1 Funding Program MSTIP 3e Funding Program total allocation: $175 million $160 million for 23 multi-modal road projects (refer to attached list) $7.5 million Opportunity Fund set-aside $7.0 million rural bridge replacement set-aside $500,000 Intelligent Transportation System (ITS) improvement set-aside

2 umber Title escription istrict 1 s th Ave (Merlo to Alexander) ESIG A POTETIA OW O for future widening of 170th to 4/5 lanes, with protected bike lanes, sidewalks, pedestrian crossings to nature park, potential roundabout at Merlo; and full funding for design and construction ($1.5 million) of Augusta ane bicycle and pedestrian bridge. A project concept plan has been completed th Ave (TV wy to Farmington) Widen to 3 lanes, with bike lanes and sidewalks. MSTIP 3e funds would supplement $14 million in MSTIP 3d funds to complete improvements to entire corridor th Ave (Quatama to Baseline) th Ave (Blanton to Kinnaman) ESIG A POTETIA OW O for future bridge replacement and widening to 5 lanes, with bike lanes and sidewalks. This project was a MSTIP 3d candidate, but was not selected. Potential Willamette Water Supply Program pipeline colocation opportunity. Widen to 5 lanes, with bike lanes and sidewalks. MSTIP 3e funds would complement previously-approved MSTIP Bonding Costsharing Program funding for improvements on 209th from TV wy to Blanton. 107 Alexander St (178th to 192nd) ESIG A POTETIA OW O for future town center street improvement including partial-movement signal at 185th and streetscape improvements. MSTIP funding will complement Metro grant funding for the Aloha Tomorrow project. 108 Beaverton Arterial/Collector Sidewalk Completion (not mapped) Scattered-site project would complete sidewalk gaps on arterial and collector roads within 1/4 mile of bus and rail transit stops. Specific sidewalk gaps would be determined through additional analysis if MSTIP funding is approved. The City of Beaverton has committed an additional $875,000 to this project, for a total project budget of $4,375, enney d (wy 217 to Scholls Ferry d) Widen to 3 lanes, with bike lanes and sidewalks. istrict 1 project list continues on Page 2 Page 1 of 4

3 umber Title escription 113 ighway 217 / Allen-enney Interchange MSTIP allocation would provide local match needed for statefunded southbound split-diamond interchange, in which Allen and enney would share a single off-ramp and a single on-ramp (similar to wy 217 / Canyon-Beaverton illsdale interchange). would improve safety and traffic flow on southbound wy 217 in the Allen-enney area. 115 Millikan Way (Watson to ombard) ew 2-lane collector, with bicycle and pedestrian facilities. Would improve access to Beaverton Transit Center. istrict 2 s 202 Garden ome d / Multnomah Blvd Intersection Intersection realignment and traffic signal, including bicycle and pedestrian facility improvements. Total project cost estimate is $2 million. The City of Portland has also committed $1 million. 204 Saltzman d (aidlaw to Bayonne) Full improvement of existing alignment, including wider travel lanes, bike lanes and sidewalks; O partial funding for improvement on "western alignment." Total project estimate is $6.5 million. The remaining $1.2 million is proposed from the Bonny Slope West funding plan. 209 Walker d (173rd to 185th) Widen to 5 lanes, with bike lanes and sidewalks. This project was a MSTIP 3d candidate, but was not funded. The Walker oad segment to the east (173rd to Schendel) will be improved to 5 lanes beginning in Walker d (Murray to wy 217) Interim safety and capacity improvements, including bicycle and pedestrian facilities. MSTIP 3e funds would supplement MSTIP 3d allocation in order to allow some level of improvement to entire corridor, including intersection improvements at Walker/Murray and Walker/Cedar ills. 211 West Union d (185th to Cornelius Pass) ESIG A POTETIA OW O for future interim 2/3-lane improvement, with bike lane and sidewalk on south side and wide shoulder on north side. Future development north of West Union would complete 5-lane improvement. This project was a MSTIP 3d candidate for design only, but was not funded. Page 2 of 4

4 umber Title escription istrict 3 s st Ave (Tippit to Whistler's oop) Construct bicycle and pedestrian facilities. 303 Basalt Creek Parkway Extension (Grahams Ferry to Boones Ferry) ight-of-way and final design for new 5-lane roadway, with bike lanes and sidewalks; O local match for outside construction funding. MSTIP 3e funding would complement prior federal funding for environmental analysis and design. 305 Bonita d / Sequoia Pkwy Intersection Install traffic signal. 318 Tualatin-Sherwood d (Teton to anger Farms Pkwy) Widen to 5 lanes, with bike lanes and sidewalks. This project would complement MSTIP 3d funding for improvements on Tualatin- Sherwood/oy ogers oads near wy 99W. Potential Willamette Water Supply Program pipeline colocation opportunity (west of 124th Ave). ew Trimet bus service to be added. istrict 4 s st Ave / Century Blvd Extension (Baseline to ois) ew 3-lane roadway and bridge, including bike lanes and sidewalks. 406 Farmington d / iver d Intersection Install traffic signal and turn lanes or construct roundabout. 407 ighway 47 / Maple-Fern ill Intersection ATEATIVES AASIS, SEECTIO A ESIG O for future safety improvements, including potential traffic/crossing signal. Alternatives analysis would be conducted in coordination with T to determine specific safety improvements and develop cost estimate. On Tualatin Valley Scenic Bikeway route. In addition to the MSTIP commitment, the City of Forest Grove has committed to provide an additional $250,000 (10% of the proposed MSTIP allocation). 408 Main St / Banks d-cedar Canyon d Intersection Intersection safety improvements; improved pedestrian and bicycle access to Banks-Vernonia trailhead. istrict 4 project list continues on Page 4 Page 3 of 4

5 umber Title escription 410 Martin d (wy 47 to Verboort d) Widen travel lanes and provide 8-foot shoulders. will include evaluation and alternatives analysis in conjunctino with T for potential intersection safety and capacity improvements at wy 47/ Martin d intersection. Total project cost estimate is $8.1 million. In addition to the MSTIP commitment, the City of Forest Grove has committed to provide an additional $740,000 (approx. 10% of the total estimated project cost). Page 4 of 4

6 EXIBIT C TAI AE Banks Washington County ong ange Planning EVETIA S MAI ST BAKS A B K MOU 408 AM ist: 3 E BEEF B Sherwood I ST MA E WET O 303 BASAT CEEK amhill \\Emcgis\nas\GISATA\Workgroups\GISPlanning\MSTIP\MSTIP3e\MX\MSTIP3e_100percent_Comish_11x17_.mxd CAPMA BV Tualatin PAKWA Wilsonville ivergrove 65T ake Oswego urham E Miles A UAM King City WO TUAATI SE U Z IK ST E 305 S E E ST Tigard VE TET O A SEIFFET 1 BV G AA I AUE E 0 E S F O C ST UT W A 302 VAESCUEE 1:125,000 A CE S O 72 K OA 202 SO E UPPE BO OES FE PEA GAE OME BA AT OGES O O O IG SP AU EW 113 BES F E Gaston AE BV Beaverton TE I I IXO M 115 WA STO GA W CUC ST O IC E C A K I O VA PA TT CA I KA E MA AV E 406 M I OTE: 108 is a scattered site proposal. It has not been mapped. S 109 BA ist: 1 UGE ST 198T 209T AV A T E IG M FA TO I PAC IF B UK E ist: 4 IV E E E ST S O E BI GE VA JO SO SC IOWA I FE GI S W OG MUA BV W AEXAE 170T AV E I VA E E JE K I S G SC agg ake WA K O Commissioner istricts 121ST 401 TUAAT MSTIP 3e s 125T 205T I BV T I W BETA PKW CO EIUS PASS KW B E BAU SU S TO MPSO M BASE IE 231ST B ST 1 0T E ST MAI ST TV W BK W O 407 Cornelius 204 A PACIFIC E UIO illsboro 19T CO E GV I SA T Z Forest Grove E E S CEEK T ECKE 25 MATI EG EE EV O SPI WEST ST TO 211 GECO E 410 I T C 174T I KAI S E SCOTC C UC MEEK E TC T A GA ist: 2 WE PU 9/21/2016 Portland 175T O IT E KEKM A SC S I MSTIP 3e ist PIIPS GO O GEEVIE K A SA I orth Plains ES C APS AW I This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information. Care was taken in the mapping but there are no warranties for this product. owever, notification of any errors will be appreciated. epartment of and Use & Transportation Planning and evelopment Services ivision

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Tigard Tigard Transit Center

Tigard Tigard Transit Center Tigard Tigard Transit Center Tigard Transit Center Tigard The Tigard Transit Center focus area is located in the City of Tigard. It is situated in the City of Tigard s downtown and is 4.5 miles from the

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

If a person walks within this focus area, these are examples of the places he or she could walk to or from: Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

Washington County Transportation Capital Improvement Program FY 1995/ FY 1999/2000

Washington County Transportation Capital Improvement Program FY 1995/ FY 1999/2000 Washington County Transportation Capital Improvement Program FY 1995/1996 - FY 1999/2000 Washington County Department of Land Use and Transportation Planning Division February 1996 BOARD OF COUNTY COMMISSIONERS

More information

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.

Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. Washington County The SW Beaverton-Hillsdale Hwy & SW Scholls Ferry Rd. focus area

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

Appendices ADOPTED TEXT APPENDIX A GLOSSARY - DEFINITIONS 1

Appendices ADOPTED TEXT APPENDIX A GLOSSARY - DEFINITIONS 1 Appendices APPENDIX A GLOSSARY - DEFINITIONS 1 2040 Growth Concept A long-range regional growth management urban form concept adopted by Metro in 1995. The concept classifies l into ten urban form categories,

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

2019 Snowflakes and Stitches Shop Hop Driving Directions

2019 Snowflakes and Stitches Shop Hop Driving Directions All shops are listed in the same order as on the Passport. While there are many different routes you could take - we have mapped out what seems to be the most direct route to each shop and between shops.

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

Kewanee ee Way. Byrd Ave N (0.6 Mile) Bassett t Creek Dr. Crestview Ave. Rice Lake. Nature Area. Wasatch La. Mary Hills. Bonnie La.

Kewanee ee Way. Byrd Ave N (0.6 Mile) Bassett t Creek Dr. Crestview Ave. Rice Lake. Nature Area. Wasatch La. Mary Hills. Bonnie La. Y Zenith Ae N M Abbott Fr 26th 1/2 Ae N Wirth Pkwy 26th Ae N Terrace La Meridian Dr iew Bld Mc Nair Dr Vista Dr Manor Dr Dresden La Byrd Ae N Kewanee ee Way Crestiew Ae Bassett t Dr Mcnair A 21st Ae Glenwood

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Aloha-Reedville Transportation Action Addressing Sidewalk Gaps Near Schools

Aloha-Reedville Transportation Action Addressing Sidewalk Gaps Near Schools Aloha-Reedville Transportation Action Addressing Sidewalk Gaps Near Schools Issue The Aloha-Reedville study area includes 12 public schools split between the Beaverton and Hillsboro School Districts. An

More information

Roadway Modal Plan. Functional Classification

Roadway Modal Plan. Functional Classification Roadway Modal Plan DRAFT Ordinance No. Page 1 of 1 Washington County s transportation system includes nearly 1,300 miles of roads, shared by motor vehicles, bicycles, pedestrians, trucks and public transit.

More information

SW 170TH AVENUE / SW MERLO ROAD CONCEPTUAL DESIGN PLAN

SW 170TH AVENUE / SW MERLO ROAD CONCEPTUAL DESIGN PLAN SW 170TH AVENUE / SW MERLO ROAD CONCEPTUAL DESIGN PLAN June 2015 ACKNOWLEDGMENTS Project Management Team Steve Szigethy, Washington County Mike Dahlstrom, Washington County Marla Vik, Washington County

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No ransportation Advisory Board of the Metropolitan Council of the win Cities A: February 22, 2018 O: FROM: ACIO RASMIAL o. 2018-22 echnical Advisory Committee AC Funding and Programming Committee PRPAR BY:

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line Background Update! (February 2018): This project has been partially funded; see below. State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95) ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P. 6.30 to M.P. 1.95) SWNI Meeting November July 18, 2016 19, 2015 Portland, Oregon BARBUR ROAD SAFETY AUDIT FHWA RSA Process

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho

More information

Online Open House Survey Report. December 2016

Online Open House Survey Report. December 2016 December 216 I. OVERVIEW & OUTREACH SUMMARY Introduction Washington County evaluated long-term transportation investments and strategies as part of the Transportation Futures Study. The purpose of the

More information

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Review of DRAFT STIP. January 5, 2017 TCC Meeting

Review of DRAFT STIP. January 5, 2017 TCC Meeting Review of DRAFT 2018-2027 STIP January 5, 2017 TCC Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

Creating the Future Bruce B Downs Blvd

Creating the Future Bruce B Downs Blvd Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail

More information

VIII. Project Prioritization & Implementation

VIII. Project Prioritization & Implementation Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

TriMet Title VI and Transit Equity Impacts Assessment Recommended Service Changes Line 47 Baseline/Evergreen and 48 Cornell

TriMet Title VI and Transit Equity Impacts Assessment Recommended Service Changes Line 47 Baseline/Evergreen and 48 Cornell TriMet Title VI and Transit Equity Impacts Assessment Recommended Service Changes Line 47 Baseline/Evergreen and 48 Cornell Final Report May 16, 2013 Table of Contents Executive Summary... 3 Title VI and

More information

Review of DRAFT STIP. January 18, 2017 MPO Meeting

Review of DRAFT STIP. January 18, 2017 MPO Meeting Review of DRAFT 2018-2027 STIP January 18, 2017 MPO Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a

More information

connections 2040 the waco metropolitan transportation plan amendment 2

connections 2040 the waco metropolitan transportation plan amendment 2 connections 2040 the waco metropolitan transportation plan amendment 2 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted December 14, 2017 amendment

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Parks, Open Space, Trails and Recreation Master Plan

Parks, Open Space, Trails and Recreation Master Plan 5.3 DEFINITIONS AND VOCABULARY In order to fully understand the range of trails that have been developed, and should be developed, throughout the community, a vocabulary needs to be established for the

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

SNCC Demographic Trends

SNCC Demographic Trends Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population

More information

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue T A N Y A B R O O K S A S S I S T A N T D I R E C T O R M O B I L I T Y P L A N N I N G M O B I L I T Y A N D S

More information

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS 01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED

More information

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements

More information

Hillsboro Tanasbourne Town Center

Hillsboro Tanasbourne Town Center Hillsboro Tanasbourne Town Center Tanasbourne Town Center Hillsboro The Tanasbourne Town Center focus area is located in the City of Hillsboro. It is situated approximately six miles from the City of Hillsboro

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

2017 General Obligation Bond

2017 General Obligation Bond 2017 General Obligation Bond Agency Presentation to Transportation & Mobility Stakeholder Committee April 6, 2017 Presentation Highlights Overview Vision and Need Projects Critical System Mobility Networks

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

North Wenatchee Transportation Master Plan

North Wenatchee Transportation Master Plan North Wenatchee Transportation Master Plan xpanding Regional Mobility nhancing Community Connections Improving Business Access QR Code As Adopted February 2011 What is the North Wenatchee Transportation

More information

RIDE III PROPOSED PROJECTS. April 2015

RIDE III PROPOSED PROJECTS. April 2015 RIDE III PROPOSED PROJECTS April 2015 Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Washington County Transportation System Plan Update

Washington County Transportation System Plan Update Washington County Transportation System Plan Update Community Advisory Committee Meeting #10 Agenda DATE: Wednesday, December 11, 2013 TIME: 6:30-9:00 p.m. LOCATION: Washington Street Conference Center

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013) B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek

More information

State Highway 44/State Street High Capacity Corridor

State Highway 44/State Street High Capacity Corridor Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

Gandy Connector: Travel Demand. Policy Committee August 2013

Gandy Connector: Travel Demand. Policy Committee August 2013 Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been

More information

Kingwood Area Mobility Study. Lake Houston Redevelopment Authority (TIRZ #10)

Kingwood Area Mobility Study. Lake Houston Redevelopment Authority (TIRZ #10) Kingwood Area Mobility Study Lake Houston Redevelopment Authority (TIRZ #10) Steering Committee Meeting #3 Date: May 27, 2014 Introductions/Remarks Steering Committee Project/Consultant Team GOALS & MOE

More information

APPENDIX D. May 22, 2002 Open House Summary and Materials

APPENDIX D. May 22, 2002 Open House Summary and Materials APPENDIX D May 22, 2002 Open House Summary and Materials TH 36 Partnership Study Open House May 22, 2002 Summary of Survey Responses 1. If no new crossing of the St. Croix River is built (e.g. the existing

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

TAKOMA METRO STATION

TAKOMA METRO STATION TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018

Advancing Transportation Choices in Des Moines. MPO Environmental Roundtable January 9, 2018 Advancing Transportation Choices in Des Moines MPO Environmental Roundtable January 9, 2018 Presented by Jennifer McCoy, PE, PTOE City Traffic Engineer Agenda Des Moines Area Transportation Planning Connect

More information

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis) Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

CHAPTER 5 TRANSPORTATION GOAL

CHAPTER 5 TRANSPORTATION GOAL CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe

More information

EXPO II BIKE PATH - NORTHVALE GAP CLOSURE

EXPO II BIKE PATH - NORTHVALE GAP CLOSURE Project Overview and Context Beverly Hills UCLA Los Angeles Project Area Santa Monica USC Culver City Source: StreetsblogLA Expo Bike Path (outside of Project Area) Vicinity Map stub of Expo Bike Path

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

Linking Transportation and Health in Nashville & Middle Tennessee

Linking Transportation and Health in Nashville & Middle Tennessee Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions Initial Alternatives Identification and Evaluation Report ovember 2011 APPEDIX B Summary of Stakeholder Single Mode Suggestions 2011 Illinois Department of Transportation Summary of Stakeholder Alternatives

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Recommendations for Chief Peguis Trail West Extension

Recommendations for Chief Peguis Trail West Extension Recommendations for Chief Peguis Trail West Extension Introduction Extension of the Chief Peguis Trail (CPT) from Main Street to Brookside Boulevard will be a major investment for the City of Winnipeg.

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information