3 Key findings of the traffic assessment are as follows: Baseline Traffic Volumes. Townhouse Road to the east of Route 25 carries approximately 3, vehicles per day (vpd) during the summer. The peak hour traffic volumes generally resulted in 3 vehicle trips per hour or less along Townhouse Road. Route 25 to the south of Townhouse Road was observed to be between 6,3 and 6,83 vehicles per day (vpd) during the summer. The peak hour traffic volumes generally resulted in 56 vehicle trips per hour or less along Route 25. Safety Characteristics. Based on a review of available NHDOT crash records, there are no immediate safety countermeasures warranted based on the limited crash history along Townhouse Road. Detailed review of NHDOT crash records for Townhouse Road also indicates a low incident rate involving only six total crashes over the past 4-year period, none of which involved pedestrians and half of which involved inclement weather (ice/snow) when the campground was closed. further notes that the available sight lines at the Mi-Te-Jo Road/Townhouse Road intersection exceed recommended sight line requirements published by SHTO. Modest Trip Generation. Peak-season trip generation increases for the proposed Mi-Te-Jo Campground expansion are estimated at 6 new vehicle trips during the Friday morning peak hour, 3 new vehicle trips during the Friday evening peak hour, and 42 new vehicle trips during the Saturday midday peak hour. Empirical data collected at the existing Mi-Te-Jo Campground under peak season conditions (ugust 27) indicate the campground generates trip activity that is up to 56% less than industry standard trip estimates. dequate Roadway Capacity. The proposed development is expected to have minimal impact on the study area intersections. No material changes in operations (levels of service) at primary intersections along Townhouse Road are projected due to the expansion. Intersections operate well below capacity with only minor delay (LOS B) or better during all peak-season study periods including traffic generated with reopening of the New Bridge Road bridge in Lebanon, Maine. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 2

4 PROJECT DESCRIPTION Mi-Te-Jo is an existing 225± acre seasonal campground located in Milton, NH adjacent to Northeast Pond. ccess to the campground is via Mi-Te-Jo Road, a private 2-foot wide gravel road off Townhouse Road. The location of the site relative to adjacent roadways is shown in Figure. The existing campground consists of 223 campsites comprised of seasonal sites, 9 transient (short-term rental) sites and 3 cabins. Campground amenities include bathhouses, recreational playground and sports facilities, beaches and a boat launch which are schematically shown on the Mi-Te-Jo Campground map provided in the ttachments. Under the proposed expansion program, a total of 73 additional campsites will be added to the property comprised of 89 seasonal, 64 transient and 2 tent sites. These include an eastern expansion of transient (short-term rental) campsites on an undeveloped forested area abutting Mi-Te-Jo Road and a western area expansion of that includes both transient and seasonal campsites. Supporting amenities include additional bathhouses, a large storage area, and a Pavilion. These additional campsites will be accessed via Mi-Te-Jo Road. The programmed expansion therefore results in a total of 396 campground sites at the property. The location and layout of campground sites and amenities is presented in a Site Plan prepared by SFC Engineering, LLC dated ugust, 27; shown in Figure 2. EXISTING TRFFIC & SFETY CHRCTERISTICS In order to provide a basis for quantifying the transportation impacts of the development, the existing roadway system and the existing traffic operations of study area roadways were reviewed. This section describes the existing traffic characteristics and operations of roadways and intersections within the study area. Specifically, this section presents an overview of the traffic data collection program, existing traffic volumes, and safety data. Roadways White Mountain Highway (Route 25) Route 25 is a north-south roadway under State (NHDOT) jurisdiction in Milton, NH. Route 25 is classified by the NHDOT as a Minor rterial roadway to the south of Townhouse Road, and a Major Collector roadway to the north of Townhouse Road. Route 25provides a connection between Route 6 to the north and Route 22 to the south in Rochester, NH. Within the study area, Route 25 generally provides one travel lane in each direction with paved shoulders for a total roadway width of approximately 37 feet. dditional turn lanes are provided at its major intersections. Pavement markings include a double yellow centerline and G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 3

5 Mi-T e-jo Roa d Traffic Impact ssessment Milton, New Hampshire Townhouse Road North Scale: Not to Scale TRNSPORTTION CONSULTNTS, INC. Site Plan Source: SFC Engineering Figure 2 Planners & Engineers Date: November 27 Dwg No. 94 MR2.dwg Copyright by Transportation Consultants, Inc. ll rights reserved. Preliminary Site Plan

6 marked single white edge lines. There are no sidewalks along Route 25 in the study area. Land use along Route 25 is a mix of residential, office, industrial and commercial land uses. Townhouse Road Townhouse Road is an east-west roadway under local jurisdiction and is classified as a Local roadway in the project area. Townhouse Road provides a connection between Route 25 to the west and the New Bridge Road at the State Line (Maine) to the east. The bridge connecting Townhouse Road to New Bridge Road in Lebanon, Maine is currently closed. Within the study area, Townhouse Road provides one lane of travel in each direction with a paved width of between 2-6 to The posted regulatory speed limit on Townhouse Road in the project area is 3 mph. Townhouse Road is a local roadway that provides access to recreational uses including the Mi-Te-Jo Campground, a marina, a beach, and residential homes/cottages. Intersections Route 25 at Townhouse Road Route 25 meets Townhouse Road to form separate three-way, unsignalized intersections, with the Milton Town House located between these intersections. The Route 25 northbound approach is approximately 2 feet wide with a 6-foot-wide shoulder. The Route 25 southbound approach is approximately 2-feet wide with a 3-foot wide shoulder. Both Townhouse Road westbound approaches to the intersection provide single multi-purpose lanes, under STOP sign control. There are no sidewalks or crosswalks provided at the intersection. Land use at the intersection consists of Milton Town House, several residential homes and the Milton Police Department. Baseline Traffic Data Traffic data used in this evaluation was collected on ugust 24-27, 27. Turning movement count (TMC) data were collected at the study area intersections during a Friday morning (7: M - 9: M), Friday evening (3: PM 6: PM), and Saturday midday (: M 2: PM) periods. The traffic counts represent summer season conditions with the traffic activity along Townhouse Road principally driven by the seasonal use of campsites at the property and privately-owned homes near Northeast Pond, Town House Pond and Milton Pond. t the time of the counts the bridge connecting Townhouse Road in Milton, NH with New Bridge Road in Lebanon, ME was closed. Traffic volume on Townhouse Road is adjusted to reflect additional trips generated once the New Town Road bridge reopens in 29, which reflects a 25% increase over existing trips (6 daily trips) based on historical counts along Townhouse Road at the State Line provided by MaineDOT. The Baseline Friday morning, Friday evening and Saturday midday peak hour traffic volumes for the study intersection are shown in Figure 3 and Figure 4. Traffic count data and adjustment calculations are provided in the ttachments. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 4

7

8

9 Daily traffic volume along Townhouse Road and Route 25 in the immediate site vicinity was collected on Thursday, Friday, Saturday and Sunday on ugust 24-27, 27. The counts along Townhouse Road have been adjusted by 25% to represent conditions with the bridge re-opened. The result of the count is summarized in Table and is included in the ttachments. TBLE BSELINE TRFFIC VOLUME SUMMRY (Summer Conditions) Time Period Daily Volume (vpd) Percent Daily Traffic 2 Peak Hour Volume (vph) 3 Peak Flow Direction 4 Peak Hour Directional Volume (vph) Townhouse Road east of Route 25 Thursday Morning Peak Hour 2,94 4% 3 74% WB 95 Thursday Morning Peak Hour 2,94 8% % EB 4 Friday Morning Peak Hour 3,3 5% 5 65% WB 98 Friday Evening Peak Hour 3,3 8% % EB 5 Saturday Midday Peak Hour 3,34 9% 3 5% EB 54 Sunday Midday Peak Hour 2,94 9% 27 59% WB 59 Route 25 south of Townhouse Road Thursday Morning Peak Hour 6,3 4% 27 63% SB 7 Thursday Morning Peak Hour 6,3 8% 48 5% NB 245 Friday Morning Peak Hour 6,83 4% 29 6% SB 74 Friday Evening Peak Hour 6,83 8% 56 55% NB 36 Saturday Midday Peak Hour 6,52 8% 52 5% SB 263 Sunday Midday Peak Hour 6,2 9% 53 52% SB 278 Two-way daily traffic expressed in vehicles per day w/ 25% adjustment to Townhouse Road for bridge re-opening at the State Line. 2 The percent of daily traffic that occurs during the peak hour. 3 Two-way peak-hour volume expressed in vehicles per hour. 4 EB = Eastbound, WB = Westbound, NB = Northbound, SB = Southbound s summarized in Table, Townhouse Road east of Route 25. Townhouse Road to the east of Route 25 carries approximately 3, vehicles per day (vpd) during the summer. The peak hour traffic volumes generally resulted in 3 vehicle trips per hour or less along Townhouse Road. Route 25 south of Townhouse Road. Route 25 to the south of Townhouse Road was observed to be between 6,3 and 6,83 vehicles per day (vpd) during the summer. The peak hour traffic volumes generally resulted in 56 vehicle trips per hour or less along Route 25. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 5

10 Existing Trip Generation Mi-Te-Jo Campground Trip generation for the Mi-Te-Jo Campground was documented at the campground driveway between the hours of 6: am and 6: pm on ugust 24-27, 27. Detailed graphs of hourly traffic activity for the campground are provided in the ttachments. detailed trip generation summary for the Mi-Te-Jo Campground under peak summer conditions by vehicle type (auto, tow-behind camper, and RV) is presented in Table 2. TBLE 2 OBSERVED TRIP-GENERTION SUMMRY (Mi-Te-Jo Campground) Vehicle-trips Period uto Tow-Camper RV Total Friday Morning Peak-Hour: Enter Exit Total Friday Evening Peak-Hour: Enter Exit Total Saturday Midday Peak-Hour: Enter Exit Total Peak hour trips based on observations along Mi-Te-Jo Road on ugust 25-26, 27 with 223 campsites comprised of seasonal sites, 9 transient (short-term rental) sites and 3 cabins. s presented in Table 2, Trip Generation. The existing 223 campsites result in less than vehicle trip per minute during the peak study periods. The campground generates approximately 2 vehicle trips during the Friday morning peak hour, 39 vehicle trips during the Friday evening peak hour, and 54 vehicle trips during the Saturday midday peak hour. Vehicle Type. The vast majority (95%±) of the campground trips during the peak study periods are automobile trips; no RV trips were observed and tow-behind camper trips generally only occurred on the weekend with a maximum of four (4) outbound trips during a midday period. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 6

11 Measured Travel Speeds Vehicle speeds were obtained for Route 25 to the south of Townhouse Road and for Townhouse Road to the east of Route 25 using radar recorder devices. These measured travel speeds provide a basis for determining sight line requirements at the intersection of Route 25 and Townhouse Road and Townhouse Road at Mi-Te-Jo Road. Table 3 presents a summary of the travel speed data with a breakdown of the speed data provided in the ttachments. The speed data sets the basis for the sight line review in the subsequent section of this report. TBLE 3 SPEED STUDY RESULTS Travel Direction Speed Limit Travel Speed Mean 2 85 th Percentile 3 Route 25 Northbound Southbound Townhouse Road Eastbound Westbound Regulatory (Posted) Speed limit in miles per hour (mph) 2 rithmetic mean 3 The speed at or below which 85 percent of the vehicles are traveling s summarized in Table 3 Route 25. The mean (average) travel speed on Route 25 traveling northbound is 45 mph and the 85 th percentile travel speed is 49 mph. In the southbound direction, the mean travel speed is 43 mph and the 85 th percentile travel speed is 48 mph. Townhouse Road. The mean (average) travel speed on Townhouse Road traveling eastbound is 33 mph and the 85 th percentile travel speed is 38 mph. In the westbound direction, the mean travel speed is 34 mph and the 85 th percentile travel speed is 39 mph. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 7

12 Safety In order to identify crash trends and safety characteristics for Townhouse Road and primary study area intersections, crash data were obtained from NHDOT for the Town of Milton for the three-year period 2 through 24. summary of the crash data with crash rates for the primary study intersection is detailed in Table 4; all recorded incidents are presented in Table 5 and referenced in Figure 5. TBLE 4 INTERSECTION CRSH SUMMRY 2 THROUGH 24 INTERSECTION Data Category Route 25 at Townhouse Road Townhouse road at Mi-Te-Jo Road/Lakeside Drive Traffic Control Signalized Signalized Year: Total Severity: P. Damage Only Personal Injury Fatality Hit and Run Surface Conditions: Dry Wet Snow Debris Other/Unreported Lighting Condition Daylight Dark No Street Lights Dark Street Lights On Dusk Unknown Source: NHDOT Crash Database. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 8

13 TBLE 5 CRSH SUMMRY TOWNHOUSE ROD BETWEEN MITEJO ROD ND ROUTE 25 JNURY 2 THROUGH DECEMBER 24 (NHDOT) Crash No. Year Day of Week Time of Day Roadway Lighting Weather Conditions Roadway Conditions Severity 22 Friday 8: Daylight Clear Snow/Slush Non-Incapacitating Injury 2 23 Thursday 3:52 Daylight Clear Dry Non-Incapacitating Injury 3 2 Thursday 6:3 Dusk Cloudy Snow/Slush Non-Incapacitating Injury 4 22 Tuesday 8:25 Daylight Clear Dry Non-Incapacitating Injury 5 22 Thursday 7:3 Daylight Sleet Ice Property Damage Only 6 2 Monday 8: Daylight Clear Dry Property Damage Only s summarized in Table 4 and Table 5: Route 25 at Townhouse Road. One () crash was reported for the unsignalized Route 25 and Townhouse Road intersection resulted in personal injury type collision. Crash records indicate that roadway surface conditions (snow, slush, other) may have been a factor in the crash. Townhouse Road at Mi-Te-Jo Road. One () crash was reported for the unsignalized Townhouse Road and Mi-Te-Jo Road intersection resulting in a property damage type collision. Crash records indicate that a vehicle struck a tree along the roadway. Townhouse Road Totals. Detailed review of NHDOT crash records for Townhouse Road also indicates a low incident rate involving only six total crashes over the past 4-year period, none of which involved pedestrians and half of which involved inclement weather (ice/snow) when the campground was closed. In summary, there is no immediate safety countermeasures warranted based on the limited crash history along Townhouse Road. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 9

14

15 SIGHT DISTNCE NLYSIS Intersection sight lines and corresponding stopping sight distance requirements along Townhouse Road at Mi-Te-Jo Road are evaluated relative to standards recommended by the merican ssociation of State Highway and Transportation Officials (SHTO). Sight lines for critical vehicle movements at Mi-Te-Jo Road along Townhouse Road were compared to minimum safe stopping sight distance (SSD) requirements for posted speed limits and ambient travel speeds on Townhouse Road. Stopping Sight Distance Sight distance is the length of roadway visible to the motorist to a fixed object. The minimum sight distance available on a roadway should be sufficiently long enough to enable a belowaverage operator, traveling at or near the design speed limit, to stop safely before reaching a stationary object in its path, in this case, a vehicle exiting onto Townhouse Road. The SSD criteria are defined by SHTO based on design and operating speeds, anticipated driver behavior and vehicle performance, as well as physical roadway conditions. SSD includes the length of roadway traveled during the perception and reaction time of a driver to an object, and the distance traveled during brake application on wet level pavement. djustment factors are applied to account for roadway grades when applicable. SSD was estimated in the field using SHTO standards for driver s eye (3.5 feet) and object height equivalent to the taillight height of a passenger car (2. feet) for the Townhouse Road approaches to Mi-Te-Jo Road. Table 6 presents a summary of the available SSD as they relate to Townhouse Road and SHTO s recommended SSD based on regulatory and observed speeds along Townhouse Road. policy on Geometric Design of Highways and Streets, merican ssociation of State Highway and Transportation Officials (SHTO), 2. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc

16 TBLE 6 STOPPING SIGHT DISTNCE SUMMRY TOWNHOUSE ROD PPROCHES TO SITE DRIVEWY SHTO Recommended pproach/ Travel Direction vailable Stopping Sight Distance Regulatory Speed (3 mph) verage Travel Speed 2 85 th Percentile Travel Speed 3 Eastbound Westbound >5 Feet >5 Feet 2 Feet 2 Feet 23 Feet 24 Feet 28 Feet 29 Feet Recommended sight distance based on SHTO, Policy on Geometric Design of Highways and Streets. Based on driver height of eye of 3.5 feet to object height of 2. feet and adjustments for roadway grade if required. 2 verage Speed is 33 mph EB and 34 mph WB th Percentile travel speed is 38 mph EB and 39 mph WB. The results shown in Table 6 indicate that the existing available stopping sight distances exceed SHTO s recommended SSD criteria for the Townhouse Road approach to the proposed site driveway for posted and 85 th percentile travel speeds. Intersection Sight Distance Clear sight lines provide sufficient sight distance for a stopped driver on a minor-road approach to depart from the intersection and enter or cross the major road. s stated under SHTO s Intersection Sight Distance (ISD) considerations, If the available sight distance for an entering vehicle is at least equal to the appropriate stopping sight distance for the major road, then drivers have sufficient sight distance to avoid collisions To enhance traffic operations, intersection sight distances that exceed stopping sight distances are desirable along the major road. SHTO s ISD criteria are defined into several cases. In this case, the site driveway approach is under STOP control. The ISD in question relates to the ability to turn either right or left onto Townhouse Road. vailable ISD was estimated in the field using SHTO standards for driver s eye (3.5 feet), object height (3.5 feet) and decision point (8 to 4.5 feet from the edge of the travel lane) for the eastbound and westbound travel directions on Townhouse Road. Table 7 presents a summary of the available ISD for the departures from Mi-Te-Jo Road and SHTO s recommended ISD. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc

17 TBLE 7 INTERSECTION SIGHT DISTNCE SUMMRY PRIMRY SITE DRIVEWY DEPRTURES TO TOWNHOUSE ROD View Direction vailable ISD SHTO Minimum SHTO Ideal 85 th Percentile Travel Speed 3 Regulatory Speed Limit 2 Looking East Looking West >5 Feet >5 Feet 29 Feet 335 Feet 375 Feet 42 Feet Recommended sight distance based on SHTO, Policy on Geometric Design of Highways and Streets. Based on driver height of eye of 3.5 feet and an object height of 3.5 feet. Minimum value as noted represents SSD per SHTO guidance. 2 Regulatory speed limit: 3 mph th Percentile travel speed is 38 mph EB and 39 mph WB. The results of the ISD analysis presented in Table 7 indicate that the available sight lines looking east and west from Mi-Te-Jo Road onto Townhouse Road exceed the sight line requirements from SHTO for the regulatory and 85 th percentile travel speeds. recommends that any new plantings (shrubs, bushes) or physical landscape features to be located within the sight lines should also be maintained at a height of 2 feet or less above the adjacent roadway grade to ensure unobstructed lines of sight. PROJECTED TRFFIC CTIVITY MI-TE-JO CMPGROUND Trip generation activity for the Mi-Te-Jo Campground was first estimated for the proposed (expanded) facility using trip rates and methodology published by the Institute of Transportation Engineers (ITE in Trip Generation th Edition). The land use that most closely reflects the characteristics of the campground is ITE Land Use Code (LUC) 46 Campground/Recreational Vehicle Park which is defined as follows: ITE LUC 46: Campgrounds and recreational vehicle parks are recreational sites that accommodate campers, trailers, tents and recreational vehicles on a transient basis. They are found in a variety of locations and provide a variety of facilities, often including restrooms with showers and recreational facilities, such as a swimming pool, convenience store and laundromat. Projected trip activity for the Mi-Te-Jo Campground based on application of ITE trip rates is summarized in Table 8. Empirical traffic data are also considered based on empirical data collected at the existing Mi-Te-Jo Campground in ugust 27 based on 223 campsites comprised of seasonal sites, 9 transient (short-term rental) sites and 3 cabins. pplication of empirically-derived trip rates for the proposed (expanded) campground results in peak hour trip increases as summarized below in Table 8. Detailed trip generation worksheets are provided in the ttachments. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 2

18 TBLE 8 TRIP-GENERTION COMPRISON MI-TE-JO CMPGROUND Period/Direction ITE Basis Basis 2 Empirical Friday Morning Peak Hour Friday Evening Peak Hour Entering Exiting Total (-56%) Entering Exiting Total (-36%) Saturday Midday Peak Hour 3 Entering Exiting Total (-37%) verage trip rates for ITE Land Use Code (LUC) 46 (Campground/Recreational Vehicle Park) applied to 73 occupied campsites. 2 Empirical trip rates based on existing patterns at the Mi-Te-Jo Campground applied to 73 campsites. s summarized in Table 8, ITE Basis. Trip generation increases for the proposed expansion of the Mi-Te-Jo Campground based on industry standard rates represents approximately 36 new vehicle trips during the Friday morning peak hour, 47 new vehicle trips during the Friday evening peak hour, and 67 new vehicle trips during the Saturday midday peak hour. Empirical Basis. Trip generation increases for the proposed expansion of the Mi-Te-Jo Campground based on empirical rates represents approximately 6 new vehicle trips during the Friday morning peak hour, 3 new vehicle trips during the Friday evening peak hour, and 42 new vehicle trips during the Saturday midday peak hour. s shown the empirical data based on actual trip generation characteristics of the existing Mi-Te-Jo Campground on a summer weekend result in significantly less trips than industry standard rates. Specifically, the empirical data suggest trips that are up to 56% less. Relative to ITE-based trip estimates the empirical data suggest trips that are up to 56% less. s a conservative measure the higher-volume ITE-based estimates were used to evaluate project impacts and as such are expected to result in fewer trips than analyzed in this TI. summary of projected trip activity for the Mi-Te-Jo Campground based on existing trip generation and projected trip increases based on application of ITE trip rates is summarized in Table 9. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 3

19 TBLE 9 TRIP-GENERTION SUMMRY MI-TE-JO CMPGROUND (ITE Basis) Period/Direction Existing Increase 2 Proposed Total Trips Friday Morning Peak Hour Entering Exiting Total Friday Evening Peak Hour Entering Exiting Total Saturday Midday Peak Hour 3 Entering Exiting Total Peak hour trips based on observations along Mi-Te-Jo Road on ugust 25-26, 27 with 223 campsites comprised of seasonal sites, 9 transient (short-term rental) sites and 3 cabins. 2 verage trip rates for ITE Land Use Code (LUC) 46 (Campground/Recreational Vehicle Park) applied to 73 occupied campsites s summarized in Table 9, the Mi-Te-Jo Campground trip activity is estimated to range from 57 to 2 vehicle-trips during peak season, peak hour conditions using the conservative ITE basis. Trip Distribution Patterns The distribution for projected traffic for the expanded campground facility is based primarily on existing travel patterns and volumes of the adjacent roadway system. Trip distribution calculations are provided in the ppendices. Development-related trips for the development were assigned to the roadway network using the ITE trip-generation estimates shown in Table 7 and the existing travel patterns distribution. New development-related trips at each intersection approach for the Friday morning, Friday evening and Saturday midday peak hours are quantified in Figure 6 and Figure 7. Design Year Conditions Design Year condition traffic volumes were arrived at by adding development-specific traffic volumes to the 27 Baseline conditions. The 27 Design Year condition traffic-volume networks for the Friday morning, Friday evening and Saturday midday are displayed in Figure 8 and Figure 9. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 4

20

21

22

23

24 OPERTIONS NLYSIS This section provides an overview of operational analysis methodology and an assessment of intersection operations under Baseline and projected Design Year conditions. nalysis Methodology Intersection capacity analyses are presented in this section for the Baseline and Design Year traffic-volume conditions. Capacity analyses, conducted in accordance with EE/MassDOT guidelines, provide an index of how well the roadway facilities serve the traffic demands placed upon them. The operational results provide the basis for recommended access and roadway improvements in the following section. Capacity analysis of intersections is developed using the Synchro computer software, which implements the methods of the 2 Highway Capacity Manual (HCM). The resulting analysis presents a level-of-service (LOS) designation for individual intersection movements. The LOS is a letter designation that provides a qualitative measure of operating conditions based on several factors including roadway geometry, speeds, ambient traffic volumes, traffic controls, and driver characteristics. Since the LOS of a traffic facility is a function of the traffic flows placed upon it, such a facility may operate at a wide range of LOS, depending on the time of day, day of week, or period of year. range of six levels of service are defined on the basis of average delay, ranging from LOS (the least delay) to LOS F (delays greater than 5 seconds for unsignalized movements). The specific control delays and associated LOS designations are presented in the ttachments. Intersection Capacity nalysis Results Level-of-Service (LOS) analyses were conducted for the Baseline and Design Year conditions for the study intersections. The results of the intersection capacity are summarized below in Table. Detailed analysis results are presented in the ttachments. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 5

25 TBLE INTERSECTION CPCITY NLYSIS RESULTS 27 Baseline 27 Design Year Period pproach v/c Delay 2 LOS 3 95 th Q 4 v/c Delay LOS 95 th Q Friday Morning Peak Hour Route 25 at WB L Exit Townhouse Road WB R Exit Northbound Southbound <5 7 B <5 7 B Townhouse Road at Mi-Te-Jo Road/ Lakeside Drive EB L Enter Westbound SB Exit < <5 9 Friday Evening Peak Hour Route 25 at Townhouse Road WB L Exit WB R Exit Northbound Southbound <5 8 B B <5 8 B B Townhouse Road at Mi-Te-Jo Road/ Lakeside Drive EB L Enter Westbound SB Exit < <5 9 Saturday Midday Peak Hour Route 25 at WB L Exit Townhouse Road WB R Exit Northbound Southbound <5 8 B B <5 8 B B Townhouse Road at Mi-Te-Jo Road/ Lakeside Drive EB L Enter Westbound SB Exit < <5 9 Volume-to-capacity ratio 2 verage control delay per vehicle (in seconds) 3 Level of service 4 95 th percentile queue length in feet s summarized in Table : The proposed development is expected to have minimal impact on the study area intersections. There will be nominal changes in the levels of service and operations of the study intersection under future conditions with the project. Under 27 Design Year, the mainline travel along Route 25 at its intersections with Townhouse Road and Townhouse Road at its intersection with Mi-Te-Jo-Road will remain well below capacity with minimal delay (LOS ) during all study periods. The side street approaches will also operate well below capacity with minor delay (LOS B) or better during all study periods. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 6

26 CONCLUSIONS Townhouse Road is a conforming local roadway that provides ample width ranging from 2- feet to 22-feet to accommodate existing and modest increases in traffic activity following campground expansion. Based on documented peak-season campground activity, projected trip increases are estimated to be 3 vehicle-trips or less during peak hours on weekdays and 42 vehicle-trips or less during peak hours on weekends; only 5 percent of these new trips involve tow-vehicles (campers). Based on field review of the roadway alignment, modest projected traffic volumes during peak season conditions and limited crash history, it is the opinion of that the proposed campground expansion will be safely and properly accommodated along Townhouse Road with no material or undue operational or safety impact. therefore concludes that on these grounds there will be no undue nuisance or serious hazard to pedestrian or vehicular traffic, including the location and design of the access currently serving the property. G:\Projects\94 - Milford NH (Mitejo)\Documents\94 MR2_Final.doc 7

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC. Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

APPENDIX D Traffic Impact Study (Draft Report)

APPENDIX D Traffic Impact Study (Draft Report) ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGISTRATION, TRAFFIC IMPACT STUDY (DRAFT REPORT), AND WATER SUPPLY SOURCE ASSESSMENT (WSSA): CAMPING PLAGE ABOITEAU BEACH, CAP-PELÉ, NB APPENDIX D (Draft Report)

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association Flathead County Rail Park Kalispell, Montana DRFT Prepared for Flathead County Economic Development ssociation Prepared by KLJ May 2013 KLJ Project # 15413003 CERTIFICTION I hereby certify that this traffic

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts Traffic Impact and Access Study The Preserve at Abbyville Proposed 40B Residential Development Norfolk, Massachusetts Prepared for DiPlacido Development Corp. April 2017 Prepared by GREEN INTERNATIONAL

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Figure 1 in the attachments shows the location of the study intersections and the general area of study.

Figure 1 in the attachments shows the location of the study intersections and the general area of study. Technical Memorandum To: Jenny Max, City of Nisswa From: Bryant Ficek, PE, PTOE Max Moreland, PE Date: July 16, 218 Re: CSH 77/Nokomis venue rea Traffic Study Existing Conditions Grand View Lodge on Gull

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Traffic Signal Redesign 50% Design Report

Traffic Signal Redesign 50% Design Report Traffic Signal Redesign 50% Design Report Joseph Davis, Jace Elkins, Jordan Weyrauch and Zach Crimmins CENE 486 Capstone J3Z Engineering March 10 th, 2016 Table of Contents 1.0 Project Description...1

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Cheyenne Metropolitan Planning Organization

Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study PHASE II SECTION 20 DRAFT Prepared for: Cheyenne Metropolitan Planning Organization November 20, 2015 (Section 20 is bordered by Powderhouse Road on the west, Storey

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Transportation Advisory Board

Transportation Advisory Board C I T Y O F WEATHERFORD Transportation Advisory Board AGENDA REPORT Meeting Date: October 15,2015 Staff Contact: Manny Palacios Jr. Phone: E-mail: 817-598-4296 mpalacios@weatherfordtx.gov SUBJECT: Discuss

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

TENW Transportation Engineering NorthWest

TENW Transportation Engineering NorthWest DRAFT FOR CLIENT REVIEW ONLY TENW Transportation Engineering NorthWest MEMORANDUM DATE: August 22, 2017 TO: FROM: SUBJECT: Patrick Yamashita City of Mercer Island Chris Forster, P.E. TENW Trip Generation

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street MEMORANDUM Date: June 28, 2012 To: From: Subject: Mr. Joseph Stigliani, Director of Public Works Kenneth J. Petraglia, P.E., PTOE Greg E. Lucas, P.E., PTOE Kingsley Road Stop Sign Warrant Analysis BETA

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for: TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Deer Street Parking Garage & Deer Street Associates Development

Deer Street Parking Garage & Deer Street Associates Development Traffic Impact and Access Study Deer Street Parking Garage & Deer Street Associates Development Portsmouth, New Hampshire Submitted to: City of Portsmouth, New Hampshire 1 Junkins Avenue Portsmouth, New

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

MUNICIPALITY OF ANCHORAGE Traffic Department MEMORANDUM

MUNICIPALITY OF ANCHORAGE Traffic Department MEMORANDUM MUNICIPALITY OF ANCHORAGE DATE: MEMORANDUM TO: FROM: SUBJECT: Anchorage Contractors, Builders, Designers, and Land Owners Robert E. Kniefel, P.E., Municipal Traffic Engineer Municipal Driveway Standards

More information

T R A N S P O R T A T I O N M E M O R A N D U M

T R A N S P O R T A T I O N M E M O R A N D U M WILKINSON LLC t raffic engineering and t ransportation p lanning 3405 Harbor Way Fort Collins, CO 80524 phone: 970-988-0143 fax: 970-472-0223 martinawilkinson@msn.com T R A N S P O R T A T I O N M E M

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Updated Traffic Impact and Access Study. Proposed Timber Crest Estates Residential Development Holliston Street and Winthrop Street

Updated Traffic Impact and Access Study. Proposed Timber Crest Estates Residential Development Holliston Street and Winthrop Street Proposed Timber Crest Estates Residential Development Holliston Street and Winthrop Street Medway, Massachusetts Prepared for TIMBER CREST ESTATES, LLC October 2016 Prepared by GREEN INTERNATIONAL AFFILIATES,

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

Monroe County Department of Transportation Vertical Curve Safety Study

Monroe County Department of Transportation Vertical Curve Safety Study Monroe County, New York PREPARED FOR: Monroe County Department of Transportation 50 West Main Street Suite 6100 Rochester, NY 14614 PREPARED BY: 255 East Avenue Rochester, New York 14604 project # 434934

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information