 6" gas main., 24//03, AR. After discussions at Concept meeting, it was determined that there was not a need for a PFPR., 23/12/12, BL. Hydrology approved by Higgins on 10/30/13., 23/12/06, BL. Parcel Ct: 4 Parcel Possessed: 3 23/11/13 23/09/16 UTL:3 of 5 Page 1 of 23

2 E7390 PETE SHAW RD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL MIS#: TASK ORDER CONTRACT-STV/RALPH W. CAT B PETE SHAW RD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL STEINHAUER RD HAZELHURST DR Scope: STV/Ralph Whitehead - Master Task Order Contract for on call services. Category B - Hwy Design: Roadway, Bridge & Surveying 03 KRISTEN ORTON 24//28 24/03/27 STV turned in final construction plans 11/21/13. Need to schedule FFPR, 23/12/10, DM. STV turned in Final ROW plans 10/29/13, 23/12/10, DM. AGL, AT&T(D), CCWS, CCG, CEMC 2/5, 23/12/10, DM. Received ROW plans 9/27/13, 23/12/10, DM. Received plans for PFPR 9/13/13. PFPR scheduled for 2pm, 23/12/10, DM. Parcel Ct: 12 Parcel Possessed: 12 23/09/10 UTL:5 of 5 E7450 SOUTH GORDON ROAD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL MIS#: TASK ORDER CONTRACT POND & CO- CAT B SOUTH GORDON ROAD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL HILLCREST DR RIVERSIDE INTERMEDIATE SCHOOL Scope: Pond & Co. - Master Task Order Cotnract for On-call Services Catergory B - Hwy Design: Roadway, Bridge & Surveying 24//28 24/03/27 PFPR plans submitted 11/27/13. PFPR set for 12/17/13., 23/12/03, BL. Parcel Ct: 3 Parcel Possessed: 1 24//06 UTL:0 of 6 E1060 OLD STILESBORO ROAD-OVER LITTLE ALLATOONA CREEK Category: BRIDGE REPLACEMENTS MIS#: Old Stilesboro Road over Little Allatoona Creek Bridge GP#L5277 OLD STILESBORO ROAD-OVER LITTLE ALLATOONA CREEK Scope: To replace the existing substandard bridge with a new structure. MIKE WRIGHT 24/03/14 24//10 Hydraulics reveiwed and approoved by Storm water, 24//27, MW. No right of way plans as such. bridge to be built on existing easement. Easememt plat has been sen t to USACE., 24//25, MW. Corps of engineers wants additional rw info. required additional survey. waiting new schedule from Long., 23/11/05, MW. AGL(NF), CCWS, CEMC, AT&T(D), Comcast, Sunesys(E/a). 2/6, 23/10/09, AR. Awaiting utility submission., 23/09/18, AR. 23/10/08 UTL:1 of 6 E7290 SIDEWALKS-ADA COMPLIANT MENTS MIS#: ADA COMPLIANT SIDEWALKS MENTS SIDEWALKS-ADA COMPLIANT MENTS County Wide Scope: In-House Design project,, 03, 24/03/14 24//10 E7320 BOB COX ROAD-FILL-IN-TH E-GAPS SIDEWALK MIS#: BOB COX ROAD SIDEWALK - E7320 BOB COX ROAD-FILL-IN-THE-GAPS SIDEWALK IVY MANOR DR GRANVILLE DR Scope: from existing sidewalk near Ivy Manor Drive to existing sidewalk near Granville Drive on west side. KRISTEN ORTON 24/03/28 24//24 Awaiting utility submittal., 23/09/18, AR. Possible UPC?, 23/08/05, KO. Fill in Gaps. Length 0.20 mi. In-house Design., 23/06/25, MS. Parcel Ct: 5 24//05 UTL:0 of 6 Page 2 of 23

3 E9110 RESURFACING SILVER COMET TRAIL Category: RESURFACING MIS#: RESURFACING 24-4 SILVER COMET TRAIL E9110 Resurfacing 24-4 Silver comet Trail Scope: Asphalt resurfacing of 12.8 miles on the Silver Comet Trail. Work includes variable depth milling, patching, leveling, resurfacing, shoulder restoration, and pavement markings. MIKE LEHNER 24/03/28 24//24 Trail will remain open on weekends, 24/03/07, DM. Resurface entire 12.8 miles between June 1, 24 and August 29, 24., 24/03/07, DM. E3060 JOHN WARD ROAD-AT CHEATHAM HILL ROAD Category: INTERSECTIONS MIS#: TASK ORDER CONTRACT KIMLEY-HORN - CAT B GP#L5275 JOHN WARD ROAD-AT CHEATHAM HILL ROAD Scope: Kimley-Horn - 22 Master TOC for On-Call Services Category B - Hwy Design: Roadway, Bridge & Surveying MIKE WRIGHT 24//25 24/05/22 Andy is coordinating utility submittals., 24/03/31, MW. Final plans to be received 4/4/4, 24/03/27, DM. John Ward Sidewalk project E7300 combined with roundabout, 24//10, DM. Ecology memo 2/6/13 indicates no need for further environmental reports., 23/12/10, DM. GPC, CEMC, AT&T(D), CCWS, CWA, Comcast, AGL, Sunesys, GPC(D) - 0/9, 23/12/10, DM. Parcel Ct: 17 Parcel Possessed: 10 23/10/30 UTL:0 of 7 E7120 EBENEZER RD-SCHOOL RELATED SIDEWALKS/SAF E ROUTES TO SCHOOL MIS#: Ebenezer Road Sidewalks - E7120 GP#L5150 EBENEZER RD-SCHOOL RELATED SIDEWALKS/SAFE ROUTES TO SCHOOL KNIGHT RD SANDY PLAINS ROAD Scope: Knight Road to Sandy Plains Road on Both Sides (IN-HOUSE DESIGN) 03 KRISTEN ORTON 24//25 24/05/22 Resolved drng issue with Parcel 18 and 19. Additional easement needed. R/W Revisions completed by the end of the week., 24/03/31, KO. Drng issue with Parcel 18 and 19. Need additional survey to resolve. The in-house survey group is aware and has it on their schedule to complete., 24/03/03, KO. Final R/W Plans were turned in on 11/06/23., 23/11/11, KO. AGL, AT&T(D), CCWS, CWA, CEMC, GPC, Comcast, Sunesys. 0/8, Relo. Agree. required., 23/10/10, AR. PFPR scheduled for 9 AM., 23/09/27, KO. Parcel Ct: 27 Parcel Possessed: 17 23/11/06 23/10/10 UTL:1 of 8 Page 3 of 23

4 E6030 PINE MOUNTAIN ROAD- Category: ROADWAYS MIS#: Pine Mountain Road S&O Improvements-Phase 1/E6030 GP#L5238 PINE MOUNTAIN ROAD- STILESBORO ROAD SHILLING ROAD Scope: Safety, traffic flow and drainage improvements, between Stilesboro Rd and Shillings Rd, including turn lanes at key intersections, sidewalks, and curb/gutter. To be coordinated with City of Kennesaw Pine Mtn Rd Project Shillings Rd to Cobb Pkwy Concep MIKE WRIGHT 24/05/16 24/06/12 Hill cut summer of 25, 24/03/31, MW. right of way plans on hold pending decision about permanent easements., 23/09/30, MW. Utilities awaiting 2nd submittal - AGL, CCWS, CWA, CEMC, Comcast, Charter, AT&T(D)., 23/09/18, AR. Schedule revised from original schedule due to negative input from homeowners after PIOH was held., 23/08/05, MW. Coordinate w/ Kennesaw. Select Committee to meet 4/10/12. RFP rankings on 5/8/12 BOC. American Engineers - NTP given 8/1/12 coordinate w/ Kennesaw. Concept Team Mtg. 10/3/12. PIOH 12/6/12 w/ City of Kennesaw. HOA mtg 2/20/13. Proposing options to Commission., 23/06/25, MS. Parcel Ct: 43 Parcel Possessed: 7 23/10/14 UTL:2 of 8 E4050 I-75-/WADE GREEN ROAD INTERCHANGE MIS#: 0007 I-75 AT WADE GREEN ROAD DDI - E I-75-/WADE GREEN ROAD INTERCHANGE BUSBEE DR SHILOH ROAD Scope: Divergent Diamond Interchange 03 MIKE WRIGHT 24/05/30 24/06/26 Project was on hold based on GDOT wanting CCDOT to do $300,000 in maintenance to bridge. Now resolved. Concept should be submitted this week. Don't have revised schedulel from Arcadis yet., 23/11/, MW. Awaiting utility submittal. AGL, CCWS, Comcast, GPC(D), CEMC, GTC, AT&T(D), 23/09/18, AR. No right of way required., 23/08/05, MW. Current scope is database, concept approval and environmental approval only. Adv and Let dates are place holders., 23/08/, MW. Utilities need plans, 23/07/30, DM. UTL:0 of 6 E60 FLOYD ROAD- Category: ROADWAYS MIS#: Floyd Road (Veterans Mem to Clay Rd) E60 GP#L5257 FLOYD ROAD- VETERANS MEMORIAL HWY CLAY RD Scope: S&O Improvements from Veterans Memorial Hwy to Clay Rd. Widen to 4-lanes w/ median and sidewalks (both sides). Dual Turn lanes from Floyd Rd onto Veterans Memorial Hwy. 24/06/13 24/07/10 Plans sent to NSR on 1/2/14., 24//18, BL. Let date moved to 7/10/14 to allow for ROW acquisition., 24//08, BL. FFPR set for 12/12/13., 23/12/, BL. NSR agreement received 10/6/13., 23/10/07, BL. Preliminary ROW plans received 9/17/13., 23/09/30, BL. Parcel Ct: 22 Parcel Possessed: 5 23/10/07 23/06/27 UTL:8 of 12 Page 4 of 23

5 D4230 WINDY HILL ROAD- MIS#: WINDY HILL ROAD/POWERS FERRY ROAD CORRIDOR - D4230 Far East Powers Ferry Road Spectrum Circle Scope: WB Lane on Windy Hill Road from Powers Ferry to Spectrum Circle. JAMES HUDGINS 24/07/18 24/08/14 R/W & Utility cost included in E40, 24/03/20, DM. To be Let with West and East, 24/03/03, DM. We have 7 Parcels from this project., 23/11/26, DM. This project has GTIB Funding of $1,500, , 23/11/26, DM. PE provided by CCID; Deffered project being Let with E40 & E4030. Plans completed as a part of the 2005 SPLOST. Project also known as the Windy HIll Far East Project., 23/11/26, DM. Parcel Ct: 11 Parcel Possessed: /03/ 23/11/15 UTL:8 of 10 D7240 SIDEWALKS-Floy d Road MIS#: Floyd Rd Sidewalk- SIDEWALKS-Floyd Road Austell Road (SR5) East-West Connector Scope: In-House Design Floyd Rd Sidewalk- Austell Rd (SR5) to East-West Connector West side KRISTEN ORTON 24/07/18 24/08/14 This projects needs to be coordinated with the resurfacing contract for Floyd Rd., 24/03/31, KO. Possible UPC?, 23/11/05, KO. Commissioner Cupid would like for us to add approx. 100' section north of Albury Drive. Need a field visit to determine if survey is needed., 23/11/05, KO. Commissioner Cupid requested a cost est. of the Floyd Rd(fill-in-the-gap) section on the east side only($47k). Does not want to include the Hurt Rd section at this time. Waiting on her decision to continue., 23/09/27, KO. Utility submittal required - AGL, CCWS, AT&T(D), CEMC, GPC(D), Comcast, CCTF, unknown fiber., 23/09/19, AR. UTL:0 of 7 E30 COOPER LAKE ROAD-AT KING SPRINGS ROAD Category: INTERSECTIONS MIS#: TASK ORDER CONTRACT-GRESHAM SMITH- CAT B GP#L4154 COOPER LAKE ROAD-AT KING SPRINGS ROAD Scope: Gresham Smith & Partners - Master TOC for on-call services Category B-Hwy Design: Roadway, Bridge & Surveying KELLY PATRICK 24/07/18 24/08/14 FFPR plans rec'd 3/14; review sched on 4/3, 24/03/18, KP. LARC reqested removing a parcel: ROW plans updated 2/27/14; FFPR plans will be sent week of 3/3/14 & review mtg sched for late March, 24//28, KP. All utilities comments received; consultant working on final plans; will schedule FFPR ASAP, most likely for March, 24//, KP. Still need Greystone Power comments; meeting w/utilities in Jan to discuss comments, schedule updated to reflect 120 days AT&T needs to reloc boxes. FFPR 2/24, 24//10, DM. AGL, AT&T(D), AT&T(T), CCWS, GEMC, GPC(NF), Sunesys (NF), Comcast, Charter, AGS(NF) 3/10, 23/12/10, DM. Parcel Ct: 4 Parcel Possessed: 2 23/09/30 23/10/ UTL:6 of 6 Page 5 of 23

6 E40 WINDY HILL ROAD-(EAST) MIS#: WINDY HILL ROAD EAST - E40 CCID-16 WINDY HILL ROAD-(EAST) Rottenwood Creek Bridge Spectrum Circle Scope: I-75 NB to Spectrum Circle/Interstate North JAMES HUDGINS 24/07/18 24/08/14 New revision on "East" recieved and distributed - ROW no longer on hold on East section, 24/03/03, DM. To be Let with West and Far East Sections, 24/03/03, DM. All PE is being provided by CCID, 23/11/26, DM. Awaiting 2nd utility submittal. AGL, AT&T(D), Comcast, CCWS, CCTS, CEMC, GPC(D), GPC(T), MEAG, Verizon, Zayo, MP, 23/11/26, DM. MAA comcept plan. CCID to fund. Deisng fee $503K, approved by CID on 1/26/09. KO mtg 2/19/09. Concept team mtg - 7/8/09. Prelim plans overdue. Concept mtg held 11/4/11. Typical section resolved. Review Prelim Plans in-house. PFPR in 1/23, 23/11/26, DM. Parcel Ct: 13 23/08/13 23/10/08 UTL:0 of 10 E4030 WINDY HILL ROAD-(WEST) MIS#: WINDY HILL ROAD WEST - E4030 CCID-15 WINDY HILL ROAD-(WEST) COBB PARKWAY CIRCLE 75 PARKWAY Scope: Cobb Parkway to I-75 JAMES HUDGINS 24/07/18 24/08/14 Project to be Let with East and Far East Sections, 24/03/03, DM. Project PE is being provided by CCID, 23/11/26, DM. Awaiting 2nd Utility submittal. AGL, AT&T(D), AT&T(T), CCWS, CWA, CEMC, CCTS, GPC(D), GPC(T), MEAG, Verizon, Comcast, Zayo, MP., 23/11/26, DM. MAA concept plan. C-CID to fund. Design fee $503k, approved by CID on 1/26/09. KO mtg 2/19/09. Concept team mtg -7/8/09 Prelim plans overdue. Concept mtg. held 11/4/11. Typical section resolved. Review Prelim Plans in-house. PFPR in 1/23., 23/11/26, DM. CCID approved SA to MAA - $197k., 23/11/26, DM. Parcel Ct: 41 Parcel Possessed: 7 23/08/13 23/10/08 UTL:0 of 13 D7210 SIDEWALKS-Clay Road MIS#: CASTEEL RD, CLAY RD, LITTLE WILLEO RD SIDEWALKS SIDEWALKS-Clay Road AUSTELL ROAD Scope: Design of sidewalks on Casteel Rd, Clay Rd & Little Willeo Rd - D7220, D7210 & D7200, respectively SPLOST JOHN MOREY 24/07/25 24/08/28 Contract docs have been sent to MA for review 3/26/14, 24/03/31, DM. Funding has been allocated for FY 24 (Kerney )., 24/03/03, JM. NTP from GDOT anticipated to be in July, 24., 24//05, JM. Funding year change is from 24 to 25., 24//05, JM. GDOT letter to Chairman dated 10/15/13 notifying funding year chagne from 23 tp 24. Advertisement and let dates changed accordingly, 23/12/12, DM. Parcel Ct: 40 Parcel Possessed: 40 21/11/ 21/03/31 UTL:6 of 6 Page 6 of 23

7 E6100 WALKER DR-EXTENSION Category: ROADWAYS MIS#: WALKER DRIVE EXTENSION - E6100 GP#L5281 WALKER DR-EXTENSION CHURCH ST OLD FLOYD RD Scope: Widen, add sidewalks and curb/gutter, and extend Walker Dr, currently a dead end street off Old Floyd Rd, west to intersect Church St at Mableton Elementary School. Will improve pedestrian, bicycle, vehicle, and school bus access to the new school KARYN MATTHEWS 24/08/15 24/09/11 Moving forward with lighting within the lighting district (Church Street, part of Walker Dr) as well as grading/landscape plan for the square. Need final concurrence from Parks for both plans. Parks to maintain square landscaping and lighting., 24/03/31, MK. Summer 25 closure for Church Steet. Walker Dr work can be done ahead., 24/03/31, MK. updating cost estimate week of 2/17/24, 24//17, MK. Asbestos surveys at parcel 14 on , 24//23, MK. Summer Closure, 24//10, DM. Parcel Ct: 19 Parcel Possessed: 3 24//15 UTL:0 of 7 E6080 SIX FLAGS DRIVE- Category: ROADWAYS MIS#: Six Flags Drive Roadway Safety and Operational Improvements - E6080 GP#L3879 E6080 Riverside to Six Flags Pkwy RIVERSIDE PKY SIX FLAGS PKWY Scope: Improvements consist of widening the road to accommodiate a three (3) lane section, and sidewalk on both sides. Project will also consist of adding traffic and pedestrian signals at the Six Flags Drive and Six Flags Parkway Intersection. 24/09/26 24/10/23 Schedule and budget updated based on scope change 2/28/14., 24//28, BL. Will Need to coordinate with possible road name change., 24//18, BL. Scope change approved by Board on 2/11/14., 24//18, BL. Revised schedule approved by Hudgins on 12/18/13., 23/12/18, BL. Awaiting scope change, fee & schedule. Need to move Let date, 23/12/11, DM. Parcel Ct: 7 23/10/09 UTL:0 of 7 E7360 LITTLE WILLEO RD-PHASE 2-FILL-IN-THE-GA PS SIDEWALK MIS#: LITTLE WILLEO ROAD SIDEWALK, PHASE 2 LITTLE WILLEO RD-PHASE 2-FILL-IN-THE-GAPS SIDEWALK LAKE FJORD PASS TIMBER RIDGE RD Scope: To extend the sidewalk along Little Willeo Road from Lake Fjord Pass to Timber Ridge Road JOHN MOREY 24/10/17 24/11/13 AGL, AT&T(D), CCWS, Comcast, CEMC, GPC, 24//17, AR. First Utility Submittal , 24//, JM. Concept plans received and under review. Preparing for first utility submittal. Waterline design reviewed and will be adjusted for ped bridge and retaining wall., 24//, JM. Contract provided to consultant for review and execution , 23/10/, JM. Schedule recieved September 12, 23, 23/09/12, DM. UTL:0 of 6 D7110 SIDEWALKS-HICK S ROAD MIS#: 0000 HICKS ROAD SIDEWALK D7110 SIDEWALKS-HICKS ROAD Scope: In-House design project KRISTEN ORTON 24/11/14 24/12/11 Parcel Ct: 6 Parcel Possessed: 6 Page 7 of 23

8 E9150 RESURFACING LMIG Category: RESURFACING MIS#: 0007 RESURFACING 25-1 LMIG RESURFACING-25-1 LMIG Scope: Resurfacing 25-1 LMIG MIKE LEHNER 24/11/14 24/12/11 25 LMIG funding anticipated to be $3.9 million, 24/03/07, DM. Submit FY25 LMIG application to GDOT in July/August 24., 24/03/07, DM. No ROW needed, 24/03/07, DM. TR463 I-75-CUMBERLAN D BOULEVARD BRIDGESCAPE Category: CUMBERLAND AREA CID MIS#: TASK ORDER CONTRACT POND & CO- CAT B I-75-CUMBERLAND BOULEVARD BRIDGESCAPE Scope: Pond & Co. - Master Task Order Cotnract for On-call Services Catergory B - Hwy Design: Roadway, Bridge & Surveying 24/11/14 24/12/11 Approved concept on 10/7/13, 23/12/20, DM. Utility owners unidentified., 23/12/10, DM. Need to add language to agreement on maintenace and accent lighting., 23/12/10, DM. Concept mtg on 7/26/13, 23/12/10, DM. Decorative bridge fence. TE project. CFA Agmt w/ccid 5/8/12. Award CSA to Pond 9/11/12 $167k. GDOT has Const 6/16/15. K/O met 11/5/12., 23/12/10, DM. E60 RIVER VIEW RD- Category: ROADWAYS MIS#: RIVER VIEW RD S&O MENTS-E60 RIVER VIEW RD- VETERANS MEMORIAL HWY NICHOLS DR Scope: S&O Imprvmt from Veterans Mem Hwy to Nichols Dr., adding turn lanes at key I/S, sidewalk, improved alignment at Veterans Mem Hwy and changes to vertical alignment to improve drainage. JANE STRICKLIN 24/11/21 24/12/18 Smyrna's annexation of the development is complete. Project is on hold pending discussion between Smyrna and Cobb County. Discussed briefly with Eric Randall of Smyrna and he said that he is holding them to all Cobb County requirements. The County is waiting to see the approved development transportation plan., 24/03/03, JS. Smyrna has deferred annexation decision until December 23. Concept decision is on hold until annexation decision is made., 23/11/05, JS. Awaiting utility submittals - AGL, CCWS, CWA, Comcast, GPC(D), GPC(T), AT&T(D), 23/09/18, AR. Development has requested to be annexed into City of Smyrna., 23/08/05, JS. Project has been on hold since PIOH., 23/08/05, JS. UTL:0 of 7 Page 8 of 23

9 D4070 CEDARCREST ROAD-(CO-344) MIS#: 0057 Cedarcrest Rd - D CEDARCREST ROAD-(CO-344) PAULDIN COUNTY LINE GOVERNORS TOWNE DRIVE Scope: Engineering to widen to 4 lanes from Cobb/Paulding Cty line to US TIP. ARC# CO-344. MIS#08-original contract w/long Eng. TranSystems acquired Long Eng - this is the contract going forward from that acquisition. KARYN MATTHEWS 24/12/12 25//08 2 houses scheduled to be burned 2/21., 24//18, MK. anticipate NTP for house demo at parcels 10 & 14 by , 24//23, MK. GDOT has January 25 Let, 24//10, DM. Waiting on RW NTP to start acquisition., 23/07/31, SJ. PFPR 3/29/12. CCDOT to let. Need IGA w/ Paulding for ROW. Waiiting for Environ.(Fish & Wildlife)l. MS4 permit required. PFPR Waiver approved. PFPR 10/25/12. Mtg w/ Chairman 2/6, 23/07/09, MS. Parcel Ct: 28 Parcel Possessed: 12 23//25 23/03/07 UTL:3 of 7 D3220 JOHNSON FERRY ROAD-SEWELL MILL ROAD (CO-365) Category: INTERSECTIONS MIS#: 0035 Johnson Ferry Rd at Sewell Mill Road - D 3220 JOHNSON FERRY ROAD-SEWELL MILL ROAD (CO-365) JOHNSON FERRY ROAD SEWELL MILL ROAD Scope: Add turn lanes on Sewell Mill Rd & Johnson Ferry Rd. Correct alignments, replace traffic signal, relocate st & make pedestrian improvements. JOHN MOREY 25//05 25// Waiting on executed contracts from consultant, 24//, JM. Meeting with Commissioner scheduled for for concept approval., 23/11/07, JM. Met with Consultant, Baker, and requested the project to restart with concept design including elimination of one of two receiving lanes on Sewell Mill. Will present new concept to Commissioner for further action., 23/10/, JM. Awaiting utility submittal - AGL, AT&T(D), CEMC, GPC(D), Comcast, CCWS, CWA, unknown fiber., 23/09/19, AR. Design activities halted before PFPR was to be held., 23/08/, JM. UTL:0 of 7 Page 9 of 23

10 D60 BELLS FERRY ROAD- Category: INTERSECTIONS MIS#: BELLS FERRY ROAD at Peidmont Road/Barrett Parkway - D60 GP#L3880 BELLS FERRY ROAD- Scope: ROADWAY SAFETY & OPERATIONAL MENTS 03 KRISTEN ORTON 25//16 25//12 Received Final Construction Plans 03/13/24. Received Final R/W Plans 03/19/24. Scheduled FFPR for 03/31/24. Plans were insufficient for review., 24/03/31, KO. Received updated scheduele from CH2MHill 2/21/24., 24/03/03, KO. Revised utility submittal required. AGL, CCWS, GPC(D), GPC (T), Comcast, CEMC, AT&T (D), Sunesys., 23/09/18, AR. New project for the intersection at Barrett/Piedmont only. Need SA#1 to BOC 8/27/13 for approval with design consultant. To widening sidewalk on corner or not to widening, that is the question. Get a cost from Consultant to include in design., 23/07/31, SJ. Utilities need revised plans, 23/07/30, DM. Parcel Ct: 45 Parcel Possessed: 1 UTL:0 of 7 E9160 RESURFACING LOCAL ROADS SOUTH Category: RESURFACING MIS#: RESURFACING 25-2 LOCAL ROADS SOUTH RESURFACING-25-2 LOCAL ROADS SOUTH Scope: Resurfacing 25-2 Local Roads South MIKE LEHNER 25//15 25//12 Resurface local residential streets primarily within Commission s 2 & 4, 24/03/07, DM. E2260 DRAINAGE SYS IMPRMTS-CIRCLE 75 PARKWAY Category: DRAINAGE/HEADWALL MIS#: TASK ORDER CONTRACT-HNTB-CAT B Circle 75 Drainage Imrvmts Scope: HNTB - Master Task Order Agmt for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying JOHN MOREY 25//15 25//26 Hydrology/Hydraulics Study submitted to Stormwater (Bill Higgins) March 7, 24 for review and concurrence., 24/03/13, JM. Parcel Ct: 3 Parcel Possessed: 2 E9170 RESURFACING LOCAL ROADS NORTH Category: RESURFACING MIS#: RESURFACING 25-3 LOCAL ROADS NORTH RESURFACING-25-3 LOCAL ROADS NORTH Scope: Resurfacing 25-3 Local Roads North MIKE LEHNER 25//13 25/03/12 Resurface local residential streets primarily within Commission s 1 & 3, 24/03/07, DM. Page 10 of 23

11 E7310 WEST SANDTOWN ROAD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL MIS#: WEST SANDTOWN ROAD SIDEWALK - E7310 WEST SANDTOWN ROAD-SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL ALAN DR MACLAND ROAD Scope: Add sidewalk on the west side of West Sandtown Rd, from existing sidewalk near Alan Dr to Macland Rd (approximately 0.2 miles), to provide sidewalks in the vicinity of Dowell Elementary School. KRISTEN ORTON 25//15 25/03/15 ARCADIS is in the process of converting the original v7 Microstation/Cacie database to an updated v8i Microstation/InRoads database., 24/03/03, KO. Need additional survey to complete the drainage changes., 23/09/27, KO. Awaiting revised Utility Submittal. AGS, AGL, AGL(T), CCWS, CEMC, AT&T, Comcast, Sunesys., 23/09/18, AR. School Zone. Length 0.24 mi. In-house Design Review to coordinate w School project., 23/06/25, MS. Parcel Ct: 7 UTL:0 of 7 E6060 SANDY PLAINS ROAD- Category: ROADWAYS MIS#: SANDY PLAINS ROAD - E6060 SANDY PLAINS ROAD- EAST PIEDMONT ROAD EBENEZER RD Scope: Sandy Plains Road East Piedmont Road to Ebenezer Road 03 KRISTEN ORTON 25//27 25/03/26 Andy Rickard to schedule a meeting to discuss pole relocations with Ga Power Transmission., 24/03/03, KO. Concept Team Meeting 2 scheduled for /28/24., 24/03/03, KO. Received Concept 11/26/23. UTL:0 of 7 Concept Team Meeting scheduled for 12/16/23., 23/12/03, KO. Traffic Study approved 11//23., 23/11/05, KO. Awaiting utility submittal; AGL, AT&T(D), CCWS, CWA, CEMC, GPC(D), GTC, Comcast, Sunesys., 23/09/19, AR. E8030 HEMBREE RD-POPE HIGH SCHOOL Category: SCHOOL ZONE IMPRVMNT MIS#: POPE HIGH SCHOOL ON HEMBREE ROAD - E8030 GP#L3885 HEMBREE RD-POPE HIGH SCHOOL Weymouth Drive Liberty Ridge Trail Scope: Lengthen the existing right turn lane on Hembree Rd at Pope High School to improve traffic flow and safety. road improvements possible if Cobb County School adds a second driveway 03 DAVE GARRETT 25/03/13 25//09 Department reviewing two concept options - roundabout vs. signal split phasing to accomplish dual left turn lanes (without major widening). Will meet with CCSD in April after determining which option is recommended., 24/03/28, GD. No cost estimate available until concept is decided upon by both CCDOT and CCSD., 24//14, GD. No longer on hold. CCSD is evaluating preliminary concepts for possible joint project., 24//14, GD. Summer 25 Closure, 24//10, DM. Preliminary concept meeting with CCSD on 1/9/24., 24//07, GD. UTL:0 of 6 Page 11 of 23

12 E1070 PITNER ROAD-OVER LITTLE ALLATOONA CREEK Category: BRIDGE REPLACEMENTS MIS#: TASK ORDER CONTRACT - ECS - CAT D Pitner Road over Little Allatoona Creek Scope: ECS SOUTHEAST - MASTER TASK ORDER CONTRACT FOR ON-CALL SERVICES CATEGORY D - SOILS, FOUNDATION & MATERIALS TESTING SERVICES JAMES HUDGINS 25/03/27 25//23 SCOPE: Database, design, hydraulics, permitting for full replacment - NO piers in creek, 24/03/20, DM. PROJECT MOVED TO 25 SUMMER CLOSURE TOTAL REPLACEMENT, 24/03/03, DM. Utility Assessment required, 23/11/26, DM. Road closure required in Summer 25, 23/11/26, DM. UTL:0 of 6 E4060 BARRETT PARKWAY-AT BUSBEE PARKWAY MIS#: TASK ORDER CONTRACT-JACOBS-CAT C BARRETT PARKWAY-AT BUSBEE PARKWAY Scope: JACOBS ENGINEERING - Master Task Order Contract for on-call services. Category C - Traffic Engineering 03 MIKE WRIGHT 25/03/27 25//23 Kickoff meeting and concept meeting combined 9/9/13, 24//21, MW. Dates per GDOT, we are actually shooting for a January 25 let., 23/12/10, DM. GDOT wants to revise schedule. Revision sent but no yet approved, 23/12/10, DM. No ROW required, 23/12/10, DM. Utility submission required?, 23/12/10, DM. UTL:0 of 8 E8050 POST OAK TRITT ROAD-HIGHTOWE R TRAIL MIDDLE SCHOOL Category: SCHOOL ZONE IMPRVMNT MIS#: HIGHTOWER TRAIL MS - E8050 POST OAK TRITT ROAD-HIGHTOWER TRAIL MIDDLE SCHOOL Long Grove Dr Twin Leaf Trail Scope: Turn lanes and improvements at school entrances - Hightower Middle School. In-house design. 03 DAVE GARRETT 25/03/27 25//23 Concept team meeting held with CCSD on 3/ CCSD in agreement with concept, but must determine if they can fully fund CCSD portion of cost estimate. A decision from CCSD is excepted in April, 24., 24/03/28, GD. Concept team meeting with CCSD rescheduled for March, 24 due to Terrell Mill Rd trafic study., 24/03/05, GD. In-house design for summer of 25. Joint project (IGA) with CCSD pending approval by both Boards., 24//14, GD. Will schedule concept team review with CCSD in February, 24., 24//17, GD. Need to schedule concept review meetings (CCDOT & CCSD)., 24//07, GD. UTL:0 of 6 E8090 SPRING HILL PWY-TEASLEY ELEMENTARY SCHOOL Category: SCHOOL ZONE IMPRVMNT MIS#: TEASLEY ELEMENTARY SCHOOL SPRING HILL PWY-TEASLEY ELEMENTARY SCHOOL Paces Ferry Road Spring Hill Road Scope: Provide a left turn lane and other school zone improvements on Spring Hill Parkway to accommodate a new Teasley Elementary School driveway (driveway being built by Cobb County School ). In-house design. DAVE GARRETT 25/03/27 25//23 In-house design. Summer 25 project - being coordinated with separate CCSD project., 24//14, GD. Likely unit price given project scope. Being coordinated with CCSD new driveway project but is a separate project., 24//30, GD. Page 12 of 23

13 D7260 SIDEWALKS-Hurt Road MIS#: Hurt Road Sidewalk - Merry Oak Rd to Floyd Rd SIDEWALKS-Hurt Road Merry Oak Rd Floyd Rd Scope: In House Design 25//17 25/05/14 Utility assessment required., 23/09/19, AR. In-house design. Survey underway 9/1/09. Design not started yet., 23/07/09, MS. UTL:0 of 6 E6090 SIX FLAGS DRIVE- Category: ROADWAYS MIS#: Six Flags Drive Roadway Safety and Operational Improvements - E6080 E6090 Factory Shoals to Riverside FACTORY SHOALS RD RIVERSIDE PKY Scope: Improvements consist of widening the road to accommodiate a three (3) lane section, and sidewalk on both sides. Project will also consist of adding traffic and pedestrian signals at the Six Flags Drive and Six Flags Parkway Intersection. 25/05/15 25/06/11 Schedule and budget updated based on scope change 2/28/14., 24//28, BL. Scope change approved by Board on 2/11/14., 24//18, BL. Awaiting scope change, fee & schedule. draft agendas needed., 23/12/11, DM. Scope change fee and schedule requested from KH on 11/13/13, 23/12/11, DM. Awaiting utility submittal; AGS, CCWS, CWA, Comcast, GPC, GEMC, AT&T(D), 23/12/11, DM. UTL:0 of 7 D7280 SIDEWALKS-BIG SHANTY ROAD MIS#: TASK ORDER CONTRACT - LPA - CAT A SIDEWALKS-BIG SHANTY ROAD CHASTAIN MEADOWS PARKWAY BELLS FERRY ROAD Scope: LPA GROUP - MASTER TASK ORDER CONTRACT FOR ON-CALL SERVICES CATEGORY A - TRANSPORTATION PLANNING & ENVIRONMENTAL SERVICES 03 RUSTAVIUS FORD 25/03/26 25/06/26 Awaiting 2nd utility submittal; AGL, AT&T(D), CCWS, CEMC, CWA, GPC(D), GPC(T), Charter., 23/12/10, DM. Waiting on ENV approval to submit plans to MAI for TE project reivew, 23/12/10, DM. Eng-$75k, ROW-$165k, Const-$937.5k. TE Agmt signed. In house design. TOC with LAP for environemntal-7/10/12 BOC. Concept approved, Environ underway, 23/12/10, DM. CE Approved on 11/14/23; Submitted PFPR and ROW Plans on 3/3/14, 23/12/03, RF. Parcel Ct: 2 24/03/03 UTL:0 of 7 D7140 SIDEWALKS-LOG CABIN ROAD MIS#: 0024 LOG CABIN ROAD SIDEWALK D7140 SIDEWALKS-LOG CABIN ROAD Log Cabin Church Woodland Brook Drive Scope: In-House Design project 25/06/26 25/07/23 Page 13 of 23

14 E3030 COBB PARKWAY-AT WINDY HILL ROAD Category: INTERSECTIONS MIS#: Cobb Parkway/US41/SR3 at Windy Hill Road - Cobb Parkway/US41 Corridor Queue Jumper Lanes CO Cobb Parkway at Windy Hill Road E3030 COBB PARKWAY WINDY HILL ROAD Scope: Proposed improvements include the addition/extension of turn and/or through lanes, a potential median along the western leg of the intersection, and the footprint of the Queue Jumper Lanes on Cobb Parkway/US41. The actual project limits will be determined KARYN MATTHEWS 25/07/26 25/08/10 Plans to Utility Cos upon completion of SUE (mid-march), 24//18, MK. Project moving forward. Concept Report approved by GDOT, pavement and SUE testing to begin in Jan-24. Coordinating ROW and Util with Windy Hill West., 24//16, MK. Project on Hold as per Director 11/12/13, 23/11/27, DM. Awaiting utility identifications., 23/11/26, DM. Need to determine if queue jumper lanes will be added to this project or not. Also City of Marietta request decorative mast arms. GDOT requested mast arms not in the raised islands and design variance maybe required for mast arm lengths over 65 ft., 23/11/26, DM. UTL:0 of 13 E4100 WINDY HILL ROAD-INTERCHA NGE AT I-75 MIS#: WINDY HILL ROAD DDI - E Windy Hill Road DDI CIRCLE 75 PARKWAY ROTTENWOOD CREEK BRIDGE Scope: I-75 at Windy Hill Road JAMES HUDGINS 25/07/17 25/08/13 CCID to fund $450,000 for bridge enhancements, 24/03/20, DM. 1st meeting set with GDOT on GDOT, 24/03/03, DM. Utility AGL, AT&T(D), AT&T(T), CCWS, CWA, CEMC, CCTS, GPC(D), GPC(T), MEAG, Verizon, Comcast, Zayo, MP, 23/11/26, DM. MAA concept plan. CCID to fund PE. CCID approved SA to MAA - $157k for concept., 23/11/26, DM. UTL:0 of 8 E60 LOWER ROSWELL ROAD- Category: ROADWAYS MIS#: LOWER ROSWELL ROAD - E60 GP#L5279 LOWER ROSWELL ROAD- WOODLAWN DRIVE DAVIDSON RD Scope: adding a median, access management, turn lanes at Woodlawn Drive, improved turn lanes at Johnson Ferry Road and Davidson Road, and improved alignment of Lower Roswell Road across Johnson Ferry Rd. Project also includes sidewalks on both sides and landscap 25/07/10 25/08/13 Utilities need plans, 23/07/30, DM. Meeting with Commissioner, County Manager, and Chairman on the Concept the week of July 8th to complete getting their direction and move forward., 23/07/, BR. Parcel Ct: 1 UTL:0 of 10 Page 14 of 23

15 E4080 COBB PARKWAY-AT CEDARCREST ROAD/AWTREY CHURCH ROAD MIS#: 0057 Cedarcrest Rd - D Cobb Cedarcrest/Awtrey Church Scope: Engineering to widen to 4 lanes from Cobb/Paulding Cty line to US TIP. ARC# CO-344. MIS#08-original contract w/long Eng. TranSystems acquired Long Eng - this is the contract going forward from that acquisition. KELLY PATRICK 25/06/12 25/09/ Concept rept sub 3/27 to GDOT, 24/03/31, KP. Sched updated 3/14 (env, let), 24/03/18, KP. Needs GDOT TIP# (not avail yet per GDOT PM), 24/03/03, KP. Concept report to be submitted this month, 24/03/03, DM. Per David Henry: Finishing up survey now; traffic study complete and under Transystem review; Prelim concept report & layout complete and under Transystem review; Expect submittal to Cobb for review next week (2/12) and GDOT the following week for CTM scheduling. Overall schedule will be impacted due to late NTP by Cobb, but can be made up to an extent due to envir not needing to be done by PFPR submittal., 24//, KP. UTL:0 of 8 CCID1033 CCID-BOB CALLAN TRUNK TRAIL, PHASE II Category: CUMBERLAND AREA CID MIS#: CCID-Bob Callan Trunk Trail Phase II (Ph2 Seg B) Segment A INTERSTATE NORTH PKWY Terrell Mill Road Scope: Design and construction of approx 2.1 miles of 10' trail. Segement A (PI 00009) limits are from Interstate North Pkwy to Interstate North Pkwy. Segement B (PI 02808) limits are from Interstate North Pkwy to Terrell Mill Rd., RUSTAVIUS FORD 25/08/18 25/09/18 Prel. Pedestrian bridge & retaining wall plans approved on 2/3/14; Will upgrade from PCE to CE because of CLOMAR and Northern Long-Eared Bat; PFPR and ROW held on Mar 4 & 5,24; CFA will be on 3/25/14 BOC meeting; Jacobs & KHA are working on utility cost estimate., 24/03/03, RF. Utilities handled by Jacobs for CCID., 23/09/18, AR. Finalizing plans, changing all permanent easement to required right of way, then submitting to GDOT for PFPR. Also need an CFA with CCID for right of way, utility cost and any other forseeable cost associated with this project., 23/07/31, SJ. Kimley-Horn - CCID funded. SA1 awarded for NEPA. SA2 for additional boardwalk design. No. const. funding - 15% in TIA. Concept submitted to GDOT for approval. PFPR -January 23, 23/06/25, MS. 24/03/31 CCID1033 CCID-BOB CALLAN TRUNK TRAIL, PHASE II Category: CUMBERLAND AREA CID MIS#: CCID-Bob Callan Trunk Trail Phase II (Ph2 Seg B) Segment B INTERSTATE NORTH PKWY Terrell Mill Road Scope: Design and construction of approx 2.1 miles of 10' trail. Segement A (PI 00009) limits are from Interstate North Pkwy to Interstate North Pkwy. Segement B (PI 02808) limits are from Interstate North Pkwy to Terrell Mill Rd., RUSTAVIUS FORD 25/08/18 25/09/18 Prel. Pedestrian bridge & retaining wall plans approved on 2/3/14; Will upgrade from PCE to CE because of CLOMAR and Northern Long-Eared Bat; PFPR and ROW held on Mar 4 & 5,24; CFA & PFA will be on 3/25/14 BOC meeting; Jacobs & KHA are working on utility cost estimate., 24/03/03, RF. Page 15 of 23

16 D11J0 FLOYD ROAD-TRAIL, PHASE 2 Category: MULTI-USE TRAILS MIS#: TASK ORDER CONTRACT-HNTB-CAT B FLOYD ROAD-TRAIL, PHASE 2 HICKS RD SILVER COMET TRAIL Scope: HNTB - Master Task Order Agmt for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying 25/08/28 25/09/24 ROW approval notice received on 3/3/14. Approval date 1/28/14., 24/03/, BL. ROW plans submitted to MA on 8/30/13, 23/12/10, DM. Schedule revised 9/17/13 to match GDOT schedule, 23/12/10, DM. Cost estimates = $516k for FY06 budget request. 10' trail & 5' grass strip. TOC w/hntb. Concept mtg - end of Spt/early Oct. Await approval on air and noise. Internal PFPR 4/23/13, 23/12/10, DM. Parcel Ct: 11 24//28 UTL:2 of 6 D6130 LOWER ROSWELL ROAD- Category: ROADWAYS MIS#: 0006 Lower Roswell Road (West) - D6130 LOWER ROSWELL ROAD- Scope: Safety and operational improvements to Lower Roswell Road (West) to widen existing lanes/shoulders, add LT and RT lanes, add/modify traffic signals and fill-in-the gap sidewalks JANE STRICKLIN 25/12/ 25/11/09 Kickoff meeting/ scoping meeting on March 19, 24., 24/03/31, JS. Contract was sent to the Chairman for signature on February 17, 24. The agenda item was approved on January 14, 24., 24/03/03, JS. Working on setting up a meeting with Commissioner Ott to review the revised concept., 23/11/05, JS. Project is deferred. Meeting with Commissioner needs to be set up to discuss modified concept before proceeding forward. Proposal to resume design provided by consultant., 23/08/, JM. Survey in house. On site field review, 6/16/09. Review impacts to Barfield Cemetery, from right turn lane. Mt. w/ both Sedelia Park and East Valley Elem. Schools, may need special provision. Design proceeding. Final plans in but utility coord. not complete., 23/07/09, MS. Parcel Ct: 80 Parcel Possessed: 2 E4090 WINDY HILL ROAD-TERRELL MILL ROAD CONNECTOR MIS#: TASK ORDER CONTRACT-GRESHAM SMITH-CAT A E4090-TO# Windy Hill/Terrell Mill Connector WINDY HILL ROAD TERRELL MILL ROAD Scope: Gresham Smith & Partners - Master TOC for on-call services Catergory A - Transportation, Planning & Environment Services KARYN MATTHEWS 25/12/ 25/12/17 GSP contract for scoping 3 alignments (incl old Leland Dr Ext alignment, CCID-12); env risks & costs., 24//18, MK. Waiting on mtg w Ott to discuss alignments/development plans., 24//18, MK. Page 16 of 23

17 CCIDTBD1 POWERS FERRY RD-BIKE/PEDESTR IAN ENHANCEMENTS Category: CUMBERLAND AREA CID MIS#: Powers Ferry Road Bike/Pedestrian Enchancements - Reference Contract POWERS FERRY RD-BIKE/PEDESTRIAN ENHANCEMENTS Scope: Powers Ferry Road Bike/Pedestrian Enchancements (3 projects - South, Central & North) JANE STRICKLIN 25/12/31 25/12/31 The project is on hold per CCID. They are assessing all their projects and developing a new list for their board to approve., 24/03/03, JS. CCID is funding the design. CCID is looking for funding for the construction. Widening will take place on the east side., 23/11/05, JS. Utilities - CCID, 23/09/19, AR. Pilot Complete Streets Projects. LCI funding from GDOT?, 23/07/09, MS. CCIDTBD2 WINDY RIDGE PKY-BIKE/PEDEST RIAN ENHANCEMENTS Category: CUMBERLAND AREA CID MIS#: Windy Ridge Bike/Pedestrian Enchancements WINDY RIDGE PKY-BIKE/PEDESTRIAN ENHANCEMENTS Scope: Windy Ridge Bike/Pedestrian Enchancements 2 Phases - Powers Ferry to Trunk Trail and Trunk Trail to Circle 75) JANE STRICKLIN 25/12/31 25/12/31 CCID has placed this project on hold. They are assessing all their projects and developing a new list for their board to approve., 24/03/03, JS. Utilities - CCID, 23/09/19, AR. CCIDTBD3 ROTTENWOOD CK-TRAIL EXTENSION Category: CUMBERLAND AREA CID MIS#: Rottenwood Creek Trail Extension ROTTENWOOD CK-TRAIL EXTENSION Scope: Rottenwood Creek Trail Extension to University Trail and to East Cobb Trail JANE STRICKLIN 25/12/31 25/12/31 CCID has placed this project on hold. They are assessing all their projects and developing a new list for their board to approve., 24/03/03, JS. Utilities - CCID, 23/09/19, AR. Request Funding 8/, 23/07/09, MS. D6250 WEST SANDTOWN ROAD- Category: ROADWAYS MIS#: 0073 West Sandtown Road - D6250 WEST SANDTOWN ROAD- South of Macland Road South of Sarina Dr/Mullins Pass Scope: Curb & gutter, sidewalk, lane widening, turn lanes, etc to West Sandtown Rd from south of Macland Rd to South of Sarina Dr/Mullins Pass. RUSTAVIUS FORD 25/12/ 25/12/31 Updated Schedule is pending availablity of In-House Design Group, 24/03/03, RF. Include Dowell Elem. Improvements. Parson Eng - award 1/22/09. Bridge replacement is Phase 1. Final Plans complete., 23/07/09, MS. Parcel Ct: 51 Parcel Possessed: 8 UTL:0 of 0 TCIDTBD1 NOONDAY CREEK TRAIL-CONNECT OR Category: TOWN CENTER AREA CID MIS#: Noonday Creek Trail Connector NOONDAY CREEK TRAIL-CONNECTOR Noonday Creek Trail (Barrett Lakes Blvd) Big Shanty Road Scope: Noonday Creek Trail Connector -Connection to Busbee Park and Ride Lot This project is will extend along Barret Lakes Blvd from Noonday Trail, Phase 2C to Big Shanty Road (Approx 815') RUSTAVIUS FORD 25/12/31 25/12/31 New Developement (auto dealership) was approved for site at the intersection Big Shanty Road and Barret Lakes Blvd. One of the conditions imposed on the zoning is wider sidewalks across their frontage. This will assist in the use of the parking lots on the north side of Big Shanty Road., 23/12/23, RF. In-house survey and design for spur connection between the trail and Big Shanty Rd Conn. May be able to proceed after GRTA P&R is done. Probably as unit price contract. Maybe needed to connect to existing P&R Lot. In-house proejct w/ possible in-house construction., 23/07/09, MS. Page 17 of 23

18 TCID-26 TCID-SOUTH BARRETT RELIEVER, PHASE 2 Category: TOWN CENTER AREA CID MIS#: TCID-South Barrett Pkwy Reliever, Ph 2 TCID-26 TCID-SOUTH BARRETT RELIEVER, PHASE 2 Scope: Preliminary conceptual development to include roadway concept, traffic analysis and environmental screening to verify construction of S. Barrett Reliever, Ph2-between Barrett Lakes Blvd and Roberts Ct. would provide benefits to Barrett Pkwy. TCID MIKE WRIGHT 25/12/ 26// Current contract for concept and environmental only. concept still in development 8/28/13., 23/08/28, MW. E4070 COBB PARKWAY-AT DALLAS ACWORTH HIGHWAY Category: INTERSECTIONS MIS#: Cobb Parkway at Dallas Acworth Hwy (US41@SR92) COBB PARKWAY-AT DALLAS ACWORTH HIGHWAY Scope: Improvements consisting of dual left turn lanes for northbound Cobb Pkwy, widening SR 92/Dallas Acworth Hwy for two southbound receiving lanes, and realigning Dallas Acworth Road. Includes traffic signal upgrades. KELLY PATRICK 25/12/15 26//15 Concept report finalized & signed 3/14, 24/03/18, KP. Revising concept report per GDOT; resubmitting ~3/7/14; Envir&Survey began in Feb, 24//28, KP. GDOT on 2/4/14, 24//, KP. Concept draft 1/7/14 discussion needed w/gdot to finalize improvement., 24//10, DM. Internal CCDOT meeting held with URS & Arcadis on 10/8/13 to discuss traffic & schedule; URS/Arcadis will coordinate with GDOT on whether interim traffic study will be needed; URS is working on short-form concept report for Nov 23, 23/11/05, KP. UTL:0 of 8 E7400 CASTEEL RD- (EAST) FILL-IN-THE-GAP S SIDEWALK MIS#: TASK ORDER CONTRACT KIMLEY-HORN - CAT B Casteel Road Sidewalks MITCHELL RD BILL MURDOCK ROAD Scope: Kimley-Horn - 22 Master TOC for On-Call Services Category B - Hwy Design: Roadway, Bridge & Surveying 03 JOHN MOREY 26//10 26/05/23 Project put on hold until cross funding becomes available., 24//05, JM. No environmental study required. No geotech required. No WFI or BFI required. No pavement analysis required., 23/12/10, DM. TO awarded to Kimley-Horn 6/11/13, 23/12/10, DM. 23/10/15 UTL:0 of 6 E10D0 COBB PARKWAY-CORR IDOR - QUEUE JUMPER LANES Category: TRANSIT INFRASTRUCTURE MENTS MIS#: COBB PARKWAY QUEUE JUMPER LANES - E10D0 GPC L5273 COBB PARKWAY-CORRIDOR - QUEUE JUMPER LANES CUMBERLAND-GALLERIA AREA TOWN CENTER AREA Scope: Add special bus lanes at major intersections on Cobb Parkway, from Cumberland Galleria area to Town Center area, for Cobb Community Transit to move passengers along this highway in less travel time KARYN MATTHEWS 26/11/ 26/11/28 Project on hold as per Director 11/12/13, 23/11/26, DM. RFP w/e3030 Cobb Windy Hill for E10D0. Wating on prototype project at Cobb Pkwy/Windy Hill to be completed., 23/06/24, DM. UTL:0 of 12 Page 18 of 23

19 CCID15 CCID-POWERS FERRY/WINDY HILL ROAD STREETSCAPES Category: CUMBERLAND AREA CID MIS#: Powers Ferry Road/Windy Hill Road Streetscapes CCID-POWERS FERRY/WINDY HILL ROAD STREETSCAPES Scope: Development of design and construction docs for approx. 9,500 linear feet of streetscape improvements along Powers Ferry Rd from Windy Ridge Pkwy to Terrell Mill Rd and along Windy HIll Rd from Spectrum Cir/Interstate N. to Powers Ferry Rd. CCID MIKE WRIGHT 26/11/21 26/12/18 Awaiting utility submittal., 23/09/18, AR. Utilities - CCID, 23/07/30, DM. Design by ARCADIS. Powers Ferry Rd from Windy Ridge to Terrell Mill Rd and Windy Hill Rd from Spectrum Circle/Interstate N Pkwy to Windy Hill Rd, approx 9500 lf. Concept Mtg in Apr. Mtg w/ Comm. Ott - 4/12/10. Prelim plans underway. PFPR held -4//11. Waiting on changes from PFPR. CCID applied for SRTA Grant for $2.5Mdid not get. ON HOLD until funding identified., 23/06/25, MS. CCID CCID-LELAND DRIVE EXTENSION Category: CUMBERLAND AREA CID MIS#: 0251* CCID-LELAND DRIVE EXTENSION CCID-12 CCID-LELAND DRIVE EXTENSION Windy Hill Road Terrell Mill Road Scope: ENG. SERVICES TO EXTEND LELAND DR.FROM WINDY HILL RD. TO TERRELL MILL FUNDED BY CCID KARYN MATTHEWS 26/12/13 26/12/22 Project on hold pending results of Windy Hill/Terrell Mill Conn. study, see project E4090, 24/03/31, MK. Utilities - CCID, 23/07/30, DM. C-CID to fund design by MAA, 12/05. contract executed. Eric Brown is MAA-PM (1/07). No ROW or construction funding set up yet. Final plans underway. Corrections to bridge plans. Simulation to CID Board 4/30/09 - shows traffic benefit. FFPR -9/15/09. Plans complete. GO to FFPR w/ GDOT? concept by 6/1/12., 23/06/25, MS. E10B0 COBB PARKWAY-CORR IDOR - SIGNAL PRE-EMPTION UPGRADES Category: TRANSIT INFRASTRUCTURE MENTS MIS#: COBB PARKWAY SIGNAL PRE-EMPTION - E10B0 COBB PARKWAY-CORRIDOR - SIGNAL PRE-EMPTION UPGRADES CUMBERLAND-GALLERIA AREA TOWN CENTER AREA Scope: Upgrade traffic signals on Cobb Pkwy, from Cumberland Galleria area to Town Center area, to allow Cobb Community Transit buses to move passengers along this highway in less travel time KARYN MATTHEWS 26/12/13 26/12/22 Project on hold as per Director on 11/12/13, 23/11/26, DM. AGL, CCWS, CWA, MP, GPC(D), CEMC, AT&T(D), Comcast, Zayo, Sunesys, Charter, X/O, T/W, Level(3), AT&T(T), Verizon,, 23/11/26, DM. AGL, CCWS, CWA, MP, GPC(D), CEMC, AT&T(D), Comcast, Zayo, Sunesys, Charter, X/O, T/W, Level(3), AT&T(T), Verizon,, 23/10/, AR. UTL:0 of 12 Page 19 of 23

20 GDOT Projects D5120 TRAFFIC SIG/PLANNING-TR ANS PLANNING STUDIES Category: TRANSP MGMT SYSTEMS MIS#: 0029 SR6 Corridor Truck-Friendly Lanes - D5120 DO TRAFFIC SIG/PLANNING-TRANS PLANNING STUDIES I-20 in Douglas Co Garrett Rd Scope: Scoping / Concept Study and Environmental Documentation SR6 Corridor Truck-Friendly Lanes - D5120 KARYN MATTHEWS 25/05/15 25/06/15 Douglas has $1.64M AQ funds in FY15, 24/03/31, MK. Per Gary Westmoreland, Douglas Co: Adding turn lanes, signal mod, communication, etc, incl. truck rollover warning detection system in Cobb. Consultant getting acquired now, need to know if we want to contribute - ASAP., 24//14, MK. Waiting to See if Douglas County Does a project that we contribute on., 23/07/31, SJ. Includes Cobb, Douglas, NSRR, GDOT. Funding: Douglas & NSRR $35K each. MOA approved 8/24/10. Selection 10/26/10 BOC - Pond & Co. Engr. schedule 18 mos. Award 1/25/11. KO Mtg. Concept Team Mtg Jan 22. 2/22 - Concept Team Mtg. Mtg w/ Douglas Cty 4/22. Need to schedule Concept TeamMtg., 23/07/09, MS GDOT-MACLAND ROAD/SR360 Category: GDOT MIS#: Macland Road/SR360 (GDOT) GDOT-MACLAND ROAD/SR360 NEW MACLAND RD Scope: Macland Road/SR360-4 lane divided from SR176/New Macland Rd. into Paulding County, SR92 and to SR120 25/07/31 25/07/31 GDOT project. Currently acquiring ROW., 23/12/12, BL. 2/21/05 - GDOT no longer holding local gov't responsible for utility relocation costs. Design recently awarded (9/05) to Mulkey Engineers, Scott Gero. concept Team Mtg. 11/14/06. Design proceeding despite no funding (12/07)., 23/07/09, MS GDOT-I-75 MANAGED LANES AND I-575 MANAGED LANES Category: GDOT MIS#: GDOT I-75 Managed Lanes (Akers Mill Rd - Wade Green Road) and I-575 managed lanes GPC - PI GDOT-I-75 MANAGED LANES AND I-575 MANAGED LANES I-75 from Akers Mill Road to Wade Green Road I-575 from I-75 to Sixes Road Scope: I-75 Managed Lanes and I-575 Managed Lanes, and I-75/I575 Interchange Modification. ROBERT GALANTE 25/12/31 25/12/31 McDuff attending coordination meetings at GDOT. Project put on hold by Governor, 10/21. Managed lanes design/build. 4 firms have been short listed. Construction expected to start June year duration - bids due 6/10/13, 24/03/20, DM. Page 20 of 23

21 D4190 SR 92-(CO-3) MIS#: SR92 from US41 to Cherokee/Glade at I75 SR 92-(CO-3) Scope: Design by GDOT MIKE WRIGHT 25/12/ 25/12/31 Interim intersection improvements requested by Acworth. 4-lane divided and triple lefts on US41 or direct connection (via 3rd Army Rd.) to I-75. URS selected.pioh scheduled for 7/8/08. Revised length showed 4 lane divided with bike lanes that fails 22. Reduced environ impacts, no 4F. FHWA challenged reasonable termini 12/08 - delay. Team concept mtg 2/ /09. Concept being approved (4/09). Prelim Design underway. Environ. Doc underway. New design contract., 23/07/09, MS. D4200 SR 92-(CO-329) MIS#: SR 92 from US 41 to just south of Cedarcrest Rd SR 92-(CO-329) Scope: Design by GDOT MIKE WRIGHT 25/12/ 25/12/31 County did not sign LGPA. Was in Long Range. Request GDOT to move up and done. URS selected. Team concept mtg Design continues - preliminary only- 6., 23/07/09, MS. D4260 I-75-@ THIRD ARMY ROAD INTERCHANGE MIS#: 0043 I-75 at Third Army Road Interchange - Scoping Phase (D4260) I-75-@ THIRD ARMY ROAD INTERCHANGE Scope: Project consists of fully directional interchange on I-75 at Third Army Rd approx 2.67 miles north of the I-75/Glade Rd I/C with a multi-lane connector to US 41 (N Cobb Pkwy) and Dabbs Bridge Rd JANE STRICKLIN 25/12/ 25/12/31 Chairman Lee met with the Chairmen of Bartow and Paulding Counties on March 29, 24. All three counties are in support of the project. Faye is working on a funding strategy for the project., 24/03/31, JS. GDOT PM is Ryan Fernandez. Possible internal concept meeting in April 24. Concept Team Meeting with GDOT projected in August 24. It should be enough time to revise the concept and create the concept report., 24/03/03, JS. Request auth. from GDOT,FHWA, ARC to start PE-Concept & Env, or "Scoping" RFP can be issued after ARC TIP Amendment is approv. approx 3/10/10, then GDOT to program & author funds. GDOT to approv RFP scoping language. Await PFA from GDOT-approv by BOC 5/11/10, 24//10, DM. New GDOT PM is Karyn Matthews / Arcadis award /21. PFA on 3/22/11 BOC. KO Mtg held Initial concept team mtg 3/1/12 final concept mtg in May. Predesign mtg 6/4/12. PIOH held 3/28/13, 24//10, DM. 23/05/16 26/05/15 Page 21 of 23

LETTING SCHEDULE REPORT

LETTING SCHEDULE REPORT LETTING SCHEDULE REPORT Transportation Improvement Projects Date: September 29, 24 Cobb ROW /UTL Cobb County Projects E2460 DRAINAGE SYS IMPRMTS-NORTH HADAWAY ROAD Category: DRAINAGE/HEADWALL MIS#: 000824

More information

LETTING SCHEDULE REPORT

LETTING SCHEDULE REPORT LETTING SCHEDULE REPORT Transportation Improvement Projects Date: June, 25 Cobb Cobb DOT Projects E1070 PITNER ROAD-OVER LITTLE ALLATOONA CREEK Category: BRIDGE REPLACEMENTS MIS#: 000574 22 TASK ORDER

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 10, 2018 CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Contractor Notice to Proceed Estimated Completion

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT October 1, 2018 CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Contractor East Cherokee Dr at Old Hwy 5 Notice to

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Cobb County Government Facilities Schedule

Cobb County Government Facilities Schedule Administrative Building 0 East Park Square 8 5 M,T,W,H,F 0 0 0 0 Adult Detention Center 825 County Services Parkway 30090 Adult Detention Center 2 825 County Services Parkway Adult Detention Center Intake

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

CUMBERLAND AREA PEDESTRIAN PLAN

CUMBERLAND AREA PEDESTRIAN PLAN CUMBERLAND AREA PEDESTRIAN PLAN Prepared for Cobb County Board of Commissioners Prepared by Gresham, Smith and Partners In collaboration with Alta Planning + Design JULY 2016 Please note that the content

More information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 29, 2017 CONSTRUCTION STATUS MONTHLY REPORT 12/2017 Project Description Contractor Notice to Proceed Estimated Completion

More information

Austell Road Access Management Plan Public Meeting February 17, 2009

Austell Road Access Management Plan Public Meeting February 17, 2009 Austell Road Access Management Plan Public Meeting February 17, 2009 Laraine Vance: Dan Cohen: Cobb DOT Project Manager Pond & Company Planning Director 1 Access Management What is Access Management? The

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Atlanta Braves Stadium and Mixed- Use Development

Atlanta Braves Stadium and Mixed- Use Development Transportation Analysis Atlanta Braves Stadium and Mixed- Use Development DRI #2381 Cobb County, Georgia Prepared for: BRED Co., LLC Prepared by: Kimley-Horn and Associates, Inc. 817 West Peachtree Street

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Charlottesville Regional Chamber of Commerce. October 28, 2014

Charlottesville Regional Chamber of Commerce. October 28, 2014 Charlottesville Regional Chamber of Commerce October 28, 2014 1 A. Rt. 29 Project Delivery Advisory Panel B. Contract Procurement Schedule Status C. Panel Recommendations D. Right of Way and Easements

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

n/a n/a $2,000,000 n/a n/a $1,018,000 n/a n/a $1,000,000 $50,000,00 $18,500,00 n/a n/a $1,600,000 $15,000,00 $84,263,46 7 n/a n/a $2,000,000

n/a n/a $2,000,000 n/a n/a $1,018,000 n/a n/a $1,000,000 $50,000,00 $18,500,00 n/a n/a $1,600,000 $15,000,00 $84,263,46 7 n/a n/a $2,000,000 x Advanced Systems Incident Inclement Weather Equipment and Supply Shortage Integrated Corridor Local Match for Future Federal/State/Other Funding and (only funding category divided equally by District)

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

GRIFFIN-SPALDING AREA TRANSPORTATION COMMITTEE AFTER AGENDA March 16, :30 p.m.

GRIFFIN-SPALDING AREA TRANSPORTATION COMMITTEE AFTER AGENDA March 16, :30 p.m. GRIFFIN-SPALDING AREA TRANSPORTATION COMMITTEE AFTER AGENDA March 16, 2016 1:30 p.m. Meeting Room (#108), Spalding County Annex, 119 East Solomon Street, Griffin Members present: Brant Keller, Bonnie Pfrogner,

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA Overview The Atlanta Braves strategically selected the location for SunTrust Park to provide an environment rich in transportation

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

STATE OF GEORGIA OFFICE OF THE GOVERNOR

STATE OF GEORGIA OFFICE OF THE GOVERNOR STATE OF GEORGIA OFFICE OF THE GOVERNOR Nathan Deal GOVERNOR For Immediate Release May 28, 2014 Deal announces $33 million in transportation infrastructure project awards 18 governments and CIDs to receive

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

State Street and Pierce Park Lane Intersection Concept Report

State Street and Pierce Park Lane Intersection Concept Report State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

Committed to Service

Committed to Service Committed to Service Sherry R. Huber, President Rebecca W. Arnold, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner Sara M. Baker, Commissioner To: From: ACHD Commissioners, Director,

More information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

2015 Data review. Capturing Ready Lane NEXUS vehicles

2015 Data review. Capturing Ready Lane NEXUS vehicles 2015 Data review Capturing Ready Lane NEXUS vehicles Problem: NEXUS users make up the majority of traffic using the Ready Lane, but they are currently considered either standard traffic or Ready Lane traffic.

More information

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Diamond Springs Parkway Project

Diamond Springs Parkway Project Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project

More information

Board of Supervisors February 27, 2017

Board of Supervisors February 27, 2017 : Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

Current Roadway Projects Wednesday, September 03, 2014

Current Roadway Projects Wednesday, September 03, 2014 Current Roadway Projects Wednesday, September 03, 2014 Restore our Roads Projects 1 US 72 East at Moores Mill Road Additional lane WB from Moores Mill to Sparkman Drive and intersection improvements at

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

Creating the Future Bruce B Downs Blvd

Creating the Future Bruce B Downs Blvd Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

City of Scotts Valley CITY COUNCIL STAFF REPORT

City of Scotts Valley CITY COUNCIL STAFF REPORT DATE: April 19, 2017 City of Scotts Valley CITY COUNCIL STAFF REPORT AGENDA ITEM 2 DATE: 4-19-2017 TO: FROM: APPROVED: SUBJECT: Honorable Mayor and City Council Scott Hamby, Public Works Director Jenny

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information