1 Funding Program MSTIP 3e Funding Program total allocation: $175 million $160 million for 23 multi-modal road projects (refer to attached list) $7.5 million Opportunity Fund set-aside $7.0 million rural bridge replacement set-aside $500,000 Intelligent Transportation System (ITS) improvement set-aside
2 umber Title escription istrict 1 s th Ave (Merlo to Alexander) ESIG A POTETIA OW O for future widening of 170th to 4/5 lanes, with protected bike lanes, sidewalks, pedestrian crossings to nature park, potential roundabout at Merlo; and full funding for design and construction ($1.5 million) of Augusta ane bicycle and pedestrian bridge. A project concept plan has been completed th Ave (TV wy to Farmington) Widen to 3 lanes, with bike lanes and sidewalks. MSTIP 3e funds would supplement $14 million in MSTIP 3d funds to complete improvements to entire corridor th Ave (Quatama to Baseline) th Ave (Blanton to Kinnaman) ESIG A POTETIA OW O for future bridge replacement and widening to 5 lanes, with bike lanes and sidewalks. This project was a MSTIP 3d candidate, but was not selected. Potential Willamette Water Supply Program pipeline colocation opportunity. Widen to 5 lanes, with bike lanes and sidewalks. MSTIP 3e funds would complement previously-approved MSTIP Bonding Costsharing Program funding for improvements on 209th from TV wy to Blanton. 107 Alexander St (178th to 192nd) ESIG A POTETIA OW O for future town center street improvement including partial-movement signal at 185th and streetscape improvements. MSTIP funding will complement Metro grant funding for the Aloha Tomorrow project. 108 Beaverton Arterial/Collector Sidewalk Completion (not mapped) Scattered-site project would complete sidewalk gaps on arterial and collector roads within 1/4 mile of bus and rail transit stops. Specific sidewalk gaps would be determined through additional analysis if MSTIP funding is approved. The City of Beaverton has committed an additional $875,000 to this project, for a total project budget of $4,375, enney d (wy 217 to Scholls Ferry d) Widen to 3 lanes, with bike lanes and sidewalks. istrict 1 project list continues on Page 2 Page 1 of 4
3 umber Title escription 113 ighway 217 / Allen-enney Interchange MSTIP allocation would provide local match needed for statefunded southbound split-diamond interchange, in which Allen and enney would share a single off-ramp and a single on-ramp (similar to wy 217 / Canyon-Beaverton illsdale interchange). would improve safety and traffic flow on southbound wy 217 in the Allen-enney area. 115 Millikan Way (Watson to ombard) ew 2-lane collector, with bicycle and pedestrian facilities. Would improve access to Beaverton Transit Center. istrict 2 s 202 Garden ome d / Multnomah Blvd Intersection Intersection realignment and traffic signal, including bicycle and pedestrian facility improvements. Total project cost estimate is $2 million. The City of Portland has also committed $1 million. 204 Saltzman d (aidlaw to Bayonne) Full improvement of existing alignment, including wider travel lanes, bike lanes and sidewalks; O partial funding for improvement on "western alignment." Total project estimate is $6.5 million. The remaining $1.2 million is proposed from the Bonny Slope West funding plan. 209 Walker d (173rd to 185th) Widen to 5 lanes, with bike lanes and sidewalks. This project was a MSTIP 3d candidate, but was not funded. The Walker oad segment to the east (173rd to Schendel) will be improved to 5 lanes beginning in Walker d (Murray to wy 217) Interim safety and capacity improvements, including bicycle and pedestrian facilities. MSTIP 3e funds would supplement MSTIP 3d allocation in order to allow some level of improvement to entire corridor, including intersection improvements at Walker/Murray and Walker/Cedar ills. 211 West Union d (185th to Cornelius Pass) ESIG A POTETIA OW O for future interim 2/3-lane improvement, with bike lane and sidewalk on south side and wide shoulder on north side. Future development north of West Union would complete 5-lane improvement. This project was a MSTIP 3d candidate for design only, but was not funded. Page 2 of 4
4 umber Title escription istrict 3 s st Ave (Tippit to Whistler's oop) Construct bicycle and pedestrian facilities. 303 Basalt Creek Parkway Extension (Grahams Ferry to Boones Ferry) ight-of-way and final design for new 5-lane roadway, with bike lanes and sidewalks; O local match for outside construction funding. MSTIP 3e funding would complement prior federal funding for environmental analysis and design. 305 Bonita d / Sequoia Pkwy Intersection Install traffic signal. 318 Tualatin-Sherwood d (Teton to anger Farms Pkwy) Widen to 5 lanes, with bike lanes and sidewalks. This project would complement MSTIP 3d funding for improvements on Tualatin- Sherwood/oy ogers oads near wy 99W. Potential Willamette Water Supply Program pipeline colocation opportunity (west of 124th Ave). ew Trimet bus service to be added. istrict 4 s st Ave / Century Blvd Extension (Baseline to ois) ew 3-lane roadway and bridge, including bike lanes and sidewalks. 406 Farmington d / iver d Intersection Install traffic signal and turn lanes or construct roundabout. 407 ighway 47 / Maple-Fern ill Intersection ATEATIVES AASIS, SEECTIO A ESIG O for future safety improvements, including potential traffic/crossing signal. Alternatives analysis would be conducted in coordination with T to determine specific safety improvements and develop cost estimate. On Tualatin Valley Scenic Bikeway route. In addition to the MSTIP commitment, the City of Forest Grove has committed to provide an additional $250,000 (10% of the proposed MSTIP allocation). 408 Main St / Banks d-cedar Canyon d Intersection Intersection safety improvements; improved pedestrian and bicycle access to Banks-Vernonia trailhead. istrict 4 project list continues on Page 4 Page 3 of 4
5 umber Title escription 410 Martin d (wy 47 to Verboort d) Widen travel lanes and provide 8-foot shoulders. will include evaluation and alternatives analysis in conjunctino with T for potential intersection safety and capacity improvements at wy 47/ Martin d intersection. Total project cost estimate is $8.1 million. In addition to the MSTIP commitment, the City of Forest Grove has committed to provide an additional $740,000 (approx. 10% of the total estimated project cost). Page 4 of 4
6 EXIBIT C TAI AE Banks Washington County ong ange Planning EVETIA S MAI ST BAKS A B K MOU 408 AM ist: 3 E BEEF B Sherwood I ST MA E WET O 303 BASAT CEEK amhill \\Emcgis\nas\GISATA\Workgroups\GISPlanning\MSTIP\MSTIP3e\MX\MSTIP3e_100percent_Comish_11x17_.mxd CAPMA BV Tualatin PAKWA Wilsonville ivergrove 65T ake Oswego urham E Miles A UAM King City WO TUAATI SE U Z IK ST E 305 S E E ST Tigard VE TET O A SEIFFET 1 BV G AA I AUE E 0 E S F O C ST UT W A 302 VAESCUEE 1:125,000 A CE S O 72 K OA 202 SO E UPPE BO OES FE PEA GAE OME BA AT OGES O O O IG SP AU EW 113 BES F E Gaston AE BV Beaverton TE I I IXO M 115 WA STO GA W CUC ST O IC E C A K I O VA PA TT CA I KA E MA AV E 406 M I OTE: 108 is a scattered site proposal. It has not been mapped. S 109 BA ist: 1 UGE ST 198T 209T AV A T E IG M FA TO I PAC IF B UK E ist: 4 IV E E E ST S O E BI GE VA JO SO SC IOWA I FE GI S W OG MUA BV W AEXAE 170T AV E I VA E E JE K I S G SC agg ake WA K O Commissioner istricts 121ST 401 TUAAT MSTIP 3e s 125T 205T I BV T I W BETA PKW CO EIUS PASS KW B E BAU SU S TO MPSO M BASE IE 231ST B ST 1 0T E ST MAI ST TV W BK W O 407 Cornelius 204 A PACIFIC E UIO illsboro 19T CO E GV I SA T Z Forest Grove E E S CEEK T ECKE 25 MATI EG EE EV O SPI WEST ST TO 211 GECO E 410 I T C 174T I KAI S E SCOTC C UC MEEK E TC T A GA ist: 2 WE PU 9/21/2016 Portland 175T O IT E KEKM A SC S I MSTIP 3e ist PIIPS GO O GEEVIE K A SA I orth Plains ES C APS AW I This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information. Care was taken in the mapping but there are no warranties for this product. owever, notification of any errors will be appreciated. epartment of and Use & Transportation Planning and evelopment Services ivision
STUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationTigard Tigard Transit Center
Tigard Tigard Transit Center Tigard Transit Center Tigard The Tigard Transit Center focus area is located in the City of Tigard. It is situated in the City of Tigard s downtown and is 4.5 miles from the
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationIf a person walks within this focus area, these are examples of the places he or she could walk to or from:
Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City
More informationHighway 217 Corridor Study. Phase I Overview Report
Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems
More informationWashington County Transportation Capital Improvement Program FY 1995/ FY 1999/2000
Washington County Transportation Capital Improvement Program FY 1995/1996 - FY 1999/2000 Washington County Department of Land Use and Transportation Planning Division February 1996 BOARD OF COUNTY COMMISSIONERS
More informationWashington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.
Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. Washington County The SW Beaverton-Hillsdale Hwy & SW Scholls Ferry Rd. focus area
More information!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!
MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions
More informationAppendices ADOPTED TEXT APPENDIX A GLOSSARY - DEFINITIONS 1
Appendices APPENDIX A GLOSSARY - DEFINITIONS 1 2040 Growth Concept A long-range regional growth management urban form concept adopted by Metro in 1995. The concept classifies l into ten urban form categories,
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More information2019 Snowflakes and Stitches Shop Hop Driving Directions
All shops are listed in the same order as on the Passport. While there are many different routes you could take - we have mapped out what seems to be the most direct route to each shop and between shops.
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationHennepin Avenue Reconstruction Washington Avenue to 12 th Street
CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat
More informationKewanee ee Way. Byrd Ave N (0.6 Mile) Bassett t Creek Dr. Crestview Ave. Rice Lake. Nature Area. Wasatch La. Mary Hills. Bonnie La.
Y Zenith Ae N M Abbott Fr 26th 1/2 Ae N Wirth Pkwy 26th Ae N Terrace La Meridian Dr iew Bld Mc Nair Dr Vista Dr Manor Dr Dresden La Byrd Ae N Kewanee ee Way Crestiew Ae Bassett t Dr Mcnair A 21st Ae Glenwood
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationAloha-Reedville Transportation Action Addressing Sidewalk Gaps Near Schools
Aloha-Reedville Transportation Action Addressing Sidewalk Gaps Near Schools Issue The Aloha-Reedville study area includes 12 public schools split between the Beaverton and Hillsboro School Districts. An
More informationRoadway Modal Plan. Functional Classification
Roadway Modal Plan DRAFT Ordinance No. Page 1 of 1 Washington County s transportation system includes nearly 1,300 miles of roads, shared by motor vehicles, bicycles, pedestrians, trucks and public transit.
More informationSW 170TH AVENUE / SW MERLO ROAD CONCEPTUAL DESIGN PLAN
SW 170TH AVENUE / SW MERLO ROAD CONCEPTUAL DESIGN PLAN June 2015 ACKNOWLEDGMENTS Project Management Team Steve Szigethy, Washington County Mike Dahlstrom, Washington County Marla Vik, Washington County
More informationACTION TRANSMITTAL No
ransportation Advisory Board of the Metropolitan Council of the win Cities A: February 22, 2018 O: FROM: ACIO RASMIAL o. 2018-22 echnical Advisory Committee AC Funding and Programming Committee PRPAR BY:
More informationTABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.
TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationState Highway 16 Kuna-Mora Road to Ada/Gem County Line
Background Update! (February 2018): This project has been partially funded; see below. State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More informationSTATION #3 INITIAL ALTERNATIVES
www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way
More informationROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)
ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P. 6.30 to M.P. 1.95) SWNI Meeting November July 18, 2016 19, 2015 Portland, Oregon BARBUR ROAD SAFETY AUDIT FHWA RSA Process
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationState Highway 16 Kuna-Mora Road to Ada/Gem County Line
Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho
More informationOnline Open House Survey Report. December 2016
December 216 I. OVERVIEW & OUTREACH SUMMARY Introduction Washington County evaluated long-term transportation investments and strategies as part of the Transportation Futures Study. The purpose of the
More informationState Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line
Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho
More informationThank you for attending
Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationReview of DRAFT STIP. January 5, 2017 TCC Meeting
Review of DRAFT 2018-2027 STIP January 5, 2017 TCC Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationLARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)
LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development
More informationTraffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon
Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section
More informationCreating the Future Bruce B Downs Blvd
Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail
More informationVIII. Project Prioritization & Implementation
Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationTriMet Title VI and Transit Equity Impacts Assessment Recommended Service Changes Line 47 Baseline/Evergreen and 48 Cornell
TriMet Title VI and Transit Equity Impacts Assessment Recommended Service Changes Line 47 Baseline/Evergreen and 48 Cornell Final Report May 16, 2013 Table of Contents Executive Summary... 3 Title VI and
More informationReview of DRAFT STIP. January 18, 2017 MPO Meeting
Review of DRAFT 2018-2027 STIP January 18, 2017 MPO Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a
More informationconnections 2040 the waco metropolitan transportation plan amendment 2
connections 2040 the waco metropolitan transportation plan amendment 2 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted December 14, 2017 amendment
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationParks, Open Space, Trails and Recreation Master Plan
5.3 DEFINITIONS AND VOCABULARY In order to fully understand the range of trails that have been developed, and should be developed, throughout the community, a vocabulary needs to be established for the
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationSNCC Demographic Trends
Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population
More informationCommerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue
Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue T A N Y A B R O O K S A S S I S T A N T D I R E C T O R M O B I L I T Y P L A N N I N G M O B I L I T Y A N D S
More information01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS
01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED
More informationR2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects
Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements
More informationHillsboro Tanasbourne Town Center
Hillsboro Tanasbourne Town Center Tanasbourne Town Center Hillsboro The Tanasbourne Town Center focus area is located in the City of Hillsboro. It is situated approximately six miles from the City of Hillsboro
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationPhone: Fax: Project Reference No. (to be filled out by MassHighway):
Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is
More informationSTREET AND HIGHWAY PLAN
STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets
More information2017 General Obligation Bond
2017 General Obligation Bond Agency Presentation to Transportation & Mobility Stakeholder Committee April 6, 2017 Presentation Highlights Overview Vision and Need Projects Critical System Mobility Networks
More informationState Route 160 (Blue Diamond Highway)
State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.
More informationNorth Wenatchee Transportation Master Plan
North Wenatchee Transportation Master Plan xpanding Regional Mobility nhancing Community Connections Improving Business Access QR Code As Adopted February 2011 What is the North Wenatchee Transportation
More informationRIDE III PROPOSED PROJECTS. April 2015
RIDE III PROPOSED PROJECTS April 2015 Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationWashington County Transportation System Plan Update
Washington County Transportation System Plan Update Community Advisory Committee Meeting #10 Agenda DATE: Wednesday, December 11, 2013 TIME: 6:30-9:00 p.m. LOCATION: Washington Street Conference Center
More informationSan Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation
San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San
More informationMUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)
B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationProject Fact Sheet. August 1,
Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation
More informationWELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationRURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.
RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project
More informationGandy Connector: Travel Demand. Policy Committee August 2013
Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been
More informationKingwood Area Mobility Study. Lake Houston Redevelopment Authority (TIRZ #10)
Kingwood Area Mobility Study Lake Houston Redevelopment Authority (TIRZ #10) Steering Committee Meeting #3 Date: May 27, 2014 Introductions/Remarks Steering Committee Project/Consultant Team GOALS & MOE
More informationAPPENDIX D. May 22, 2002 Open House Summary and Materials
APPENDIX D May 22, 2002 Open House Summary and Materials TH 36 Partnership Study Open House May 22, 2002 Summary of Survey Responses 1. If no new crossing of the St. Croix River is built (e.g. the existing
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationTAKOMA METRO STATION
TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationPortland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements
Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner
More informationNEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING
NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,
More informationCottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement
Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,
More informationPreliminary Engineering Study
Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary
More informationAdvancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018
Advancing Transportation Choices in Des Moines MPO Environmental Roundtable January 9, 2018 Presented by Jennifer McCoy, PE, PTOE City Traffic Engineer Agenda Des Moines Area Transportation Planning Connect
More informationComplete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)
Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationCHAPTER 5 TRANSPORTATION GOAL
CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe
More informationEXPO II BIKE PATH - NORTHVALE GAP CLOSURE
Project Overview and Context Beverly Hills UCLA Los Angeles Project Area Santa Monica USC Culver City Source: StreetsblogLA Expo Bike Path (outside of Project Area) Vicinity Map stub of Expo Bike Path
More informationPrinceton Avenue and Spruce Street Transportation and Site Access Enhancements Project
Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status
More informationLinking Transportation and Health in Nashville & Middle Tennessee
Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationInitial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions
Initial Alternatives Identification and Evaluation Report ovember 2011 APPEDIX B Summary of Stakeholder Single Mode Suggestions 2011 Illinois Department of Transportation Summary of Stakeholder Alternatives
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationRecommendations for Chief Peguis Trail West Extension
Recommendations for Chief Peguis Trail West Extension Introduction Extension of the Chief Peguis Trail (CPT) from Main Street to Brookside Boulevard will be a major investment for the City of Winnipeg.
More informationBalancing Operation & Safety for Motorized and Non-Motorized Traffic
Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete
More information