1 Appendix H Traffic Study Report

2 City of Oshawa Thornton Road Environment Assessment Traffic Study Report May 215

3

4 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ i

5 Table of contents 1. Introduction Traffic forecasting Baseline (213) traffic conditions Future (231) traffic conditions Traffic assessment Baseline (213) traffic conditions Future (231) traffic conditions...17 Table index Table 1 Baseline (213) traffic conditions...16 Table 2 Future (231) Do Nothing traffic conditions...19 Table 3 Future (231) four-lane cross section traffic conditions...21 Table 4 Thornton Road / Taunton Road right turn lane sensitivity results...22 Figure index Figure 1 Baseline traffic data...3 Figure 2 Baseline (213) traffic volumes...4 Figure 3 Future (231) natural growth traffic volumes...6 Figure 4 Location of developments Figure 5 Location of Northwood Industrial Park...8 Figure 6 Potential development traffic volumes...9 Figure 7 Highway 47 Thornton interchange ramp traffic volumes related to development...11 Figure 8 Winchester Road traffic diversion to Highway Figure 9 Future (231) traffic volumes...13 Figure 1 Existing lane configuration...15 Figure 11 Do Nothing lane configuration...18 Figure 12 Future (231) lane configuration...2 Figure 13 Future (231) recommended lane configuration...24 ii Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

6 Appendices Appendix A Traffic data and growth rate Appendix B Derivation of future traffic Appendix C Background study excerpts Appendix D Existing traffic conditions Appendix E Future Do Nothing traffic conditions Appendix F Future widening traffic conditions Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ iii

7

8 1. Introduction was retained by City of Oshawa to conduct the Thornton Road EA study. Our study corridor is the segment of Thornton Road between Winchester Road to the north and Taunton Road to the south in the City of Oshawa. The objective of this report is to describe the method adopted by to forecast future (231) traffic volumes on Thornton Road, present the traffic operational conditions of the future horizon (231) and recommend roadway, intersection and traffic control improvements to mitigate the impacts of future traffic growth within the Thornton Road corridor. Our findings are herein. Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 1

9 2. Traffic forecasting 2.1 Baseline (213) traffic conditions obtained the existing turning movement counts (TMCs) at the intersections of Thornton Road & Winchester Road and Thornton Road & Taunton Road from the Region of Durham, which are dated April 1, 213 and October 6, 211, respectively, found In Appendix A. Since the Region does not have recent counts at the intersection of Thornton Road & Conlin Road, we reviewed background studies and obtained this information from the Dantonbury Windfields West Development Traffic Study dated March 3, 212, prepared by the MMM Group. Figure 1 shows the raw traffic data. Since the dates of the traffic data vary (some of the information dating back two years), we reviewed background reports and historical data in the study area, in order to see if any adjustments were necessary to best represent the present day (213). According to the Dantonbury Windfields West Development study, a 1% annual growth was adopted for future north-south through volumes along Thornton Road and for east-west through volumes crossing Thornton Road (at Taunton, Winchester and Conlin). This forecasting approach contrasts against a review of historical annual average daily traffic volumes (AADT) data, which indicates decreasing traffic volumes (negative growth) on Thornton Road. The related data and reviewing process are included in Appendix A. Although historic data suggests otherwise, we have adopted a conservative 1% annual growth rate and applied it to the existing traffic data as appropriate except for the north-south volumes traveling the Thornton Road corridor to establish baseline (213) traffic volumes. This approach reasonably posits there has been growth in east-west travel on Taunton, Conlin, and Winchester, but also acknowledges there has been little north-south growth recently along Thornton (as borne out in the historic data). We believe this is a reasonable approach to equalize the volumes for the baseline condition. A somewhat different approach was adopted for the long-term future traffic forecasting exercise, which follows in subsequent sections of this report. After the above baseline growth rates were applied, the intersection volumes were then adjusted to better balance the north-south link volumes between key study intersections. Figure 2 shows the adjusted and balanced baseline (213) traffic volumes. 2 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

10 Figure 1 Baseline traffic data Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 3

11 Figure 2 Baseline (213) traffic volumes 4 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

12 ":' -~ --~~~ ~7 -_,- _ - _ :: - _ - ~ _.,.,..-fj i":-1.-'-- ~ ~,, --.fl.~:_. 11_ / ,. -:: 2.2 Future (231) traffic conditions To derive the future (231) traffic volumes, considered the following: Natural growth Potential development traffic Highway 47 I Thornton Road interchange ramp volumes Traffic diversion from Winchester Road to Highway 47 The details of these four steps in deriving the future traffic forecasts are provided in Appendix B Natural growth As discussed previously in Section 2.1, an annual growth rate of 1 % was again applied to forecast the future (231') 'natural growth' in traffic volumes (i.e., non-specific background inte-regionallinter City growth). This results in a compounded growth of 2% from the baseline (213) traffic volumes. Please note that the 1% is not applied to Thornton Road north-south volumes as discussed in Section 2.1 and does not consider the future Highway 47 ramp volumes and nearby background developments - both of which are treated as separate traffic generators more directly affecting Thornton Road. The resultant future (231) 'natural growth' volumes are illustrated in Figure 3. I Report for Cily of Oshawa Thornton Road Environment Assessment. 28/

13 Figure 3 Future (231) natural growth traffic volumes 6 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

14 2.2.2 Potential development traffic After reviewing the Traffic Study, Dantonbury Windfields West Development, City of Oshawa and in consultation with City of Oshawa staff, identified the following developments to be considered as direct traffic contributors to the Thornton Road corridor: 1. Dantonbury and Urban Village developments at the Windfields West Development area; 2. Windfields North Central Commercial Area (RioCan Development); 3. Minto Communities Residential Development; 4. Metrus Residential Development; 5. UOIT North Campus; 6. Highway 47 East Park-and-Ride Facility; and, 7. Northwood Industrial Park. The locations of these developments are illustrated in Figure 4. The location of Northwood Industrial park is shown in Figure 5. The total traffic volumes generated by the developments listed above, as derived from other studies and as per standard trip generation, distribution, and assignment procedures can be found in Figure 6. Winchester Road Thornton Road Dantonbury & Urban Village Britannia Avenue Conlin Road Simcoe Street Figure 4 Location of developments 1-6 (Source: Dantonbury Windfields West Development Traffic Study) Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 7

15 Winchester Road Northwood Industrial Park Conlin Road Thornton Road Stevenson Road Simcoe Street Taunton Road Figure 5 Location of Northwood Industrial Park (Source: Northwood Industrial Park Area Transportation Master Plan Public Open House Panel) 8 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

16 Figure 6 Potential development traffic volumes Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 9

17 2.2.3 Highway 47 / Thornton Road interchange ramp volumes Based on pre-consultation with the city staff, it was confirmed that the 47 / Thornton Road Interchange will be in place within our study horizon (i.e. by 231). To derive the future interchange ramp volumes, reviewed the 47 Traffic Report which was prepared by AECOM in July 21. The forecasted ramp volumes contained in the AECOM study included the traffic generated by the background developments discussed in Section Consequently, we considered the difference between the ramp volumes and our forecasts. The associated study excerpts are included in Appendix C. The ramp volumes associated with development were distributed through our study corridor according to existing traffic patterns at the study intersections. The resultant 47 Interchange ramp volumes are illustrated in Figure Winchester Road traffic diversion to Highway 47 In comparing our traffic forecasts along Winchester Road with the forecasts in the 47 Traffic Report, our forecasts appear higher. This is the result of diversion to the new Highway 47 from other east-west corridors. Consequently, to be consistent with the forecasts in the 47 Traffic Report some of the east-west volumes on Winchester Road were diverted onto the 47ETR. For example, during the am peak, a 4% diversion of eastbound traffic and a 6% diversion of westbound traffic was assumed, while during the pm peak, a 55% diversion of eastbound traffic and a 1% diversion of westbound traffic along Winchester Road was assumed. The resultant total volumes are consistent with or slightly higher than the forecasts in the 47 Traffic Report. The diversion volumes are illustrated in Figure Total (231) traffic volumes By combining the natural traffic growth, potential future development traffic, Highway 47 / Thornton Road interchange ramp volumes, and estimated traffic diversion from Winchester Road to Highway 47, the total (231) traffic volumes were derived. The total (231) traffic volumes are illustrated in Figure 9. 1 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

18 Figure 7 Highway 47 Thornton interchange ramp traffic volumes related to development Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 11

19 Figure 8 Winchester Road traffic diversion to Highway Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

20 Figure 9 Future (231) traffic volumes Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 13

21 3. Traffic assessment In this chapter, analyzes the traffic operations at the study intersections for our study horizons. The effectiveness of an intersection s operations is generally measured in terms of Level-of-Service (LOS). LOS ranges from LOS A to LOS F, with LOS A being the best level of operation for an intersection representing free flow conditions where the general level of comfort and convenience experienced by motorists is excellent. LOS F represents an at-capacity condition usually associated with heavy congestion, and occasionally severe delays and queuing. Another metric that is useful for assessing intersection operations is volume to capacity ratio (V/C). A v/c ratio of over 1. represents an at-capacity condition. The following capacity analyses are based on the methodology contained in the 2 Highway Capacity Manual, which assigns an intersection Level of Service (LOS) based on the average control delay experienced by each vehicle passing through an intersection. The signalized intersections are assessed using Synchro v8., while the the capacity analysis at the roundabout is conducted using ACRADY software. 3.1 Baseline (213) traffic conditions Using the existing study road network as shown in Figure 1, analyzed the existing traffic operating conditions at the study intersections. The capacity analysis results of the baseline (213) are summarized in Table 1. The detailed capacity calculation worksheets are provided in Appendix D. 14 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

22 Note This is the 213 lane configuration. Currently, a roundabout has been constructed and opened in early 214. Figure 1 Existing lane configuration Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 15

23 Table 1 Baseline (213) traffic conditions 1n1ersec 1ion Control Type Overall v/c (LOS} Delay in Seconds AM Peak Period Critical/ Key M"lvements v/c(los} Delay in Seconds 95th %ile Queues(m) Overall v/c (LOS) Delay in Seconds -1 PM Peak Period Cril ical/ Key Movements v/ c(los) Delay in Seconds 9Sth %ile Qu eues (m) Thornton Road & Winchester Road Two-way Stop NBTUI 1.59 (F) >2 EBTLR =.1 (A) WBTLR =.6 (A) 2 NBTLR "1.59 (F} >2 S8TLR =.86 (F) 11 EBTLR =Sm WBTLR=5 m N8TLR=85 m SBTLR =45 m NBTLR 1.87 (F) >2 EBTUI =.2 (A) WBTLR.3 (A) 1 NBTLR = 1.87 (F) >2 SBTLR =.64 (F) 66 EBTLR = 5 m WBTLR=S m NBTLR llsm SBTLR 3m Thornton Road & Conlin Road EBTLR ".75 () 3 EBTLR =Om WSTLR =.81 (E) 36 WBTLR=Om AM-way Stop (OJ 3 ()29 NSTLR =.69 () 26 NBTLR=Om SSTLR ".66 (O) 25 SBTLR =Om Roundabout (Slngle lane) {A) <S SB=.19 (A) 3 EB =.22 (A) 3 NB=.1 (A) 3 WB =.22 (A) 3 58<25 m E8<2Sm NB<25 m WB<25m (A)<S EBTLR =.71 () 26 W8TLR :.85 (E) 38 NBTLR =.71 () 26 SBTLR =.44 (C) 17 SB=.13 (A) 3 EB.21 (A) 3 NB a:.12 (A)3 WB =.25 (A) 3 EBTLR:Om WBTLR Om NBTLR=Om SBTLR Om 58<25 m EB<2S m N8<25m W8<2Sm Thornton Road & Taunton Road Signal.71 (CJ 25 EBL.44 (C) 26 EBTR =.87 () 36 WBL =.78 (C) 29 WBTR =.65 (8) 17 NBL.53 (C) 3 NBT =.32 (C) 22 NBR =.14 (8) 2 SBL =.8 (BJ 19 SBTR =.54 (C) 26 EBL= 25 m EBTR = 12 m WBL=SS m WBTR=95 m NBL 45m N8T=45m NBR= lsm SBL= 1 m SBTR=75 m 1.3 (C)32 EBL =.12 (B) 14 EBTR =.9 (C) 3 WBL 1.19 (F) 143 WBTR =.51 (8) 12 NBL =.66 () 38 NBT =.5 (C) 29 NBR".36 (C) 26 SBL =.23 (CJ 25 SBTR.44 (C) 28 EBL=lO m EBTR m WBL=8m WBTR 7m NBL=6m NBT=65 m NBR=4m SBL 2m SBTR=SS m Thornton Road & Winchester Road At this two-way stop control interesection, during am and pm peak periods both northbound and southbound left/through/right shared movements have LOS 'F'. The volume to capacity ratio (vie) for the northbound lefvthrough/right shared movement is over 1. during both am and pm periods, indicating an at-capacity condition. Thornton Road &Conlin Road At this all-way slop control intersection, during am and pm peak periods westbound left/through/right shared movement has LOS 'E'. These long delays do not translate into extraordinarily poor vie ratios; both am and pm remaining within theorectical capacity. Currently, a roundabout has been constructed and opened in early 214. The roundabout at Thornton and Conlin works better (all LOS 'A') as single lane entries on all legs. For future traffic volumes (231) there were 2 alternatives: a partial 2-lane with right-turn by-passe!? North- and Southbound, and a full 2 lane roundabout. Thornton Road & Taunton Road At this signalized intersection, during pm peak period the overall vie ratio is 1.3 which represents that the intersection operates at-capacity. The westbound left tum movement has LOS 'F' with 1.19 vie ratio. 16 IGHO IReport for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

24 3.2 Future (231) traffic conditions Do Nothing Alternative (Two-Lane Alternative) In this section, examined the traffic operating conditions by applying future forecasted traffic volumes (i.e. as shown in Figure 9) to the Do Nothing study road network as shown in Figure 11. Please note that in the Do Nothing study road network Thornton Road keeps its two-lane crosssection and at the new intersections adopts the control type and the lane configurations of those documented in the background studies mentioned in Section 2. The associated capacity analysis results are summarized in Table 2. The detailed capacity calculation worksheets are provided in Appendix E. Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 17

25 Note This is the 213 lane configuration. Currently, a roundabout has been constructed and opened in early 214. The roundabout lane configuration is shown below. Figure 11 Do Nothing lane configuration 18 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

26 Table 2 Future (231) Do Nothing traffic conditions Intersection Control Type Overall v/c (LOS) Delay in Seconds AM Peak Period Critical/ Key Movements v/c(los) Delay in Seconds 95th %ile Queues (m) Overall v/c (LOS) Delay in Seconds PM Peak Period Critical/ Key Movements v/c(los) Delay in Seconds 95th %ile Queues (m) Thornton Road & 47 North Ramp Signal.6 (C) 21 WBLR =.76 (D) 35 WBR =.3 (C) 26 NBTR =.54 (B) 11 SBTL =.4 (A) 1 WBLR = 7 m WBR = 1 m NBTR = 9 m SBTL = 45 m.59 (A) 8 WBLR =.25 (D) 41 WBR =.2 (D) 4 NBTR =.55 (A) 5 SBTL =.62 (A) 8 WBLR = 1 m WBR = 1 m NBTR = 65 m SBTL = 6 m Thornton Road & Winchester Road Two-way Stop SBTLR > 2. (F) >2 EBTLR =.1 (A) WBTLR =.22 (A) 6 NBTLR = > 2. (F) >2 SBTLR = > 2. (F) >2 EBTLR = 5 m WBTLR = 1 m NBTLR = Exceed 1 SBTLR = Exceed 1 SBTLR > 2. (F) >2 EBTLR =.2 (A) 1 WBTLR =.8 (A) 2 NBTLR = > 2. (F) >2 SBTLR = > 2. (F) >2 EBTLR = 5 m WBTLR = 5 m NBTLR = Exceed 1 SBTLR = Exceed 1 Thornton Road & 47 South Ramp Signal 1.23 (F) 123 WBLR = 1.36 (F) 22 NBTR =.45 (B) 16 SBTL = 1.15 (F) 11 WBLR = 26 m NBTR = 7 m SBTL = 29 m.83 (C) 21 WBLR =.79 (D) 47 NBTR =.84 (B) 18 SBTL =.35 (A) 7 WBLR = 75 m NBTR = 235 m SBTL = 5 m Thornton Road & Britannia Ave Signal >2. (F) >2 WBL =.83 (D) 53 WBR =.8 (C) 32 NBTR =.72 (B) 12 SBTL = >2. (F) >2 WBL = 8 m WBR = 15 m NBTR = 13 m SBTL = 42 m >2. (F) >2 WBL = 1.19 (F) 146 WBR =.6 (C) 29 NBTR = 1.2 (F) 115 SBTL = >2. (F) >2 WBL = 15 m WBR = 15 m NBTR = 38 m SBTL = 385 m Thornton Road & Conlin Road All-way Stop (F) >2 Roundabout (Partial Twolane) (F) 165 EBTLR = >2. (F) >2 WBTLR = >2. (F) >2 NBTLR = >2. (F) >2 SBTLR = >2. (F) >2 SB = 1.33 (F) 565 EB =.59 (A) 5 NB =.77(C) 21 WB =.5 (A) 4 EBTLR = m WBTLR = m NBTLR = m SBTLR = m SB = 14 m EB = <25 m NB = 7 m WB = <25 m (F) >2 (F) 148 EBTLR = >2. (F) >2 WBTLR = >2. (F) >2 NBTLR = >2. (F) >2 SBTLR = >2. (F) >2 SB = 1.32 (F) 537 EB =.57 (A) 5 NB =.97 (F) 73 WB =.64 (A) 6 EBTLR = m WBTLR = m NBTLR = m SBTLR = m SB = 132 m EB = <25 m NB = 378 m WB = <25 m Thornton Road & Taunton Road Signal >2. (F) >2 EBL = >2. (F) >2 EBTR = 1.8 (F) 81 WBL =.79 (C) 33 WBTR =.91 (C) 27 NBL = 1.76 (F) >2 NBT =.93 (D) 5 NBR =.14 (C) 21 SBL = 1.9 (F) >2 SBTR = 1.26 (F) 158 EBL = 16 m EBTR = 18 m WBL = 6 m WBTR = 165 m NBL = 75 m NBT = 165 m NBR = 15 m SBL = 7 m SBTR = 245 m >2. (F) >2 EBL = 1.22 (F) 182 EBTR = 1.6 (E) 66 WBL = 1.2 (F) 152 WBTR =.74 (B) 16 NBL = >2. (F) >2 NBT = 1.4 (F) 82 NBR =.38 (C) 28 SBL = >2. (F) >2 SBTR = 1.89 (F) >2 EBL = 6 m EBTR = 22 m WBL = 8 m WBTR = 12 m NBL = 85 m NBT = 175 m NBR = 45 m SBL = 14 m SBTR = 345 m Note: 1 Exceed available link length From Table 2, it can be seen that except for the intersection of Thornton Road & 47 North Ramp under the Do Nothing conditions all intersections have either overall or individual movements performing at poor LOS and/or high v/c ratios Widening Alternative In this section, we examined the traffic operating conditions by applying the forecasted traffic volumes (i.e. as shown in Figure 9) with the proposed future road study network as shown in Figure 12 (i.e. four-lane cross-section on Thornton Road). The associated capacity analysis results are summarized in Table 3. The detailed capacity calculation worksheets are provided in Appendix F. Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 19

27 Figure 12 Future (231) lane configuration 2 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

28 Table 3 Future (231) four-lane cross section traffic conditions AM Peak Period PM Peak Period Part Control Type Overall v/c (LOS) Delay in Seconds Critical/ Key Movements v/c(los) Delay in Seconds 95th %ile Queues (m) Overall v/c (LOS) Delay in Seconds Critical/ Key Movements v/c(los) Delay in Seconds 95th %ile Queues (m) Thornton Road & 47 North Ramp Signal.43 (B) 16 WBLR =.71 (C) 28 WBR =.3 (C) 21 NBTR =.31 (A) 8 SBL =.22 (A) 9 SBT =.1 (A) 7 WBLR = 55 m WBR = 1 m NBTR = 35 m SBL = 15 m SBT = 15 m.37 (A) 6 WBLR =.25 (D) 4 WBR =.2 (D) 39 NBTR =.27 (A) 3 SBL =.38 (A) 5 SBT =.8 (A) 2 WBLR = 1 m WBR = 1 m NBTR = 15 m SBL = 2 m SBT = 1 m Thornton Road & Winchester Road Signal.76 (C) 28 EBL =.3 (B) 19 EBTR =.91 (D) 45 WBL =.8 (C) 33 WBTR =.37 (B) 14 NBL =.61 (D) 38 NBTR =.52 (C) 23 SBL =.11 (B) 19 SBTR =.59 (C) 24 EBL = 5 m EBTR = 15 m WBL = 55 m WBTR = 5 m NBL = 4 m NBTR = 65 m SBL = 1 m SBTR = 75 m.95 (C) 31 EBL =.13 (B) 18 EBTR =.95 (D) 49 WBL =.47 (C) 2 WBTR =.8 (C) 24 NBL =.65 (C) 26 NBTR =.66 (C) 26 SBL =.25 (C) 34 SBTR =.32 (C) 31 EBL = 1 m EBTR = 18 m WBL = 15 m WBTR = 145 m NBL = 55 m NBTR = 85 m SBL = 15 m SBTR = 3 m Thornton Road & 47 South Ramp Signal.89 (C) 33 WBLR =.95 (D) 41 NBTR =.34 (C) 22 SBL =.1 (B) 2 SBT =.81 (C) 32 WBLR = 25 m NBTR = 4 m SBL = 1 m SBT = 11 m.52 (B) 13 WBLR =.71 (D) 36 NBTR =.46 (A) 8 SBL = () SBT =.19 (A) 6 WBLR = 6 m NBTR = 65 m SBL = m SBT = 25 m Thornton Road & Britannia Ave Signal.58 (B) 11 WBL =.66 (C) 31 WBR =.8 (C) 23 NBT =.31 (A) 7 NBR =.15 (A) 6 SBL =.56 (B) 13 SBT =.55 (A) 9 WBL = 55 m WBR = 15 m NBT = 35 m NBR = 1 m SBL = 5 m SBT = 75 m.82 (B) 2 WBL =.89 (D) 38 WBR =.6 (B) 16 NBT =.75 (C) 22 NBR =.3 (B) 16 SBL =.57 (B) 14 SBT =.44 (B) 1 WBL = 9 m WBR = 1 m NBT = 8 m NBR = 2 m SBL = 15 m SBT = 4 m Thornton Road & Conlin Road Roundabout (Full Twolane) (A) 5 SB =.63(A) 6 EB =.66 (A) 7 NB =.48 (A) 4 WB =.5 (A) 4 SB = <25 m EB = <25 m NB = <25 m WB = <25 m (A) 6 SB =.61 (A) 6 EB =.62 (A) 5 NB =.62 (A) 6 WB =.65 (A) 6 SB = <25 m EB = <25 m NB = <25 m WB = <25 m Thornton Road & Taunton Road Signal 1.11 (F) 97 EBL =.95 (E) 71 EBTR =.84 (D) 35 WBL =.92 (E) 66 WBTR = 1.21 (F) 139 NBL =.89 (E) 79 NBTR = 1.23 (F) 168 SBL =.65 (D) 39 SBTR =.98 (E) 74 EBL = 125 m EBTR = 17 m WBL = 95 m WBTR = 29 m NBL = 55 m NBTR = 17 m SBL = 45 m SBTR = 14 m 1.22 (F) 119 EBL = 1.31 (F) 231 EBTR = 1.15 (F) 111 WBL =.94 (E) 77 WBTR =.74 (C) 22 NBL =.81 (E) 56 NBTR = 1.42 (F) 248 SBL =.95 (E) 68 SBTR = 1.28 (F) 185 EBL = 75 m EBTR = 295 m WBL = 9 m WBTR = 155 m NBL = 65 m NBTR = 18 m SBL = 115 m SBTR = 195 m Table 3 indicates that although an improvement, with that with the four-lane cross section all intersections are expected to operate within design capacity and have acceptable LOS (LOS E or better). The glaring exception to this is the intersection of Thornton Road and Taunton Road. This intersection has been subject to further investigation and mitigation as described in the next section. The roundabout at Thornton and Conlin works better as two circulating lanes (with two-lane north and south approaches). The current single lane roundabout will be modified to accommodate the additional lane at the north and south approaches in the preferred design scenario. Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 21

29 3.2.3 Right Turn Lane Sensitivity Analysis To examine the effects of installing exclusive right turn lanes and to help mitigate the impacts of future traffic growth, we also conducted a sensitivity analysis at the intersection of Thornton Road and Taunton Road. We tested the effects of exclusive right turn lanes individually at each of the approaches at this intersection, as well as at all four approaches together, with the results summarized in Table 4. From the results, it can be concluded that implementing incremental right turn lanes at individual approaches mitigates the traffic operations at that approach, however leaves the other approaches functioning with poor levels of service. Therefore, it is recommended that an exclusive right turn lane be implemented at all approaches to this intersection for the 231 horizon year. Therefore, based on the analysis results, we conclude by recommending the lane configurations and traffic controls shown in Figure 13. Table 4 Thornton Road / Taunton Road right turn lane sensitivity results Intersection Thornton Road & Taunton Road Control Type Signal (With EBR Lane) Signal (With WBR Lane) Signal (With NBR Lane) Signal (With SBR Lane) Overall v/c (LOS) Delay in Seconds 1.1 (F) 94 1 (E) (F) (F) 94 AM Peak Period Critical/ Key Movements v/c(los) Delay in Seconds EBL =.94 (E) 7 EBT =.73 (C) 3 EBR =.1 (C) 2 WBL =.83 (D) 4 WBTR = 1.21 (F) 14 NBL =.89 (E) 8 NBTR = 1.23 (F) 168 SBL =.66 (D) 39 SBTR =.98 (E) 74 EBL =.94 (E) 7 EBTR =.85 (D) 36 WBL =.91 (E) 63 WBT =.99 (E) 58 WBR =.23 (C) 26 NBL =.89 (E) 8 NBTR = 1.23 (F) 168 SBL =.66 (D) 39 SBTR =.98 (E) 74 EBL =.94 (E) 7 EBTR =.85 (D) 36 WBL =.91 (E) 63 WBTR = 1.21 (F) 14 NBL =.89 (E) 8 NBT =.9 (E) 65 NBR =.14 (D) 42 SBL =.66 (D) 38 SBTR =.98 (E) 74 EBL =.94 (E) 7 EBTR =.85 (D) 36 WBL =.91 (E) 63 WBTR = 1.21 (F) 14 NBL =.89 (E) 79 NBTR = 1.23 (F) 168 SBL =.66 (D) 39 SBT =.84 (D) 54 SBR =.7 (D) 37 95th %ile Queues (m) EBL = 125 m EBT = 14 m EBR = 15 m WBL = 75 m WBTR = 29 m NBL = 55 m NBTR = 165 m SBL = 45 m SBTR = 14 m EBL = 125 m EBTR = 17 m WBL = 95 m WBT = 215 m WBR = 3 m NBL = 55 m NBTR = 165 m SBL = 45 m SBTR = 14 m EBL = 125 m EBTR = 17 m WBL = 95 m WBTR = 29 m NBL = 55 m NBT = 11 m NBR = 2 m SBL = 45 m SBTR = 14 m EBL = 125 m EBTR = 17 m WBL = 95 m WBTR = 29 m NBL = 55 m NBTR = 165 m SBL = 45 m SBT = 15 m SBR = 15 m Overall v/c (LOS) Delay in Seconds 1.22 (F) (F) (F) (F) 97 PM Peak Period Critical/ Key Movements v/c(los) Delay in Seconds EBL = 1.31 (F) 231 EBT =.99 (E) 56 EBR =.14 (C) 22 WBL =.94 (E) 77 WBTR =.74 (C) 22 NBL =.81 (E) 56 NBTR = 1.42 (F) 248 SBL =.95 (E) 68 SBTR = 1.28 (F) 185 EBL =.88 (E) 74 EBTR = 1.15 (F) 111 WBL =.94 (E) 77 WBT =.64 (B) 19 WBR =.11 (B) 13 NBL =.81 (E) 56 NBTR = 1.42 (F) 248 SBL =.95 (E) 68 SBTR = 1.28 (F) 185 EBL = 1.31 (F) 231 EBTR = 1.15 (F) 111 WBL =.94 (E) 77 WBTR =.74 (C) 22 NBL =.81 (E) 56 NBT =.96 (E) 77 NBR =.4 (D) 49 SBL =.95 (E) 68 SBTR = 1.28 (F) 185 EBL = 1.31 (F) 231 EBTR = 1.15 (F) 111 WBL =.94 (E) 77 WBTR =.74 (C) 22 NBL =.81 (E) 55 NBTR = 1.42 (F) 248 SBL =.95 (E) 68 SBT =.87 (E) 58 SBR =.69 (D) 53 95th %ile Queues (m) EBL = 75 m EBT = 235 m EBR = 2 m WBL = 9 m WBTR = 155 m NBL = 65 m NBTR = 18 m SBL = 115 m SBTR = 195 m EBL = 65 m EBTR = 295 m WBL = 9 m WBT = 125 m WBR = 1 m NBL = 65 m NBTR = 18 m SBL = 115 m SBTR = 195 m EBL = 75 m EBTR = 295 m WBL = 9 m WBTR = 155 m NBL = 65 m NBT = 11 m NBR = 45 m SBL = 115 m SBTR = 195 m EBL = 75 m EBTR = 295 m WBL = 9 m WBTR = 155 m NBL = 65 m NBTR = 18 m SBL = 115 m SBT = 115 m SBR = 85 m 22 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

30 Intersection Control Type Signal (Right turn lanes at all approaches) Overall v/c (LOS) Delay in Seconds.94 (D) 48 AM Peak Period Critical/ Key Movements v/c(los) Delay in Seconds EBL =.94 (E) 7 EBT =.73 (C) 3 EBR =.1 (C) 2 WBL =.83 (D) 4 WBT =.99 (E) 58 WBR =.23 (C) 26 NBL =.89 (E) 79 NBT =.9 (E) 65 NBR =.14 (D) 42 SBL =.66 (D) 38 SBT =.84 (D) 54 SBR =.7 (D) 37 95th %ile Queues (m) EBL = 125 m EBT = 14 m EBR = 15 m WBL = 75 m WBT = 215 m WBR = 3 m NBL = 55 m NBT = 11 m NBR = 2 m SBL = 45 m SBT = 15 m SBR = 15 m Overall v/c (LOS) Delay in Seconds.99 (D) 49 PM Peak Period Critical/ Key Movements v/c(los) Delay in Seconds EBL =.88 (E) 74 EBT =.99 (E) 56 EBR =.14 (C) 22 WBL =.94 (E) 77 WBT =.64 (B) 19 WBR =.11 (B) 13 NBL =.81 (E) 55 NBT =.96 (E) 77 NBR =.4 (D) 49 SBL =.95 (E) 68 SBT =.87 (E) 58 SBR =.69 (D) 53 95th %ile Queues (m) EBL = 65 m EBT = 235 m EBR = 2 m WBL = 9 m WBT = 125 m WBR = 1 m NBL = 65 m NBT = 11 m NBR = 45 m SBL = 115 m SBT = 115 m SBR = 85 m Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/ 23

31 Figure 13 Future (231) recommended lane configuration 24 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

32 Appendices Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

33 Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

34 Appendix A Traffic data and growth rate Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

35

36 TMC Tabular Report WINCHESTER RD THORNTON RD TMC No. : 313 Intersection ID : 284 Count ID: Count Date: 4/1/213 AM Peak: 7:45 am ê.63 %.5.89 % 2% é Ped. 1 é Trucks % MD Peak: 12:3 pm ê.63 % % 5% é Ped. é Trucks % Ped. PHF é % 9% 2% Trucks Cars É Ê É Ê 1 Ë É Ê Ì 8 Cars Trucks % 4% 11% PHF é PHF Ped. é % 8% % Trucks Cars É Ê É Ê 2 Ë É Ê Ì 17 Cars Trucks % 9% % é PHF Trucks % é Ped. 19 ê 1 %.5 3%.78 %.71 Ped. é Trucks % é Ped. 99 ê 2 2 %.85 6%.97 6%.75 Ped. é PHF PM Peak: 4:3 pm ê Ped. é % 3% 3% Trucks Cars.65 8% 1 13 % % 2 51 É Ê É Ê Ë é É Ê Ì 8 Cars Ped Trucks 764 é 1 1 Trucks % % 3% 8% é PHF Total Count 8 hours ê Ped. é 7% 6% 3% Trucks Cars É 5% 5 93 Ê É % 3% é 444 Ê É Ê Ë Ì 73 3 Cars Ped. 2 Trucks 3292 é Trucks % é 3% 5% 6% Trucks % é Ped. 128 ê 2 %.67 4%.7 %.59 Ped. é Trucks % é Ped ê 6 3% % 4% Ped. é Print date: 7/16/213 Page 1 of 2

37 Count Date: 4/1/213 TMC 15 Min Report WINCHESTER RD THORNTON RD NORTH APPROACH EAST APPROACH SOUTH APPROACH WEST APPROACH Time Cars Trucks Heavies Ped Period 1 Period 2 Left Thru Right Left Thru Right Left Thru Right Cars Trucks Heavies Ped Left Thru Right Left Thru Right Left Thru Right Cars Trucks Heavies Ped Left Thru Right Left Thru Right Left Thru Right Cars Trucks Heavies Ped Left Thru Right Left Thru Right Left Thru Right 6: : : : : : : : : : : : Period 3 15: : : : : : : : Total Print date: 7/16/213 Page 2 of 2

38 TMC Tabular Report TAUNTON RD THORNTON RD (R.R.52) TMC No. : 417 Intersection ID : 3832 Count ID: Count Date: 1/6/211 AM Peak: 7:45 am ê Ped. PHF é % 11% 6% Trucks Cars.67 8% % 2% É Ê É Ê Ë é É Ê Ì 195 Cars Ped Trucks 896 é Trucks % 18% 6% 2% PHF é PHF MD Peak: 12:45 pm ê Ped. é % 9% 4% Trucks Cars.88 7% % 4% 3 1 É Ê É Ê Ë é É Ê Ì 231 Cars Ped. 1 Trucks é Trucks % 4% 7% 2% é PHF Trucks % é Ped. 672 ê %.87 3%.89 5%.81 Ped. é Trucks % é Ped ê %.84 2%.8 7%.92 Ped. é PHF PM Peak: 4:3 pm ê Ped. é % 3% 3% Trucks Cars.61 12% 2 17 % 1% É Ê É Ê Ë é É Ê Ì 26 Cars Ped Trucks 1392 é Trucks % 8% 5% 1% é PHF Total Count 8 hours ê Ped. 2 é 4% 7% 4% Trucks Cars É 9% Ê É 7% 2% é 1762 Ê É Ê Ë Ì Cars Ped. 4 Trucks 7857 é Trucks % é 8% 5% 2% Trucks % é Ped. 615 ê %.88 2%.84 2%.86 Ped. é Trucks % é Ped ê 57 5% % 2% 1 Ped. é Print date: 7/16/213 Page 1 of 2

39 Count Date: 1/6/211 TMC 15 Min Report TAUNTON RD THORNTON RD (R.R.52) NORTH APPROACH EAST APPROACH SOUTH APPROACH WEST APPROACH Time Cars Trucks Heavies Ped Period 1 Period 2 Left Thru Right Left Thru Right Left Thru Right Cars Trucks Heavies Ped Left Thru Right Left Thru Right Left Thru Right Cars Trucks Heavies Ped Left Thru Right Left Thru Right Left Thru Right Cars Trucks Heavies Ped Left Thru Right Left Thru Right Left Thru Right 6: : : : : : : : : : : : Period 3 15: : : : : : : : Total Print date: 7/16/213 Page 2 of 2

40 Page 1 of 11 TRANSPORTATION STUDIES AND DATA A.A.D.T. PROGRAM STATION LOCATION Brock Road (R.R. 1) 11 2 m. S. of York R. R. 32 (Udora) D m. N. of Regional Rd m. N. of Sandford Rd. (R.R. 11) m. N. of Ninth Conc. (R.R. 5) (Claremont) m. S. of Davis Dr m. N. of Hwy m. S. of Hwy. 47 S. Jct m. S. of Ninth Conc. (R.R. 5) (Claremont) m. S. of Seventh Concession (R.R. 31) m. N. of Taunton Rd. (R.R. 4) m. N. of Finch Ave. (R.R. 37) (*) m. S. of Bayly St. (R.R. 22) (*) m. S. of Taunton Rd. (R.R. 4) m. S. of Hwy. 2 (*) m. S. of Hwy. 41 (*) Simcoe Street (R.R. 2) 21 5 m. N. of Cameron St. (R.R. 12) m. N. of Hwy. 7 (Manilla) m. N. of Scugog Line m. N. of Reach St. (R.R. 8) (Port Perry) Immediately S. of Reach St. (R.R. 8) (Port Perry) m. N. Hwy. 7A (Port Perry) km S. of Hwy. 7A (Port Perry) m. N. of Myrtle Rd. (R.R. 5) m. N. of Winchester Rd. (R.R. 3) m. S. of Conlin Rd m. S. of Taunton Rd. (R.R.4) Simcoe St. at C.P. U/P Fisher St. (Oshawa) m. S. of Wentworth St. (R.R. 6) m. N. of Shirley Rd. (R.R. 19) m. N. of Richmond St m. S. of King St m. S. of Rossland Rd. (R.R. 28) m. S. of Bloor St. (R.R. 22) Centre Street (R.R. 2A) m. N. of Bond St. W m. S. of King St. W Winchester Road/Grandview Street (R.R. 3) m. W. of Thickson Rd. (R.R. 26) Const m. W. of Simcoe St. (R.R. 2)

41 Page 2 of 11 TRANSPORTATION STUDIES AND DATA A.A.D.T. PROGRAM STATION LOCATION m. E. of Simcoe St. (R.R. 2) m. N. of Winchester Rd. (R.R.3) km E. of Enfield Rd. (R.R. 34) m. W. of Harmony Rd. (R.R. 33) m. W. of Langmaid Rd m. W. of Regional Rd Taunton Road (R.R. 4) m. W. of Brock Rd. (R.R. 1) (*) m. W. of Westney Rd. (R.R. 31) m. E. of Wilson Rd. (R.R. 35) m. E. of Cochrane St m. E. of Riverwood St./ McKinney Dr m. E. of Thickson Rd. (R.R. 26) m. W. of Wilson Rd. (R.R. 35) m. W. of Townline Rd. (R.R. 55) m. E. of Townline Rd. (R.R. 55) m. E. of Courtice Rd. (R.R. 34) m. E. of Regional Rd m. W. of Main St. (R.R. 17) m. E. of Stevenson Rd. (at the bridge) m. W. of Altona Rd. (R.R. 27) (*) m. W. of Lake Ridge Rd. (R.R. 23) Const m. E. of Anderson St m. W. of Grandview St m. W. of Whites Rd. (R.R. 38) (*) Ninth Concession Rd./Myrtle Rd. (R.R. 5) 51 1 km. W. of Regional Rd. 1 (Claremont) m. E. of Regional Rd. 1 (Claremont) m. E. of Lake Ridge Rd. (R.R. 23) m. W. of Hwy. 7/ m. E. of Hwy. 7/ m. E. of Markham Pickering Townline Const. X Saintfield Road (R.R. 6) 61 2 m. E. of Hwy. 7/ m. W. of Simcoe St. (R.R. 2) Scugog Island Road (R.R. 7) 71 2 m. N. Demara Rd m. N. of Hwy. 7A m. N. of Pogue Rd

42 Page 8 of 11 TRANSPORTATION STUDIES AND DATA A.A.D.T. PROGRAM STATION LOCATION Salem Rd (R.R. 41) m S. of Hwy Const. Const m N. of Bayly St. (R.R. 22) Darlington/Clarke Townline (R.R. 42) m. N. of Hwy Cochrane Street (R.R. 43) m. N. of Dundas St./Hwy Harwood Avenue (R.R. 44) m. N. of Bayly St. (R.R. 22) (*) m. N. of Falby Ct Henry Street (R.R. 45) m. S. of Dundas St./Hwy. 2 (Whitby) Immediately N. of Iroquois Park Brock Street (Regional Highway #12) m. S. of Victoria St. (R.R. 22) m. N. of Victoria St. (R.R. 22) m. N. of Taunton Rd. (R.R. 4) m. N. of Timbermill/Joy Thompson Ave Shoreline Road (R.R. 47) m. N. of Regional Rd Const Canal Road (R.R. 5) 51 4 m. N. of Hwy. 12 (Gamebridge) Const m. E. of Regional Rd. 51 (Gamebridge) Thornton Road/Boundary Road (R.R. 52) m. S. of Taunton Rd. (R.R. 4) m. S. of Gibb St. (R.R. 59) m. S. of Wentworth St. (R.R. 6) m. W. of Park Rd. (R.R. 54) m. N. of King St m. S. of King St m. N. of Adelaide Ave. (R.R. 58) Stevenson Road (R.R. 53) m. N. of Adelaide Ave. W. (R.R. 58) m. S. of Gibb St. (R.R. 59) New m. S. of Bloor St. S. Ramps (R.R. 22) New m. S. of Wentworth St. (R.R. 6) m. N. of Bond St m. S. of King St

43 Background Growth Factor Calculation Winchester (2 m. W. of Simcoe St) Regression Analysis ( AADT) Year AADT (x) AADT Regression (y = mx + b) ,46 1, ,15 1, ,78 11, ,49 11, ,8 11, ,89 12, ,94 12, ,8 12, ,47 12, ,96 13, ,6 13, ,83 13, ,8 231 Regression-212 Regression 6,74 (231 Regression-212 Regression)/212 Regression 43.59% Annual Growth Rate: 1.922% Growth Factor: Slope (m): Growth Result 2,8 y-intercept (b): Check OK Taunton Rd (6 m. E. of Stevenson Rd) Regression Analysis ( AADT) Year AADT (x) AADT Regression (y = mx + b) ,2 22, ,54 22, ,9 23, , , ,187 26, ,2 26, ,35 27, ,4 28, ,75 29, ,5 29, ,56 3, , Regression-212 Regression 15,698 (231 Regression-212 Regression)/212 Regression 52.43% Annual Growth Rate: 2.13% Growth Factor: Slope (m): Growth Result 45,639 y-intercept (b): Check OK Thornton Road (3 m. S. of Taunton Rd) Regression Analysis ( AADT) Year AADT (x) AADT Regression (y = mx + b) ,17 8, ,65 9, ,96 9, ,26 1, ,95 1, ,913 11, ,64 11, ,3 12, ,22 12, ,81 13, ,73 13, ,67 14, ,31 23, Regression-212 Regression 1,122 (231 Regression-212 Regression)/212 Regression 73.79% Annual Growth Rate: 2.82% Growth Factor: Slope (m): Growth Result 23,839 y-intercept (b): Check OK Winchester (2 m. W. of Simcoe St) Regression Analysis ( AADT) Year AADT (x) AADT Regression (y = mx + b) ,47 14, ,96 13, ,6 12, ,83 12,7 22 4, Regression-212 Regression -7,56 (231 Regression-212 Regression)/212 Regression % Annual Growth Rate: % Growth Factor:.412 Slope (m): Growth Result 4,951 y-intercept (b): Check OK Taunton Rd (6 m. E. of Stevenson Rd) Regression Analysis ( AADT) Regression Year AADT (x) AADT (y = mx + b) ,2 26, ,35 27, ,4 28, ,75 29, ,5 3, ,56 31, , Regression-212 Regression 18,186 (231 Regression-212 Regression)/212 Regression 58.37% Annual Growth Rate: 2.449% Growth Factor: Slope (m): Growth Result 49,342 y-intercept (b): Check OK Thornton Road (3 m. S. of Taunton Rd) Regression Analysis ( AADT) Regression Year AADT (x) AADT (y = mx + b) ,81 13, ,73 13, ,67 13, ,31 12, Regression-212 Regression -1,4 (231 Regression-212 Regression)/212 Regression -1.19% Annual Growth Rate: -.536% Growth Factor:.898 Slope (m): Growth Result 12,337 y-intercept (b): Check OK

44 Appendix B Derivation of future traffic Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

45

46 Thornton Road Future 47 North Ramp (67) I... t ~ (86 ) ~!!!. fi 197 (131) ~ 16 (8) -- ca ca "' "' (336) Winchester Road... :Ill 42 (131 (19) " 9 " -- " ~ Date: April 213 (779) "' " t: ource: Region of Durham ~.., 89 "' 1(67) :Ill 8 :!. en - (17)!!!.!!!. Future 47 South Ramp Future Britannia Ave Extension LEGEND xx AM Peak Hour Volumes (XX) PM Peak Hour Volumes Signalized Intersection... Stop Control " NOTTO SCALE 175 (111) 213 (165) 349 (281) I - ~e ;;, "' "' "... \OJ 3 (282) 284 1(15) 14 I ca... O> "' "' "... (27) 59 en io o ~ ~ "' :Ill " +.. ~ - ca!!!. O> "' (1 15) (197) 149 :Ill (627) i ~ + ~ ".., ~ ~ + ca ~ ~ 4 (16) t 95 (11 } 249 (273) Conlin Road l'ii;\ Date: "' " ~ :8 SN ~!!! "' " ~.., O> ~ "' m::11 id ~~ "' ca C:!. ~ t April 29 Source: Dantonbury Windfields 235 West Development (181 } Traffic Study, MMM Group 296 t(321 ) (4) (865) Taunton Road (224) Date: June 211 Source: Region of Durham 53 t(698) City of Oshawa Job Number Thornton Road Environmental Assessement Traffic Study Revision A Raw Data Date April 214 Figure Scotia Court, Unlt41, \IVhltby Ontario L1N 8Y7 T F E info@ghdcanada.com W com

47 Thornton Road Future 47 North Ramp 112 (85) I en!:,.!. ~ It 16 N a,.. N 647 -r- It.. :» It 57 (19) 9 11 It t 11 (779) , ~ 268 1(91) 121 :» "' lo (178) ;::- SN ~e~ 92 t(117) (8) (336) Winchester Road ) t 118 (163) Future 47 South Ramp Future Britannia Ave Extension 268 I (178) 118 t(163) LEGEND XX (XX) -- AM Peak Hour Volumes PM Peak Hour Volumes Signalized Intersection Stop Control NOTTO SCALE -r \:>J 3 (293) 349 I(26) (281) :g (281) I coijl;a,lt 691 1(197) "' ~ ~ It 4 N It t :» It a, """ ; 23 "' ;~~ 46 N N N (27) (1127) ~ :!!.., a, ~ N (16) (284) Conlin Road,a~, 296 t(321 ) 296 t(321 ) (4) (882) Taunton Road (224) t 149 :» 53 (627) (698) mui it,11 City of Oshawa Job Number ft) Thornton Road Environmental Assessement Revision A Traffic Study Baseline (213) Traffic Volumes Date April 214 Figure ScoU1 Court, Unit 41, \IVhltby Ontario L1N 8Y7 T F E info@ghdcanada com W www ghd.ccm

48 Thornton Road : e:.. Q It O () () 47 North Ramp "' lll () l : : : : : t () () () (153) () l It flt "' lll ~ : : : : : () (66) Winchester Road () t () LEGEND XX AM Peak Hour Volumes (XX) PM Peak Hour Volumes Signalized Intersection -- Stop Control () l () l () l () (57) () l() () It.. e: e: It.. e: e: e: "' lll e: e: lll "' e: e: It O Q O + 51 flt.. It lll 58 + "' ~ : : : flt.. () (221) ~ : : : It + 2 lll "' : : : (O) 47 South Ramp () (O) Britannia Ave () O t () () (56) Conlin Road () t () () (173) Taunton Road () t () NOTTO SCALE 11 5 i1 City of Oshawa Job Number Revision A Thornton Road Environmental Assessement Traffic Study Natural Growth (231) Traffic Volumes Date April 214 Figure Scotia Court, Unit 41, VVhitby Ontario LIN 8Y7 T F E lnfo@ghdcanada.co,n W www ghd.com

49 LEGEND 68 (111) I 18 (147) 18 (147) ;:: I Thornton Road 18 :::. e: t(154).,.. I - ;;; - "' :::.., ".. ~ ~ It " ~., "' " ~ r: ::.. "' "' c. It 28 "' 191 " 142 () (297) , ~ ; (223) (53) 19 ~ "' 411 ;;; "' (223) I "., ~ ~ ::.. "' c....!:,. ~ ~... It I.. " , " 743 (321) I ;1; "' "' a, to"... ~ '!:e.::::. 721 F:' ai'... (656) ~::..., "' :8 It " 8 (952) "' "'., ;::-... N 763 (961) I ~ "' ~ "' "' ~!!?.. ::.. "' ~...., "'..,. "' ~ '.:!. O It 124 ~ r452) (723) (117) 75 ~ 348 ".. (34) " I., "' "' ~ ~ ~ (949) 6' N,:: O> (1) "' ~ "' - ;;; io ii: "'., - e::.. () 47 North Ramp (36) t 177 (491) t 177 (491) 215 "' ~ ~ It (128) ~ 25 (119) Taunton Road () xx ".. AM Peak Hour Volumes (86) 27 "... " (XX) PM Peak Hour Volumes (43) I :ii O ~ Signalized Intersection 18 Roundabout (432) -., t 356 (278)... NOTTO SCALE -~ l!ili it "' e: (99) (265) Winchester Road (47) t 248 (649) t 248 (649) () 47 South Ramp (98) t 271 (764) t 119 (77) (77) Britannia Ave (45) t 72 (1129) t 737 (112) (154) (56) Conlin Road (97) t 57 (816) t 841 (492) City of Oshawa Job Number Thornton Road Environmental Assessement Revision A Traffic Study Potential Developments Traffic Volumes. Date Apnl 214 Figure Scotia Court, Unlt 41, Whitby Ontario L1N 8Y7 T F t E lnfo@ghdcanada com W www ghd com

50 Thornton Road I _,;, ~., - :::. "' ::l ~ 41 (33) 47 North Ramp (14) ,. "' 299 t (3) e e : ~ (),,,-.. "' ~ "' + () Winchester Road ".. () () I () 3 ~ N "' ~ N..,. ff :.. ID "'.;- ~ e. 448 t 34 (15) (123) -M "'~~~ () 348 "' "' (192) ;;; ~ "' 348 (192) 47 South Ramp 16 (7) : ~ (1) I t (29) : : I "' "'.. ID ~ ~ (13) Britannia Ave () t ~ : 26 (5) s ~ : 183 (4) I "'., (16) ~ () "' ~ + () Conlin Road ".. (1) () () ~ ~ ff e: "' ~ "' ~ ~ LEGEND ".. XX AM Peak Hour Volumes (1) (XX) PM Peak Hour Volumes () Signalized Intersection 155 Roundabout (3) ~ : () t (6) ~ (1) + () Taunton Road () : ~ : t (4) NOTTO SCALE,t, (() &:N id City of Oshawa Thornton Road Environmental Assessement Traffic Study Hwy 47 Interchange Ramp Traffic Volumes Job Number Revision A Date April 214 Figure Scotia Court, Unit 41. Whitby Ontario L1N BY7 T F E lnfo@ghdcanada.com W WWW ghd com

51 Thornton Road : : + ~ () 47 North Ramp () l t e: : () () : : : ~ () () -7 (-1) Winchester Road () () () () 47 South Ramp () () I : : : : t () () I ~ a : : : : : ~ () " () Britan nla Ave () t () () () Conlin Road () () + LEGEND () I () ~ : : : : : : " + ~ xx AM Peak Hour Volumes () {XX) PM Peak Hour Volumes () + Signalized Intersection ~ Roundabout () : : : t () () () Taunton Road () t () NOTTO SCALE (/) "' taui it City of Oshawa Thornton Road Environmental Assessement fu~~~ Hwy 47 Traffic Diversion Traffic Volumes Job Number Revision A. Date Apnl 214 Figure Scotia Court, Unit 4 1, VVhltby Ontario L1N 8Y7 T t F E lnfo@ghdcanada com W

52 xx 27 (379) I 74 (247) 74 (247) Thornton Road ~ "' "' "' N "' ~ "' It It " fil I "' I ~i a, ~::..!::!. ~ ;::!2. "' "' e It 44 "' ~ N ~ "' N It... It 199 (19) 9 + " r479) + (144) 26 f;l"' (44) ~ "' M in CD N O r,.. i ::. 978 ~ e: (44) :!:. l 1385 (59) I 1363 (844) l 1357 (1135) l ;;; "' It It 438 +" "' "' N s :;;: "' ~ t:::.:::. "' N..,... N ~ ~... e. ::. N It It 228 +" N.; "' N 18 ~ l l t 545 (427) (33) 47 North Ramp (5) t 573 (731) t 573 (731) (17) (567) Winchester Road (65) 1237 e ::!.. (1144) ~ LO in (1191) N,._...!2 It 128 (17) "' ~ "' "' ~ + 74 (9) Conlin Road It (19) (319) " 123 r 82) ~ ~ ~ on t 866 N (18) (1 43) 98 ~ (1143) ON;:.., ~ '.!:,. r:::.!2 88 Signalized Intersection 126 (1234) 8 ;:-,;, 1 (1 97)... "'!:'.?. ~... "'... O N ~ It 261 ~ "' ~ LEGEND It AM Peak Hour Volumes (114) PM Peak Hour Volumes (1391 ) " :ll.....,...,n N Roundabout (162) g i i!:,. ~ ~ t 71 4 (14) t 71 4 (14) (192) 47 South Ramp (15) t 389 (956) t 737 (956) (9) Britannia Ave (45) t 838 (138) t 855 t1137 (819) (169) (1174) Taunton Road (224) 886 t(98) NOTTO SCALE 1\1 (/) tm,1 ft City of Oshawa Thornton Road Environmental Assessement Traffic Study Future (231) Traffic Volumes Job Number Revision A Date April 214 Figure Scotia Court, Unit 4 1, \IVhitby Ontario L1N 8Y7 T F E lnfo@ghdcanada.com W

53 Appendix C Background study excerpts Report for City of Oshawa - Thornton Road Environment Assessment, 28/2147/

54 Study Area Location FIGURE 1.1 Study Area

55 Highway 47 Hwy 47 East Park and Ride Winchester Road Thornton Road Windfields Drive Street J Parkville Road RioCan Commercial Development Simcoe Street Minto Development Bridle Road Metrus Development Britannia Avenue UOIT North Campus FIGURE 4.2 Background Developments

56 (59) (67) (7) Winchester Road 2 ( 1) 12 (18) (13) (28) ( 1) 12 Street J Parkville Road 21 1 (16) (7) (35) (21) (8) 1 (16) (13) (25) (25) (37) 19 (76) 1 (119) Windfields Drive 9 22 (87) (39) 12 (19) ( ) 63 ( 1) 38 ( 8) (31) (51) 1 (8) 1 (26) (3 ) 6 (13) Thornton Road Simcoe Street (25) (62) ( ) (19) ( ) 16 (11) 22 (15) (2) (2) 18 (22) (33) (22) ( 1) (3) (1) 9 (17) (51) (26) 52 (18) Street G (32) 21 (31) (13) (3) (11) (6) 27 (1 ) Street L (5) (23) 13 7 ( ) 1 (1) (2) 2 (25) 1 (2) (23) 6 ( 1) 53 (12) (2) (7) (3) (2) 2 (1 ) 2 (1) Street M (2) (61) (2 ) (15) (9) (38) (6) (21) (3) (22) ( ) (8) 3 ( ) 27 (16) 6 (2) 22 (7) 18 (29) Street N 59 (29) (1) 19 Street E (2) ( 9) (6) 15 ( 6) (36) (17) 33 (62) (15) (6 ) (22) 9 Street O 12 (7) 12 (2 ) 19 (3) (3) 1 32 (18) Street D (38) (2) (2 ) 15 (7) (2) (2) (33) (1) (25) (3) (2) 12 (6) 11 (7) (1) (2) ( 5) (52) (32) (75) (3 ) ( ) (53) (5) (97) ( ) 9 (6) 1 (15) 36 (21) 38 (127) Street P 15 (7) ( ) 2 2 (26) (3) 8 Street B (7) (92) ( ) (112) (78) (13) ( ) (7 ) (33) (53) (36) (5 ) ( ) (18 ) (58) (-1 ) 8 (37) (75) 39 (85) 117 (163) 12 (76) 68 (115) 79 (16) Britannia Avenue 126 (7 ) (73) 5 (81) (27) 19 (58) 19 8 (18) 59 (8) 99 (17) 167 (79) 85 (159) (78) (111) (72) (5) (135) (9) (192) (-11) 7 (6) 15 (7) (17) (3) ( 9) (132) (33) (17 ) (96) ( 3) Conlin Road (51) 3 37 (5) (62) (127) 7 (18) (17) Street C Street I Urban Village Access 7 Urban Village Access 6 Urban Village Access 5 Urban Village Access 3 Urban Village Access 4 Urban Village Access 2 Urban Village Access 1 Street S Northern Dancer Drive 131 Not to Scale XX (XX) LEGEND AM Peak Hour Volumes PM Peak Hour Volumes FIGURE Site Traffic Volumes

57 (15) Thornton Road ~ ~ ~ e (69) Winchester Road Street J w(}e N s Parkville Road (48) (57) Simcoe Street &! It 19 :'.? ~ It i: "' 28 ~ "' co G;" ~ ::::.. (21) (41) io!:::. Wlndfle)ds Drive :ll... II... :'.? " (1 1) "' ~ ~ :::. ~ ~ ~ It 17 II 2 ~ " ~ (8) (1) 136) (18) (38) (18) 136) (18) Britannia Avenue (36) ;:: e :ll ~ 27 + It 113 (52) + 37 (18) II 237 (126) N " ~ :;, ~ lo ~ Northern Dancer Drive ~ ::l N ~ ~ ~ (123) ~ N ~ (67) Conlin Road (123) ;:::: e ~ II m co :?.. ~ of; ~,i, ~ It ;ii; (44) i1 i[ ia,, Not to Scale MMMGROUP xx (XX) ~ 221 Minto Development Traffic Conditions (Within Windfields West Study Area) AM Peak Hour Volumes PM Peak Hour Volumes

58 Thornton Road ~.. N 33 + (311) 18 + "' (18) Winchester Road w()e N s (3) Simcoe Street 18 + E It 14., 33 :II (1) (18) fi StreetJ Parkville Road Wlndfields Drive I I ~ It 6 (2) N 14 (8) 14 (8) 14 i8) 14 (8) :II It 8 (6) It 122 (69) " (13) 5 + (13) a + 113) 6 + (13} s +.,;" Britannia Avenue e ~ ::. Northern Dancer 6, e ~.. Drive +.,; l, ~ (4) 19 + : ~~E.. (24)..,....., ~ It "'.. :II... + (4) , e LL It 6 (12) ;;; e ia,, Nol lo Scale MMMGROUP xx (XX) AM Peak Hour Volumes PM Peak Hour Volumes 221 Metrus Development Traffic Conditions (Within Windfields West Study Area)

59 Thornton Road &., lll (112) 42 _. ~ 5 (22) StreetJ w<)e N Parkville Road Simcoe Street s i i ;; - :::. t::.., "' " lll 27 (119) ~ 2 Winchester Road ".. (47) ~ (51) 29 _. (44) 4 lll ) "' "' 62 (276) :: (286) ~ Wlndflelds Drive.. lll (19) " 8 ".. lll (36) " 14 ~ (15) 21 ~ (254) 95 _. (316) 75 _. :: (317) 87 _. "' (52) 4 lll " -... ee " ~... ~ "' " M CD e::, - - ) "' ;;!; G' "' ' ~ ~ :::. - ~!:i ~ 29 (99) ~ 2 (9) (48) (12) 17 (483) ft 35 (26)... ~ ~ "'... "'"'"' "' ~~g... ~ E. "' ".. (165) 62 ~ (37) 14 _. :e ;;; "' - -)!:,!. ~ e!:i!:!.. ~ 52 (171) "' 1 1 (31... ~ (3).; ) 17 (44) ft 69 (36) lll.. lll (135) " 22 ~ (254) " 95 ~ (15) " 6 ~ (31) 11 ~ 1t... (45) ) 17 _. (31) (78) 18 _. :5l - Britannia (16) 4 lll Avenue i a3" 6'!:,!. ::::.. "'!:i " Northern Dancer Drive ;;;., e..., "' ,:::, -) e!:i:::. 9 (39) ~ "' ) (29) Conlin Road " 7 ".. lll... ~ (55) 2 ~ ~ [ 1t 2 (51) ) ~ oi' E. :::. ia,, Not to Scale MMMGROUP xx (XX) ~ 221 Riocan Development Traffic Conditions (Within Windfields West Study Area) AM Peak Hour Volumes PM Peak Hour Volumes N ~

60 Thornton Road!::!. It 5 4' (112) 42 + (22) (119) Winchester Road Street J 4' 82 (276) Wlndfields Drive (254) 95 + (36) (316) N w()e s Parkville Road Cn -.;;!!..... ~:::.. - It 29 (99) :: II - IO 4' 62 (286) - N II 8 (19) 14,i " N :: - e..,!!:!. Simcoe Street -oi"., e:::.. "'... t::.., IO v ~ 4' 2 II II (47) " It... N (51) 29 + ~ (44) M CD e =. (48) (12) - in id ;1~ It 2 (9) e... o, N 4' 17 (483) II II 35 (26) (15) 21,i It... " (317) 87 + (52) ,... IO N <'> N![E II 69 (36) " - ii,,!::!. ~!::!. N IO II (254) (45) 95,i (3) (45) ' 7 (3) s!'.!. II (15) (31) ;;; e It 52 (171) f;j " 11 + Britannia Avenue (31) (78) (16) "' - -, ~!:?. 1o, ,i ' 17 II 22 It... ill~ CC O :::.. "'... ~ (44) (135) ;;;.,!'.!. Northern Dancer Drive., IO...,.... ~ ;:: ~ in ~ ~ II "'... (165) 62,i (37) 14 + II , (39) (29) "... Conlin Road , e!:! ::.. :!? N IO o, II (55) 2,i It (51) M oi" E::.. ia,, ;;. IO!::!. Not to Scale MMMGROUP xx (XX) ~ 221 Riocan Development Traffic Conditions (Within Windfields West Study Area) AM Peak Hour Volumes PM Peak Hour Volumes

61 Thornton Road w()e N Simcoe Street a: s ~~ ~ 23 (77) ~ -6 (-2) ~.. -8 (43) 'I'.., 81 (2) lll II 3 (1) Winchester Road.. lll " (9) 36 + ~ (15) ~.. 5 " (68) 13 + ~ ~ (11) -7 lll ~ e 2 StreetJ Parkville Road : ~ Wlndflelds Drive.. I; f' ~ I.. a ~ e ~ ~ e Britannia a: Avenue ff.. :.., Northern Dancer Drive.... e ii ~ e ~.. Conlin Road ~ e ii.., ia,, Not to Scale MMMGROUP xx (XX) AM Peak Hour Volumes PM Peak Hour Volumes 221 Highway 47 Park-and-Ride Traffic Conditions (Within Windfields West Study Area)

62 NORTHWOOD INDUSTRIAL PARK AREA TRANSPORTATION MASTER PLAN PUBLIC OPEN HOUSE #1 MAY 3, 25 WELCOME.

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Appendix G: Future Conditions Traffic Analysis Memorandum

Appendix G: Future Conditions Traffic Analysis Memorandum ppendix G: Future Conditions Traffic nalysis Memorandum Prepared by: Bolton & Menk, Inc. Riverfront Drive Corridor Study ǀ T42.867 ppendix MEMORNDUM Date: pril, 27 To: Paul Vogel From: Ross B. Tillman,

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

S. Johnston (IBI Group)

S. Johnston (IBI Group) IBI GROUP 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention Project File Date October 15, 2013 From A. Ortlieb Project No 24RX12.0246.00

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc. 1420 Spring Hill Road, Suite 00 McLean, Virginia

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study. Welcome The Town of Whitby is undertaking a study to prepare a Secondary Plan and Transportation Master Plan to guide and manage growth in the Brooklin area. The Brooklin Secondary Plan and Transportation

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Erickson Living at Limestone Valley

Erickson Living at Limestone Valley Erickson Living at Limestone Valley Howard County, Maryland July 28, 27 Adequate Road Facilities Test Evaluation and Traffic Study Prepared for: Erickson Living Steven Montgomery Vice President of Development

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM Date of Meeting: May 12, 2017 # 1 SUBJECT: ELECTION DISTRICT: Response to Board Member Initiative: Safety Concerns for Left Hand Turn

More information

Taming Traffic: Bethlehem Pike Phase II - Road Diet Evaluation

Taming Traffic: Bethlehem Pike Phase II - Road Diet Evaluation Taming Traffic: Bethlehem Pike Phase II - Road Diet Evaluation March 2012 i Taming Traffic: Bethlehem Pike Phase II - Road Diet Evaluation March 2012 i The Delaware Valley Regional Planning Commission

More information

Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment. Appendix 8 Traffic Impact Assessment

Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment. Appendix 8 Traffic Impact Assessment Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment Appendix 8 Traffic Impact Assessment August 216 Riverdale Resources Proposed Coal Mine near Blairmore AB Traffic

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

BAYVIEW DRIVE & BIG BAY POINT ROAD

BAYVIEW DRIVE & BIG BAY POINT ROAD BAYVIEW DRIVE & BIG BAY POINT ROAD City of Barrie DRAFT FINAL prepared by: C.C. Tatham & Associates Ltd. 41 King Street, Unit 4 Barrie, ON L4N 6B5 Tel: (705) 733-9037 Fax: (705) 733-1520 info@cctatham.com

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

Proposed Trial of Lane Reduction on Highway 19A (McMillan Corfield) City of Parksville Town Hall Meeting

Proposed Trial of Lane Reduction on Highway 19A (McMillan Corfield) City of Parksville Town Hall Meeting Proposed Trial of Lane Reduction on Highway 19A (McMillan Corfield) City of Parksville Town Hall Meeting October 21 st, 2013 On August 7, 2013, Council directed staff to forward the following topic to

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Collision Estimation and Cost Calculation

Collision Estimation and Cost Calculation Collision Estimation and Cost Calculation Table of Contents Introduction... 3 Rates Based Method... 4 20-Year Collision Cost Procedure... 4 Safety Performance Function Method... 7 Important notes when

More information

New Peterborough Regional Health Centre Road Network Improvements Environmental Study Report Addendum

New Peterborough Regional Health Centre Road Network Improvements Environmental Study Report Addendum City of Peterborough New Peterborough Regional Health Centre Road Network Improvements Environmental Study Report Addendum Prepared by: AECOM 300 Water Street 905 668 9363 tel Whitby, ON, Canada L1N 9J2

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

Ajax. Ajax Downs. Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax

Ajax. Ajax Downs. Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax Ajax Ajax Downs Proposed Ajax Downs Expansion Transportation Assessment Town of Ajax 2821628 (13281) March 2015 March 19, 2015 Mr Andrew Picov Ajax Downs 50 Alexander s Crossing Ajax ON L1Z 2E6 Dear Mr

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018 STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Clay Street Realignment Project Traffic Study

Clay Street Realignment Project Traffic Study Final Clay Street Realignment Project Traffic Study November 24, 2009 Prepared for: City of Placerville RS07-2466 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 (916) 773-1900 Fax (916) 773-2015

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

City of Los Banos Traffic Model and Transportation Master Plan

City of Los Banos Traffic Model and Transportation Master Plan T A B L E O F C O N T E N T S P a g e 1 City of Los Banos Traffic Model and Transportation Master Plan Prepared for the City of Los Banos by PRISM Engineering Grant P. Johnson, PTOE, PE Professional Traffic

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

US-6 Spanish Fork Fact Finding Study. December 2017

US-6 Spanish Fork Fact Finding Study. December 2017 US-6 Spanish Fork Fact Finding Study December 2017 US-6 Spanish Fork Fact Finding Study Avenue Consultants December 2017 US-6 Spanish Fork Fact Finding Study December 2017 Table of Contents 1 Introduction...

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

APPENDIX B EXISTING AND FUTURE TRAFFIC OPERATIONS REPORT

APPENDIX B EXISTING AND FUTURE TRAFFIC OPERATIONS REPORT Toronto Transit Commission / City of Toronto SCARBOROUGH-MALVERN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT STUDY ENVIRONMENTAL PROJECT REPORT APPENDICES APPENDIX B EXISTING AND FUTURE TRAFFIC OPERATIONS

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA

CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA CRYSTAL HOUSE III TRAFFIC IMPACT ANALYSIS ARLINGTON COUNTY, VA Prepared for: Roseland, A Mack-Cali Company Prepared by: Wells + Associates, Inc. Michael R. Pinkoske, PTP Henry C. Clarke, EIT 70.97.660

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Durham Region TMP Durham Region Transportation Planning Model Documentation

Durham Region TMP Durham Region Transportation Planning Model Documentation If this information is required in an accessible format, please contact 1-800-372-1102 ext. 3753 Background Report Durham Region Transportation Planning Model Documentation by IBI Group January 2018 Table

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Appendix B Transportation Report

Appendix B Transportation Report Project File Report Appendix B Transportation Report Town of Whitby HMM Project No. 327878 Final Report October 2014 Revision and Version Tracking CP Rail Crossing at New Coronation Road Class EA Study

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

Low Level Road Improvements Traffic Analysis. Report

Low Level Road Improvements Traffic Analysis. Report Low Level Road Improvements Traffic Analysis Report June, 22 Table of Contents. INTRODUCTION.... LOW LEVEL ROAD PROJECT....2 STUDY AREA....2. West-End Corridor Improvements... 2.2.2 East-End Corridor Improvements...

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County

Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Traffic Analysis Report I-5 Interchanges 14 and 19 (Green Springs and North Ashland Interchanges) City of Ashland Jackson County Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information