1 Rebecca W. Arnold, President Sara M. Baker, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner Mitchell Jaurena, Commissioner June 19, 2012 Planning & Programming Department TO: FROM: ACHD Commissioners, Director Wong Matt Edmond, Senior Transportation Planner SUBJECT: Ten Mile Corridor Intersection Analysis & Recommendations for Adoption Regular Agenda June 27, 2012 Commission Meeting Executive Summary The purpose of this memorandum is to identify how to address interim and long term (2035+) transportation improvement needs at the six major unimproved intersections on Ten Mile Road between I-84 and Kuna. If adopted, these recommendations will be added to the Master Street Map in order to improve the District s ability to preserve the appropriate right-of-way at intersections and provide a scope for future projects not identified in the Capital Improvements Plan (CIP). Based on the Ten Mile Analysis conducted, and in consideration of the findings and recommendations of the South Meridian Study Analysis and 2012 CIP update, staff makes the following recommendations for interim improvements and long term improvement/right-of-way preservation at each intersection. Additional details are included in Attachment 1. These recommendations include two changes from the previous configurations presented to the Commission: the Victory intersection reflects the configuration from the adopted CIP update, and the Hubbard intersection was changed from a single-lane to a multi-lane roundabout with two lanes on the Ten Mile approaches. Table 1: Recommended Interim Improvement and Long Term Improvement/ROW Preservation Proposed Improvements Intersection Recommended Interim Improvement Recommended Long-Term Improvement / Right-of-Way Preservation Traffic Control Device Estimated Timeframe Traffic Control Device Estimated Timeframe Ten Mile & Victory Interim Signal In Progress Ultimate 5 x 6 Signal Ten Mile & Amity Interim Signal (in FYWP) Ultimate 7 x 7 Signal Ten Mile & Lake Hazel Single-Lane Roundabout (add to FYWP prioritization) Dual-Lane Roundabout with SB bypass lane 2024 Ten Mile & Columbia Single-Lane Roundabout (add to FYWP priortization) Dual-Lane Roundabout 2026 Ten Mile & Hubbard All-Way Stop TBD Multi-Lane Roundabout Ten Mile & Deer Flat All-Way Stop TBD Single-Lane Roundabout Ada County Highway District 3775 Adams Street Garden City, ID PH FX
2 Background The opening of the Ten Mile Interchange prompted ACHD staff to analyze the transportation needs at the six major unimproved intersections along Ten Mile Road south of I-84. This analysis included the timing of interim improvements as well as the timing and configuration of ultimate improvements that would ensure efficient traffic operations through the year The following outlines a brief history of the Ten Mile Analysis: May 2011: Ten Mile Interchange opened. July 2011: ACHD staff completed initial Ten Mile Analysis of intersections. September 2011: Roundabout templates updated. December 2011: Work session with ACHD commission and staff brief to Kuna and Meridian city councils on findings of Ten Mile Analysis. January 2012: South Meridian Study traffic analysis began. Project limits included the area bounded by Linder, Lake Hazel, McDermott, and Overland. March 2012: Public involvement meeting and comment period May 2012: ACHD Commission adopted CIP update. June 2012: ACHD staff reconciled Ten Mile Analysis with CIP update and South Meridian Study. Facts and Findings During the public involvement meeting and ensuing public comment period, ACHD received 34 written comments. Approximately two-thirds of the comments were generally supportive of the improvements proposed, and a majority expressed support for roundabouts. About one-quarter of the comments were critical of the proposed improvements, and four expressed opposition to or concern over the proposed roundabouts. The most frequent comment against the proposed improvements was against installing an all-way stop at Hubbard or Deer Flat. Fiscal Implications Right-of-way is designated as impact fee eligible in the recently adopted CIP. Additional right-of-way must be dedicated as a condition of development. Programming of projects for construction will be done through the Five-Year Work Plan. Policy Implications This action will establish the first preservation footprints for intersections in the Master Street Map. Alternatives for the Ten Mile Corridor Intersection Analysis The Commission has the following alternatives: 1) Adopt the recommendations of the Ten Mile Analysis and add to the Master Street Map. 2) Adopt the recommendations of the Ten Mile Analysis with Commission-directed changes. 3) Remand the Ten Mile Analysis to staff with additional direction. Staff Recommendation Staff recommends Alternative 1: Adopt the recommendations of the Ten Mile Analysis and add to the Master Street Map. Attachment(s): 1. Discussion and Diagrams of Long-Term Intersection Recommendations 2. Letter from Mayor de Weerd 2
3 Attachment 1: Discussion and Diagrams of Long-Term Intersection Recommendations Ten Mile & Victory Intersection An interim signal is in the process of being installed at this intersection. for Ten Mile Road and 3 lanes for Victory Road. The Ten Mile Analysis forecasted this intersection would operate acceptably as a conventional intersection with dual thru/receiving lanes and a dedicated left turn lane on each approach, with the addition of a dedicated right turn lane on the southbound and westbound approaches. This indicated the possible need to expand Victory Road from 3 lanes as currently called for in the Master Street Map to 5 lanes. Since that time, however, the South Meridian Study determined that Victory Road would remain constrained to 3 lanes. Additionally, the CIP update and South Meridian Study determined that the intersection should have dual thru/receiving lanes and a left turn lane on the Ten Mile approaches, a single thru-receiving lane and dual left turn lanes on the Victory approaches, and dedicated right turn lanes on all approaches. Additionally, the City of Meridian has requested that ACHD preserve right-of-way for dedicated right turn lanes on all approaches at this intersection. Staff recommends preserving right-of-way in accordance with the improvements listed in both the CIP update and the South Meridian Study. Ten Mile & Amity Intersection An interim signal is programmed in the FYWP in Preliminary Development (PD). The Master Street Map currently prescribes preservation for 5 lanes for both Ten Mile Road and Amity Road. The Ten Mile Analysis forecasts this intersection would operate acceptably as a conventional 7x7 intersection with dual thru/receiving lanes, dual left turn lanes, and a dedicated right turn lane on each approach in This is consistent with the recently adopted CIP update and Meridian s request to preserve right-of-way of dedicated right turn lanes on all approaches. Although the South Meridian Study forecasts that only single left turn lanes would be needed on the north and south legs in 2035, these movements would be operating near capacity. Therefore, staff recommends preserving right-of-way in accordance with the Ten Mile Analysis and CIP update, with dual left turn lanes on the north and south legs. Ten Mile & Lake Hazel Intersection for both Ten Mile Road and Lake Hazel Road. The Ten Mile Analysis forecasts this intersection would operate acceptably as a dual lane roundabout with a southbound right-turn bypass lane in This is consistent with the recently adopted CIP update. The South Meridian Study is forecasting that this intersection would require a conventional 7x7 intersection to operate acceptably in This is due to the fact that the Ten Mile Analysis assumed Lake Hazel at 3 lanes and the South Meridian Study assumed Lake Hazel at 5 lanes. Staff recommends preserving right-of-way in accordance with the Ten Mile
4 Attachment 1: Discussion and Diagrams of Long-Term Intersection Recommendations Analysis and CIP update in order to maintain consistency with the proposed roundabout corridor to the south. Ten Mile & Columbia Intersection for Ten Mile Road and 3 lanes for Columbia Road. The Ten Mile Analysis forecasts that this intersection would operate acceptably as a dual lane roundabout in This is consistent with the recently adopted CIP update, and this intersection was not included in the South Meridian Study. Staff recommends preserving right-of-way in accordance with the Ten Mile Analysis and CIP update. Ten Mile & Hubbard Intersection for Ten Mile Road and 3 lanes for Hubbard Road. The Ten Mile Analysis forecasts that this intersection would operate acceptably as a single lane roundabout in This intersection was not included in either the CIP update or the South Meridian Study. Although the Ten Mile Analysis forecasts that a single lane roundabout would be adequate in 2035, staff recommends preserving right-of-way for a multilane roundabout, with dual lanes on the Ten Mile approaches, in order to accommodate the potential widening of Ten Mile to five lanes through the intersection. Ten Mile & Deer Flat Intersection for both Ten Mile Road and Deer Flat Road. The Ten Mile Analysis forecasts that this intersection would operate acceptably as either an all-way stop or a single lane roundabout in This intersection was not included in either the CIP or South Meridian Study. Although a single lane roundabout could not accommodate 5 lane road segments, as the Master Street Map is currently preserving for on Ten Mile and Deer Flat, no modeling to date has forecast future traffic volumes that would justify widening either of these roads to 5 lanes near this intersection. Therefore, staff recommends preserving for a single-lane roundabout at this intersection, and conducting follow-on analysis of whether the Master Street Map should continue to preserve for 5 lanes along the adjacent road segments.
5
Committed to Service
Committed to Service Sherry R. Huber, President Rebecca W. Arnold, Vice President John S. Franden, Commissioner Carol A. McKee, Commissioner Sara M. Baker, Commissioner To: From: ACHD Commissioners, Director,
More information5.0 Roadway System Plan
Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,
More informationCommitted to Service
Development Services Department Committed to Service TO: FROM: Ada County Highway District Commissioners Mindy Wallace, AICP Planner III COMISSION HEARING: January 27, 2016 SUBJECT: Syringa Valley Specific
More informationDevelopment Services Department
Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner July 28, 2016 Development Services Department To: From: ACHD
More informationFinal Report. Southwest Boise Transportation Study. Prepared For: Ada County Highway District
Final Report Southwest Boise Transportation Study Ada County, Idaho September 2009 Prepared by: 101 S Capitol Boulevard, Suite 301 Boise, ID 83702 (208) 338-2683 Southwest Boise Transportation Study Final
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner March 14, 2017 Planning and Programming
More informationReview and Comment ACHD s FY Five Year Work Program Draft for Adoption
Date: January 5, 2006 To: From: Mayor and City Council Karen Gallagher Planning and Development Services Meeting: January 10, 2006 Re: Review and Comment ACHD s FY 2007-2011Five Year Work Program Draft
More informationState Highway 16 Kuna-Mora Road to Ada/Gem County Line
Background Update! (February 2018): This project has been partially funded; see below. State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents
More informationCommitted to Service
Development Services Department Committed to Service January 19, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Mindy Wallace, AICP Planner III Kirsten Subdivision/BPP15-0023 Executive Summary: The
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study
More informationState Highway 16 Kuna-Mora Road to Ada/Gem County Line
Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho
More informationState Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line
Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho
More informationNorthwest Foothills Transportation Study Update
DRAFT Northwest Foothills Transportation Study Update Ada County, Idaho Study Area Parks Schools Prepared For Ada County Highway District 3775 Adams Street Garden City, Idaho 83714 (208) 387-6100 Prepared
More informationACHD COMMISSION DECISION
DRAFT ACHD COMMISSION DECISION On January 22, 2014, the ACHD Commission voted to delay the decision on the adoption of this study until January 2015. The decision to the delay the adoption was a result
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION SHA CTP Project No. MO891A21, US 29, Fairland Road to Musgrove Road Interchange Improvement, Design Review
More informationCommitted to Service
Development Services Department Committed to Service November 4, 2014 TO: FROM: SUBJECT: ACHD Board of Commissioners Mindy Wallace, AICP Planner III Village Charter School/ BOI14-0105/CUP14-00046/DRH14-000324
More informationCommerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue
Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue T A N Y A B R O O K S A S S I S T A N T D I R E C T O R M O B I L I T Y P L A N N I N G M O B I L I T Y A N D S
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationState Street and Pierce Park Lane Intersection Concept Report
State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September
More informationNorthwest Foothills Transportation Study Update
DRAFT Northwest Foothills Transportation Study Update Ada County, Idaho Study Area Parks Schools Prepared For Ada County Highway District 3775 Adams Street Garden City, Idaho 83714 (28) 387-61 Prepared
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationDevelopment Services Department Project/File: Lead Agency: Site address: Fall Creek Subdivision (MPP-12-016) This is a preliminary plat application to subdivision approximately 110 acres into 296 residential
More informationDiamond Springs Parkway Project
Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationTraffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning
F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,
More informationDevelopment Services Department Project/File: Lead Agency: Site address: Applicant: Memory Ranch / KPP15-0003 / 15-02-AN / 15-01-S The applicant is requesting annexation of approximately 10 acres, rezoning
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationA copy of the draft plan is available at:
To: From: Re: Mayor and City Council Patricia Nilsson, AICP, Comprehensive Planning Manager Boise Central Bench Neighborhood Pedestrian and Bicycle Plan Date: August 24, 2012 Requested Action Provide comments
More informationArterial Management Plan for US Route 250 and State Route 623
Arterial Management Plan for US Route 250 and State Route 623 June 25, 2014 Brad Shelton, AICP Access Management and Traffic Impact Analysis Programs Manager Transportation and Mobility Planning Division
More informationPreliminary Engineering Study
Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary
More informationReport Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).
COUNCIL MEETING Meeting Date: March 10, 2015 Agenda Item #: 13.1 Wye Road Functional Planning Study (January 2015) Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationVIII. Project Prioritization & Implementation
Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More informationRoute 29 Corridor Assessment Update. Development of Possible Solutions
Route 29 Corridor Assessment Update Development of Possible Solutions Public Workshop #3 October 27, 2016 Purpose of Developing Possible Solutions Recap of where we ve been and timeline for moving forward
More informationRoundabouts Near At-Grade Railroad Crossings
Roundabouts Near At-Grade Railroad Crossings May 12, 2008 1,592 Words Alex J. Ariniello LSC Transportation Consultants, Inc., 1889 York Street Denver, CO 80206 Phone: 303-333-1105 FAX: 303-333-1107 email:
More informationUniversity Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007
Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationBroad Street Bicycle Boulevard City Council Study Session Summary
Broad Street Bicycle Boulevard City Council Study Session Summary Overview: On August 15 th, 2017, a City Council Study Session was held to invite community input and request City Council guidance on a
More informationCITY OF KINGSTON REPORT TO COUNCIL. Report No.:
CITY OF KINGSTON REPORT TO COUNCIL Report No.: 13-072 TO: FROM: RESOURCE STAFF: Mayor and Members of Council Jim Keech, President and CEO, Utilities Kingston Mark Van Buren, Director of Engineering DATE
More informationTo: ACHD Commissioners and Director 3/14/2017. Peer Review of Highlands Neighborhood Traffic and Pedestrian Safety Plan Information Briefing
Paul Woods, President Rebecca W. Arnold, Vice President Kent Goldthorpe, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner MEMORANDUM Engineering To: ACHD Commissioners and Director
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner September 19, 2017 Development Services
More informationCITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017
CITY OF FRANKLIN, TENNESSEE Columbia Avenue Widening & Improvements Project Public Meeting May 16, 2017 Agenda 6:00 6:30 Formal Presentation 6:30 8:00 Town Hall Forum City of Franklin Columbia Avenue Alternatives
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationACHD Commission, Director, and Deputy Directors
John S. Franden, President Mitchell A. Jaurena, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner March 19, 2014 TO: FROM: SUBJECT: ACHD Commission,
More informationPlanning & Programming
Kent Goldthorpe, President Paul Woods, Vice President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner September 14, 2016 Planning & Programming TO: ACHD Commissioners,
More informationTRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION
TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212
More informationHighway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More informationCommitted to Service. Development Services. February 21, ACHD Commission. Mindy Wallace, AICP
Committed to Service Sara M. Baker, President Rebecca W. Arnold, Vice President Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner Paul Woods, Commissioner February 21, 2018 Development Services
More informationTRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations
More informationExisting Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer
Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /
More informationCTH M Reconstruction
CTH M Reconstruction ID 5992 09 81 City of Madison, South Pleasant View Road (Cross Country Road Prairie Hill Road) CTH M Dane County Public Information Meeting Thursday, May 24, 2012 6 p.m. to 8 p.m.
More informationPRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT
PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership
More informationACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16
Development Services Department DATE: December 14, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP16-0012/ PP-07-16/ Executive Summary: This is an annexation,
More informationSANTA MONICA BOULEVARD CORRIDOR
CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly
More informationCITY CLERK. (City Council on October 2, 3 and 4, 2001, adopted this Clause, without amendment.)
CITY CLERK Clause embodied in Report No. 7 of the, as adopted by the Council of the City of Toronto at its meeting held on October 2, 3 and 4, 2001. 15 Draft By-laws- Installation of Speed Humps - Various
More informationShockoe Bottom Preliminary Traffic and Parking Analysis
Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA
More informationPAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT
Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationRoundabout Feasibility Memorandum
Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01
More informationRe: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input
September 9, 2009 To: Mayor and City Council From: Karen Gallagher Transportation Planner Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input Requested
More informationTraffic Study 30th Street Specific Area Plan
Prepared for HDR Engineering, Inc. River Quarry at Park Center 412 E. Parkcenter Blvd., Suite 100 Boise, ID 83706-6659 Prepared by 5561 N Glenwood Street, Suite B Boise, ID 83714-1336 208-898-0012 www.parametrix.com
More informationDesign Traffic Technical Memorandum
State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared
More informationMINUTES. BROWARD COUNTY BICYCLING AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING WEDNESDAY, March 9 th, :30 PM
MINUTES BROWARD COUNTY BICYCLING AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING WEDNESDAY, March 9 th, 2016 6:30 PM BROWARD COUNTY GOVERNMENTAL CENTER 115 South Andrews Avenue, Room 329 F Ft. Lauderdale,
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationTransportation Impacts: Toronto York Spadina Subway Extension
STAFF REPORT ACTION REQUIRED Transportation Impacts: Toronto York Spadina Subway Extension Date: June 6, 2011 To: From: Wards: Reference Number: North York Community Council Director, Transportation Services
More informationAlberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future
Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # 4b City Council Meeting 6/2/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE
More informationAnholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)
Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18) Overview: On August 14, 2018, the Planning Commission considered plans for the middle section of the Anholm Bikeway Plan, focusing on the
More informationDRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners
DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationGlebe Neighbourhood Cycling Plan
Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling
More information#!! "$% ##! &! # '#! % $ #!
Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal
More informationDavid DiPierro, John Amberson. Steering Committee Meeting #4 Overview
IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project
More informationArlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016
Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities
More informationCITY OF BOISE COUNCIL MEETING MINUTES JUNE 3, 2014 WORK SESSION. City Hall - Council Chambers Final 4:00 PM 150 N CAPITOL BLVD BOISE, ID 83702
CITY OF BOISE COUNCIL MEETING MINUTES JUNE 3, 2014 WORK SESSION City Hall - Council Chambers Final 4:00 PM 150 N CAPITOL BLVD BOISE, ID 83702 I. Call to Order PRESENT: Clegg, Eberle, Jordan, McLean, Quintana,
More informationWest Circle Drive (CSAH 22) Traffic Operations Study
West Circle Drive (CSAH 22) Traffic Operations Study May 24, 2016 Open House Harriet Bishop Elementary School 6:45 8:00 p.m. Presentation at 7:00 p.m. Purpose of Tonight s Meeting Introductions Explain
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationTRAFFIC STUDY GUIDELINES Clarksville Street Department
TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two
More informationWEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS
Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More informationOthers present: Greg Kyle, Kimley-Horn Associates/Stanley Consultants; and Claudia Devitt, Transfield Services.
METROPOLITAN PLANNING ORGANIZATION A meeting of the Indian River County (IRC) Metropolitan Planning Organization (MPO) was held at 10:00 a.m. on Wednesday, March 10, 2010, in the County Administration
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationLSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)
LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC
More informationCRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN
CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,
More informationCity of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee Thursday, April 21, :00 PM
1. CALL TO ORDER 2. ROLL CALL 3. ADOPTION OF AGENDA 4. PUBLIC COMMENTS 5. OLD BUSINESS 6. NEW BUSINESS City of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee
More informationBUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE
FORM GEN. 160 (Rev. 11-02) CITY OF LOS ANGELES INTERDEPARTMENTAL CORRESPONDENCE Date: To: Honorable City Council From: Gary Lee Moore, City Engineer Bureau of Engineering 7%mt /Electronically signed by
More informationOwl Canyon Corridor Project Overview and Summary
Owl Canyon Corridor Project Overview and Summary December 22, 2008 The Owl Canyon corridor (generally the connection between the I-25 / Larimer County Road 70 interchange and the US 287 / Larimer County
More informationWelcome. If you have any questions or comments on the project, please contact:
Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue
More informationIntersection Traffic Control Feasibility Study
Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,
More informationGiles Run Connector Road
Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment
More information4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project
City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering
More information