ROAD SAFETY AUDIT. Route 28 (Main Street) at North Street. Town of Stoneham. August 29, Prepared For: MassDOT Highway Division

Size: px
Start display at page:

Download "ROAD SAFETY AUDIT. Route 28 (Main Street) at North Street. Town of Stoneham. August 29, Prepared For: MassDOT Highway Division"

Transcription

1 ROAD SAFETY AUDIT Rute 28 (Main Street) at Nrth Street Twn f Stneham August 29, 2013 Prepared Fr: MassDOT Highway Divisin Prepared By: BETA Grup, Inc.

2 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Table f Cntents Prject Data... 1 Backgrund... 2 Prject Descriptin... 2 Audit Observatins... 6 Ptential Safety Enhancements Summary f Rad Safety Audit List f Appendices Appendix A. Appendix B. Appendix C. RSA Meeting Agenda RSA Audit Team Cntact List Detailed Crash Data List f Figures Figure 1. Lcatin Map... 3 List f Tables Table 1. Participating Audit Team Members... 1 Table 2. Estimated Time Frame and Csts Breakdwn Table 3. Ptential Safety Enhancement Summary... 16

3 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Prject Data A Rad Safety Audit fr the intersectin f Rute 28 (Main Street) and Nrth Street was held n August 5, 2013 at the Stneham Plice Department in Stneham, MA. As indicated in Table 1, the audit team cnsisted f representatives frm State, Reginal and Lcal agencies and included a crss-sectin f engineering, planning and emergency respnse expertise. Table 1. Participating Audit Team Members Audit Team Member Lisa Schletzbaum Crey O Cnnr Sean Sullivan Carley Pryzstac Mark Abbtt Sara Timner Amy Lynch Cnstance Raphael Jseph Rlli Richard McCarthy James McIntyre Rbert Grver David Ragucci Greg Lucas Justin Curewitz Agency/Affiliatin MassDOT Highway Divisin Safety Sectin MassDOT Highway Divisin Safety Sectin MassDOT Highway Divisin (Intern) MassDOT Highway Divisin (Intern) Bstn Regin MPO MassDOT Highway Divisin District 4 Traffic MassDOT Highway Divisin District 4 Prjects MassDOT Highway Divisin District 4 Planning Stneham Fire Chief Stneham Plice Stneham Plice Chief Stneham DPW Directr Stneham Twn Administratr BETA Grup, Inc. BETA Grup, Inc. Page 1

4 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Backgrund The Federal Highway Administratin defines a Rad Safety Audit (RSA) as the frmal safety examinatin f an existing r future rad r intersectin by an independent, multidisciplinary team. The purpse f an RSA is t identify ptential safety issues and pssible pprtunities fr safety imprvements cnsidering all radway users. A Rad Safety Audit was scheduled fr the intersectin f Rute 28 (Main Street) and Nrth Street because it is identified as a high crash lcatin within the Metrplitan Area Planning Cuncil (MAPC) regin. The RSA is intended t identify ptential shrt and lng term safety imprvements that can be made at the intersectins, which can then be implemented thrugh general maintenance fr shrt term lw cst imprvements r incrprated int a recnstructin prject fr lng term imprvements. Prject Descriptin Rute 28 (Main Street) is a nrthsuth crridr functinally classified as an Urban Principal Arterial and is State-wned in the vicinity f Nrth Street. Rute 28 is an imprtant reginal radway, running essentially parallel t I-93 and cnnecting t I-93 t the suth and I-95/Rute 128 t the nrth. Main Street prvides access frm the highways t Stneham and t surrunding cmmunities, and serves as an alternate rute t the highways during times f heavy cngestin. The intersectin f Rute 28 and Nrth Street, shwn in Figure 1, is a 4-way signalized intersectin apprximately ¼ mile suth f the Rute 28 interchange at I-95/Rute 128. The Rute 28 (Main Street) at Nrth Street (lking nrth) Reading/Stneham twn line is lcated between I-95/Rute 128 interchange and the study intersectin. Nrth Street is Twn-wned and is functinally classified as an Urban Cllectr west f Rute 28 and as an Urban Principal Arterial east f Rute 28. Nrth Street intersects Rute 28 at a skewed angle, which impacts peratin and driver behavir at the intersectin. Rute 28 (Main Street) prvides tw thrugh lanes in each directin and is median-divided alng its length in the vicinity f Nrth Street, frm nrth f I-95/Rute 128 t suth f the Redstne Shpping Center. Rute 28 prvides an exclusive left turn lane suthbund at Nrth Street, and the traffic signal prvides prtected phasing via a lead phase fr the suthbund apprach. N left turn lane is prvided nrthbund, and nrthbund left turns perate under permissive/prtected phasing with a prtected lag phase when vehicles are present. A scred cncrete island extends beynd the center median fr bth the nrthbund and suthbund appraches, likely intended t prvide further channelizatin fr left turning Page 2

5 READIN G WAKE F IELD 128 RT / 5 I-9 WAKEFIE LD STONEH AM GEO RGE ST R E ET RE ET ST NO RT H ROUTE 28 (MAIN STREET) NORTH ST RE ET 8 E 2 T) UT EE RO STR IN ( MA G READIN AM STONEH LEGEND STUDY INTERSECTION TOWN LINE Rad Safety Audit Rute 28 (Main Street) at Nrth Street Stneham, MA Figure 1 Lcatin Map

6 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. vehicles, but lcal fficials nted that aggressive drivers and larger vehicles make a sharp turn acrss the scred cncrete area. Nrth Street generally prvides a single lane f travel in each directin. A triangular island is prvided n the suthwest crner t channelize right turns frm Nrth Street eastbund t Rute 28 suth. The channelized right turn lane is nt cntrlled by the signal, and n signs are prvided t establish stp r yield cntrl. A painted stp line is prvided, and a crsswalk is prvided frm the channelized island t the sidewalk n the suthwest crner f the intersectin. Nrth Street westbund is designed as a single lane, but is wide enugh at its apprach t Rute 28 that rightturning vehicles use the wide lane t bypass vehicles waiting t g left r straight at the intersectin. Nrth Street west f Rute 28 prvides access t residential streets and neighbrhds that are brdered by I-93 t the west and I-95/Rute 128 t the nrth. Nrth Street east f Rute 28 prvides a cntinuus alignment with Prspect Street and cnnects t the twn f Wakefield. It was nted that vehicles turning right frm Nrth Street t Rute 28 suth are knwn t bypass the signalized intersectin via Gerge Street. Cntinuus sidewalks are prvided alng bth sides f Rute 28 and alng the suth side f Nrth Street within the intersectin vicinity. Crsswalks are prvided acrss bth Nrth Street legs and acrss the suth leg f Rute 28, althugh n pushbuttns r pedestrian signals are prvided acrss the east Nrth Street leg r frm the triangular channelizing island t the sidewalk n the suthwest crner f the intersectin. An exclusive pedestrian phase is activated by pushbuttns lcated adjacent t the crsswalks acrss the west and suth legs; pushbuttns are lder and d nt meet current accessibility requirements, and pedestrian signals d nt have cuntdwn displays as required by current MassDOT and Manual n Unifrm Traffic Cntrl Devices (MUTCD) requirements. Land use in the area is a mix f cmmercial and residential. Multi-stry apartment buildings are lcated alng the west side f Rute 28 nrth f Nrth Street, and alng the east side f Rute 28 suth f Nrth Street. A small strip mall is lcated n the suthwest crner f the intersectin husing a chclatier and a cnvenience stre. An abandned gas statin is lcated n the nrtheast crner f the intersectin; a lcal resident mentined t audit participants that the site is planned fr redevelpment. A 99 Restaurant is nrth f the abandned gas statin n the east side f Rute 28, and single and multi-family hmes are lcated alng Nrth Street and Gerge Street west f Rute 28. Crash data prvided by the Stneham Plice Department and summarized by MassDOT shw 32 plice dcumented crashes ccurred fr the three year perid frm 2010 thrugh A crash data summary and a cllisin diagram are included in the Appendix. Crashes were evenly split between angle and rearend crashes, with 16 f each type ccurring during the study perid. Twelve f the 16 rear-end crashes ccurred n Rute 28 nrthbund. Several f these crashes were attributed t hydrplaning r issues related t wet radway cnditins, while thers were attributed t driver inattentin. Crashes n this apprach may be the result f differing levels f driver aggressin related t entering the intersectin during the yellw clearance phase. Driver frustratin and aggressin may play a factr in all crash types at this intersectin, due t its prximity t a highway interchange and its rle as a cmmuter rute. Three rear-end crashes ccurred n the suthbund apprach, and may be related t vehicle speeds due t the dwnhill grade f this apprach and higher vehicle speeds departing I-95/Rute 128. One rear-end crash ccurred in the middle f the intersectin, where a thrugh vehicle which is assumed t have the right-fway stpped fr traffic in the intersectin. Page 4

7 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Angle crashes ccurred in all directins and n all appraches. Three angle crashes ccurred between a suthbund thrugh vehicle and a westbund vehicle, and may indicate clearance vilatins r inadequacy f existing clearance intervals, r may be related t cnfusin created by the intersectin gemetry. Tw crashes between eastbund thrugh vehicles and a suthbund vehicle were attributed t signals being bstructed by snw. A bicycle crash ccurred where a suthbund cyclist disregarded the traffic signal and was struck by a vehicle departing Nrth Street wh had the right-f-way. Tw crashes invlved vehicles exiting nt Nrth Street frm the small strip mall at 41 Main Street. One crash invlved a vehicle turning left int the steep driveway at 65 Nrth Street, which is identified as a blind driveway by a small sign facing westbund traffic. Page 5

8 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Audit Observatins Fllwing a brief intrductin t the RSA prcess and a summary f existing gemetry and crash infrmatin, the audit participants were asked t discuss issues that affect safety at the intersectin f Rute 28 (Main Street) and Nrth Street. Audit participants then cnducted a site visit as a grup, at which time they ffered bservatins n safety issues and cncerns. A summary f thse majr safety cnsideratins is as fllws: Intersectin Layut Nrth Street intersects Rute 28 at a skewed angle, and the skewed alignment and size f the intersectin impact peratins and driver behavir at the intersectin. The width f the intersectin and skewed alignment create cnfusin fr Nrth Street vehicles. Bth Nrth Street appraches receive a green indicatin at the same time, and audit participants familiar with the intersectin nted that driver hesitatin is cmmn due t cnfusin ver wh has the right-f-way. Turning vehicles may enter their turn befre realizing that they have a ptential cnflict with a thrugh vehicle traveling in the ppsite directin, due t the width f the intersectin and the distance they must travel befre encuntering the cnflicting vehicle. Cnfusin ver right f way may cause vehicles t take lnger t clear the intersectin, and as a result exit the intersectin during the red indicatin, which may be a factr in right angle crashes. Additinally, the gemetry may create cnfusin fr drivers turning left frm Nrth Street ver whether they shuld pass in frnt f r behind a left turning vehicle frm the ppsite Nrth Street apprach. The skewed alignment als creates a lnger intersectin fr thrugh traffic n Rute 28, which may cntribute t clearance time vilatins, which may be a factr in bth rearend and angle crashes. Rear-end crashes can ccur between drivers f different levels f aggressin, where a trailing driver plans t enter the intersectin during the yellw but the leading driver stps. Traffic cngestin and driver frustratin typically lead t increases in driver aggressin. The scred cncrete area extending beynd the raised center median n bth the nrth and suth Rute 28 legs was likely intended t prvide additinal channelizatin, but instead prmtes variance in turning paths fr left-turning vehicles and U-turns. Sme drivers cntinue past the scred cncrete area befre beginning their turn, while thers turn acrss the scred cncrete. It was nted that the scred area can prvide refuge fr a nrthbund left-turning vehicle waiting during the permissive phase, but that a vehicle waiting here wuld nt be detected by the lp detectrs lcated in the turn lane. The lack f a nrthbund left turn lane was identified as a safety cncern. Althugh vehicles can mve int the scred cncrete area, waiting vehicles typically either partially r fully blck the thrugh travel lane. This can cntribute t rear-end crashes either because f an inattentive driver wh des nt see the stpped vehicle, r frm a driver in the left lane quickly mving t the right lane t bypass a waiting vehicle, which creates Page 6

9 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. ptential fr a rear-end crash in the right lane. This was specifically nted as the cause f ne crash n this apprach, and may be a factr in the histry f rear-end crashes. Vehicles waiting in the suthbund left turn lane can blck visibility f ther suthbund thrugh traffic fr nrthbund vehicles waiting t make a permissive left turn. This is a likely factr in ne crash invlving a nrthbund u-turning vehicle. Traffic Signals A number f issues related t the existing traffic signal equipment and peratin were identified. The previusly discussed cnflicts between ppsing vehicles n the Nrth Street appraches generally exist because f the existing gemetry, but culd be imprved upn r eliminated thrugh cnsideratin f a prtected lead phase r split phasing fr the Nrth Street appraches. The lack f a lead phase r split phasing was identified as a safety cncern. Yellw and all-red clearance times may be inadequate at the intersectin. This culd be a factr in nrthbund rear-end crashes due t varying levels f driver aggressin n the apprach, and culd als be a factr in angle crashes where vehicles are still in the intersectin during the red indicatin cntrlling their entry apprach. The lack f emergency pre-emptin equipment n the Nrth Street appraches was identified as a safety issue. Preemptin equipment is prvided fr the Rute 28 appraches, and its peratin was verified n the day f the audit. The eastbund signal has a yellw indicatin that is burnt ut. Signals at the intersectin are free-swinging n a span wire assembly, which are mre susceptible t misalignment due t wind. A signal head facing suthbund traffic is slightly twisted, reducing its effectiveness. N backplates are prvided fr verhead signals. Backplates help signal visibility by prviding negative cntrast f the signal indicatin against a lighter backgrund. Shulders The lack f shulders was nted as a safety cncern. The current radway cnfiguratin des nt allw vehicles t pull ver t make way fr fire and ther emergency apparatus. This als affects pprtunities fr speed and red light enfrcement because plice have n rm t safely pull vehicles ver. Pedestrian Accmmdatin A number f issues related t pedestrian accmmdatins were discussed. A crsswalk is prvided acrss the east leg f Nrth Street, but n pedestrian signals r pushbuttns are prvided. Pedestrians crssing this apprach must d s cncurrently with Page 7

10 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. nrthbund traffic, which can create cnflicts between pedestrians and bth nrthbund right-turning vehicles and suthbund left-turning vehicles. The crsswalk between the channelizing island and the suthwest crner f the intersectin is als unprtected. Pedestrians have been bserved crssing at unprtected lcatins suth f the intersectin. It was nted that a crsswalk is prvided at the signalized entrance t the Redstne Shpping Center suth f the study intersectin, but that pedestrians riginating in the residential cmplexes n the east side f Rute 28 are unlikely t walk all the way dwn t the signalized lcatin if their destinatin is at the nrth end f the shpping center. An audit member nted that residents f the cmplex park at the shpping center and walk acrss Rute 28. N cuntdwn pedestrian signals are prvided at the intersectin, and pushbuttns d nt meet current standards fr accessibility. N detectable warning panels are prvided fr the pedestrian passageways prvided in the island n the suthwest crner f the intersectin. All ther ramps prvide detectable warning panels and appear t be recently recnstructed. A hydrant and pedestrian signal pst are lcated in the middle f the sidewalk n the nrthwest crner f the intersectin, blcking the pedestrian path. Lack f detectable warning panels Pavement Cnditin Ten crashes ccurred under wet, snwy r icy rad cnditins, and hydrplaning r vehicle sliding was nted as a factr in several f these crashes. It was nted that Rute 28 was recently resurfaced, which helps address these crashes because newer pavement will have increased pavement frictin. It was als nted that the resurfacing eliminated rutting that had develped at the stp lines n the Rute 28 appraches. Bicycle Accmmdatin The lack f shulders alng Rute 28 r Nrth Street illustrates a lack f accmmdatin fr bicyclists. It shuld als be nted that n bicycle detectin is prvided with the existing signal. Speed It was nted that speeding is a cncern during ff-peak perids, and that vehicles traveling suth can pick up speed due t the suthbund dwnhill grade. It was nted that enfrcement is difficult fr nrthbund vehicles due t the prximity f the twn line, and due t the previusly nted lack f shulders. Lane Delineatin The lack f lane delineatin thrugh the intersectin was identified as a safety cncern. Page 8

11 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Traffic Cngestin/Cut-Thrugh Traffic The intersectin s prximity t bth I-93 and I-95/Rute 128 makes it bth a heavily traveled crridr fr interstate access but als a likely cut-thrugh path when delays exist n the interstates. Drivers heading suth n Rute 28 frm Nrth Street are knwn t use Gerge Street t avid the signal at Nrth Street. Cngestin can lead t driver frustratin, which can lead t varying degrees f driver aggressin which influences previusly discussed safety cncerns. Pavement Markings N ONLY markings are prvided in cnjunctin with the left arrws in the Rute 28 suthbund left turn lane. Signage Several issues related t signage were discussed r bserved at the audit. The stub f a sign pst was bserved n the western edge f the small island n the suthwest crner f the intersectin. It is assumed that this was an bject marker sign, which shuld be replaced. The lack f an bject marker may increase the likelihd that a vehicle will strike the island, especially at night r during wintry cnditins when the island is cvered with snw. N ONLY markings N traffic cntrl signage is prvided fr the Sign pst stub channelized right turn frm Nrth Street eastbund t Rute 28 suthbund. The presence f a painted stp bar suggests that this is a stp cnditin. A Keep Right sign is prvided n the nse f the island n the suth leg f the intersectin, but n sign is prvided n the nse f the island n the nrth leg. N Left Turn Yield n Green Ball sign is prvided fr the permissive/prtected phasing fr nrthbund left turns. Other signs at the intersectin are faded, including a N Parking sign n the eastbund Nrth Street departure, and a speed limit sign and Rute 28 sign n the suthbund apprach t the intersectin. There is an lder Signal Ahead sign n the westbund Nrth Street apprach which is lder, nt retrreflective, and partially bscured by graffiti. N advance warning signs are prvided n the ther three appraches. Page 9

12 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Radway Grade Rute 28 has steep crss-slpes, which create a crest curve cnditin fr vehicles crssing frm the Nrth Street appraches. This presents additinal challenges t crssing vehicles and can exacerbate ther cncerns related t cnflicts between side street vehicles. Overgrwth Brush vergrwing the edge f the radway n the nrth side f Nrth Street west f the intersectin blcks visibility f the driveway at #65 Nrth Street. It is unknwn if this was a factr in the crash that ccurred at this lcatin. Glf Curse Audit participants nted that the Bear Hill Glf Club n Prspect Street east f the intersectin has a hle that tees ff n ne side f the rad, with a fairway n the ppsite side f the rad. This may create cnfusin fr drivers and pedestrians passing by. Distracted Driving Texting by drivers was nted as a cmmn prblem regin-wide, and cited as a ptential factr in rear-end crashes at the intersectin. Brush vergrwth alng Nrth Street. Page 10

13 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Ptential Safety Enhancements After the site visit, audit participants returned t the meeting lcatin t discuss the safety issues and cnsider imprvements. Audit participants were encuraged t cnsider bth shrt and lng term imprvements fr each issue. Each imprvement cnsidered has been categrized as shrt-term, midterm, r lng-term based n the definitins shwn in Table 2. Additinally, a cst categry has been assigned t each imprvement based n the parameters set frth in Table 2. Table 2. Estimated Time Frame and Csts Breakdwn Time Frame Csts Shrt-term <1 year Lw <$10,000 Mid-term 1 3 years Medium $10,000 $50,000 Lng-term >3 years High >$50,000 Cnduct a traffic study f the intersectin, including cllectin f current vehicle, bicycle and pedestrian cunts at bth Rute 28/Nrth Street and Rute 28/Gerge Street. Several recmmendatins invlved changes t signal strategies, which first require analysis using current traffic data. The intersectin f Rute 28 and Gerge Street shuld be included in the data cllectin and analysis effrt t determine the amunt f cut-thrugh traffic and cnsider the ptential fr current cut-thrugh traffic using Gerge Street t instead turn right at an upgraded signal at Nrth Street. A traffic study is the first step twards imprvements aimed at addressing cngestin, traffic signal imprvements, and gemetric imprvements. This is a shrt-term, medium cst imprvement. Cnsider phasing alternatives fr the Nrth Street appraches. Three ptential phasing imprvements were discussed by the audit team. It was suggested that increased green time fr the side street appraches culd eliminate cnflicts related t waiting vehicles. This mdificatin wuld nt address cnflicts between side street vehicles and wuld nt address ptential cnfusin ver right-f-way, and therefre is nt recmmended. Lead/lag phasing was als suggested as an imprvement strategy. Lead/lag phasing wuld prvide a prtected lead phase fr left turns and thrugh mvements in ne directin n Nrth Street, and then prvide a shared phase fr thrugh mvements and permissive left turns in bth directins, fllwed by a prtected lag phase fr left turns and thrugh mvements in the ppsite directin. Permissive left turns must still be allwed because n exclusive left turn lanes are prvided n the Nrth Street appraches. Lead/lag phasing wuld prvide prtected phases fr left turns in bth directins, but wuld nt eliminate cnflicts between ppsing Nrth Street vehicles. Lead/lag phasing with prtected/permissive peratin als creates the yellw trap, which ccurs when the driver turning frm ne directin enters during the yellw, assuming that the ppsing driver als has the yellw, but the green is still displayed t the ppsing driver frm the lagging phase. Lead/lag phasing is nt recmmended fr this reasn. Page 11

14 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Split phasing wuld prvide a separate prtected phase fr each directin n Nrth Street. This wuld eliminate cnflicts between Nrth Street vehicles, which shuld reduce angle crashes invlving Nrth Street vehicles. All three phasing alternatives discussed wuld extend the time required t service the Nrth Street phases, which wuld likely degrade the verall intersectin peratin and increase delay n the Rute 28 appraches. Split phasing shuld nt be implemented until assciated timings are determined fllwing a study using current traffic vlumes. This is a shrt-term, lw cst imprvement. Recnstruct the intersectin. All imprvements listed belw are assumed t be cmbined as part f a lng-term, high cst recnstructin prject. Cnsider the additin f a nrthbund left turn lane. This wuld eliminate the need fr left turning vehicles t share a lane with thrugh vehicles, which wuld in turn reduce the likelihd f rear-end cllisins due t inattentive drivers. The additin f a nrthbund left turn lane wuld als allw prtected nly left turns, which wuld eliminate visibility cncerns created by queued suthbund left-turning vehicles. Cnstructin f a nrthbund left-turn lane is recmmended as part f an verall recnstructin strategy because it is likely t require ther gemetric mdificatins t accmmdate the width required. Prvide fixed munted verhead signals with backplates. Fixed munted signals wuld prevent misalignments that exist tday with the free swinging signal heads. Backplates wuld increase visibility f signal heads fr appraching traffic, and assist with sun glare fr east-west traffic. Fixed munted signals wuld require new mast arms, which shuld be incrprated with ther gemetric imprvements. It was nted that any prtected/permissive phases prvided within a recnstructed signal wuld perate with the flashing yellw arrw, which is a new standard in the 2009 MUTCD and is being evaluated and implemented by MassDOT statewide. Prvide cuntdwn pedestrian signal heads and accessible pedestrian pushbuttns lcated accrding t Sectin 4E.08 f the MUTCD. This is recmmended in cnjunctin with verall recnstructin because it wuld require extensive relcatin f pedestrian signals and pushbuttns t meet current ADA, MUTCD and MassDOT requirements. Prvide bicycle detectin as part f traffic signal imprvements. Reduce crss slpes n Rute 28 in cnjunctin with ther gemetric imprvements. Crss slpes shuld be reduced fllwing MassDOT guidelines t the greatest extent practicable, eliminating r reducing the crest cnditin fr Nrth Street vehicles. Cnsider ther gemetric imprvements aimed at reducing the verall size f the intersectin while maintaining ptimal sight lines fr all entering traffic. This is a lngterm, high cst imprvement. Remve the scred cncrete area at the end f the median islands n bth Rute 28 appraches. A review f turning paths shuld be dne in cnjunctin with this imprvement t ensure that remval Page 12

15 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. f the cncrete will nt be detrimental t turning paths and existing vehicle cnflicts. It is expected that eliminatin f the scred cncrete area will reduce the variance in turning paths, which in turn can imprve cnsistently between driver behavir and ther driver expectatins, which can reduce the ptential fr crashes. It shuld be nted that this imprvement will increase the area f undefined pavement cntained within the intersectin. This is a shrt-term, lw cst imprvement. Prvide emergency pre-emptin fr the Nrth Street appraches. This imprvement can be accmmdated within the existing signal and shuld be implemented as a shrt-term, lw cst imprvement. Replace burnt ut eastbund yellw signal indicatin. This is a shrt-term, lw cst imprvement. Realign suthbund signal heads s that they are clearly visible t appraching traffic. This is a shrtterm, lw cst imprvement. Study clearance times. The existing yellw and all red clearance times shuld be determined frm the existing traffic signal cntrller and cmpared t minimum requirements calculated based n the latest MassDOT guidance. If existing clearance times are insufficient, clearance times shuld be increased accrdingly. This is a shrt-term, lw cst imprvement. Prvide pedestrian signals and pushbuttns fr the crsswalk acrss the east leg f the intersectin. This imprvement shuld be included in verall intersectin imprvements, but can be dne n a shrt-term basis with the existing signal. This is a shrt-term, medium cst imprvement. Cnsider pedestrian travel patterns suth f the intersectin. It was nted that pedestrians crss at unprtected lcatins between Nrth Street and the Redstne Shpping Center entrance. Intersectin imprvements at Nrth Street shuld cnsider whether additinal pedestrian imprvements are required in this area. This is a lng-term imprvement with a cst t be determined. Prvide detectable warning panels fr the pedestrian passageways in the island n the suthwest crner f the intersectin. This is a shrt-term, lw cst imprvement. Relcate the hydrant in the sidewalk n the nrthwest crner f the intersectin. The hydrant shuld be relcated s that a minimum pedestrian access rute is prvided meeting current ADA and MassDOT requirements. This is a shrt-term, lw cst imprvement. Prvide bicycle accmmdatin at the intersectin and alng Rute 28 t the greatest extent practicable. Imprvements shuld prvide minimum 4-ft shulders, which meet MassDOT guidelines fr bicycle accmmdatin. This is a lng-term, high cst imprvement. Cntinue speed enfrcement effrts in the area. Speed enfrcement is an nging imprvement, the cst f which is the use f plice resurces. Prvide lane delineatin lines where apprpriate within the intersectin. Dtted guide lines shuld be prvided t aid turning vehicles within the intersectin, which can help reduce cnflicts between turning vehicles and set a greater expectatin as t a vehicle s turning path. This is a shrt-term, lw cst imprvement. Page 13

16 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Prvide ONLY markings in the Rute 28 suthbund left turn lane. Presently, nly arrw markings are prvided. This is a shrt-term, lw cst imprvement. Reinstall H1-2 bject marker sign n the nse f the island n the suthwest crner f the intersectin. This is a shrt-term, lw cst imprvement. Prvide a STOP sign fr the channelized right turn frm Nrth Street t Rute 28 suthbund. The presence f a stp bar indicates that this is intended t be a stp-cntrlled mvement, and the alignment and apprach speeds fr suthbund traffic suggests that a stp cnditin is mre prudent than a yield cnditin. This is a shrt-term, lw cst imprvement. Prvide a graphical R4-7 Keep Right sign fr the nse f the island n the nrth leg f the intersectin, and replace the existing wrd sign n the suth leg with a graphical R4-7 sign. This is a shrt-term, lw cst imprvement. Prvide an R10-12 Left Turn Must Yield n Green Ball sign fr the 5-sectin dghuse signal facing nrthbund traffic. This is a shrt-term, lw cst imprvement. Replace the lder Signal Ahead sign n the westbund apprach with a graphical W3-3 sign, and cnsider W3-3 signs n all appraches if a cntinuus view f at least tw signal faces cannt be maintained fr the distance specified in Table 4D-2 f the MUTCD. This is a shrt-term, lw cst imprvement. Replace the faded N Parking sign n the eastbund Nrth Street departure with a new sign. This is a shrt-term, lw cst imprvement. Replace the Speed Limit 35 sign and the Rute 28 sign n the suthbund apprach. This is a shrtterm, lw cst imprvement. Trim brush n the nrth side f Nrth Street west f the intersectin. This will imprve visibility fr drivers as they apprach the driveway at 65 Nrth Street. Cnsider if Bear Hill Glf Curse peratins create a significant impact n vehicles and pedestrians n Prspect Street. The twn line between Wakefield and Stneham runs parallel t Prspect Street and bisects the glf curse prperty, s bth twns shuld be cnsulted with regards t impacts r ptential actins. This is a shrt-term, lw cst imprvement. Cntinue prgrams aimed at enfrcement f anti-texting laws fr drivers. If texting is a mre significant prblem in Stneham, lcal prgrams culd be cnsidered. This is a shrt-term, lw cst imprvement. Page 14

17 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Summary f Rad Safety Audit Table 3 summarizes ptential recmmendatins discussed by the audit team. The recmmendatins are categrized based n the ptential safety payff, as well as by time frame and cst. The safety payff is a qualitative judgment f the effectiveness f the ptential safety imprvements. Each recmmendatin has a respnsibility assigned t it stating whether MassDOT r the Twn f Stneham wuld be respnsible fr implementing the recmmended imprvement. Page 15

18 Rad Safety Audit Lincln Street (Rute 70) Wrcester, MA Prepared by BETA Grup, Inc. Table 3. Ptential Safety Enhancement Summary Safety Issue Safety Enhancement Respnsibility Traffic Signals, Traffic Cngestin Traffic Signal, Intersectin Layut Intersectin Layut Cnduct a traffic study f the intersectin, including cllectin f current vehicle, bicycle and pedestrian cunts at bth Rute 28/Nrth Street and Rute 28/Gerge Street. MassDOT/ Bstn MPO Safety Payff Time Frame Cst N/A Shrt-term $15,000 Cnsider split phasing fr the Nrth Street appraches. Twn/MassDOT High Shrt-term $5,000 Recnstruct the intersectin. Specific imprvements are listed belw. Cnsider the additin f a nrthbund left turn lane, and implement prtected-nly left turns t eliminate visibility cncerns. MassDOT High Lng-term TBD (High) MassDOT High Lng-term High* Traffic Signals Prvide fixed munted verhead signals with backplates. MassDOT Medium Lng-term High* Traffic Signals, Pedestrian Accmmdatin Traffic Signals, Bicycle Accmm. Intersectin Layut Intersectin Layut Intersectin Layut Prvide cuntdwn pedestrian signal heads and accessible pedestrian pushbuttns lcated accrding t Sectin 4E.08 f the MUTCD. MassDOT High Lng-term Medium* Prvide bicycle detectin as part f traffic signal imprvements. MassDOT Medium Lng-term Lw* Reduce crss slpes n Rute 28 in cnjunctin with ther gemetric imprvements. Cnsider ther gemetric imprvements aimed at reducing the verall size f the intersectin while maintaining ptimal sight lines fr all entering traffic. Remve the scred cncrete area at the end f the median islands n bth Rute 28 appraches. Turning paths shuld be reviewed in cnjunctin with this imprvement. MassDOT Medium Lng-term High* MassDOT Medium Lng-term High* MassDOT Medium Shrt-term $5,000 Traffic Signals Prvide emergency pre-emptin fr the Nrth Street appraches. MassDOT Medium Shrt-term $5,000 Traffic Signals Replace burnt ut eastbund yellw signal indicatin. MassDOT Lw Shrt-term $1,000 Traffic Signals Realign suthbund signal heads s that they are clearly visible t appraching traffic. MassDOT Medium Shrt-term $1,000 Traffic Signals Study clearance times, and implement changes as necessary. MassDOT Medium Shrt-term $2,000 Page 16

19 Rad Safety Audit Lincln Street (Rute 70) Wrcester, MA Prepared by BETA Grup, Inc. Table 3. Ptential Safety Enhancement Summary Safety Issue Safety Enhancement Respnsibility Traffic Signals, Pedestrian Accm. Pedestrian Accmmdatin Pedestrian Accmmdatin Pedestrian Accmmdatin Shulders, Bicycle Accmmdatin Prvide pedestrian signals and pushbuttns fr the crsswalk acrss the east leg f the intersectin Cnsider pedestrian travel patterns suth f the intersectin. Intersectin imprvements shuld cnsider whether additinal pedestrian imprvements are required. Prvide detectable warning panels fr the pedestrian passageways in the island n the suthwest crner f the intersectin. Relcate the hydrant in the sidewalk n the nrthwest crner f the intersectin. Prvide bicycle accmmdatin at the intersectin and alng Rute 28 t the greatest extent practicable. Safety Payff Time Frame Cst MassDOT Medium Shrt-term $15,000 MassDOT Medium Lng-term TBD MassDOT Lw Shrt-term $2,000 Twn Lw Shrt-term $3,000 MassDOT Medium Lng-term TBD (High) Speed Cntinue speed enfrcement effrts in the area. Twn High Shrt-term $0 Lane Delineatin Pavement Markings Signage Signage Signage Signage Signage Signage Prvide lane delineatin lines where apprpriate within the intersectin. Prvide ONLY markings in the Rute 28 suthbund left turn lane. Reinstall H1-2 bject marker sign n the nse f the island n the suthwest crner f the intersectin. Prvide a STOP sign fr the channelized right turn frm Nrth Street t Rute 28 suthbund. Prvide a graphical R4-7 Keep Right sign fr the nse f the island n the nrth leg f the intersectin, and replace the existing wrd sign n the suth leg with an R4-7 sign. Prvide an R10-12 Left Turn Must Yield n Green Ball sign fr the 5-sectin dghuse signal facing nrthbund traffic. Replace the lder Signal Ahead sign n the westbund apprach with a new graphical W3-3 sign, and cnsider W3-3 signs n ther appraches (where apprpriate). Replace the faded N Parking sign n the eastbund Nrth Street departure with a new sign. MassDOT Medium Shrt-term $3,000 MassDOT Lw Shrt-term $2,500 MassDOT Medium Shrt-term $200 MassDOT High Shrt-term $200 MassDOT Lw Shrt-term $500 MassDOT Medium Shrt-term $500 MassDOT Lw Shrt-term $200-$1000 MassDOT Lw Shrt-term $200 Page 17

20 Rad Safety Audit Lincln Street (Rute 70) Wrcester, MA Prepared by BETA Grup, Inc. Table 3. Ptential Safety Enhancement Summary Safety Issue Safety Enhancement Respnsibility Signage Overgrwth Glf Curse Replace the Speed Limit 35 sign and the Rute 28 sign n the suthbund apprach. Trim brush n the nrth side f Nrth Street west f the intersectin. Cnsider if Bear Hill Glf Curse peratins create a significant impact n vehicles and pedestrians n Prspect Street. Safety Payff Time Frame Cst MassDOT Medium Shrt-term $500 Twn Medium Shrt-term $500 Twn (Stneham & Wakefield) Lw Shrt-term TBD Cntinue prgrams aimed at enfrcement f anti-texting laws fr Distracted Driving MassDOT/Twn Lw Shrt-term Onging drivers. * Imprvements are assumed t be cmbined int an verall recnstructin prject; csts are rder f magnitude cmpnents f the verall prject cst. Page 18

21 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Appendix A. RSA Meeting Agenda

22 Rad Safety Audit Stneham, MA Rute 28 (Main Street)/Nrth Street Meeting Lcatin: Stneham Plice Dept. 47 Central Street, Stneham, MA Mnday, August 5, :00 AM 12:00 nn Type f meeting: Attendees: Please bring: High Crash Lcatin Rad Safety Audit Invited Participants t Cmprise a Multidisciplinary Team Thughts and Enthusiasm!! 10:00 AM Welcme and Intrductins 10:15 AM Discussin f Safety Issues 10:45 AM Site Visit Crash histry prvided in advance Existing Gemetries and Cnditins Drive t the intersectin f Rute 28 and Nrth Street As a grup, identify areas fr imprvement 11:15 AM Discussin f Ptential Imprvements Discuss bservatins and finalize safety issue areas Discuss ptential imprvements and finalize recmmendatins 12:00 nn Adjurn fr the Day but the RSA has nt ended Instructins fr Participants: Befre attending the RSA n August 5th, participants are encuraged t drive/walk thrugh the intersectin and cmplete/cnsider elements n the RSA Prmpt List with a fcus n safety. All participants will be actively invlved in the prcess thrughut. Participants are encuraged t cme with thughts and ideas, but are reminded that the synergy that develps and respect fr thers pinins are key elements t the success f the verall RSA prcess. After the RSA meeting, participants will be asked t cmment and respnd t the dcument materials t assure it is reflective f the RSA cmpleted by the multidisciplinary team.

23 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Appendix B. RSA Audit Team Cntact List

24 Participating Audit Team Members Date: August 5, 2013 Lcatin: Stneham Main Street (Rute 28) at Nrth Street Audit Team Member Agency/Affiliatin Address Phne Number Greg Lucas BETA Justin Curewitz BETA Lisa Schletzbaum MassDOT Safety Crey O Cnnr MassDOT Safety Crey.cnnr@state.ma.us Sean Sullivan MassDOT Safety Sean.R.Sullivan@state.ma.us Carley Przystac MassDOT Safety Carley.przystac@state.ma.us Mark Abbtt Bstn Regin MPO mabbtt@ctps.rg Sara Timner MassDOT D4 Traffic Sara.timner@dt.state.ma.us Amy Lynch MassDOT D4 Prjects Amy.lynch@dt.state.ma.us Cnstance Raphael MassDOT D4 Planning Cnnie.Raphael@dt.state.ma.us Jseph Rlli Stneham Fire Dept JRlli@ci.stneham.ma.us Richard McCarthy Stneham Plice RMcCarthy@plice.stneham.ma.us x3149 James McIntyre Stneham PD JMcIntyre@plice.stneham.ma.us x3130 Rbert Grver Stneham DPW RGrver@ci.stneham.ma.us David Ragucci Stneham T.A. DRagucci@ci.stneham.ma.us

25 Rad Safety Audit Rute 28(Main Street) at Nrth Street Stneham, MA Prepared by BETA Grup, Inc. Appendix C. Detailed Crash Data

26

27 Crash Diagram Ref # Crash Data Summary Table Main st (Rt 28) and Nrth st, Stneham, MA 2010, 2011, 2012 Crash Date Crash Day Time f Day Manner f Cllisin Light Cnditin Weather Cnditin Rad Surface Driver Cntributing Cde Ages Cmments m/d/y Type Type Type Type Type D1 D2 D3 D4 1 1/5/10 Tuesday 1:11 PM Angle Unknwn Unknwn Unknwn Unknwn Reprt nt fully filled ut, 41 Main st 2 3/3/10 Wednesday 2:42 PM Rear-end Daylight Cludy Dry Fllwed t clsely Op 1 didn't see signal 3 3/25/10 Thursday 11:31 AM Rear-end Daylight Clear Dry Failed t yield right f way Veh 1 stpped fr traffic in intersectin 4 5/17/10 Mnday 1:29 PM Rear-end Daylight Clear Dry Physical Impairment Veh 1 Culd nt stp in time 5 6/24/10 Thursday 11:00 AM Angle Daylight Clear Dry Failed t yield right f way Bth claimed green light 6 6/25/10 Friday 7:56 AM Angle Daylight Clear Dry Other imprper actin Veh 1 was TT unit, taking wide turn 7 7/15/10 Thursday 1:17 PM Angle Daylight Clear Dry Failed t yield right f way Veh 1 making U-turn 8 7/17/10 Saturday 11:36 AM Angle Daylight Clear Dry Failed t yield right f way Op 2 distracted 9 9/2/10 Thursday 4:18 PM Rear-end Daylight Clear Dry Operating Vehicle in erratic, reckless, careless, negligent, r aggressive manner OUI cming ff 128, Veh 2 is tw truck twing Veh /28/10 Tuesday 8:10 AM Rear-end Daylight Cludy Wet Unknwn Unrelated vehicle cut ff Veh 1, starting chain reactin 11 9/30/10 Thursday 12:47 PM Angle Daylight Severe Crsswinds Dry Failed t yield right f way Veh 3 attempted t g arund Veh 1 waiting t make left, sideswiping V /4/10 Thursday 12:03 PM Rear-end Daylight Rain Wet Driving t fast fr cnditins Veh 2 hydrplaned 13 1/3/11 Mnday 7:05 AM Angle Daylight Clear Wet N Imprper Driving Veh 1 ran light, light was bstructed by snw 14 1/13/11 Thursday 9:36 AM Angle Daylight Clear Wet Disregarded traffic signs, signals, rad markings Veh 2 was unaware f red light, bstructed by snw 15 5/19/11 Thursday 9:41 AM Angle Daylight Clear Wet Operating defective equiptment Veh 2 entered intersectin unexpectedly 16 5/28/11 Saturday 4:18 PM Rear-end Daylight Clear Dry Inattentin Op 2 hit gas instead f brake 17 7/14/11 Thursday 5:43 PM Rear-end Daylight Clear Dry Inattentin /18/11 Mnday 5:30 PM Rear-end Daylight Rain Wet N Imprper Driving Cllisin caused by sliding in rain 19 7/23/11 Saturday 7:50 PM Angle Dusk Clear Dry Disregarded traffic signs, signals, rad markings Bicycle crash, cyclist ran red light 20 8/8/11 Mnday 2:31 PM Rear-end Daylight Rain Wet Fllwed t clsely Cllisin caused by sliding in rain 21 8/19/11 Friday 6:13 PM Angle Daylight Clear Dry Failed t yield right f way /5/11 Mnday 2:42 PM Rear-end Daylight Clear Dry Operating Vehicle in erratic, reckless, careless, negligent, r aggressive manner /23/11 Friday 6:00 PM Rear-end Dark - lighted radway Rain Wet Unknwn Rear end in traffic 24 12/24/11 Saturday 2:22 PM Rear-end Daylight Clear Dry Fllwed t clsely Rear end in traffic 25 1/9/12 Mnday 10:01 AM Rear-end Daylight Clear Dry Inattentin Op 2 thught light had turned green 26 1/26/12 Thursday 8:20 AM Angle Daylight Clear Wet Failed t yield right f way Nrth st 27 6/11/12 Mnday 8:06 AM Angle Daylight Clear Dry N Imprper Driving Nrth st 28 6/11/12 Mnday 1:08 PM Angle Daylight Clear Dry Failed t yield right f way Op 2 misjudged turning gap 29 6/24/12 Sunday 11:00 AM Angle Daylight Clear Dry Failed t yield right f way N diagram r narrative 30 7/11/12 Wednesday 5:11 PM Rear-end Daylight Clear Dry Fllwed t clsely Veh 1 attempted t avided turning vehicle 31 9/4/12 Tuesday 2:27 PM Rear-end Daylight Rain Wet Inattentin N diagram r narrative 32 10/5/12 Friday 11:49 PM Angle Dark - radway nt lighted Clear Dry Made an imprper turn Veh 1 making U-turn *Curtesy Crash - A term used t describe a crash that ccurs subsequent t a nn-invlved mainline driver wh gives the right f way, cntrary t the rules f the rad, t anther driver.

28 Crash Data Summary Tables and Charts Main st (Rt 28) and Nrth st, Stneham, MA 20% 15% 10% 5% 0% CRASH MONTH 19% 19% 16% 16% 9% 6% 6% 3% 3% 3% 0% 0% J F M A M J J A S O N D 40% 30% 20% 10% 0% CRASH DAY OF WEEK 31% 25% 13% 13% 9% 6% 3% Mnday Tuesday Wednesday Thursday Friday Saturday Sunday 20% 15% 10% 5% 0% 6% 6AM- 8AM 16% 16% 8AM- 10AM 10AM- 12PM CRASH TIME OF DAY 19% 16% 16% 12PM- 2PM 2PM- 4PM 4PM- 6PM 9% 6PM- 8PM 0% 8PM- 10PM 3% 10PM- 12AM 0% 0% 0% 12AM- 2AM 2AM- 4AM 4AM- 6AM 60% 50% 40% 30% 20% 10% 0% 0% Single Vehicle Crash CRASH MANNER OF COLLISION 50% 50% Rear-end Angle Sideswipe, same directin 0% 0% 0% 0% 0% Sideswipe, ppsite directin Head n Rear t Rear Unknwn Data Summary_updated.xlsx 2 f 3 8/5/2013

29 Crash Data Summary Tables and Charts Main st (Rt 28) and Nrth st, Stneham, MA 100% 80% 60% 40% 20% 0% 88% CRASH LIGHT CONDITION 0% 3% 3% 3% 0% 0% 3% Daylight Dawn Dusk Dark - Lighted Radway Dark - Radway nt lighted Dark - unknwn radway lighting Other Unknwn 80% 72% CRASH WEATHER CONDITION 60% 40% 20% 0% Clear 6% Cludy 16% Rain 0% 0% 0% 3% 0% 0% 3% Snw Sleet, Hail, Freezing Rain Fg, Smg, Smke Severe Crsswinds Blwing sand, snw Other Unknwn 80% 60% 40% 20% 0% 30% 20% 10% 0% 66% 31% CRASH ROAD SURFACE 0% 0% 0% 0% 0% 0% 0% Dry Wet Snw Ice Sand, mud, dirt, il, gravel 1% 22% 21% CRASH DRIVER AGES 18% Water (standing, mving) 15% 13% Slush Other Unknwn 7% % Data Summary_updated.xlsx 3 f 3 8/5/2013

ROAD SAFETY AUDIT. Main Street (Route 28) at Elm Street Main Street (Route 28) at William Street Town of Stoneham.

ROAD SAFETY AUDIT. Main Street (Route 28) at Elm Street Main Street (Route 28) at William Street Town of Stoneham. ROAD SAFETY AUDIT Main Street (Rute 28) at Elm Street Main Street (Rute 28) at William Street Twn f Stneham January 19, 2011 Prepared Fr: MassDOT Highway Divisin Prepared By: BETA Grup, Inc. Rad Safety

More information

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013 PUBLIC OPEN HOUSE Panet Rad / Mlsn Street Recnstructin April 24, 2013 T address issues assciated with traffic grwth arund Mlsn Street. Prject issues include: Delay at rail crssings Traffic cngestin at

More information

Technical Memorandum. Introduction. Projected Traffic Volumes

Technical Memorandum. Introduction. Projected Traffic Volumes Technical Memrandum T: Mr. Eduard Garcia, PSW Real Estate, LLC Frm: Christy Lambeth, P.E., PTOE Lambeth Engineering Assciates, PLLC, F-19508 Date: May 29, 2018 Re: Traffic Assessment fr Prpsed Single-Family

More information

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012 PUBLIC OPEN HOUSE Preliminary Engineering Study t Upgrade the Pembina Highway Underpass MAY 9, 2012 The number f nrthbund traffic lanes at the Pembina Highway Underpass need t be increased frm tw lanes

More information

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated. 100 20111 93A Avenue Langley, BC V1M 4A9 e bcta@bctrucking.cm t 604 888 5319 f 604 888 2941 tll free 1 800 565 2282 bctrucking.cm 16 th Avenue Crridr Imprvements BCTA Survey Results & Recmmendatins September

More information

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY

Comments Heard PUBLIC INFORMATION CENTRE #1: SUMMARY Images f cmmunity cmments n the Study Area maps The first Public Infrmatin Centre was held fr bth the Casablanca Bulevard and GO Access Envirnmental Assessment and the Livingstn Avenue Extensin Envirnmental

More information

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4 MEETING SUMMARY Nrth Avenue Recnstructin Prject Cntext Sensitive Slutins Advisry Grup Meeting #4 ATTENDEES: LOCATION: PREPARED BY: COPIES: Sign-in sheet attached Brkfield Library, Snia Bielmeier Cmmunity

More information

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission Philadelphia City Planning Cmmissin INSTRUCTIONS This Checklist is an implementatin tl f the Philadelphia Cmplete Streets Handbk (the Handbk ) and enables City engineers and planners t review prjects fr

More information

Projects, Grouped by MPO Investment Category

Projects, Grouped by MPO Investment Category FFYs 2019-2023 TIP Develpment: Descriptins f All Evaluated, Unfunded Prjects Prjects, Gruped by MPO Investment Categry Bicycle/Pedestrian 608006 Framingham Pedestrian Hybrid Beacn Installatin at Rute 9

More information

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include:

Location Consider areas in your community to focus attention on pedestrian safety. Example locations include: Crsswalk event verview (Saint Paul) A crsswalk event ccurs when an individual r grup f individuals prmte pedestrian safety by demnstrating the prper use f a crsswalk. During the event, a grup f cmmunity

More information

POWELL BOULEVARD ROAD SAFETY AUDIT

POWELL BOULEVARD ROAD SAFETY AUDIT Oregn Department f Transprtatin POWELL BOULEVARD ROAD SAFETY AUDIT 20th Avenue t 33rd Avenue September 2014 Prepared fr: ODOT Regin 1 Traffic 123 NW Flanders Prtland, OR 97209 503.731.8220 Prepared by:

More information

Completed Project Justification Package Example

Completed Project Justification Package Example Cmpleted Prject Justificatin Package Example Nature f the Prblem: Describe the nature f the prblem that the prject intends t mitigate r fix. Fr example, is it designed t address a current cngestin, peratinal

More information

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No. MEMORANDUM PROJECT: Nrth Santa Mnica Bulevard Resnsturctin Prject N. 1BEVO41000 T: frm: City f Beverly Hills Traffic and Cmmissin Psmas Iteris Date: July,9 2015 Subject: Traffic Mitigatin During NSMB Cnstructin

More information

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV Lamb Bulevard Safety Management Plan Between E. Desert Inn Rd. t Lake Mead Blvd. Clark Cunty, NV Tuesday, December 5, 2017 4-7 p.m. Presentatin at 5:30 p.m. Walnut Cmmunity Center 3075 N. Walnut Rd. Las

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Seven (7) Page Frm An Applicatin frm the State Highway r Transprtatin Department f Oklahma fr (select ne f the fllwing): Eliminatin f a U.S.

More information

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1

Alternative Ways to Improve Traffic on Loop 360 Paul Schumann 1 Alternative Ways t Imprve Traffic n Lp 360 Paul Schumann 1 February 13, 2015 Intrductin "Lp 360 prvides primary access t far west Austin, acting as a thrughfare fr residents and as a cmmuter rute fr thse

More information

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting MEETING MINUTES Athertn Middleield Rad Bicycle Lane Imprvements Public Meeting Date: Octber 2, 2017 Time: 4:00 pm 6:00 pm Lcatin: 94 Ashield Rad, Athertn, CA Presenters: Nadia Bsan, Interwest Cnsulting

More information

Project Advisory Team Existing Conditions Meeting Agenda

Project Advisory Team Existing Conditions Meeting Agenda Prject Advisry Team Existing Cnditins Meeting Agenda April 25, 2017 Viera Gvernmental Center, Atlantic Rm, Building C, 3 rd Flr 10:00 AM 12:00 PM Wickham Rad Operatinal Analysis 1. Prject Backgrund/Overview

More information

Presented by: Presented to:

Presented by: Presented to: The Challenge f Implementing Prtected Bike Lanes Delaware Avenue: A Case Study Demnstratin Presented by: Presented t: Octber 25, 2016 Presentatin Outline FAST Act Impact n Bicycle Facilities Planning Ptential

More information

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station CARLSON BOULEVARD CORRIDOR OVERVIEW The prtin f Carlsn Bulevard within the study area stretches apprximately 3.25 miles nrth t suth frm Maine Avenue t the El Cerrit Plaza BART Statin area near San Pabl

More information

South Portland Public Input Meeting Summary Notes and Public Comments

South Portland Public Input Meeting Summary Notes and Public Comments Prtland Suth Prtland Smart Crridr Plan Bradway Neighbrhd Meeting Intrductin Prtland Suth Prtland Smart Crridr Plan Suth Prtland Public Input Meeting Summary Ntes and Public Cmments Nvember 2, 2017, Suth

More information

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures

More information

Federal Way City Center Access Study Comment Log Summary

Federal Way City Center Access Study Comment Log Summary Prject verview The City f Federal Way is pursuing the City Center Access prject t find ways t imprve access t Federal Way s City Center and the surrunding area. The City is studying slutins t cngestin

More information

Technical Briefing Rapid Transit

Technical Briefing Rapid Transit Technical Briefing Rapid Transit T Rapid Transit Implementatin Wrking Grup Date March 6, 2017 Frm Subject The Shift Team Preferred Dwntwn Ruting The preferred Dwntwn rutes fr Rapid Transit are illustrated

More information

Nine Elms Lane and Battersea Park Road

Nine Elms Lane and Battersea Park Road Nine Elms Lane and Battersea Park Rad Sustrans respnse t Transprt fr Lndn Summary Sustrans welcmes the cnsultatin n prpsals fr changes t Nine Elms Lane and Battersea Park Rad, and supprts the ambitin t

More information

CHAPTER 4 VISION, GOALS AND OBJECTIVES

CHAPTER 4 VISION, GOALS AND OBJECTIVES CHAPTER 4 VISION, GOALS AND OBJECTIVES Defining a visin, gals, and bjectives creates the structure fr a plan. T develp the visin fr this Plan, the team reviewed the 2012 MPO Cmprehensive Pathways Plan

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Mnday, Nvember 12, 2018 6:00 p.m. (r immediately fllwing previusly scheduled meeting) Plice Department 933 Michigan Avenue Stevens Pint, WI 54481 AGENDA

More information

2017 Active Allegheny Grant Program Program Guidelines

2017 Active Allegheny Grant Program Program Guidelines Redevelpment Authrity f Allegheny Cunty Nte: Fr infrmatin purpses nly. Prgram guidelines subject t change prir t next funding cycle. 2017 Active Allegheny Grant Prgram Prgram Guidelines Intrductin The

More information

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network Mp, Revised Criteria and Joint Resolution EXECUTIVB SUMMARY Regular Bard Actin Item 98 Apprval f Revised Reginal Radway Netwrk M"p, Revised Criteria and Jint Reslutin Objective: Fr the Bard t apprve the revised Reginal Radway Netwrk Map, Revised

More information

Project No.: Notes taken by:

Project No.: Notes taken by: Transprtatin Land Develpment Envirnmental S e r v i c e s 101 Walnut Street Pst Office Bx 9151 Watertwn, MA 02471-9151 Telephne (617) 924-1770 Fax (617) 924-2286 Meeting Ntes Attendees: Attached Date/Time:

More information

Training Teams and Selection Criteria:

Training Teams and Selection Criteria: January 17, 2019 Biathln Canada 2019-2020 Training Selectin Criteria Intrductin: The purpse f this dcument is t define the selectin criteria fr athletes t be selected fr a Training. A Training is a grup

More information

Pedestrian Safety Fourth Grade Lesson 1. Subject: Health, Physical Education

Pedestrian Safety Fourth Grade Lesson 1. Subject: Health, Physical Education Pedestrian Safety Furth Grade Lessn 1 Subject: Health, Physical Educatin Materials: Chart Paper; Marker; 12 Picture Cards; Reflective Vest; Tw wastebaskets (r ther classrm items, i.e., chair, t be used

More information

A template mass rescue operations plan

A template mass rescue operations plan The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: T: Frm: Subject: Adam Varat and Ilaria Salvadri, City f San Francisc Clin Burgett, Fehr & Peers Intersectin Level f Service Analysis f Ptential Missin Streetscape Plan Imprvements

More information

Sellwood Bridge AM Traffic Evaluation

Sellwood Bridge AM Traffic Evaluation Sellwd Bridge AM Traffic Evaluatin SMILE Transprtatin Cmmittee Meeting Prtland Bureau f Transprtatin Jamie Jeffrey, Rich Newlands, Jake Milligan Gals and Objectives Understand and reduce the impacts f

More information

Meeting Summary Virginia Regional Transportation Safety Road Show Northern Virginia Meeting December 1, 2016

Meeting Summary Virginia Regional Transportation Safety Road Show Northern Virginia Meeting December 1, 2016 Virginia Strategic Highway Safety Plan Meeting Summary Virginia Reginal Transprtatin Safety Rad Shw Nrthern Virginia Meeting December 1, 2016 ATTENDEES Asma Ali, T3 Design Ivan Hrdyskyj, VDOT Sree Nampthiri,

More information

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner, Minutes f the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE DATE: December 10, 2015 TIME: PLACE: 10:00 a.m. Cnference Rm B Kensha Cunty Center 19600 75 th Street Bristl, WI Members Present Gary

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

Highway Construction

Highway Construction Ohi Department f Transprtatin Traffic Advisry DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 Nrth McCullugh St. Lima, Ohi 45801 www.transprtatin.hi.gv/dist1 www.facebk.cm/odotdistrict1; https://twitter.cm/dt_nwhi

More information

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK

GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK GIRLS ON THE RUN NYC 5k JUNE 4, 2017 VOLUNTEER HANDBOOK Page 2 Event Details Page 3.5k Vlunteer Descriptins Page 4-5..Vlunteer FAQs Please nte the Firefighters Field Map can be viewed at gtrnyc.rg/5kinf

More information

Introductory Training Guide. for. All New Students. Piscataway Martial Arts. www. PiscatawayDojo. Org. Belongs to. Student Name. Training Started On

Introductory Training Guide. for. All New Students. Piscataway Martial Arts. www. PiscatawayDojo. Org. Belongs to. Student Name. Training Started On Intrductry Training Guide fr All New Students At Piscataway Martial Arts www. PiscatawayDj. Org Belngs t Student Name Training Started On Date Persnal Prgress Lg My Martial Arts Jurney Student Name Date

More information

City of Ottawa. Transit Solutions. O c t o b e r

City of Ottawa. Transit Solutions. O c t o b e r City f Ottawa Prject N. 101-16386 O c t b e r 2 0 1 1 O p e r a t i n a l I m p a c t s a n d P l i c y I m p l i c a t i n s f B u s B a y s i n t h e C i t y f O t t a w a - E x e c u t i v e S u m m

More information

Users Requirements Statement

Users Requirements Statement Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin

More information

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options Glden Valley Rad Parking Management Strategies Assessment Purpse The purpse f the Parking Management Strategy Assessment is t synthesize parking discussins during the Metr Blue Line Extensin (Bttineau

More information

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 Athletic Australia Selectin Plicy 2019 Wrld Crss Cuntry Champinships ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 This dcument sets ut the basis

More information

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008 Binghamtn Metrplitan Transprtatin Study Pedestrian & Bicycle Advisry Cmmittee Meeting Minutes April 14, 2008 Attendance: Sctt Reigle, Tby Wllin, Christine Muss, Kris Gilbert, Warren Wetzelberg, Steven

More information

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts One Financial Plaza 1350 Main Street 3rd Flr, Cmmunity Rm A Springfield, Massachusetts 1 Leading the Natin in Transprtatin Excellence www.mass.gv/massdt April 9, 2015 Agenda Welcme & Intrductins Overview

More information

CITYCOUNCIL. CITY OF KENMORE Public Works Department PO Box Kenmore, WA David Baker, Mayor Allan VanNess, Deputy Mayor

CITYCOUNCIL. CITY OF KENMORE Public Works Department PO Box Kenmore, WA David Baker, Mayor Allan VanNess, Deputy Mayor CITYCUNCIL CUNCIL CITY David Baker, Mayor David Baker, Mayor Allan VanNess, Deputy Mayor Allan VanNess, Deputy Mayor Milton Curtis Milton Curtis Stacey Denuski Stacey Denuski Nigel Herbig Nigel Herbig

More information

Recreational Sports Racquetball Rules

Recreational Sports Racquetball Rules Recreatinal Sprts Racquetball Rules Mdificatins have been made t suit BYU-Idah Recreatinal Sprts prgrams. Rule 1: Players Racquetball is an individual sprt, as such each team shall cnsist f ne (1) player.

More information

Kilkivan State School Executive Summary

Kilkivan State School Executive Summary Kilkivan State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kilkivan State Schl frm 17 t 18 August 2015. It prvides an evaluatin f the schl s perfrmance

More information

SMALL SIDED FOOTBALL 2012

SMALL SIDED FOOTBALL 2012 Blacktwn Districts Sccer Ftball Assciatin Incrprated. SMALL SIDED FOOTBALL 2012 GUIDELINES FOR CLUB ADMINISTRATORS, SSF CO-ORDINATORS COACH S & REFEREES Nn Cmpetitive & Small Sided Ftball Frmats & Rules

More information

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018

District 6 and Unit 190 (D4) STaC - Conditions of Contest & Reporting Instructions Fall 2018 District 6 and Unit 190 (D4) STaC - Cnditins f Cntest & Reprting Instructins Fall 2018 Key Infrmatin fr Club Owners: Please read and pst near the scring cmputer fr the directrs use during STaC week. Sanctin

More information

Plain Language Summary

Plain Language Summary Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same

More information

USTA Atlanta Combo Doubles Registration Information Play begins in late April

USTA Atlanta Combo Doubles Registration Information Play begins in late April Serving Cbb, Fultn, Dekalb, Gwinnett and Frsyth cunties USTA Atlanta Cmb Dubles Registratin Infrmatin Play begins in late April Spring 2011 League Infrmatin and Dates NEW! Team Match Frmat: Each team match

More information

Kenmore South State School Executive Summary

Kenmore South State School Executive Summary Kenmre Suth State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kenmre Suth State Schl frm 26 t 28 Octber 2015. It prvides an evaluatin f the schl s

More information

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 PILKINGTON RESPONSE Rich Martink returned call n 8/10/2014 at 2:50pm and spke with Ms. Pilkingtn The infrmatin belw was given t her. She thanked me fr the fllw-up. Thank

More information

Bikeway Classification

Bikeway Classification Bikeway Classificatin Classificatin f bikeway types is an imprtant step t help planners cmprehend hw parts f the bike netwrk functin and wrk tgether. Classificatin can als prvide an understanding f the

More information

STATE OF NORTH CAROLINA Office of the State Auditor

STATE OF NORTH CAROLINA Office of the State Auditor STATE OF NORTH CAROLINA Office f the State Auditr Beth A. Wd, CPA State Auditr 2 S. Salisbury Street 20601 Mail Service Center Raleigh, NC 27699-0601 Telephne: (919) 807-7500 Fax: (919) 807-7647 Internet

More information

ESF #5 Emergency Management Annex (1.0)

ESF #5 Emergency Management Annex (1.0) ESF #5 Emergency Management Annex (1.0) DCCCD Emergency Management Apprval and Implementatin Dallas Cunty Cmmunity Cllege District Emergency Supprt Functin #5 Emergency Management Annex This Emergency

More information

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill. OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,

More information

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3 Supplement t Plicy 7 - Rep Hckey Date Revised: July 2017 Versin 1.3 1 Table f Cntents Table f Cntents 1 Rep Tryut Prcedure Guidelines 2 Intrductin: 2 Rep Tryut Objectives: 2 Purpse f Player Evaluatin and

More information

Hudson Bay Mountain Resort Uphill Travel Policy

Hudson Bay Mountain Resort Uphill Travel Policy Hudsn Bay Muntain Resrt Uphill Travel Plicy Hudsn Bay Muntain Resrt welcmes winter uphill travel enthusiasts by means f skinning and snwsheing. In rder t help prvide a fun safe experience fr bth uphill

More information

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons: 6.004. Plicy Cncerning Schl Attendance and Truancy 6.004. Plicy Cncerning Schl Attendance and Truancy Cperative Educatinal Services (C.E.S.) believes that regular schl attendance is essential fr an effective

More information

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary

TRANSPORTATION IMPACT ASSESSMENT. Executive Summary TRANSPORTATION IMPACT ASSESSMENT Executive Summary OVERVIEW Early in ur dialgue with neighburs, the prject team fund that a number f cmmunity members had questins abut the impact that the prpsed develpment

More information

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan Swim Arund Lid Key Saturday, April 22, 2017 Race and Safety Plan This dcument utlines the details abut the race and safety plans fr ur 7-mile pen water race n Lid Key, Flrida. It cntains the fllwing: Race

More information

Appendix C. Travel Demand Forecasting Technical Memorandum

Appendix C. Travel Demand Forecasting Technical Memorandum Appendix C Travel Demand Frecasting Technical Memrandum MEMORANDUM Date: T: Frm: Subject: Bb Watts, Twn f Castle Rck Karl Buchhlz, Muller Engineering Chris Sheffer, Nick VanderKwaak, Fehr & Peers Travel

More information

Modified ISL Playing Rules

Modified ISL Playing Rules Mdified ISL Playing Rules Althugh all FIFA Laws f the games will be applied during the games, belw are specific laws that have been mdified fr use in yuth league games. T differentiate between the FIFA

More information

CITY OF SACRAMENTO. Regulatory Compliance Program

CITY OF SACRAMENTO. Regulatory Compliance Program CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03

More information

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature Fire Chief Signature Date Effective: 01apr13 Revised: Page: 1 f 5 Purpse: T establish standards fr GFD peratins when facilitatings ice r water rescue incidents,including safety cnsideratins, respnsibility,

More information

Positive Handling Policy

Positive Handling Policy Hillcrest Children s Services Jubilee Schl Psitive Handling Plicy Lcal Prcedure Owner: Tim Rgers Issue date: September 2016 Review date: September 2017 Linked with lcal prcedures: Anti Bullying Behaviur

More information

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

DRAFT - TRANSPORTATION AND PUBLIC HEALTH DRAFT - TRANSPORTATION AND PUBLIC HEALTH Backgrund/Intrductin Transprtatin Outlk 2040, the Kansas City regin s lng-range transprtatin plan, includes a public health gal t facilitate healthy, active living.

More information

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur

More information

Modified ISL Playing Rules

Modified ISL Playing Rules Mdified ISL Playing Rules Althugh all FIFA Laws f the games will be applied during the games, belw are specific laws that have been mdified fr use in yuth league games. T differentiate between the FIFA

More information

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone.

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone. Shuld I wear an aer helmet? This is a great questin and ne n hand, the answer is easy: Yes, buy any equipment that will reduce air resistance during cycling. On the ther hand, the answer is mre cmplicated

More information

Appendix A. Bicycle Design Guidelines

Appendix A. Bicycle Design Guidelines Appendix A This Appendix includes the fllwing guidelines: Appendix A. Bicycle Design Guidelines The design guidelines presented in this appendix are a cmbinatin f minimum standards utlined by the Califrnia

More information

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents Installatin Manual fr VersaScreen Pr and VersaScreen IceBlaster Gutter Prtectin Prducts Table f Cntents VersaScreen/VersaScreen Pr Installatin p. 2-4 VersaScreen IceBlaster p. 5-7 IceBlaster RE p. 5-6

More information

Grade 11 Performance Task

Grade 11 Performance Task Thermmeter Crickets 1. Classrm Activity 2. Student Task 3. Task Specificatins 4. Scring Rubric Classrm Activity Nte: Since perfrmance tasks span different parts f the assessment system (summative, interim,

More information

Highway Construction

Highway Construction Ohi Department f Transprtatin Traffic Advisry DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 Nrth McCullugh St. Lima, Ohi 45801 www.transprtatin.hi.gv/dist1 www.facebk.cm/odotdistrict1; https://twitter.cm/dt_nwhi

More information

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE Are the emplyees r cntractrs wh wrk in yur facility expsed t cnfined space hazards? Have yu cnducted a thrugh assessment f yur facility

More information

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings

More information

Parking Committee Report to Commissioners AUGUST 17, 2018

Parking Committee Report to Commissioners AUGUST 17, 2018 Parking Cmmittee Reprt t Cmmissiners AUGUST 17, 2018 REHOBOTH IN THE SUMMER The Cmmittee Linda Kauffman Chair Trey Krause Mark Saunders Je Hill Jess Behringer Randy Masn Brian Barry Jeff Hamer The Basics

More information

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success) ELLERSLIE AFC OPERATIONAL PLAN (Game Develpment and Ftball Success) Ellerslie AFC has a reputatin thrughut the Auckland ftball cmmunity as a family-friendly club that prvides an enjyable and rewarding

More information

Deer harvest objective for the Deer Plan

Deer harvest objective for the Deer Plan Deer harvest bjective fr the Deer Plan December 12, 2017 Summary and Backgrund fr DMPAC April 2018 NOTE: THIS IS A COPY OF A DOCUMENT DISCUSSED WITH DMPAC IN 2017. IT CONTAINS INFORMATION CONSIDERED BY

More information

Stakeholder Working Group (SWG) Meeting #2 Summary

Stakeholder Working Group (SWG) Meeting #2 Summary Stakehlder Wrking Grup (SWG) Meeting #2 Summary Date: Thursday, September 22, 2016 Time: 5:30-7:30 PM Lcatin: Fur Mile Histric Park Overview The G Speer Leetsdale Mbility Study is explring ptential imprvement

More information

MECHANICS & TECHNIQUES 3PO

MECHANICS & TECHNIQUES 3PO MECHANICS & TECHNIQUES 3PO FIBA Main Cmpetitins Summer 2014 2 This material includes mre practical apprach and detailed techniques fr sme key situatins n the curt and it is based n FIBA Referees Manual

More information

HAWKS Flag Football Rule Book. First Edition. 1/1/2017 Spring Hill Hawks

HAWKS Flag Football Rule Book. First Edition. 1/1/2017 Spring Hill Hawks HAWKS 2017 Flag Ftball Rule Bk First Editin 1/1/2017 Spring Hill Hawks GAME At the start f each game, captains frm bth teams shall meet at midfield fr the cin tss t determine wh shall start with the ball.

More information

Kowanyama State School Executive Summary

Kowanyama State School Executive Summary Kwanyama State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kwanyama State Schl frm 16 t 19 March 2015. It prvides an evaluatin f the schl s perfrmance

More information

Traffic & Safety Update

Traffic & Safety Update Traffic & Transprtatin Safety Update Mary Ellen Dunn Asst. Supt. Finance and Business Operatins Liaisn,Traffic Safety Advisry Cmmittee and Schl Transprtatin & Safety Study Judy Crcker Chair, Schl Transprtatin

More information

!! 1st/ 2nd Grade. 3rd Grade

!! 1st/ 2nd Grade. 3rd Grade !! 1st/ 2nd Grade 3rd Grade This is an intrductry prgram. Players are put n teams based n request, their schl r prximity t ther players. At this level caches simply wrk with the players n fundamental skills

More information

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads Guidance n Exceptin Reprting fr Educatinal and Clinical Supervisrs and Leads Exceptin Reprting is the mechanism used by dctrs t infrm the emplyer when their day-t day wrk varies significantly and/r regularly

More information

OFFICIAL RULES FIELD:

OFFICIAL RULES FIELD: OFFICIAL RULES FIELD: The kickball diamnd is a square with equal sides f apprximately 60 feet. There will be a pitcher s circle that designates the 'area f cntrl'. Once the ball is returned t this area

More information

URGENT MEDICAL DEVICE RECALL : /29/ C Z

URGENT MEDICAL DEVICE RECALL : /29/ C Z Custmer Cde Number: ##### Custmer Address City, State, Zip Cuntry Attentin: Risk Management Attentin: Reference: URGENT MEDICAL DEVICE RECALL March 09, 2012 Risk Management, Operating Rm Directr, Operating

More information

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems General Industry Tlbx Talks Prviding Excellence in Regulatry Cmpliance Management Systems General Industry Tlbx Talks Table f Cntents Why Safety Meetings are Imprtant...- 3 - Guidelines fr Safety Training

More information

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work Field Instructin 5.2 Ples Inspectin and Supprt Prir t Cmmencement f Wrk Purpse This instructin utlines the minimum inspectin and supprting requirements fr wrk n ples. Safety Befre cmmencement f wrk, a

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

Cycling Strategy Group. Terms of Reference

Cycling Strategy Group. Terms of Reference Cycling Strategy Grup Terms f Reference 1. Cntext In May 2014 the Ecnmic and Envirnmental Wellbeing Scrutiny and Plicy Develpment Cmmittee cncluded its Cycling Inquiry. It set ut an ambitius visin fr cycling

More information

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad. Selectin Plicy fr Badmintn Australia Supprt Structure (BASS) and Natinal Squad. Prgram Outline The main purpse f the Badmintn Australia s (BA) High Perfrmance (HP) prgram is t achieve internatinal success.

More information

Pike County Housing Authority Trespass Policy i

Pike County Housing Authority Trespass Policy i Pike Cunty Husing Authrity Trespass Plicy i Intrductin This sectin explains the cmpnents f the Pike Cunty Husing Authrity s (PCHA) trespass plicy, based n HUD regulatins, State f Illinis statutes, and

More information

Carlsbad Galaxy 2018 Referee Meeting

Carlsbad Galaxy 2018 Referee Meeting Carlsbad Galaxy 2018 Referee Meeting Assignr: Betsy Nanthakumar Directr f Recreatin: Gregg Cacipp 760-505-0154 (after 5pm n weekdays) 760-224-1173 referee@lagalaxysd.cm Gregg@lagalaxysd.cm CalSuth Referee

More information

CITY of LOMPOC 2030 General Plan

CITY of LOMPOC 2030 General Plan 2030 General Plan INTRODUCTION AND AUTHORITY The Circulatin Element is required by the Gvernment Cde [Sectin 65302(b)], which states that the Circulatin Element must include the general lcatin and extent

More information