TZ Vista Traffic Impact Study

Size: px
Start display at page:

Download "TZ Vista Traffic Impact Study"

Transcription

1 TZ Vista Traffic Impact Study A. INTRODUCTION This Traffic Impact Study (TIS) provides a detailed analysis to assess the potential traffic and transportation impacts of the TZ Vista multi-family residential project (the Proposed Project ). The Proposed Project is to be located at 25 and 26 Lydecker Street and 41 and 55 Gedney Street (the Project Site ) in the Village of Nyack, NY and is proposed to comprise of 128 residential units located within three buildings, an accessory café, 263 parking spaces and a pedestrian walkway along the Hudson River. Potential impacts of the Proposed Project were analyzed using the Synchro 8 traffic analysis software (latest version approved by NYSDOT) to calculate existing and future traffic operating conditions (Level of Service, average delay, and queuing) at each of the Study Area intersections. The TIS describes traffic conditions for existing conditions within the Study Area and for conditions in the future without the Proposed Project (the No Build analysis), and in the future with the Proposed Project (the Build analysis). B. EXECUTIVE SUMMARY A quantified traffic analysis was conducted at thirteen (13) intersections in the vicinity of the Project Site for the Weekday AM, Weekday PM, and Saturday Midday peak hours to assess the potential effects of the Proposed Project on the area traffic network. Roadway geometry, traffic control device, and traffic (vehicle, pedestrian, bike) volume count data was collected. In order to estimate 2017 existing traffic conditions during the peak summer months, the following adjustments were made to the 2017 February/April counts: A New York State Department of Transportation (NYSDOT) seasonal adjustment factor of 1.25 was applied to the existing counts. The traffic generated by the Nyack Boat Club was added to the existing counts. The potential effects of project related traffic on the area traffic network was assessed by comparing future traffic conditions without the Proposed Project to the future traffic conditions with the Proposed Project. An evaluation of on-street parking on nearby streets was conducted. As part of this assessment, hourly parking counts were conducted to determine the existing capacity and demand on nearby streets. On-street parking in the study area was found to be at its highest utilization during the weekday evening and Saturday evening hours. During these time periods restaurants and 1 The Proposed Project is anticipated to be completed in /24/17

2 businesses along Main Street are busy and residents (particularly those with single car driveways) on nearby local streets may begin to search for overnight on-street parking. In order to establish future 2019 traffic volumes without the Proposed Project (No Build Conditions), NYSDOT and the Village s Traffic Consultant were contacted for information regarding traffic growth rates for the area and No Build projects. An annual growth rate of 0.5 percent was provided by both NYSDOT and the Village for use in this study and applied to the 2017 Existing traffic volumes. Five future projects were identified by the Village in the area: Nyack Pavion, 48 South Franklin Street, 263 Main Street, Montclare, and Gateway Lofts. Vehicle trips from these projects also were assigned to the study area intersections. Future 2019 traffic volumes with the Proposed Project (Build) conditions were determined by adding and assigning project generated traffic to the 2019 No Build traffic. Estimates for the site traffic were based on trip generation rates provided in the Institute of Transportation Engineers (ITE) Trip Generation Manual (9th Edition). A comparison of the 2019 No Build and 2019 Build analyses revealed that one of the study area intersection movements (the eastbound approach of the Main Street and /South Broadway intersection) would experience an impact with a continued operation at Level of Service (LOS). The impact could be mitigated with signal retimings (reallocation of signal green time from one phase to another) at that intersection. No other impacts were identified. Vehicular ingress and egress to the parking garage would be provided in a single location on Main Street, close to the intersection with Gedney Street. Pedestrian access to the site would be provided in numerous locations along Main Street and Gedney Street. Public access to and through the site would be provided from the Main Street and Water Street intersection, as well as across the garage podium from High Street. The Proposed Project would include a total of 263 parking spaces. Of these, 236 would be provided within the parking garage. The remaining 27 parking spaces would be provided within two surface parking lots on Lydecker Street. The proposed surface parking satisfies the Village Code requirement for public parking (22 parking spaces or 10 percent of the required number of parking spaces). In addition, the garage includes 22 parking spaces for the residents of Clermont Condominium Association. These parking spaces will replace surface parking presently on Lot 2 (41 Gedney Street) for the use by the Clermont Condominium Association. The proposed 263 parking spaces satisfies the Village Code and exceeds the average peak parking demand based on the Institute of Transportation Engineers (ITE) data. Therefore, residents are not expected to require the use of on street parking. C. EXISTING CONDITIONS STUDY AREA AND DATA COLLECTION PROGRAM To assess the traffic impacts associated with the Proposed Project, a study area was identified that considered key intersections that might be affected by Project-generated trips. A total of 13 locations were identified for analysis, as shown in Figure 1. These intersections are: 1. Main Street and /South Broadway 2. Main Street and Piermont Avenue 3. Main Street and Gedney Street 4. Gedney Street and Lydecker Street 5. Gedney Street and High Avenue 6. Gedney Street and 1st Avenue 4/24/17 2

3 Co u rt Stree ay eet Ce dar S tr treet Stree t Bu rd S et adw ay ar H ill Av enu Division Aven e 5 S tr e et 4 3 treet et Sp ea rs tree ree t n Stre ue Hudson River t R5UBH E1UBL6 ue Legend 1 So uth B ro Depot Place C ed Lyde cker 2 Re ms e Aven 6 1 y Stre Nyack P la za Hu dson Aven ue Libe rt South Franklin Street De p ew 7 adw ay eet Main S venu e e 1 0 No rth B ro Pa rk Str e et treet Bridge S High Ave n ue Ne w S tr 2nd A nt Av enue North 1st A v enu Ch urc h 8 11 Pierm o Drive w Mario n Jeffe rson S Stre et s Av enue 4th A ve nu e Cou rt S t treet 1 3 3rd A ven u e Fran klin Sick le Ackerman Place t 4/21/2017 Ha ve n FEET Project Site Analyzed Intersection TZ VISTA Traffic Study Area Intersections Figure 1

4 7. Gedney Street and 2nd Avenue 8. Gedney Street and 3rd Avenue 9. Gedney Street and 4th Avenue 10. and 1st Avenue 11. and 2nd Avenue 12. and 3rd Avenue 13. and 4th Avenue Manual turning movement counts were collected at all the Study Area intersections during the weekday AM (7:00 AM 9:00 AM), weekday PM (3:00 PM 6:00 PM), and Saturday morning/midday (10:00 AM 2:00 PM) peak periods. Data collection sheets are provided in Appendix A. Existing traffic conditions at the 13 study area intersections were established based on traffic counts conducted in February and April The highest volumes (February or April) were utilized in the study. Generally, the April counts were higher. Therefore, the existing volumes utilized in the study reflect April conditions. At the request of the Village the April counts were seasonally adjusted to reflect peak summer conditions. The following adjustments were applied to the April counts: A summer (August) adjustment factor of 1.25 was applied to the April counts. This factor was developed based on NYSDOT seasonal adjustment factor data. The adjacent Nyack Boat Club was not in operation during the April counts. The traffic generated by the boat club was determined based on data presented in the ITE Trip Generation Manual, 9th Edition. The traffic generated by the boat club was added to seasonally adjusted traffic volumes. The analysis presented in the TIS is conservative because the seasonally adjusted volumes (August) utilized in the capacity analysis also includes weekday school traffic (from the April counts). The NYSDOT seasonal adjustment factor data and the trip generation/trip assignment for the Nyack Boat Club are provided in Appendix A. Field inventories of roadway geometry and signal timings/phasings were also conducted to provide the appropriate inputs to the operational analyses. Signal timing plans were also provided by the Village for the Main Street and /South Broadway intersection. Field inventories and traffic signal timing plans are provided in Appendix A. To assess on-street parking conditions in the area, parking counts were conducted on an hourly basis to determine parking demand within the study area. These parking counts were conducted along the following roadways as shown in Figure 2: 1. Main Street, between Gedney Street and 2. Lydecker Street, between Gedney Street and 3. High Avenue, between Gedney Street and 4. 1st Avenue, between Gedney Street and 5. Gedney Street, between Main Street and Ackerman Place 6. 2nd Avenue, between Gedney Street and 7. 3rd Avenue, between Gedney Street and 8. 4th Avenue, between Gedney Street and These parking counts were conducted during the following time periods: 3 4/24/17

5 4/21/ Miles Sources: Esri, HERE, DeLorme, USGS, Intermap, On-street Parking Survey Locations Figure 2

6 Weekday morning (6:00 AM 10:00 AM) Weekday afternoon (3:00 PM 7:00 PM) Weekday evening (7:00 PM 11:00 PM) Saturday morning/midday (8:00 AM 2:00 PM) Saturday evening (5:00 PM 10:00 PM) Data collection sheets are provided in Appendix A. ROADWAY CHARACTERISTICS The following is a brief description of the major roadways within the study area. MAIN STREET Main Street is an east-west roadway which is under the jurisdiction of the Village of Nyack within the study area. From its eastern terminus to its intersection with /South Broadway, Main Street is classified by NYSDOT as a local roadway. From its intersection with /South Broadway to its intersection with Highland Avenue, Main Street is classified by NYSDOT as a collector roadway. Main Street generally provides one moving lane in each direction and varies in width between approximately 22 and 34 feet within the study area. In addition to center line striping, pavement markings along Main Street in the study area include parking stall, crosswalk, stop line, and Fire Zone markings. On-street parking is permitted along sections of Main Street. There are no public bus stops along Main Street within the study area. Traffic controls along Main Street include a traffic signal at its intersection with /South Broadway. Pedestrian facilities provided along Main Street include sidewalks and crosswalks. Based on field observations, the pavement along Main Street in the study area is generally in fair to good condition. NORTH BROADWAY, SOUTH BROADWAY and South Broadway are classified by NYSDOT as collector roadways and generally traverse in a north-south direction within the study area. Both roadways are under the jurisdiction of the Village of Nyack. and South Broadway generally provide one moving lane in each direction and vary in width between 34 and 37 feet within the study area. In addition to center line striping, pavement markings along and South Broadway in the study area include crosswalk, stop line, and parking stall markings and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of and South Broadway. There are no public bus stops along and South Broadway within the study area. Traffic controls along North Broadway and South Broadway within the study area include a traffic signal at its intersection with Main Street. Pedestrian facilities provided along and South Broadway include sidewalks and crosswalks. Based on field observations, the pavement along North Broadway and South Broadway in the study area is generally in good condition. GEDNEY STREET Gedney Street is classified by NYSDOT as a local roadway and generally traverses in a northsouth direction within the study area. Gedney Street Avenue generally provides one moving lane in each direction and is approximately 27 feet wide within the study area. There is no center line striping along Gedney Street. Pavement markings along Gedney Street include stop lines, Stop markings, crosswalks, and hatch markings to delineate areas where on-street parking is 4/24/17 4

7 prohibited. On-street parking is permitted along sections of Gedney Street. There are no public bus stops along Gedney Street. Traffic controls along Gedney Street include a stop sign at its intersection with Main Street. Pedestrian facilities provided along Gedney Street include sidewalks and crosswalks. Based on field observations, the pavement along Gedney Street in the study area is generally in fair to good condition with notable fading on some of the pavement markings. PIERMONT AVENUE Piermont Avenue is classified by NYSDOT as a local roadway and generally traverses in a north-south direction within the study area. Piermont Avenue generally provides one moving lane in each direction and is approximately 29 feet wide within the study area. There is no center line striping along Piermont Avenue. Pavement markings along Piermont Avenue include stop lines, Stop markings, crosswalks, and pedestrian warning symbol markings. On-street parking is prohibited on Piermont Avenue south of its intersection with Main Street. There are no public bus stops along Piermont Avenue. Traffic controls along Piermont Avenue include a stop sign at its intersection with Main Street. Pedestrian facilities provided along Piermont Avenue include sidewalks and crosswalks. Based on field observations, the pavement along Piermont Avenue in the study area is in fair to good condition with notable fading on some of the pavement markings. LYDECKER STREET Lydecker Street is classified by NYSDOT as a local roadway and generally traverses in an eastwest direction within the study area. Lydecker Street is a one-way eastbound roadway, provides one moving lane, and is approximately 22 feet wide within the study area. Pavement markings along Lydecker Street include stop lines, Stop markings, crosswalks, pedestrian warning symbol markings, parking stall markings, and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of Lydecker Street. There are no public bus stops along Lydecker Street. Traffic controls along Lydecker Street include One Way signs and a stop sign at its intersection with Gedney Street. Pedestrian facilities provided along Lydecker Street include sidewalks and crosswalks. Based on field observations, the pavement along Lydecker Street in the study area is generally in good condition with notable fading on some of the pavement markings. HIGH AVENUE High Avenue is classified by NYSDOT as a local roadway and generally traverses in an eastwest direction within the study area. High Avenue is a one-way eastbound roadway, provides one moving lane, and is approximately 22 feet wide within the study area. Pavement markings along High Avenue include stop lines, Stop markings, crosswalks, parking stall markings, and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of High Avenue. There are no public bus stops along High Avenue. Traffic controls along High Avenue include One Way signs and a stop sign at its intersection with Gedney Street. Pedestrian facilities provided along High Avenue include sidewalks and crosswalks. Based on field observations, the pavement along High Avenue in the study area is generally in good condition with notable fading on some of the pavement markings. 5 4/24/17

8 1ST AVENUE 1st Avenue is classified by NYSDOT as a local roadway and generally traverses in an east-west direction within the study area. First Avenue is a one-way westbound roadway, provides one moving lane, and is approximately 25 feet wide within the study area. Pavement markings along 1st Avenue include stop lines, Stop markings, crosswalks, parking stall markings, and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of 1st Avenue. There are no public bus stops along 1st Avenue. Traffic controls along 1st Avenue include One Way signs and a stop sign at its intersection with North Broadway. Pedestrian facilities provided along 1st Avenue include sidewalks and crosswalks. Based on field observations, the pavement along 1st Avenue in the study area is generally in good condition with notable fading on some of the pavement markings. 2ND AVENUE Second Avenue is classified by NYSDOT as a local roadway and generally traverses in an eastwest direction within the study area. Second Avenue generally provides one moving lane in each direction and is approximately 28 feet wide within the study area. In addition to center line striping, pavement markings along 2nd Avenue include stop lines, Stop markings, crosswalks, parking stall markings, and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of 2nd Avenue. There are no public bus stops along 2nd Avenue. Traffic controls along 2nd Avenue include stop signs at its intersections with and Gedney Street. Pedestrian facilities provided along 2nd Avenue include sidewalks and crosswalks. Based on field observations, the pavement along 2nd Avenue in the study area is in good condition with notable fading on some of the pavement markings. 3RD AVENUE Third Avenue is classified by NYSDOT as a local roadway and generally traverses in an eastwest direction within the study area. Third Avenue is a one-way eastbound roadway, provides one moving lane, and is approximately 24 to 26 feet wide within the study area. Pavement markings along 3rd Avenue include stop lines, Stop markings, crosswalks, parking stall markings, and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of 3rd Avenue. There are no public bus stops along 3rd Avenue. Traffic controls along 3rd Avenue include One Way signs and a stop sign at its intersection with Gedney Street. Pedestrian facilities provided along 3rd Avenue include sidewalks and crosswalks. Based on field observations, the pavement along 3rd Avenue in the study area is generally in good condition with notable fading on some of the pavement markings. 4TH AVENUE Fourth Avenue is classified by NYSDOT as a local roadway and generally traverses in an eastwest direction within the study area. 4th Avenue generally provides one moving lane in each direction and is approximately 24 to 27 feet wide within the study area. In addition to center line striping, pavement markings along 4th Avenue include stop lines, Stop markings, crosswalks, parking stall markings, and hatch markings to delineate areas where on-street parking is prohibited. On-street parking is permitted along sections of 4th Avenue. There are no public bus stops along 4th Avenue. Traffic controls along 4th Avenue include stop signs at its intersections with and Gedney Street. Pedestrian facilities provided along 4th Avenue include sidewalks and crosswalks. Based on field observations, the pavement along 4th Avenue 4/24/17 6

9 in the study area is generally in good condition with notable fading on some of the pavement markings. TRAFFIC CONDITIONS PEAK HOURS AND TRAFFIC VOLUMES Based on a review of all the traffic count data, the peak hours for the study area were determined to be as follows: Weekday AM Peak Hour 8:00 AM to 9:00 AM Weekday PM Peak Hour 5:00 PM to 6:00 PM Saturday Midday Peak Hour 12:30 PM to 1:30 PM Figures 3, 4, and 5 show the roadway volumes at the study area intersections for existing conditions (including adjustments made to estimate summer conditions) for the peak hours analyzed. CAPACITY ANALYSIS METHODOLOGY Signalized Intersections The operation of signalized intersections in the Study Area was analyzed by applying the Percentile Delay Methodology included in the Synchro 8 traffic signal software (latest version approved by NYSDOT). This methodology builds on the methodologies presented in the 2010 Highway Capacity Manual (HCM2010) for signalized intersections and evaluates signalized intersections for average control delay per vehicle and level of service (LOS). LOS can be characterized for the entire intersection, each intersection approach, and each lane group. Control delay alone is used to characterize LOS for the entire intersection or an approach. Control delay and volume-to-capacity (v/c) ratio are used to characterize LOS for a lane group. Delay quantifies the increase in travel time due to traffic signal control. It is also a surrogate measure of driver discomfort and fuel consumption. The volume-to-capacity ratio quantifies the degree to which a phase s capacity is utilized by a lane group. LOS A describes operation with a control delay of 10 seconds per vehicle or less and a volumeto-capacity ratio no greater than 1.0. This level is typically assigned when the volume-tocapacity ratio is low and either progression is exceptionally favorable or the cycle length is very short. If it is due to favorable progression, most vehicles arrive during the green indication and travel through the intersection without stopping. LOS B describes operation with control delay between 10 and 20 seconds per vehicle and a volume-to-capacity ratio no greater than 1.0. This level is typically assigned when the volumeto-capacity ratio is low and either progression is highly favorable or the cycle length is short. More vehicles stop than with LOS A. LOS C describes operation with control delay between 20 and 35 seconds per vehicle and a volume-to-capacity ratio no greater than 1.0. This level is typically assigned when the volumeto-capacity ratio is favorable or the cycle length is moderate. Individual cycle failures (i.e., one or more queued vehicles are not able to depart as a result of insufficient capacity during the cycle) may appear at this level. The number of vehicles stopping is significant, although many vehicles still pass through the intersection without stopping. 7 4/24/17

10 Gedney Street N th Avenue 6 4th Avenue 0 Driveway rd Avenue 3rd Avenue nd Avenue 3 Driveway st Avenue 11 1st Avenue High Avenue Lydecker Street Main Street Main Street South Broadway Piermont Avenue Figure Existing Traffic Volumes Weekday AM Peak Hour (8:00 AM - 9:00 AM)

11 Gedney Street N th Avenue 10 4th Avenue 0 Driveway rd Avenue 3rd Avenue nd Avenue 5 Driveway st Avenue 11 1st Avenue High Avenue Lydecker Street Main Street Main Street South Broadway Piermont Avenue Figure Existing Traffic Volumes Weekday PM Peak Hour (5:00 PM - 6:00 PM)

12 Gedney Street N th Avenue 15 4th Avenue 0 Driveway rd Avenue 3rd Avenue nd Avenue 17 Driveway st Avenue 6 1st Avenue High Avenue Lydecker Street Main Street Main Street South Broadway Piermont Avenue Figure Existing Traffic Volumes Saturday Midday Peak Hour (12:30 PM - 1:30 PM)

13 LOS D describes operation with control delay between 35 and 55 seconds per vehicle and a volume-to-capacity ratio no greater than 1.0. This level is typically assigned when the volumeto-capacity ratio is high and either progression is ineffective or the cycle length is long. Many vehicles stop and individual cycle failures are noticeable. LOS E describes operation with control delay between 55 and 80 seconds per vehicle and a volume-to-capacity ratio no greater than 1.0. This level is typically assigned when the volumeto-capacity ratio is high, progression is unfavorable, and the cycle length is long. Individual cycle failures are frequent. LOS F describes operation with control delay exceeding 80 seconds per vehicle or a volume-tocapacity ratio greater than 1.0. This level is typically assigned when the volume-to-capacity ratio is very high, progression is very poor, and the cycle length is long. Most cycles fail to clear the queue. A lane group can incur a delay less than 80 seconds per vehicle when the volume-to-capacity ratio exceeds 1.0. This condition typically occurs when the cycle length is short, the signal progression is favorable, or both. As a result, both the delay and volume-to-capacity ratio are considered when lane group LOS is established. A ratio of 1.0 or more indicates that cycle capacity is fully utilized and represents failure from a capacity perspective (just as delay in excess of 80 seconds per vehicle represents failure from a delay perspective). The control delay criteria for the range of service levels for signalized intersections are shown in Table 1. Table 1 LOS Criteria for Signalized Intersections Level-of-Service (LOS )(1) Control Delay Per Vehicle v/c ratio 1.0 v/c ratio > seconds A F >10.0 and 20.0 seconds B F >20.0 and 35.0 seconds C F >35.0 and 55.0 seconds D F >55.0 and 80.0 seconds E F >80.0 seconds F F Source: Transportation Research Board Highway Capacity Manual. Note: (1) For approach-based and intersectionwide assessments, LOS is defined solely by control delay. Unsignalized Intersections LOS for a two-way stop-controlled (TWSC) and all-way stop-controlled (AWSC) intersections is determined by the computed or measured control delay. For motor vehicles, LOS is determined for each minor-street movement (or shared movement) as well as major-street left turns at TWSC intersections and for all movements at AWSC intersections. LOS is not defined for the intersection as a whole for TWSC and AWSC intersections. The LOS criteria for both TWSC and AWSC unsignalized intersections are summarized in Table 2. 4/24/17 8

14 Table 2 LOS Criteria for Unsignalized Intersections Level-of-Service (LOS )(1) Control Delay Per Vehicle v/c ratio 1.0 v/c ratio > seconds A F >10.0 and 15.0 seconds B F >15.0 and 25.0 seconds C F >25.0 and 35.0 seconds D F >35.0 and 50.0 seconds E F >50.0 seconds F F Source: Transportation Research Board Highway Capacity Manual. Note: (1) For TWSC intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street (for TWSC intersections). LOS is not calculated for major-street approaches or for the intersection as a whole. Note that the LOS criteria for unsignalized intersections are somewhat different from the criteria used in signalized intersections. At TWSC intersections, drivers on the stop-controlled approaches are required to select gaps in the major-street flow in order to execute crossing or turning maneuvers. In the presence of a queue, each driver on the controlled approach must also use some time to move into the front-of-queue position and prepare to evaluate gaps in the major-street flow. AWSC intersections require drivers on all approaches to stop before proceeding into the intersection. EXISTING OPERATING CONDITIONS Traffic operating conditions at each Study Area intersection were analyzed using the methodologies outlined above (see Appendix A) in order to compute delays, v/c ratios, and LOS as described above. During peak hours, LOS D operations are generally considered to be acceptable operating conditions for signalized and unsignalized intersections. As shown in Table 3 most of the study area intersection lane groups/approaches operate better than LOS D under 2017 Existing Conditions during the peak hours analyzed with the following exception: Main Street and /South Broadway The eastbound approach operates at LOS E during the Saturday Midday peak hour. A review of the Synchro 95th Percentile queue data shows that vehicle queues at the study area intersection approaches would generally not extend to or block the corresponding adjacent intersections with the following exceptions: Main Street and /South Broadway The eastbound Main Street approach (Saturday Midday peak hour), the northbound South Broadway approach (Weekday PM peak hour, Saturday Midday peak hour), and the southbound approach (Weekday AM and Weekday PM peak hours). 9 4/24/17

15 Table Existing Conditions Level of Service Analysis AM Peak Hour PM Peak Hour Sat. MD Peak Hour Lane V/C Delay V/C Delay V/C Delay No. Intersection Approach Group Ratio (sec) LOS Ratio (sec) LOS Ratio (sec) LOS Signalized Intersections 1 Main Street EB LTR B C E & /South Broadway WB LTR B B C NB LTR B B B SB LTR B B B Intersection 17.6 B 22.6 C 38.1 D Unsignalized Intersections 2 Main Street WB L A A A & Piermont Avenue NB LR B B B 3 Main Street EB L A A A & Gedney Street SB LR A B B 4 Lydecker Street EB LR A B B & Gedney Street 5 High Avenue EB LR A B B & Gedney Street 6 1st Avenue NB LT A A A & Gedney Street* 7 2nd Avenue EB LTR A A B & Gedney Street WB LTR A B B NB L A A A SB L A A A 8 3rd Avenue EB LR A A B & Gedney Street 9 4th Avenue EB LTR A B B & Gedney Street WL LTR A A B NB L A A A SB L A A A 10 1st Avenue WB LTR B C B & NB L A A A 11 2nd Avenue WB LR B B B & SB L A A A 12 3rd Avenue EB LTR B B B & SB L A A A 13 4th Avenue EB LTR B C C & WB LTR C B C NB L A A A SB L A A A Notes: EB = Eastbound; WB = Westbound; NB = Northbound; SB = Southbound; INT = Intersection. L = Left-Turn; T = Through; R = Right-Turn. V/C = Volume to Capacity; SPV = Seconds per Vehicle; LOS = Level of Service. *Analyzed utilizing the HCM2000 methodology.

16 CRASH DATA 2 Table 4 summarizes the most recent three year s traffic crash data for each of the study area intersections compiled from the NYSDOT and Orangetown Police Department records for the period of January 1, 2014 through December 31, 2016 (see Appendix A for NYSDOT and Orangetown Police Department crash data records). Table 5 summarizes the most recent three year s traffic crash data for each of the study area non-intersection locations (i.e., road segments between study area intersections) compiled from the same NYSDOT and Orangetown Police Department records. INTERSECTION CRASHES As shown in Table 4, the largest number of intersection crashes (19) occurred at the intersection of Main Street and /South Broadway over the 3-year period studied (January, 2014 through December, 2016). With an average of 6.3 crashes per year, this location could be considered as a High Accident Location (HAL) as defined in the Highway Capacity Manual (any location with 5 or more crashes in a 12-month period). The most commonly occurring types of crashes at this location (and overall at this study area intersections) was overtaking/sideswipe collisions. Many of these collisions involved sideswiping of parked vehicles or vehicles performing parallel parking maneuvers. Right-angle, left-turn, right-turn, and head on collisions were other types of collisions which occurred at the study area intersections. The most common crash factors at the study area intersections involved passing, parallel parking maneuvers, improper lane usage, driver inattention, and failure to yield right of way. There were no fatalities reported at any of the study area intersections in the records provided by NYSDOT and the Orangetown Police Department during the 3-year time period studied. NON-INTERSECTION CRASHES As shown in Table 5, the segment of Main Street between /South Broadway and Piermont Avenue had the highest number of crashes (4) over the 3-year time period examined within the study area. A lower number of crashes (3) occurred along the segment of Gedney Steet between 2nd Avenue and 3rd Avenue. The most commonly occurring types of crashes along these road segments were overtaking/sideswipe collisions. Many of these collisions involved sideswiping of parked vehicles or vehicles performing parallel parking maneuvers. Rear end, right angle, and fixed object collisions were other types of collisions which occurred along the road segments examined were reported at unspecified locations along Route 202/35. No HALs were identified among the road segments examined in the study area. The most common crash factors at the study area intersections involved passing, parallel parking maneuvers, improper lane usage, driver inattention, and failure to yield right of way. No fatalities were reported along any of the road segments studied. PARKING An evaluation of on-street parking on nearby streets was conducted. As part of this assessment, hourly parking counts were conducted to determine the existing capacity and demand on nearby streets (see Figure 2 for count locations). The observed peak parking utilization numbers and 2 Crash Data Records have been requested from NYSDOT and the Orangetown Police Department for the intersections of at 2nd, 3rd, and 4th Avenues. See Tables 4 and 5 for specific locations. This section will be updated when the requested records are received. 4/24/17 10

17 Number of Crashes Crash Trend Table 4 Study Area Crash Summary - Intersection Locations Intersection Avg/ Yr 1/1/14 12/31/16 Personal Injuries Fatalities Reported Non Reported Overtaking / Sideswipe Rear End Right Angle Left Turn (with other car) Left Turn (against other car) Right Turn Right Turn (with other car) (against other car) Ped/Bike Head On Fixed Object Animal Other Unknown Main Street and North Broadway/South Broadway Main Street and Piermont Avenue Main Street and Gedney Street Gedney Street and Lydecker Street Gedney Street and High Avenue Gedney Street and 1st Avenue Gedney Street and 2nd Avenue Gedney Street and 3rd Avenue Gedney Street and 4th Avenue and 1st Avenue (1) and 2nd Avenue and 3rd Avenue and 4th Avenue Source: NYSDOT and Orangetown Police Department (except where noted). Notes: (1) Data from NYSDOT only. Data for this location has been requested from the Orangetown Police Department. (2) Data for these locations has been requested from the Orangetown Police Department and NYSDOT. (DATA TO COME) (2)

18 Number of Crashes Crash Trend Table 5 Study Area Crash Summary - Non-Intersection Locations Main Street between North Broadway/South Broadway and Piermont Avenue Main Street between Piermont Avenue and Gedney Street Gedney Street between Main Street and Lydecker Street Gedney Street between Lydecker Street and High Avenue Gedney Street between High Avenue and 1st Avenue Gedney Street between1st Avenue and 2nd Avenue Gedney Street between 2nd Avenue and 3rd Avenue Gedney Street between 3rd Avenue and 4th Avenue between1st Avenue and 2nd Avenue between 2nd Avenue and 3rd Avenue between 3rd Avenue and 4th Avenue 1st Avenue between North Broadway and Gedney Street 2nd Avenue between North Broadway and Gedney Street 3rd Avenue between North Broadway and Gedney Street 4th Avenue between North Broadway and Gedney Street Avg/ Yr 1/1/14 12/31/16 Personal Injuries Fatalities Reported Non Reported Overtaking / Sideswipe Rear End Right Angle Left Turn (with other car) Left Turn (against other car) Right Turn Right Turn (with other car) (against other car) Ped/Bike Head On Source: NYSDOT and Orangetown Police Department (except where noted). Notes: Road Segment (1) Data for this location has been requested from the Orangetown Police Department and NYSDOT. (DATA TO COME) (1) (DATA TO COME) (1) Fixed Object Animal Other Unknown

19 percentages by block face are summarized in Table 6. Based on the on-street parking surveys conducted, on-street parking in the project area was found to be at its overall highest utilization during the weekday and Saturday evening hours (approximately 75 percent and 69 percent, respectively) as summarized in Table 7. During these hours restaurants and businesses along Main Street are busy as well as residents (particularly those with single car driveways) on nearby local streets may begin to search for overnight on-street parking. Peak parking utilization periods by street are summarized in Table 8. PEDESTRIAN AND BICYCLE CONDITIONS The study area is characterized with moderate to heavy pedestrian and bicycle activity. Sidewalks and crosswalks are provided along most of the study area streets. Portions of Piermont Avenue, Main Street, Gedney Street, 4th Avenue, and are designated as NY Bike Route 9 the study area. PUBLIC TRANSPORTATION No public bus or rail stops are present in the immediate study area. However, the Transport of Rockland (TOR) bus system operates bus routes nearby including TOR Routes 59, 91, 92 and the Tappan Zee Express. These routes operate along Main Street, west of the study area, and nearby stops are available on Artopee Way. D. FUTURE WITHOUT THE PROPOSED PROJECT TRAFFIC CONDITIONS The Future without the Proposed Project, or No Build, traffic condition is an interim scenario that establishes a future baseline condition without the Proposed Project. The No Build year is the same year as the Build year of the Proposed Project (2019). No Build traffic conditions are ascertained based on the following procedure: Increase the 2017 Existing Conditions traffic volumes by 0.5 percent per year from 2017 to 2019 for background growth, resulting in an overall growth rate of 1.0 percent. The use of 0.5 percent per year was based on guidance from NYSDOT and the Village. Include trips from pending developments (No Build projects) located in the vicinity of the TZ Vista site. Consideration of major roadway improvements in the vicinity of study area. A list of pending developments located in the vicinity of the project site was provided by the Village for inclusion in the future background conditions. These developments are listed below: Nyack Pavion 135 Apartment Units, 2,730 SF of retail space, Café (located on Cedar Hill Avenue, east of South Franklin Street) Traffic Study provided by the applicant. 48 South Franklin Street 3 Apartment Units, 2,000 SF of office space 263 Main Street 38 Apartment Units Montclare 48 Apartment Units (located on the northwest corner of the intersection of Main Street and North Midland Avenue) Traffic Study provided by the applicant. Gateway Lofts 33 Apartment Units (located on the southeast corner of the intersection of Route 9W, Route 59, and Main Street) Traffic Study provided by the applicant. 11 4/24/17

20 Table 6 On-Street Parking Utilization Survey Results - Maximum Utilization* Weekday Morning Weekday Afternoon Weekday Evening Saturday Morning/Midday Saturday Evening Max Utilization Max Utilization Max Utilization Max Utilization Max Utilization No. of Legal Spaces # % # % # % # % # % From To 1 Main Street (South Piermont Ave. - Gedney St. 0 2 Main Street (South Broadway - Piermont St. 0 3 Main Street (North Gedney St. - Broadway % 3 60% 5 100% 4 80% 6 100% 4 Lydecker Street (South Broadway - Gedney St % 16 89% 16 89% 10 56% 14 78% 5 Lydecker Street (North Broadway - Gedney St. 0 6 High Avenue (South Broadway - Gedney St. 0 7 High Avenue (North Broadway - Gedney St % 12 86% 13 93% 11 79% 12 86% 8 1st Avenue (South Broadway - Gedney St % 11 73% 12 80% 11 73% 9 60% 9 1st Avenue (North Broadway - Gedney St % 15 94% % 7 44% 15 94% 10 Gedney Street (West Main St. - Lydecker St Gedney Street (East Main St. - Lydecker St Gedney Street (West Lydecker St. - High Ave Gedney Street (East Lydecker St. - High Ave % 1 20% 1 20% 0 0% 0 0% 14 Gedney Street (West High Ave. - 1st Ave Gedney Street (East High Ave. - 1st Ave % 3 43% 9 100% 2 29% 5 71% 16 Gedney Street (West 1st Ave. - 2nd Ave Gedney Street (East 1st Ave. - 2nd Ave % 4 50% % 3 38% 4 50% 18 Gedney Street (West 2nd Ave. 3rd Ave Gedney Street (East 2nd Ave. 3rd Ave % % % 6 75% % 20 Gedney Street (West 3rd Ave. 4th Ave Gedney Street (East 3rd Ave. 4th Ave % 5 100% 5 100% 4 80% 8 100% 22 Gedney Street (West 4th Ave. Ackerman Pl Gedney Street (East 4th Ave. Ackerman Pl % 6 86% 6 86% 3 43% 7 100% 24 2nd Avenue (South Broadway - Gedney St nd Avenue (North Broadway - Gedney St % 8 44% 11 61% 15 83% 14 78% 26 3rd Avenue (South Broadway - Gedney St % 15 83% 17 94% 11 61% 14 78% 27 3rd Avenue (North Broadway - Gedney St % 11 65% 13 76% 7 41% 8 47% 28 4th Avenue (South Broadway - Gedney St % 11 61% 13 72% 11 61% 17 94% 29 4th Avenue (North Broadway - Gedney St. 0 Note: *Surveys conducted on 3/2/17, 3/4/17, 4/5/17, and 4/8/17.

21 Time Period Surveyed Table 7 Overall On-Street Parking Peak Utilization Summary (1) On-Street Parking Capacity (# of Legal Spaces on Surveyed Streets) Peak Utilization Hour(s) # of Vehicles* % of Capacity* Weekday Morning 9-10 AM 72 40% Weekday Afternoon 4-5 PM % Weekday Evening Approximately PM % Saturday Morning/Midday 12-1 PM 95 53% Saturday Evening 9-10 PM % Note: (1) Surveys conducted on 3/2/17, 3/4/17, 4/5/17, and 4/8/17. *Some illegal parking was observed on study area streets. Numbers shown are reflective of legal parking only.

22 Table 8 Parking Utilization Summary By Street (1) Street % Utilization (Range)* Main Street 40% - 100% Time of Day for Peak Utilization Weekday Evening, Saturday Evening Gedney Street 0% - 100% Weekday Afternoon, Weekday Evening, Saturday Evening Lydecker Street 56% - 89% Weekday Evening High Avenue 79% - 93% Weekday Evening 1st Avenue 44% - 100% Weekday Morning, Weekday Evening 2nd Avenue 44% - 83% Saturday Morning/Midday 3rd Avenue 41% - 94% Weekday Evening 4th Avenue 56% - 94% Saturday Evening Note: (1) Surveys conducted on 3/2/17, 3/4/17, 4/5/17, and 4/8/17. *Some illegal parking was observed on study area streets. The percentages shown are reflective of legal parking only.

23 For No Build projects where traffic studies were provided by the applicant, the trip generation and assignment data was utilized from these studies. For 48 South Franklin Street and 263 Main Street the trip generation for these projects was determined utilizing the ITE Trip Generation Manual, 9th Edition. Trips from these two projects were assigned to study area roadways based on existing traffic patterns. Appendix A contains the trip generation and assignment data for all the No Build projects. Based on the most recently published New York State Transportation Improvement Program (TIP) listings no major roadway improvement projects were identified in the study area. The traffic from the No Build projects were added to the grown 2019 traffic volumes to develop the 2019 No Build volumes. Traffic volumes for the 2019 No Build peak hours analyzed are shown in Figures 6, 7, and 8. Table 9 presents a comparison of the 2017 Existing and 2019 No Build LOS conditions for the study area intersections. Synchro 8 outputs for the 2019 No Build scenario are provided in Appendix A. Under the 2019 No Build conditions, there would be the following notable changes in LOS for the study area intersections: Main Street and /South Broadway The eastbound approach would deteriorate from LOS E to LOS F during the Saturday Midday peak hour. LOS E and LOS F generally indicate congested conditions and notable delays. A review of the Synchro 95th Percentile queue data shows that the same intersection approaches identified in Existing Conditions (see Section C) would continue to extend to or block the corresponding adjacent intersections. CRASH DATA No significant changes in the study area crash experience are expected under 2019 No Build Conditions. PEDESTRIAN AND BICYCLE CONDITIONS No significant changes in study area pedestrian and bicycle conditions are expected under 2019 No Build Conditions. PUBLIC TRANSPORTATION No significant changes in public transportation conditions are expected under 2019 No Build Conditions. E. POTENTIAL IMPACTS OF THE PROPOSED PROJECT PROJECT DESCRIPTION The Proposed Project consists of a 128 residential units with an accessory café, pedestrian walkway along the Hudson River, and 263 parking spaces. The Proposed Project would be located at 41 and 55 Gedney Street, and 25 and 26 Lydecker Street. The main portion of the Project Site 41 and 55 Gedney Street consisting of the residential building, café, underground parking garage, and pedestrian walkway, is bounded by Gedney Street on the west, Main Street on the south, Hudson River on the east, and the Nyack Boat Club on the north. In 4/24/17 12

24 Gedney Street N th Avenue 6 4th Avenue 0 Driveway rd Avenue 3rd Avenue nd Avenue 3 Driveway st Avenue 11 1st Avenue High Avenue Lydecker Street Main Street Main Street South Broadway Piermont Avenue Figure No Build Traffic Volumes Weekday AM Peak Hour (8:00 AM - 9:00 AM)

25 Gedney Street N th Avenue 10 4th Avenue 0 Driveway rd Avenue 3rd Avenue nd Avenue 5 Driveway st Avenue 11 1st Avenue High Avenue Lydecker Street Main Street Main Street South Broadway Piermont Avenue Figure No Build Traffic Volumes Weekday PM Peak Hour (5:00 PM - 6:00 PM)

26 Gedney Street N th Avenue 15 4th Avenue 0 Driveway rd Avenue 3rd Avenue nd Avenue 17 Driveway st Avenue 6 1st Avenue High Avenue Lydecker Street Main Street Main Street South Broadway Piermont Avenue Figure No Build Traffic Volumes Saturday Midday Peak Hour (12:30 PM - 1:30 PM)

27 Table Existing and 2019 No Build Conditions Level of Service Analyses AM Peak Period PM Peak Period Saturday Peak Period 2017 Existing 2019 No Build 2017 Existing 2019 No Build 2017 Existing 2019 No Build Lane V/C Delay V/C Delay V/C Delay V/C Delay V/C Delay V/C Delay No. Intersection Approach Group Ratio (spv) LOS Ratio (spv) LOS Ratio (spv) LOS Ratio (spv) LOS Ratio (spv) LOS Ratio (spv) LOS Signalized Intersections 1 Main Street EB LTR B C C C E F & /South Broadway WB LTR B B B B C C NB LTR B B B C B B SB LTR B B B C B B INT 17.6 B 18.1 B 22.6 C 23.9 C 38.1 D 42.6 D Unsignalized Intersections 2 Main Street WB L A A A A A A & Piermont Avenue NB LR B B B B B B 3 Main Street EB L A A A A A A & Gedney Street SB LR A A B B B B 4 Lydecker Street EB LR A A B B B B & Gedney Street 5 High Avenue EB LR A A B B B B & Gedney Street 6 1st Avenue NB LT A A A A A A & Gedney Street* 7 2nd Avenue EB LTR A A A A B B & Gedney Street WB LTR A A B B B B NB L A A A A A A SB L A A A A A A 8 3rd Avenue EB LR A A A A B B & Gedney Street 9 4th Avenue EB LTR A A B B B B & Gedney Street WL LTR A A A A B B NB L A A A A A A SB L A A A A A A 10 1st Avenue WB LTR B B C C B B & NB L A A A A A A 11 2nd Avenue WB LR B B B B B B & SB L A A A A A A 12 3rd Avenue EB LTR B B B B B C & SB L A A A A A A 13 4th Avenue EB LTR B C C C C C & WB LTR C C B B C C NB L A A A A A A SB L A A A A A A Notes: EB = Eastbound; WB = Westbound; NB = Northbound; SB = Southbound; INT = Intersection. L = Left-Turn; T = Through; R = Right-Turn. V/C = Volume to Capacity; SPV = Seconds per Vehicle; LOS = Level of Service. *Analyzed utilizing the HCM2000 methodology.

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC. Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

A. INTRODUCTION B. METHODOLOGY

A. INTRODUCTION B. METHODOLOGY Chapter 2, Section E: Traffic and Parking A. INTRODUCTION This chapter examines the potential for impacts of the proposed project on the study area s roadway network. To facilitate street improvements

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC

FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC Howes Technical Advantage Ltd. This report was prepared by Howes Technical Advantage Ltd. for the City of Port

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 2016 Church Street Access Study 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 13202 www.smtcmpo.org Syracuse Metropolitan Transportation Council Final Report February 23, 2016 This

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Water Street Corridor Streetscape TRAFFIC STUDY

Water Street Corridor Streetscape TRAFFIC STUDY TRAFFIC STUDY November 12, 2015 WATER STREET CORRIDOR STREETSCAPE IMPROVEMENTS PROJECT BOROUGH OF MANHATTAN EDC Contract No.: 48480002 Prepared for: Prepared by: TABLE OF CONTENTS I. INTRODUCTION/ EXECUTIVE

More information